Top Banner
Ark Continuity Client Contact: Kevin Bone - Business Programme Director Ark Continuity Hartham Park | Hartham | Corsham | Wiltshire | SN13 0RP mobile:+44 (0) 7526 419391 direct dial:+44 (0) 1249 700423 Customer: Ark Continuity Location: UK Data centre Start Date: Sept 2011 Description: Data Centre, M&E and ICT Installation Size: 1 Data Hall: 10,000 sqft Scope of Works: Design, Project Management, Installation and Migration of Critical M&E and ICT Infrastructure. Supply and Installation of Critical Power, Air Cooling, Tempesting, BMS, Racks, Containment, Copper Cabling, Fibre Optic Network and Power Distribution.
2
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Norland client references ark continuity

Ark Continuity

Client Contact:

Kevin Bone - Business Programme DirectorArk Continuity Hartham Park | Hartham | Corsham | Wiltshire | SN13 0RP mobile:+44 (0) 7526 419391 direct dial:+44 (0) 1249 700423

Customer: Ark Continuity Location: UK Data centreStart Date: Sept 2011Description: Data Centre, M&E and ICT InstallationSize: 1 Data Hall: 10,000 sqftScope of Works:Design, Project Management, Installation and Migration of Critical M&E and ICT Infrastructure.Supply and Installation of Critical Power, Air Cooling, Tempesting, BMS, Racks, Containment, Copper Cabling, Fibre Optic Network and Power Distribution.Project Team: 30 people