7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office Building with the following members present: W. R. Ely, D. K. Martin, Chairman Member It is ordered by the Commission that each of the following contracts having been examined by the Commission, and it being found that it compliss with the order of award by the Commission, is hereby approved in accor- dance with Section 12, Chapter 186, General Laws of Texas as passed by tbj|e 1925 Legislature, 39th. Regular Session. COUNTY PROJECT NO LENGTH UNIT DATE OF AWARD NAME OF CONTRACTOR AMOUNT CONTRA OF hff Polk s 752 1.942 II 9-22-32 D. T. Parmley $10,930.67 Polk s 890-3 19.213 II 9-22-32 D. T. Parmley 90,610.42 Archer s 1015-3 12.424 II 10-25-32 Dexter Const. Co. 98,392.07 Archer s 1015-3 5.991 III 10-24-32 Stuckey Const. Co. 118,865.38 Bexar F 633-A 14.793 II 11-3-32 R. W. Briggs & Co. 275,916.96 Bowie F 313-A Reop 1.660 II 11-3-32 Sullivan, Long & 46,770.17 Baggerty Bowie F 202-A Reop 3.740 II 11-3-32 Sullivan, Long & 79,560.35 Haggerty Brazos F 620-A 7,390 II 10-26-32 Union Paving Co. 133,366.00 Brazos S 668-A 0.059 II 10-26-32 Union Paving Co. 1,451.30 Brazos F 620-C 2.840 II 10-26-32 John B. Deal 14,930.42 Brazos F 471-F 3.129 II 10-26-32 Union Paving Co. 55,691.13 Brazos S 738-F 0.111 II 10-26-32 Union Paving Co. 3,071.98 Caldwell S 932-A 1.153 II ll-3-32 ' S & H Const. Co. 20,144.02 Caldwell F 522-A 5.731 II 11-3-32 S & H Const. Co. 96,375.77 Caldwell F 522-3 0.256 II 11-3-32 3 & H Const. Co. 4,712.87 Caldwell F 79-Reop 2.573 I 11-3-32 S & H Const. Co, 43,275.62 Caldwell S 787-0 1.152 II 11-3-32 S & H Const. Co. 3,910.00 Childress F 573-A 9.209 II 10-26-32 L,. E. Whitham & Co. 161,741.28 Childress S 941-A II 10-26-32 L. E. Whitham & Co. 982.23 Colorado F 417-0 11.143 II 10-26-32 W. Raymond Can ion 51,425.73 Comal F 66-Reop 9.136 III 11-3-32 Brown & Root, Inc. 54,953.81 Concho F 626-O 3.931 II 10-26-32 Southwest Const. Mat'Is 51,412.46 Company Crockett F 619-0 12.978 I 10-26-32 L. J. Miles 220,038.91 Dallas S 230 8.751 I 10-25-32 Gifford-Hill Co. Inc. 78,031.04 DeWitt F 542-D 6.276 II 10-26-32 Buss Mitchell, Inc. 94,440.81 DeWitt F 542-E 8.169 II 10-26-32 Buss Mitchell, Inc. 142,403.50 Fayette F 417-A 4.556 II 10-26-32 W. Raymond Canion 23,845.92 Fisher F 96-Reop 8.578 I 10-26-32 Womack-Henning ConstCo. 49,915,30 Gaines S 936-E 13.204 II 10-25-32 Field Bros. & McCelvey 53,179.91 Guadalupe F 537-D 12.621 II 10-26-32 R. W. Briggs & Co. 232,114.76 Jasper F 30-D 15.727 I 11-3-32 Brown & Root, Inc. 56,480.92 Jasper F 30-D Bridges I 11-3-32 Mecom & Johnson 34,299.89 Jasper F 350-Reop 1.488 I 11-3-32 Brown & Root, Inc. 6,300.79 Jasper F 350-Reop Bridges I 11-3-32 Mecom & Johnson 1,310.98 Kinney F 484-C 18,626 II 10-26-32 H. B. Zachry 186,817.02 Knox S 923-A 11.495 II 10-24-32 L. E. Whitham & Co. 180,039.66 Madison F 48 6-A 10,103 II 10-26 "32 D. H. Dalton Co. 265,707.52 Madison F 486-3 5.684 II 10-26-32 D. H. Dalton Co. 139,661.56 McLennan F 593-A 3.873 II 10-26-32 Froemming Bros. 75,696.42 McLennan S 895-A II 10-26-32 Froemming Bros. 360.00 McLennan F 593-3 3.920 II 10-26-32 Froemming Bros. 69,927.75 McLennan F 593-E 0.597 II 10-26-32 Froemming Bros. 11,031.23 McLennan S 895-E II 10-26-32 Froemming Bros. 1,740.00 McLennan F 614-C 3.139 II 10-25-32 Womack-Henning Const. Co59,575.90 McLennan F614-C Bridge I 10-25-32 Brown-Abbott & E.L. 278,442.11 Mart in McLennan F--614-0 Bridge I 10-25-32 West & Womack 17,238.81 McLennan S 996-0 0.724 I 10-25-32 Womack-Henning Const.Co 2.875.11 Nueces S 886-H 3.026 I 10-24-32 Cage Brothers 57,147.08 Nueces S 498-D 6.115 I 10-24-32 Brown & Root 22,933.04 Shelby s 277-0 7.479 I 10-25-32 J . S. Moore & Sons 34,571.15
14

November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

Feb 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7108

1 November 28, 1932

Minutes of the One Hundred Sixt ieth Meeting of the State Highway Commission, held in the State Office Building with the following members present:

W. R. Ely, D. K. Martin,

Chairman Member

I t is ordered by the Commission that each of the following contracts having been examined by the Commission, and i t being found that i t compliss with the order of award by the Commission, is hereby approved in accor­dance with Section 12, Chapter 186, General Laws of Texas as passed by tbj|e 1925 Legislature, 39th. Regular Session.

COUNTY PROJECT NO LENGTH UNIT DATE OF AWARD NAME OF CONTRACTOR AMOUNT CONTRA

OF hff

Polk s 752 1.942 I I 9-22-32 D. T. Parmley $10,930.67 Polk s 890-3 19.213 I I 9-22-32 D. T. Parmley 90,610.42 Archer s 1015-3 12.424 I I 10-25-32 Dexter Const. Co. 98,392.07 Archer s 1015-3 5.991 I I I 10-24-32 Stuckey Const. Co. 118,865.38 Bexar F 633-A 14.793 I I 11-3-32 R. W. Briggs & Co. 275,916.96 Bowie F 313-A Reop 1.660 I I 11-3-32 Sul l ivan, Long & 46,770.17

Baggerty Bowie F 202-A Reop 3.740 I I 11-3-32 Sul l ivan, Long & 79,560.35

Haggerty Brazos F 620-A 7,390 I I 10-26-32 Union Paving Co. 133,366.00 Brazos S 668-A 0.059 I I 10-26-32 Union Paving Co. 1,451.30 Brazos F 620-C 2.840 I I 10-26-32 John B. Deal 14,930.42 Brazos F 471-F 3.129 I I 10-26-32 Union Paving Co. 55,691.13 Brazos S 738-F 0.111 I I 10-26-32 Union Paving Co. 3,071.98 Caldwell S 932-A 1.153 I I l l - 3 - 3 2 ' S & H Const. Co. 20,144.02 Caldwell F 522-A 5.731 I I 11-3-32 S & H Const. Co. 96,375.77 Caldwell F 522-3 0.256 I I 11-3-32 3 & H Const. Co. 4,712.87 Caldwell F 79-Reop 2.573 I 11-3-32 S & H Const. Co, 43,275.62 Caldwell S 787-0 1.152 I I 11-3-32 S & H Const. Co. 3,910.00 Childress F 573-A 9.209 I I 10-26-32 L, . E. Whitham & Co. 161,741.28 Childress S 941-A I I 10-26-32 L . E. Whitham & Co. 982.23 Colorado F 417-0 11.143 I I 10-26-32 W. Raymond Can ion 51,425.73 Comal F 66-Reop 9.136 I I I 11-3-32 Brown & Root, Inc. 54,953.81 Concho F 626-O 3.931 I I 10-26-32 Southwest Const. Mat ' Is 51,412.46

Company Crockett F 619-0 12.978 I 10-26-32 L . J . Miles 220,038.91 Dallas S 230 8.751 I 10-25-32 G i f f o r d - H i l l Co. Inc . 78,031.04 DeWitt F 542-D 6.276 I I 10-26-32 Buss M i t c h e l l , Inc. 94,440.81 DeWitt F 542-E 8.169 I I 10-26-32 Buss M i t c h e l l , Inc. 142,403.50 Fayette F 417-A 4.556 I I 10-26-32 W. Raymond Canion 23,845.92 Fisher F 96-Reop 8.578 I 10-26-32 Womack-Henning ConstCo. 49,915,30 Gaines S 936-E 13.204 I I 10-25-32 Fie ld Bros. & McCelvey 53,179.91 Guadalupe F 537-D 12.621 I I 10-26-32 R. W. Briggs & Co. 232,114.76 Jasper F 30-D 15.727 I 11-3-32 Brown & Root, Inc. 56,480.92 Jasper F 30-D Bridges I 11-3-32 Mecom & Johnson 34,299.89 Jasper F 350-Reop 1.488 I 11-3-32 Brown & Root, Inc . 6,300.79 Jasper F 350-Reop Bridges I 11-3-32 Mecom & Johnson 1,310.98 Kinney F 484-C 18,626 I I 10-26-32 H. B. Zachry 186,817.02 Knox S 923-A 11.495 I I 10-24-32 L . E. Whitham & Co. 180,039.66 Madison F 48 6-A 10,103 I I 10-26 "32 D. H. Dalton Co. 265,707.52 Madison F 486-3 5.684 I I 10-26-32 D. H. Dalton Co. 139,661.56 McLennan F 593-A 3.873 I I 10-26-32 Froemming Bros. 75,696.42 McLennan S 895-A I I 10-26-32 Froemming Bros. 360.00 McLennan F 593-3 3.920 I I 10-26-32 Froemming Bros. 69,927.75 McLennan F 593-E 0.597 I I 10-26-32 Froemming Bros. 11,031.23 McLennan S 895-E I I 10-26-32 Froemming Bros. 1,740.00 McLennan F 614-C 3.139 I I 10-25-32 Womack-Henning Const. Co59,575.90 McLennan F614-C Bridge I 10-25-32 Brown-Abbott & E.L. 278,442.11

Mart i n McLennan F--614-0 Bridge I 10-25-32 West & Womack 17,238.81 McLennan S 996-0 0.724 I 10-25-32 Womack-Henning Const.Co 2.875.11 Nueces S 886-H 3.026 I 10-24-32 Cage Brothers 57,147.08 Nueces S 498-D 6.115 I 10-24-32 Brown & Root 22,933.04 Shelby s 277-0 7.479 I 10-25-32 J . S. Moore & Sons 34,571.15

Page 2: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7108

COUNTY Tarrant Tarrant Tarrant Tyler Tyler Webb Webb Wharton Wharton Wichita Val Verde Val Verde Val Verde Calhoun Jackson Jackson Caldwell & Guadalupe Garza Hamilton Limestone Runnels Runnels

7109

November 20, 1932

Continued:

PROJECT NO LENGTH UNIT DATE OF AWARD NAME OF CONTRACTOR AMOUNT OF S 241-F 300-A S 587-A

890-C 890-D 718-E 718-F 15-Reop

F 506-13 S 1015-A F 411-E S 955-E

437-A 1010-A 1018-A 1010-B 79-Reop

1.250 3.210

12.099 5.556

16.478 16.466 2.774 4.267 2.947

13.366

0.519 4.637

13.055 11.243 IV

S 755-0 0.029 S 975-C 0.256 S 146-Reop 0.215 F 267- " 2.101 F 176- " 1.260

I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I

10- 34-32 11 - 16-32 11-16-32 10-35-33 10-35-33 10-35-33 10-35-33 10-36-33 10-36-33 10- 34-33 11- 3-33 11-3-33 11-3-33 10-35-33 10-35-33 10-35-33 10-36-33

10-34-33 10-24-33 10- 35-32 11- 14-32 11-14-33

West Texas Const. Co. $ 37,470. West Texas Const. Co. 118,178. West Texas Const. Co. E. B. Smith E. B. Smith Brown & Boot, Inc . Eickessen & S h i l l i n g Russ M i t c h e l l , Inc . Enss M i t c h e l l , Inc . Stuckey Const. Co. J . Lee & E. A. V i l b i g J . Lee & E. A. V i l b i g J . Lee & E. A. V i l b i g Hidalgo Const. Co. W. W. Vann Hidalgo Const, Co.

93, 23, 49, 38, 47,

485 056 619.4

84X . ] , f

684 804

J5 C5

.SO

Austin Bridge Co.

J . S. Harrison Const. Austin Bridge Co. Purvis & Bertram Bontke Brothers Bontke Brothers

75,514 59,982.^2

234,949, 2,265.C|0

10,945 10,002 40,559 32,666 62,444

%7 0 8

Co, 11,870. 48,686. 59,750. 63,661.2 9,662.3

,14 (7 »6 6

The following agreements supplemental to contracts previously approved and entered into, having been examined and the terms and con­ditions found satisfactory, and i t appearing that an additional approp­riation of funds w i l l not be required, are hereby approved:

Brazoria Gounty, S.P. 125-Reop., Jno. F. Buckner, Contractor, providing for elimination of item of grouted rip rap and for purchase from contractor of rip rap materials; actual decrease in cost $389.12.

Goliad County, S.P. 835 A & D, Cocke & Braden, Contractors, pro viding for o i l treatment of caliche base; estimated cost of additional work $3,709.16.

Harris County F.A.P. 565-B, Buss Mitchell, Inc., Contractors, providing for added item of class "B" culvert excavation, also changes in quantities of contract items at unit bid prices; actual net increase in cost $181.70.

Live Oak County, S.P. 931-D & E, J. W. Gwin, Contractor, pro­viding for o i l treatment of caliche base; estimated cost of additional work $4,029.25.

Pecos County, F.A.P. 618-F, Sanders & Hurlburt, Contractors, providing for added items of class "C" culvert excavation, dry rip rap and extra rolling; actual cost of additional work $846.20.

Real County, S.E. 986-C, Cage Bros., Contractors, providing foi added items of grouted rip rap and class "0" culvert excavation; actual cost of additional work $148,40.

Swisher County, S.P. 848-F, Ernest Loyd, Contractor, providing for construction of caliche base course from Randall County Line to Happfa as a supplement to F.A.P. 546-G-; estimated cost of additional work $2»972L54.

Tyler County, F.A.P. 606-C, E. G. Powell, Contractor, providing for added item of clay blanket course; actual cost of additional work $324.75.

COPT,

Page 3: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

2

7110

7111

7112

7113

November 28, 1932

I t le orderedby tbe Commission that eeobof tbe fol lowlngprojeots , havlngbeen sa t i s fac tor i ly completed In accordance wl th thep lans , sped-flcat lons andapproved changes, Is hereby accepted as recommended In tbe report of tbe Engineer* end that e l l monies due on each f i n a l estimate bepaid tbe respective contractor.

County Project Contractor Bate Completed

Andrews S 936-C Bone Star Const. Co. 10-31-32 Brazoria S889-B Culf B i t u l i t h i c Co. 10-15-32 Brazoria S 889-C Culf B i t u l i t h i c Co. 10-15-32 Brazoria S125-B-Beou. Jno. F. Buckner 8-16-32 Bexar F833-A Bozier Const. Co. 10-1-32 Caldwell S787-C J . P. Bahcock 10-21-32 Calhoun S807-F Buss Mitchell 10-13-32 Crockett F619-C Purvis ^Bertram 10-18-32 BeWitt P542-E T ^ N i O . B.B. Co. 3-26-32 Fayette S955-B E. 0. Powell 9-24-32 Fisher F511-C Morgan Const. Co. 10-31-32 Freestone F453-B Valley Bredging Co. 8-29-32 Harris F565-B Buss Mitchell , Inc. 10-3-32 Henderson F560 B. H. Bacy Const. Co. 9-30-32 Boon F453-A T. B. James^ Co. 9-30-32 Been F582-A T. B. James^ Co. 9-30-32 Biherty S358-B B. T. Parmley 10-29-32 McBennan F605-C J . E. Johnson Const. Co. 10-12-32 Madison F 490-B J . P . F o t y 11-9-32 Matagorda F609-B Northwest Hwy. Co. 10-12-32 Matagorda S455 Highway Const. Co. 10-1^-32 Matagorda S 976-B Northwest Hwy. Co. 10-12^32 Monard S1004 Bucy^ Childs 10-1-32 Menard F616-B Cage Const. Co. 10-10-32 Nolan F511-A Morgan Const. Co. 10-21-32 Pecos F618-F Sanders^ Hurlhurt 9-23-32 Potter S 984-C McClure^Benison 9-17-32 Peal S988-C(Cr.) Cage Bros. 9-17-32 Peal S 988-C(Br.) Cage Bros. 8-27-32 Berugio S807-B National Surety Co. 9-8-32 Befugio S840-A H. B. Zachry 10-14-32 Bohertson F582-C J . S. Moored Sons 9-5-32 Smith S 368- Koss Const. Co. 10-6-32 Tr in i ty S177-Beou. FroemmingBros. 10-19-32 Van Zandt F363-B Koss Const. Co. 10-6-32 Van Zandt S496-C Koss Const. Co. 10-6-32

In Pass Counts Minute No. 7002, datedOctoher 25, 1932, Isamended to road as follows:

I t Is orderedhy tho commission that locatlonhemade of Highway #77 f romAt lan ta to BouglasvIIIe, and as soon as County furnishes not loss thaniOO' right-of-way onapprovedlocatlon, f u l l y fenced, contract fo r Unit I h e l e t , subject to dlssolu t l o n o f Injunction now ponding.

In Shackelford, Callahan and CoIemanCountles, a StateHighway Is hereby designated from Albany vdaBalrd to Coleman wi th the understand­ing that suchhlghway w i l l not he taken over for malntenanoeuntll f i n a l l y constructedand that work w i l l not heg lnun t l l funds are avallD

November 29, 1932

In Cherokee andNacogdoches Counties I t Is orderedhy the Commission that I f andwhen the Injunction now pending Is dissolved, theState HIghwayEnglneerbe authorised t o m a k e a l o c a t l o n o f ahlghway from Busk to SummerfleldandfromBeklawto Summerfleld, taking Into con-slderatlontheuse of a jo in t readbedfromSummerfleld to somewhere In t h e v l c l n l t y of ^onta; and to make alocatlonfromBeklaw across the Angelina Biver to Sacul.

Page 4: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7

7114

County

Denton Johnson) Wise & ) Hood )

M-3-C-4 M-2-E-4 M-2-F-4

Hacogdoche iM-ll-P-4 Brazoria M-12-L-5 Bee M-16-K-3 Maverick M-23-E

7115

7116

7117

7118

November 30, 1932

I t is ordered by the Commission that each of the following contracts having been examined by the Commission and i t being found that I t compile Is withthe order of award by the Commission is hereby approved i n accordance with Section 12, Chapter 186, General Laws of Texas as passed by the 1925 Legislature, 39th. Regular Session.

Job Ho. Hwy. Ho. length Date flame of Contractor

7119

7120

Amount

M-18-Z-2 10 Ss 40 Bridges 10-24-32 Public Const. Co. $21,139.2 3

68,2 & 10 5.188 Mi " 21 16.746 Mi " 58 Austin Bayou Bridge

16 19.62 Mi. • 85 10.398 Ml. »

Public Const. Co. 3,573.6 3 J.F.Cook,Crockett,Tex, 53,678.13 Austin Bridge Co. 3,400.5 5 Colglazier & Hoff 29,812.3 3 Colglazier & Hoff 25,031.5p

In Angelina County an increase appropriation of $20,973.33 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway Ho.94 from City l imi t s of Lufkin West to Heches Biver, a distance of 8.2 miles f o r completion of grading and drainage structures. This appropriation being made for Betterment Work, Job Ho. M-ll-N-4 .

A.F.E.-32-952

In Bastrop County an i n i t i a l appropriation of $3,965.50 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on the Old Sen Antonio Boad, fr|om it s Intersection with Highway No. 71, six miles west of Bastrop to Bastrop-Caldwell County Line, a distance of 13.2 miles for clearing and grubbing. This appropriation being made for Betterment Work, Job No. [-14-2-5 and on condition that said oounty w i l l furnish such right-of-way! as-may be required to be not less than 100ft. in width, fencing to be done by the County. A.F.E.-32-953

In Bowie County an increase appropriation of $4,355.15 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 11 from DeKalb to Sulphur Mver a distance of 14.91 miles to cover overrun in­curred because i t was necessary to place more gravel than originally authorized, in order to secure a satisfactory thickness of base for sur­face treating. This appropriation being made for Betterment Work, Job No [-1-X-5. A.F.E.-32-954

I t is ordered by the Commission that an appropriation of $693.76 be made to cover the claims of the Austin Bridge Company on F.A.P. 584-A, Brown and McCulloch Counties, this amount being recommended by the Claims Committee, and covers additional compensation on reinforcing steel in the amount of $148.16 and additional rock compensation in the amount of $545.|p0,

A.F.E .-32-955

In Cameron County an i n i t i a l appropriation of $10,836.37 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 48 between Barlingen and Brownsville, a to ta l distance of 9.89 miles f o r recon­dit ioning and surface treating gravel shoulders. This appropriation be­ing made fo r Betterment Work, Job No, M-21-H without right-of-way re­quirements. A.P.E.-32-956

In Camp and Titus Counties an increase appropriation of $10,139.65 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 65 from Mt. Pleasant to Pittsburg, a distance of 11.0 miles to cover overrun incurred because i t was necessary to place more gravel than! or ig ina l ly authorized, i n order to secure a satisfactory thickness of basj fo r surface treat ing. This appropriation being made f o r Betterment ^ork Job No. M-1-1-5. A.F.E.-32-957

Page 5: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7121

d November 30, 1932

In Cass Oounty en increase appropriationof $4,062.30 State Funds ishereby made to be expendedunder the direction of tbe State Highway engineer through the Maintenance Divisionon State HighwayNo. 47 from end of Concrete 5mlles west of Atlanta to Blndena distance of S.SSmlle^ to cover uverrunbecause I t was necessary to place moregravel than nrlgD Inal ly authorized, In order to secure a satisfactory thickness of base for surface treating. Thl^ appropriationheingmade forBotterment ^ r k , JobNo.M-l-E-6. A.F^E.-32-95S

In Ohambers Oounty an I n i t i a l appropriation of $1,199.00 State Funds Is hereby made to be expended under the direction of the State Highway Engineer throughthe MaintenancoDivision on State HighwayNo. 125 where the ^nahuacDStowell Canal Crosses the highway f o r construction of a 24 f t . Oreosoted Timber Hridge, and fo r 4-40 f t . 24^ Diameter Corrugated IronPlpes for drainage of roaddltchesunder the Canal. This approp-rlatlonbelngmade for Betterment Work, JobNo. M-20-B without rlght-of-^ay requirements. A.F.E.-32-959

In OlavOountv an I n i t i a l appropriationof $7,365.60State Funds Is hereby made to be expendedunder the direction o f the State Highway Engineer throughthe Maintenance Division onState HighwayNo. 5 f r o m the WlchltaCounty l i ne to Henrietta, adistance of 14.03mlles for raising concretepavement with mudjack to eliminate objectlonablehlgh jo in ts and sunken slabs. This approprlatlonbelng madeforBetterment Work, JobNo. M-3-F-2 without right-of-way requirements as suff ic ient right-of-way has prevlouslybeen secured.

A . F . E ^ ^ 6 0

Minute #7027, passedby thoHighway CommlsslonOctober 24th. which deslgnatedaHlghway from, at or near Columbus or ^l leyton, in Colorado County to Katy, and ordering that Highway #73 fromKaty to Industrybe cancelled, Is hereby amended to provide that only that section of the newly designated Highway extending fromKaty onthe South side o f t h e M,K. ^ T. Ballroad Track t o , at or near Sealybe taken over forMaln-tenance, and that the balance of this Highway w i l l not be taken over fo r Malntenanoeuntll a f te r I t hasbeen constructed. I t Is also ordered that Malntenancebe discontinued onthe old Highway fromKaty through Batters son, Sealy and NewHlm to a connection wlthHlghway No. 159 near the Austin-Fayette County Bine.

I t Is orderedby the Commissionthat pending thepermanent location and construction of HighwayNo. 66 through Bexar and Comal Counties, tha^ In Comal County an extenslonbemade to the present maintained route of Highway No. 66, extending fromtheBexar-Comal County l ine over the Coun^ road a distance of 6.5 miles to a connection wlthHlghway No. 46a t Smlthson Valley. Anapproprlatlon Intheamount of $1300.00 Is hereby made to cover the cost of maintenance of this section of road f o r the balance of the f i sca l year, I t being understood that whenthegrade and structures onHighwayNo. 66 in Comal County are constructed that th is temporary designation Is cancelled and maintenance w i l l automatically cease except fo r detour purposes when the pavement Is being placed. This temporary designation Is made and this appropriation Is available contingent on the County procuring amlnlmum of 60 f t . of Blght-of-way o this County road. ^A.F.E.-32-961

In Comal County an I n i t i a l appropriation of $5,080.00 State Funds 1 hereby madetobe expendedunder thedl rec t lon of the State Highway engineer through the MalntenanceDlvlsion^rom intersection of Highway ^2 at Hunter to Highway #2 northofNewBraunfels^ adistance of 9.0 miles f o r b u l l d l n g a d e t o u r around construction workon Highway #2. This appropriationheingmade fo r Betterment ^ork, JobNo. M-15-J-4.

A.F.E.-32-962

In Dallas County an I n i t i a l appropriationof $4,5SS.69 State Funds Is hereby made to be expendedunder the direction ofthe State Highway engineer throughthe Maintenance Division, 3600 feet f o r f la t tening two dangerous curves on HighwayNo. 40 between theDenton Countyllne and Carrollton. This approprlatlonbelng made forBotterment W rk Job No. M-18-^-3andoncondltln that said county w i l l furnlshsuch rlght-of-^ay

as maybe reouired t o b e not less than 100 f t . I nwid th , fencing to be doneby the County. A.F.E^S2-963

Page 6: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7128

7129

7130

7131

7132

7133

7134

7135

7136

1 t

November 30, 1932

In DeWitt County, a state highway is hereby designated from Cuero to a point on State Highway No. 119 in Goliad County; said intersection to be at most practical point, or as near as possible to the place where State Highway No. 119 turns in a northwesterly direction, with the understanding that such highway w i l l not be taken over for maintenance until finally constructed,

A state highway is hereby designated from Catarina, In Dimmit County to a connection with State Highway #55 at or near Artesia Wells, in La Salle County, on condition that counties affected w i l l provide not less than 100' right-of-way on location to he approved hy the State Highway Engineer, and with the further understanding that such road w i l l not he taken over for maintenance until finally constructed.

In Dimmit County an i n i t i a l appropriation of $2,000.00 State Funds is herehy made to he expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway Ho. 85 ahout 7 miles east of Carrizo Springs over the Hueces Biver for cleaning and painting steel Bridge. This appropriation.being made for Betterment Work, Job Ho. M-22-F. A.F.E.-32-964

In Dimmit County an i n i t i a l appropriation of $3,221.36 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 4 , 0.58 mile south of Carrizo Springs a net length 192 f t . for recon­ditioning of a bridge over Carrizo Creek . This appropriation being made for Betterment "ork, Job No. M-22-G.

A.F.E.-32-965

I t is moved by Judge Hy, seconded by Mr. Martin, that a highway be designated from Cisco northeast to a point on Highway No. 67, on con­dition that the State w i l l not assume maintenance on such highway until Eastland County has furnished not less than 100 f t . right-of-way on location approved by the State Highway Commission,

I t is ordered hy the Commission that the section of Highway No. 55 extending from Hock Springs in Edwards County to a connection with High­way No. 30 in Sutton County, as designated in Minute #7003 passed October5; 25th. 1932, be taken over for Maintenance, after grade and drainage completed.

In Erath County an i n i t i a l appropriation of $20,861.71 State Punds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 10, from east end of pavement, Stephenville to Hood County Line, a distance of 15.9 miles for building a detour to be used during the construction of S.P, 563-B and P.A.P. 164. This appropriation being made for Betterment Wort, Job No. M-2-C-4 and on condition that said county w i l l furnish suchj right-of-way as may be required, fencing to be done by the County.

A.FA-32-966

In Fisher County an i n i t i a l appropriation of $7,146.11 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No. 83 from Roby to the Jones County Line, a distance of 13*604 miles for treating gravel base with 0.30 gallon of Road Oil. This appropriation being made for Betterment Work, Job No. M-8-V-4. A.F.E.-32-967

In Franklin County an i n i t i a l appropriation of $2,806.45 State Funds is hereby made to be expended under the direction of the State Highway Engineer through the Maintenance Division on State Highway No.33} from the Wood County line north a distance of 860 f t . for Iron Ore Grave] Base & Double Bituminous Surface Treatment. This appropriation being maqje for Betterment Work, Job No. Mrl-H-7 and on condition that the city w i l l furnish such right-of-way as may be required, and construct curbs and gutters. A.F5E.-32-968

Page 7: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

1^

November 30, 1932

In Caines Oounty an I n i t i a l appropriation of $4,000,00 StateFunds Is hereby made tobe expendedunder the direction of the State Highway engineer throughthe Maintenance DlvIsIononState HighwayNo, 137 from Seminole to the Terry Oounty Dine, adistance of 20 miles forBoadway ^aintenancefor f i s ca l year ending August 31, 1933, and the State Highway engineer Is Instructed to take this section of road over for maintenance Inasmuch as a l l conditions Imposed In this designation havebeen compiled with. This appropriationheingmade for General MaintenanceBudget,

A,F,E,D32-9S9

In Hardin Oounty an Increase appropriation of $3,0S5,2SState Funds Is hereby made to be expendedunder the direction o f t h e State Highway Engineer throughthe Maintenance Divis ionon State HighwayNo, Sbe-g innlngof Heches Biver f i l l toNechesBiverBridge, ad is tanceof 1,32S miles for wire cable guard fence. This appropriationheingmade fo r Betterment Work, JobNo, M-20-C, A,F,E,D32-970

I t i s orderedby the Commissionthat $l,000,00 beappropriated fo r the construction of a standard section corrugated metal warehouse at Marshall, Texas, on a one and four-tenths acre s i te deeded to the State by the Chamber of Commerce of that c i t y . Job No, M-19-K,

A,F,E,-S2-971 I t Is orderedby the Commission that a State Highwaybe designated

from Chann^ng, InHart ley County, to Vega, InOldhamCounty, to Hereford In Deaf Smith County, to Dimmit, In Castro County, on condition that the counties affected w i l l furnlshnot less than 100' right-of-way on approved location, and with theunderstandlng that said road w i l l not be taken over for malntenanceuntll constructed.

I t Is suggested that In making alocatlonfromChannlng that a future extension of State Highway #5 fromChannlng to Amarillobe taken into consideration in the selection of a j o in t crossing fo r the two roads ove the Canadian Hiver,

InHaskell County an i n i t i a l appropriationof $7,924,3SStateFunds is hereby made tobe expendedunder thedl rec t lon of the State Highway Engineer through the Maintenance Division on State HighwayNo, IS in the town of Rochester a distance of 0,8Smiles f o r constructing grade base, and DoubleBituminous Surface Treatment ona loop through the town of Rochester, This appropriationheingmade forBotterment ^ r k , Job No, MDSDH-4and on condition that said county w i l l furnish such r igh t -o f way as maybe required, fencing to be doneby the County, I t isunder-stood that th is loop i s n o t tobe apar t of the StateHighway System and not to be maintained, A,F,E,-32-972

I t is orderedby the Commission that thedesignationof State High­way #4be extended from Mission, viaHidalgo, to Brogresso, in Hidalgo County and thence onpresent location to Brownsville, i n Cameron County,

I t i s orderedby the Commissionthat the contract between this Department andHaden^ Austin, Contractors, Houston, Texas, fo r aBouble BituminousSurface Treatment onHighw^ No, 63, JobNo, M-ll-A-4 Jasper County, extending from Intersection of HighwayNo, 45 and 63west of Jasper to theproposed Intersection of HighwayNo, S3and45 east of Jasper, a distance of 4,Smiles, be and is hereby cancelled. This con­tract is cancelled wi th the consent of Haden^ Austin, Contractors, because the condition of thebase fo r theproposed DoubleBituminous Surface Treatment is such that the work can no tbedonea t this t^me,

Anapproprlatlon intheamount of $10,000,00 ishereby made to be expendedby the State HighwayEngineer throughtheMalntenance Divi^on to cover the cost of constructing a D i s t r i c t Warehouse in Beaumont, this Building tobeconstructed in accordance withplans and specifications as designedby Cieseke^ Harris, Architects, Job No, M-20-0 ,

A,F,E,D32-973

I t is movedby Mr, Martin, secondedby Judge Ely, that ahighway be designated fromBoxton, inBamar County, north to apoint onHighway No, 5; on condition that Bamar County w i l l fu rn lshnot less thaniOO f t , right-of-way onlocation tobe approvedby the Highway Department,

Page 8: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

^

November 30, 1932

I n Llano Oounty an I n i t i a l appropriationof $44,871.75State Punds Is hereby made to be expendedunder tbe direction of tbe State Highway Engineer throughthe MaintenanceDivisionon State HighwayNo. 81 from Llano nor th to the San Saba County Line, adistance of 11.3mlles for Crading and Drainage Structures. This appropriation beingmade f o r Betterment No. M-14-^-5 and on condition that said county w i l l furnish such right-of-way asmaybe reou i red tohonot less thaniOO f t . I n w i d t h , fencing tobe doneby the Oounty. A.E.E^-32-974

InMadlson Oounty the State Highway Engineer Is authorized and directed toprepareplans fo r constructlonof pavement onHighwayNo. 90 from the Crimes CountyLlno to a connectlonwlth HighwayNo. 32 north east of the Court House InMadlsonvllle, adistance of approximately 7 . smi les .

I t Is orderedby the Commission that the State HIghwayEnglneer, through theMalntenanceDIvIslonbe authorized to pay out of the regular Maintenance approprlatlonone-thtrd, and not exceeding $288.87 of the cost of moving Texas^ Pacific Section House In Stanton, Martin County, In order to relocate HighwayNo. 1 through Stanton.

InMcCulloch County I t Is orderedby the Commission that the town of Melvlnbemade a control point on State Highways.

InMIlamCounty an I n i t i a l appropriationof $83,080.09StateEunds Ishereby made tobe expendedunder the direction of theStateHighway engineer throughthe Maintenance DlvIsIononState HighwayNo. 44 from Minerva to the Lee County Line, ad is tanceof 18.5mlles fo r widening roadway, rebaslngand surface treat ing. This appropriationheingmade forBotterment Work, JobNo. M-17-P-4and on conditionthat said county w i l l furnish such right-of-way as maybe reoulredto be not less than 100 f t . Inwid th , fenc lng tobedoneby the County.

A.P.E.-32-975

In Mitchell and Sterling Counties astatehlghway Ishereby desig­nated fromColorado, In Mitchell County, to Sterling City, In Sterling County, wi th the understanding tha t l t w i l l notbe takenover formaln-tenanceuntll constructed andwlth the further understanding and on con­d i t ion that the counties affected w i l l furn lshnot less thaniOO' r ight -of-way onlocation to be approvedby the State HIghwayEnglneer.

I t Is orderedby the Commission that $474.00be appropriated to purchase the corrugatedmetal warehouse size 40'xI00' located on the property of A. T. Mast onHighwayNo. ^5north of Nacogdoches, con­ditioned that said A. T. Mast w i l l give theDepartment free use of this property on Itspresent l oca t l on fo r six months from December 1st, 1932, material andbulldlng to be sal vagedonorbefore June, 1933. Job No. M-11-^4. A.E.E.-32-978

InNewton Countyan I n i t i a l appropriationof $3,139.10 StatePunds Is hereby oade to be expendedunder the direction o f t h e State Highway Engineer throughthe MaintenancoDivision on State HighwayNo. 83,garnet length of 345 f t . f o r constructlngnewfloor, newhand-ralls, and asphalt top on the Caney Creek Bridge. This appropriationheingmade forBetter^ ment Work, Job No. M-20-0. A.E.E.-32-977

I t Ismovedby Mr. Martin, secondedbyJudgeEly, that State Highway No. 89be extended from Weatherford, In Parker County. toDecatur, InWI^e County, andthat State HighwayNo. 189 from Decatur, to Calnesvlllebe changed to HighwayNo. 89; thecondltlon of th is deslgnatlonbelng that th is r o a d w l l l not be takenover formalntenanceuntll f i n a l l y con­structed, andthat the counties a f f e c t e d w l l l furnlshnot less than 100 f t . right-of-way onlocatlonapprovedby the State Highway Commission,

I t Ismovedby Judge Ely, secondedby Mr. Martin, that ahlghwaybe desIgnatedfromEort Stockton, In Pecos County, to Pecos, In Beeves Co. with theunderstandlng that same w i l l notbe takenoyer fo r maintenance u n t i l f i n a l l y constructed, and on condition that Pecos andBeeves Counties w i l l furnlshnot less than 1 0 0 f t . right-of-way onlocatlonapprovedby the State Highway Commission.

Page 9: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

17

Novembers 1932

I t Is orderedhy the Commission that Inasmuchas Becos and Terrell Counties have compiled with the requirements of MlnuteNo, 1984andMln-uteNo, 2101 with regard to Improvement of HighwayNo, 82 from Fort Stockton to Sanderson that this Highway he taken over fo r Maintenance and an appropriation of $8,100,00 i n Becos County and ^1,850,00 In Terrel l County Isherehy made to cover the cost of suchMalntenance fo r thehalanceof this f i s c a l year, A,F,E,-32-978

InHeeves Countyan I n i t i a l appropriationof $5,898,70 State Funds Is herehy made tohe expendedunder the direction of the State Highway Engineer through the MaintenanceDivisionon State HighwayNo, 1, a d i s ­tance of 0,571 miles forhulldlngapproaches to Salt Drawbridge, This approprlatlonhelng made forBotterment Work, Joh No, M-8-D-4and on condition that said county w i l l fumlshsuch right-of-way as may he re­quired to he not less thaniOO' i n w i d t h , fencing to he donehy the County, A,F,E,-32-979

I t is ordered hy the Commission that Highway #9 he extended from Stratford, in Sherman County, northwest to the Oklahoma State Dine, on condition that said county w i l l furnlshnot less than 100' right-of-way on l oca t l on tohe approvedhy the State HIghwayEnglneer, andwl th the further understanding that this designation w i l l not hecome f i n a l u n t i l the State of Oklahoma designates a road from Boise City, InOklahoma, to the Texas StateBlne* andthat suchHlghway InTexas Is not to he taken over for malntenanceuntll f i n a l l y constructed,

A statehlghway Isherehy deslgnatedfromBlo Crande City, In Starr County, to Hehhronvllle, In Jlm^Hogg County on condition that I t w i l l not he taken over for malntenanceuntll constructed, and wlththeunderstand-Ing and on condition that counties affected w i l l furnlshnot less than 100' right-of-way on location to he approvedhy the State Highway Engineer,

In Travis County an Increase appropriation of $2,585,00 State Funds is herehy made to he expendedunderthe direction of the State Highway Engineer through the MaintenanceDivisionon State HighwayNo, 20, from 2,5mlles east of Manor to Bastrop County Dine, a distance of 9,15mlles for additional gravel required to hrlng thehase to thenecessary depth for surface treat ing. This appropriationheingmade forBotterment Work, JohNo,M-14-K-5, A,F^E,-32-980

InTravis Countyan I n i t i a l appropriationof $19,079,02State Funds Is herehy made to he expendedunder the direction of the StateHighway Engineer through the MaintenanceDivisionon State HighwayNo, 2 f rom City l l m l t s o f Austin to Williamson Creek, adistance of 2,185mlles for Crading and Drainage Structures, This appropriationheingmade f o r B e t t e ^ ment Work, JohNo, M-14-^-5 and on condition that said county w i l l f u r n ^ h such right-of-way as mayhe required t ohe not less thaniOO f t . In width, fencing tohe donehy the County, A,F,E^32-981

I t I s herehy orderedhy the Commission that Highway #55 InHvalde County he extended fromHvalde v laBatesv l l le , In 3avalaCounty, to Dl l ley , In Frio County: thence vlaSta te Highway #2 to at ornear Artes^a Wells, InBaSalle County: thence on themost practical route to SanDleg^ in Duval County, on conditionthat a l l counties affectedprovldenot less than 100' right-of-way onapprovedlocatlon, and with the understanding that the unimproved sections of said highway w i l l not he taken over fo r malntenancehy the S ta t eun t l l f i n a l l y constructed.

I t Is orderedhy the Commissionthat MlnuteNo, 7085 andMlnute #7074, authorlzlnga total appropriation of $51,745,08 for hase workon HighwayNo, 45 fromBolnt Blank In San Jacinto County to Bhelps Spur In Walker County he amended to provide fo r anapproprlatlon of $18,021,51 Instead of $20,181,71 InWalker Counts, and$15,705,88 Insteadof $11,581,35 In San Jacinto County, thereby reducing the to ta l appropriate for thecomhlned johs, forhasework, from $31,743,08 to$31,727,17, Anapproprlatlonof $8,105,00for JohNo, M-17-C-4, Walker County and fo^ Joh^No, M-ll-0^-4 San Jacinto County Is also made to Cover the oost of a l i gh t asphaltlc surface treatment on th is section of road,

A,F^E,-32-982

Page 10: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

1^

November 30, 1932

I t Is orderedby tbe Commission that a state highway bedeslgnated fromGraham, In^oun^ County, vlaMetcalfe Gap and over Highways 1-Aand #1 to Strawn, In Pale Pinto County, with the understanding that theunD improved sections of saldhlghway are not to be taken over fo r main-tenanceuntll f i n a l l y constructed and oncondltlnnthat tbe counties affect e d w l l l furnish not less thaniOO' right-of-way onlocatlonapprovedby tne State Highway Engineer.

I t is orderedby tbe State Highway Commission and State Board of Control that there be appropriated out of theBeglslatlve appropriation for the construction of the newHlghway Building, $14,475.00 or as much thereof asmlght be necessary for the Insta l la t ion of abo l i e r and necD essary equipment In the old Capitol Power House for fumlshlngheat to thenewStateHlghwayBulldlng. A.E.E.-32-9S3

Whereas, Itappears to the Commission that when the description of the Highway System was approved there were several Highways inadvertently omitted.

I t I s , therefore, orderedby the Oommlsslon, In order that the records might be c l a r i f i e d , that the Highway Systemas previously approved bemodlfled to Include the following described Highways:

1 , Prom Annona north to aconnectlon with Highway Ho. 5, 2, Gary east to aconnectlon with Highway Ho. S. 3, C^ultmanwest t o a connectlonwlth Highway Ho. 42 southeast of Bm ry 4, Whitewrlght vlaBeonard to Greenville. 5, Ballas vlaMesoulte to a connectlonwlthHlghwayHo. l i n e a r

Mesqulte. 5. W^nut Springs t o a connectlonwlthHlghwayHo. 2-A northeast of

Cleburne. 7, Bronson to Hemphill. S. Seadrlft to a connection wlthHlghway Ho. 57. 9. Willacy-Kenedy County Bine via Blvlera to Chapman's Bench. Thls

Highway deslgnatedoncondltlnn that the Oounty comply withthe orders of the Commission In regardto securlngrlght-of-way).

10. Busk to Summerfleld. 12. Welllngtonto Hedley.

I t Ismovedby the State Highway Commission that anapproprlatlon of $S41.50bemade to cover thepurchase of the following eouipment from the J. B. Adams Company, Ballas, this firmbeing the lowest bidder on machlnemeetlng specifications:

1 Heavy dutyAdamsHo. SO Scarifier P.O.B. Waco, Texas BlstPrlce $924.00

Discount S2.50

HBTPB1CE--$S41.50 A.P.E.-32-9S4

I t is moved by the State Highway Commission that an appropriation oj| $2797.00 be made to cover the purchase of the following equipment from the Happy Motor Company, Happy, Texas, this f i rm being the lowest bidder on same:

2 Latest Model Ford Pickups P.O.B. Lubbock List Price 555.00 $1110.00

3 Latest Model 1 1/2 ton Per d Trucks (less body) List Price 682.00 2046.00

1 1 l/2 ton Truck as above except with express body. List Price 769.00 769.00 Total List Price 3925.00 Total Discount 325.00 Net Price 3600.00

Less allowance on trade-in of:

1 Ford Pickup, State #3405 Allowance 241.00 ' 1 « " " #3550 « 271.00 1 " " " #3553 " 291.00 803.00

NET DIFFERENCE "-2,797.00

Page 11: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7168

7169

7170

7171

7172

^

November 30, 1932

Continued:

NOTE: Tne ^e tDi f fe rence^ Is tne amount tne Department pays out end covers t h e p r i c e of tne new macnines, less discount and allowance on tne oldmachines traded I n . A l l bids recelvedare tabulated showing tbe DNet Di f fe rence" p r i c e . A.P.E.-32-985

I t i smovedby tbe State HighwayDepartment tnat anappropr ia t ion of $510.00be made to cover tbepurcbase o f t h e fo l lowing eouipment f r o m t h e Dempster M i l l Manufacturing Oompany, Amar i l lo , t h i s f i r m b e i n g the lowest bidder on same:

3Pi t t sburghAutomat ic CasDhit Heaters P.O.B. Amarillo

^$170.00 $510.00 A.E.E.DS2-986

i t i smovedby the State Highway Commission tha t anappropr ia t ion of $790.00 bemade to cover thepurchase of the fo l lowing eouipment from the CurtisNorman Company, Brady, t h i s f i r m b e i n g the lowest bidder on same:

2Bates t Model PordPickupsP.O.B. San Angelo Diet Price 557.00 $1114.00 Discount 30.00 60.00 Net Price $1054.00

Dess allowance ontrade-in of :

1 Ford Pickup, State #3427 132.00 1 Ford Pickup, State #3428 132.00 264.00

NET DIFFERENCE $ 790.00

NOTE: The ^ e t Differences i s the amount theDepartment pays out and covers the pr ice of the new machines, less discount and allowance on the old machines traded i n . A l l bids received are tabulated showing the "Net Di f fe rence" p r i c e . A.F.E.-22-987

I t i smovedby the St^te Highway Commission t h a t anappropr ia t ion of $1929.97 bemade to cover thepurchase of the fo l l owing eouipment f r o m t h e Ford MotcB Company, Houston, t h i s f i r m b e i n g the lowest bidder on same:

3BatestMode1 1 l / 2 t o n F o r d T r u c k s F . o . B . San Angelo Dist Price 874.12 $2622.36 Discount 77.10 231.30 Net Pride $2391.06

Dess allowance on t r ade - in o f :

1 B e o 1 l / 2 t o n T r u c k , State #3501153.70 I B e o D " " " #3502 153.70 I B e o " " " " #3506 153.69 461.09

HETDiFFEBENCE---1929.97

NOTE: The ^ e t Dif ference" i s theamount the Department pays out and c o v e r s t h e p r i c e of the new machines, less discount andallowance on the oldmachines t raded i n . A l l bids recelvedare tabulated showing the ^Ne Di f fe rence" p r i c e . A.F.E.-32-988

i t i s movedby the State Highway Commission tha t anappropr ia t ion of $2,642.96 bemade to cover the purchase of the f o l l o w i n g equipment f rom theBul l -S tewar t Eouipment Co., Houston, t h i s f i r m b e i n g the lowes t bidder on same:

2Datest Model PowerMaintainers, Warco "EB"^ "ED w i t h Fordson Power, P.O.B. El Paso,

1 - M o d e l DEBDBist Price 2193.75 1 - M o d e l "ED " " 2093.75 $4,287.50

Discount 669.20 D 621.40 1.290.60

N e t P r i c e $2,996.90

Page 12: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7172

7173

7174

7175

2

November 30, 1932

Continued:

Loss allowance on trade-in of:

1 H.P.Maint. State #1150, Allowance 150.00 I H . P . M a i n t . State #1155, " 150.00 300.00

NET DIFFERENCED- $2,642.96

NOTE: The "Net Difference" Is the amount theDepartment pays out and cove thepr ice of thenewmachines, less discount and allowance on the old macD nines traded I n . A l l hids received are tabulated showing the "Net D i f f e r e d price. A.F.E^-32-989

I t Is movedby the State Highway Oommlsslon that anappropriation of $S00.00 bemade to cover thepurchase of the following eouipment from the Steel Products Corporation, El Paso, this f i rmbeing the lowest bidder on same:

2 Trailer Type American Chief Model "R" Asphalt Heaters, withMotor Driven Asphalt Spray

F.O.B.Brownwood, Texas Net Price 400.00 $800.00

I t Ismovedby the State Highway Commission that an appropriation of $369.79be made to cover thepurchase of the following eouipment from the Pord Motor Company, Houston, this f i rmbeing the lowest bidder on same

1 LatestModel Ford V-8 Coupe P.O.B. Balmorhea List Price $639.75 Discount 52.39 Net Price 587.36

Bess allowance ontrade-in of:

1 PordCoupe, State #58A 217.57 HET DIFFERENCE $369.79

NOTE: The DHet Difference" Is the amount theDepartment pays out and covers the price of the new machine, less discount and allowance on the oldmachine traded i n . A l l bids recelvedare tabulated showing the "Net Difference" price. A.F.ED-32-990

I t ismovedby the State Highway Commission that anappropriation of $1786.77 be made to cover thepurchase o f t h e following eouipment from the International Harvester Company, San Antonio, this f i rmbe ing the lowest bidder on same:

3 Latest Model International 1 l / 2 tontrucks F.O.B.El Paso List Price 1020.34 $3061.02

Discount 129.75 389.25 Het Price 890.59 $2671.77

Less allowance on trade-in of:

1 Indianatruck, State #3187 295.00 1 " " " #3188 295.00 1 " " " #3189 295.00 685.00

NET DIFFERENCE ^$1786.77

NOTE: The "Net Difference" is the amount theDepartment pays out and covers the price of the new machines, less discount and allowance on the oldmachinestraded i n . A l l bids received are tabulated showing the "Net Difference" price. A.F.E.-32-991

Page 13: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7176

7177

7178

7179

^

November 30, 1932

^ I t Is movedby tbe State Highway Oommlsslon that anapproprlatlon of $2210.40 be made to cover thepurchase of tbe following equipment from tbe Motor Equipment Corporation, San Antonio, this f i rmbeing tbe lowest bidder meeting specifications on seme:

1 Diamonds. Model 310 Truck with expressbody P.O.B. Amarillo List Price $1228.00

1 Truckas above except w l t b f l a t platformbody P.O.B. Amarillo Lis t Price 1418.00

Total List Price 2848.00 Total discount 235.80

Net Price 2410.40

Less allowance ontradeDln of:

1 Beo Truck, State #3255 Allowance 200.00

HETD1PPEBEHCE 2210.40

NOTE: Tbe DHet Differences Is theamount theDepartmentpays out and covers the price of the newmachlnes, less discount and allowance on the old machine traded I n . A l l bids recelvedare tabulated showing the "Net Difference" price. A.P.E.D32D992

i t ismovedby the State Highway Oommlsslon that an appropriation of $1180.OObe made to cover thepurchase o f t h e following equipment f romthe Servis Equipment Oompany, Dallas, this f l r m ' s b l d b e l n g t h e only bldmeetlng specifications:

1 - 4-wheel Servis Scarifier P.O.B. Dallas List Price $1400.00 Discount 240.00

HETPB10E $1180.00 A.P.E.D32D993

I t Ismovedby the State Highway Commissionthat anapproprlatlon of $1,085.85 be made to cover the purchaseof the following equipment f romthe O.P. Holllngsworth Supply Company, San Antonio, this f i rmbeing the lowest bidder on seme:

1 Hatlonal WHD18DA Portable Air Compressor P.O.B. Dvalde, Texas $1,085.85

A.P.E.D32D994

I t Is movedby the State Highway Commission that anapproprlatlon of $l033.00 bemade to cover the purchase of the following equipment f romthe Pord Motor Company, Houston, this f i rmbeing thelowest bidder on^same:

1 LatestModel Pl ckup, L l s t P r l c e - E . O . B . Tyler $534.98

1 Latest M o d e l l l / 2 t o n Truck " - " " 905.78 Total Lis t Price 1440.74 Discount 121.30 Het Price 1319.44

Less allowance ontrade-In of:

1 Pord Pickup, State #3434 Allowance 143.22 1 Chevrolet Truck, State #3819 " 143.22 288.44

HETDIEE^BEHCE 1033.00

HOTE: The "Het Difference" Is the amount theDepartmentpays out and covers theprice of the newmachlnes, less discount and allowance on the old machines traded I n . A l l bids recelvedare tabulated showing the "Het Difference" price. A.P.E.D32-995

Page 14: November 28, 1932 Minutes of the One Hundred Sixtieth ...7108 1 November 28, 1932 Minutes of the One Hundred Sixtieth Meeting of the State Highway Commission, held in the State Office

7180

7181

7183

2

November 30, 1932

I t is moved by the State Highway Oommlsslon that an appropriation of $968.56 be made to cover the purchase of the following equipment from the Ford Motor Company, Houston, this f i r m being the lowest bidder on same:

2 - 1 1/2 ton Ford Trucks (no bodies) F.O.B. Atlanta, Texas List Price 656.19 $1312.38 Discount 56.60 113.20 Net Price $1199.18

Less allowance on trade-in of:

1 Reo Truck, State #3267 115.31 1 " " " #3514 115.31 230.62

NET DIFFERENCE $968.56

NOTE: The "Net Difference" is the amount the Department pays out and covers the price of the new machines, less discount and allowance on the old machines traded i n . A l l bids received are tabulated showing the "Net Difference" price. A.F.E.-33-996

I t i s moved by the State Highway Commission that an appropriation of $1328,56 be made to cover the purchase of the following equipment fron the Ford Motor Company, Houston, this f i rmbe ing the lowest bidder on same:

2 Latest Model 1 l / 2 ton Ford Trucks with Hydraulic Hoist Dump Body F.O.B, Childress, Texas Net Price $1328.56

A.F.E.-32-997

I t i s moved by the State Highway Commission that an appropriation of $1810.47 be made to cover the purchase of the following equipment fron the Ford Motor Company, Houston, this f i rm being the lowest bidder on same:

3 Latest Model 1 l / 2 ton Ford Trucks F.O.B, Uvalde List Price 808.69 $2426,07 Discount 67,60 208.80 Net Price $2217.27

Less allowance on trade-in of:

1 Indiana Truck, State #3211 135,60 1 " " " #3207 135.60 1 " " " #3209 135.60 406.80

NET DIFFERENCE $1810.47

NOTE: The "Net Difference" is the amount the Department pays out and covers the price of the new machines, less discount and allowance on the old machines traded i n . A l l bids received are tabulated showing the"Net Difference" price. A.F.E.-32-998

APPROVED:

Btate Highway Engineer Chairman