1 NORDPIANC 2019 Expansion of Port of Hanstholm New Western Breakwater NORDPIANC 2019 13 SEPTEMBER 2019 Thomas Gierlevsen Technical & Project Director COWI A/S April 2019
28

NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Dec 09, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

1

NORDPIANC 2019

Expansion of Port of HanstholmNew Western Breakwater

NORDPIANC 2019

13 SEPTEMBER 2019

Thomas Gierlevsen

Technical & Project DirectorCOWI A/S

April 2019

Page 2: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

The Project

2

Expansion of Port of Hanstholm

› Design and build contract signed November 2017

› The winning team:

› Client: Port of Hanstholm

› Client consultant: Rambøll A/S

› Project cost: ~ 500 mio. DKK

› Outer breakwaters ~ 300 mio. DKK

NORDPIANC 2019

13 SEPTEMBER 2019

COWI’s role

1) Tender design of new outer breakwaters

2) Detailed design of:

› New western breakwater (incl. physical model test)

› Caisson for new breakwater head

› New eastern breakwater

› Spur breakwater (incl. physical model tests)

3) Assistance regarding various marine engineering issues during construction

4) Construction supervision

Page 3: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Exposed project location

13 SEPTEMBER 2019

NORDPIANC 20193

Expansion of Port of Hanstholm

Hanstholm

Page 4: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Design Conditions

13 SEPTEMBER 2019

NORDPIANC 20194

Offshore:

At the breakwater:

› Water depths from 9m to 13.5m

› Waves: Hs = 7.5-8.5m, Tp = 14-16s

› Water levels: -0.5m to +1.7m

Expansion of Port of Hanstholm

Page 5: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

13 SEPTEMBER 2019

NORDPIANC 20195

Western breakwater with Cubipods

Outer cross-section

Expansion of Port of Hanstholm

North Sea Harbour

~ 90 m

~21 m

Page 6: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Expansion of Port of Hanstholm

NORDPIANC 2019613 SEPTEMBER 2019

Western breakwater with Cubipods

Page 7: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

› Design wave heights:Hs=8.5 m ; Hmax,offshore~15 m

› Breaking wave conditions

› Typical rock solution would require 40-50 t rocks!

› 30 t granite (max. size) not sufficient

› Special concrete elements are necessary

Why concrete elements?

7

Expansion of Port of HanstholmTraditional rubble mound breakwater, Hvide Sande, 2013-14

NORDPIANC 2019

13 SEPTEMBER 2019

Page 8: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Other alternatives

8

Caissons • Critical with respect to weather

windows

• Construction logistics locally

X-bloc / Accropode• 14m3 (34t)

• 2-5 t filter rock

• Slope, 1:1.5

Rectangular Blocks• High density

• 14m3 (38t)

• 6-14t filter rock

• Slope, 1:1.7513 SEPTEMBER 2019

NORDPIANC 2019

Expansion of Port of Hanstholm

Page 9: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

› Caissons- Limited weather windows for installation

› Other monolayer concrete units:

› All units have strict placement tolerances

› Require steep slope and small filter rock (interlocking units)

› High risk of severe damage during construction

› Less robust. If units are damaged or extracted, the breakwater becomes very vulnerable

› Damages are difficult to repair

13 SEPTEMBER 2019

NORDPIANC 20199

Accropod I Accropod II Core-Loc X-block

Other alternatives

Expansion of Port of Hanstholm

Page 10: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

13 SEPTEMBER 2019

NORDPIANC 201910

› There are examples of similar type of damage

› Broken units

› Large settlements in armour layer

› Exposed filter rock

› Significantly reduced stability

‘Modern’ monolayer solutions

Expansion of Port of Hanstholm

Page 11: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Remember the history…

13 SEPTEMBER 2019

NORDPIANC 201911

Arzew El Djedid Breakwater, Algeria, 1981

› Tetrapods 48 t, Slope 1:1.3

› Broken armour units

Expansion of Port of Hanstholm

Page 12: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

13 SEPTEMBER 2019

NORDPIANC 201912

Sines Breakwater, Portugal, 1978

› Dolos 42t, Slope 1:1.5

› Broken armour units

Remember the history…

Expansion of Port of Hanstholm

Page 13: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

› Robust solution - for the Port as well as for the Contractor

› 3-8 t filter rock withstands summer storms up to Hs ~ 4m

› High density concrete used to keep weight down

Cubipods

13 SEPTEMBER 2019

NORDPIANC 201913

3-8 tfilter rocks

15 tCubipods

Expansion of Port of Hanstholm

Page 14: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

› Developed in University of Valencia, Spain(Prof. J.R. Medina) in 2005

› Patented by SATO (part of OHL group)

› About 6 projects completed in the Mediterranean

› Hanstholm Breakwater is the first project outside the Mediterranean

Cubipods

13 SEPTEMBER 2019

NORDPIANC 201914

Expansion of Port of Hanstholm

Page 15: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Cubipods

15

› Concept:

› Cubes: High porosity --> High Stability

› Cubes obtain a low porosity and tends to create a smooth surface

› ‘Pods’ on the Cubes (‘Cubipods’) ensures a high porosity, p = 40-43%.

13 SEPTEMBER 2019

NORDPIANC 2019

Expansion of Port of Hanstholm

Page 16: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Cubipod

13 SEPTEMBER 2019

NORDPIANC 201916

Advantages:

› More stable than cubes (higher KD)

› Less steep slope than other monolayer units

› Robust bulky shape – no broken units

› Larger filter rock up to W50f = W/3

› Filter layer at a flatter slope – less risk during construction

› Simple production and placement compared to other monolayer units

Expansion of Port of Hanstholm

Page 17: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Expected wave conditions during construction

13 SEPTEMBER 2019

NORDPIANC 201917

› Construction from April – September

› Wave hindcast data, 1981-2015 (DHI)

› Hs > 2m almost every week

› Storms with Hs > 3.5 m every year

Expansion of Port of Hanstholm

Page 18: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Stability of filter rock during summer storm

13 SEPTEMBER 2019

NORDPIANC 201918

Expansion of Port of Hanstholm

Page 19: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Friday, 21st Sept. 2018: The storm ‘Knud’

13 SEPTEMBER 2019

NORDPIANC 201919

Expansion of Port of Hanstholm

Page 20: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Design verification by 3D Model tests

20

Expansion of Port of Hanstholm

NORDPIANC 2019

13 SEPTEMBER 2019

Page 21: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Expansion of Port of Hanstholm

NORDPIANC 201921

Upgrading front amour layer

Before testsAfter 100 year wave conditions

15 t CP22 t CP

30/32.5 t CP

Significant damage detected in 15 t CP with extraction of units and large settlements13 SEPTEMBER 2019

Page 22: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Expansion of Port of Hanstholm

NORDPIANC 201922

Testing with 15-22 t rocks on rear side

Before testing After 100 wave conditions

Significant damage and failure of crest and rear protection

15-22 t rocks

13 SEPTEMBER 2019

Page 23: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Expansion of Port of Hanstholm

NORDPIANC 201923

Before testing After 100 wave conditions

Some settlements are observed but no units extracted

15 t CP

13 SEPTEMBER 2019

Testing with 15 t Cubipods rear side

Page 24: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Breakwater head – concrete caisson (40 x 22 x 16m)

Weight: 7000 t

24

Expansion of Port of Hanstholm

NORDPIANC 2019

13 SEPTEMBER 2019

Departure from Poland, 18 June 2019

Page 25: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Float off operation offshore Frederikshavn, 23 June 2019

25

Expansion of Port of Hanstholm

NORDPIANC 2019

13 SEPTEMBER 2019

Page 26: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Installation in Hanstholm, 25 June 2019

26

Expansion of Port of Hanstholm

NORDPIANC 2019

13 SEPTEMBER 2019

Page 27: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

Ballasting with water, 25 June 2019

27

Expansion of Port of Hanstholm

NORDPIANC 2019

13 SEPTEMBER 2019

Page 28: NORDPIANC 2019 Expansion of Port of Hanstholm New Western ...

28

Thank you for your attention