HSEQ NEWSLETTER PV DRILLING’s Dear all employees of PV Drilling Corporation, In 2019, there was a steady recovery in the oil and gas exploration and exploitation operations in Southeast Asia, resulting in an increase in drilling demand, creating a foundation for PV Drilling's recovery and growth. In addition to accomplshing the business objectives, it is worth to highlight that by the end of 2019, PV Drilling has successfully implemented the strategy of providing drilling service to foreign countries with 4 Jack-Up rigs currently working in Malaysia, facilitating the supply of more drilling-related services overseas. For safety performance, we are proud that the rig PV DRILLING I officially achieved 12 consecutive years of safe operation (Zero LTI) on March 10th, 2019, the PV DRILLING II and PV DRILLING III rigs achieved 10 consecutive years of Zero LTI respectively on September 15th, 2019 and on November 12th, 2019; PV DRILLING VI rig achieved 4 consecutive years of Zero LTI on February 28th, 2019. In addition to these encouraging achievements, we need to remember to always follow safe working rules, absolutely do not let pride become complacency, not to recur any accidents such as the LTI on PV DRILLING III rig on December 6th, 2019. The year 2020 has been forecast to be another challenging year for PV Drilling. In order to achieve the business goals, PV Drilling Corporation has proposed short -term and long-term solutions in accordance with the difficult situation of the market such as: Continuing to focus on improving the quality of services, maintaining operations safely and effectively in parallel with the implementation of the strategy of bringing services overseas; Restructuring the Corporation to enhance efficiency in PV Drilling’s business activities in the current difficult period; Completing the new construction of the Drilling Equipment Services (DES) on schedule and reactivate the PV DRILLING V rig most effectively, safely and economically. Many jobs on the offshore drilling rigs and onshore facilities of PV Drilling require the use of forklifts, so knowledge of safety when working with forklifts is very necessary to prevent and minimize the risks that may occur. In order to disseminate this topic in the Corporation, besides the usual content, an article about Safety When Working With Forklifts is also introduced in this Newsletter. Hopefully this useful information will provide you with a basic understanding of the safety when using forklifts in work as well as in everyday life. On the occasion of Lunar New Year 2020, the first year of the new decade with many positive signs for the development of PV Drilling, on behalf of the Board of Management of the Corporation, I would love to wish all employees of PV Drilling Corporation and your families a new successful and happy year. I also wish all our duties and activities to be always safe and highly productive for each and every day! Yours sincerely, Vice President of PV Drilling Tran Van Hoat Chief Editor: Vice President Tran Van Hoat Editors: HSEQ Division 4th Floor, Sailling Tower, Pasteur Street, District 1, Ho Chi Minh City, Vietnam. tel: (84-28) 39142012 - fax: (84-28) 39142021 27 Quarter 4 - 2019 No 1. Letter from Vice President. HSEQ Activity News. 6. Safe Operation of Fork Lift. 8. Safety Performance; PVD Fleet Location; Legal Update. 9. Safety Awards. IN THIS ISSUE PV DRILLING II On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma- laysia, the Jack-up rig PV DRILLING II was honored to re- ceive the safety award from Sapu- ra OMV for her outstanding HSSE performance throughout the drilling campaign from March 06, 2019 to August 03, 2019. Ac- cordingly, the rig has recorded 5,303 PVD Observation Cards and achieved 191,796 safe man- hours without any incidents rec- orded including Near Miss, First Aid, Recordable Incident, Envi- ronmental Spill and LTI (Lost Time Incident). This absolute HSSE performance has greatly contributed to Sapura OMV’s achievement of HSSE objectives of the year 2019 as well. This is a clear evidence of the leadership's commitment to safety perfor- mance as well as safety culture of PV DRILLING II rig in par- ticular and PV Drilling Corpora- tion in general. After finishing the drilling cam- paign for Sapura OMV, PV DRILLING II returned to Vi- etnam and accomplished the 70- day drilling campaign for Japan Vietnam Petroleum Company (JVPC) with absolute HSE per- formance and very high operat- ing efficiency. Then, the rig came back to Malaysia again and currently is drilling for Petronas Malaysia. CONGRATULATION TO PV DRILLING II RECEIVING SAFETY AWARD FROM SAPURA OMV RECEIVING SAFETY AWARD FROM SAPURA OMV
9

No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

Mar 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

HSEQ

NEWSLETTER PV DRILLING’s

Dear all employees of PV Drilling Corporation,

In 2019, there was a steady recovery in the oil and gas exploration and exploitation operations in Southeast Asia, resulting in an increase in drilling demand, creating a foundation for PV Drilling's recovery and growth. In addition to accomplshing the business objectives, it is worth to highlight that by the end of 2019, PV Drilling has successfully implemented the strategy of providing drilling service to foreign countries with 4 Jack-Up rigs currently working in Malaysia, facilitating the supply of more drilling-related services overseas. For safety performance, we are proud that the rig PV DRILLING I officially achieved 12 consecutive years of safe operation (Zero LTI) on March 10th, 2019, the PV DRILLING II and PV DRILLING III rigs achieved 10 consecutive years of Zero LTI respectively on September 15th, 2019 and on November 12th, 2019; PV DRILLING VI rig achieved 4 consecutive years of Zero LTI on February 28th, 2019. In addition to these encouraging achievements, we need to remember to always follow safe working rules, absolutely do not let pride become complacency, not to recur any accidents such as the LTI on PV DRILLING III rig on December 6th, 2019.

The year 2020 has been forecast to be another challenging year for PV Drilling. In order to achieve the business goals, PV Drilling Corporation has proposed short-term and long-term solutions in accordance with the difficult situation of the market such as: Continuing to focus on improving the quality of services, maintaining operations safely and effectively in parallel with the implementation of the strategy of bringing services overseas; Restructuring the Corporation to enhance efficiency in PV Drilling’s business activities in the current difficult period; Completing the new construction of the Drilling Equipment Services (DES) on schedule and reactivate the PV DRILLING V rig most effectively, safely and economically.

Many jobs on the offshore drilling rigs and onshore facilities of PV Drilling require the use of forklifts, so knowledge of safety when working with forklifts is very necessary to prevent and minimize the risks that may occur. In order to disseminate this topic in the Corporation, besides the usual content, an article about Safety When Working With Forklifts is also introduced in this Newsletter. Hopefully this useful information will provide you with a basic understanding of the safety when using forklifts in work as well as in everyday life.

On the occasion of Lunar New Year 2020, the first year of the new decade with many positive signs for the development of PV Drilling, on behalf of the Board of Management of the Corporation, I would love to wish all employees of PV Drilling Corporation and your families a new successful and happy year. I also wish all our duties and activities to be always safe and highly productive for each and every day!

Yours sincerely, Vice President of PV Drilling Tran Van Hoat

Chief Editor: Vice President Tran Van Hoat

Editors: HSEQ Division

4th Floor, Sailling Tower, Pasteur Street,

District 1, Ho Chi Minh City, Vietnam.

tel: (84-28) 39142012 - fax: (84-28)

39142021

27Quarter 4 - 2019

No

1. Letter from VicePresident.HSEQ Activity News.

6. Safe Operation of ForkLift.

8. Safety Performance;PVD Fleet Location;Legal Update.

9. Safety Awards.

IN THIS ISSUE

PV DRILLING II

On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up rig PV DRILLING II was honored to re-ceive the safety award from Sapu-ra OMV for her outstanding HSSE performance throughout the drilling campaign from March 06, 2019 to August 03, 2019. Ac-cordingly, the rig has recorded 5,303 PVD Observation Cards and achieved 191,796 safe man-hours without any incidents rec-orded including Near Miss, First Aid, Recordable Incident, Envi-ronmental Spill and LTI (Lost Time Incident). This absolute HSSE performance has greatly contributed to Sapura OMV’s achievement of HSSE objectives of the year 2019 as well. This is a clear evidence of the leadership's commitment to safety perfor-

mance as well as safety culture of PV DRILLING II rig in par-ticular and PV Drilling Corpora-tion in general.

After finishing the drilling cam-paign for Sapura OMV, PV DRILLING II returned to Vi-etnam and accomplished the 70-day drilling campaign for Japan Vietnam Petroleum Company (JVPC) with absolute HSE per-formance and very high operat-ing efficiency. Then, the rig came back to Malaysia again and currently is drilling for Petronas Malaysia.

CONGRATULATION TO PV DRILLING II

RECEIVING SAFETY AWARD FROM SAPURA OMV

RECEIVING SAFETY AWARD FROM SAPURA OMV

Page 2: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

6

Safety campaign of quarter 4 “Job Preparation”

2

dited by their customers to ensure the

HSEQ management system and quality of

services provided fully met customers’

strict requirements. Specifically, PVD Off-

shore was audited by its customers namely

Idemitsu, Biendong POC and Rosneft re-

spectively on 18/10/2019, 24/10/2019 and

02/12/2019. The audit results showed that

the company's HSEQ management system

is still being maintained effectively and ful-

ly met the requirements of the ISO 9001,

ISO 14001 and OHSAS 18001 standards.

The subcontractor and supplier evaluations

were also taken seriously by PV Drilling.

According to the plan, on 16/12/2019, PVD

Logging held an internal meeting to evalu-

ate and select suppliers and subcontractors

for 2020. Specifically, the Company evalu-

ated 137 suppliers and 20 subcontractors.

After reviewing and evaluating, PVD Log-

ging removed 2 suppliers from and added 5

new ones to the approved list.

OHS HYGIENE ACTIVITIES

On November 18th – 19th, 2019, the HSEQ

Division – PV Drilling organized an unan-

HSE ACTIVITIES ON THE

FLEET

In the 4th quarter of 2019, besides TAD -

PV DRILLING V rig was still in Cold

Stacked, the PV DRILLING 11 was also

on standby in Algeria; PV DRILLING VI

rig continued drilling for Sapura Malaysia;

PV DRILLING I rig started drilling cam-

paign for Petronas Malaysia after finishing

the drilling contract for Hibiscus Malay-

sia; PV DRILLING III rig continued drill-

ing for Repsol Malaysia; PV DRILLING

II rig finished the drilling contract for

JVPC Vietnam and returned to Malaysia

to start the drilling campaign for Petronas

Malaysia in early November.

Periodically, the 4th quarter safety cam-

paign with the theme: "Job Preparation"

was widely deployed on all jack-up rigs of

PV Drilling. The subject of this quarter is

to ensure that all the work before starting

must be under good control, in compliance

with the relevant procedures, rules, man-

datory work permits (PTW, Sub Certifi-

cate) and job safety analysis (JSA).

In order to ensure the compliance with the

Drug and Alcohol Policy on PV Drilling’s

rigs, on 5/11/2019 and 6/11/2019 right on

board of the rig PV DRILLING II, the in-

spection team from HSEQ department of

the PVD Drilling Division conducted un-

expected inspection of the alcohol and

drug for crews before moving to Malaysia,

commencing drilling campaign for

Petronas. The test was carried out for all

crews on board of PV DRILLING II. The

results of all the test for alcohol and drug

were negative, in full compliance with the

requirements and regulations of PV Drill-

ing and customers.

HSEQ MANAGEMENT SYSTEM

The external audit for HSEQ MS of PV

Drilling Head Office and its subsidiaries

in compliance with the requirements of

ISO 9001: 2015, ISO 14001: 2015 and

OHSAS 18001: 2007 standards was im-

plemented by DNV GL in October 2019

as planned.

The objectives of this second periodical

audit were to assess the compliance of

HSEQ MS with the applied standards and

also to recognize opportunities for system

improvement.

DNV GL Experts showed their apprecia-

tion for the robust and continual improve-

ment of the PV Drilling HSEQ manage-

ment system in the closing meeting. This

also helps to prepare for the transition of

PV Drilling’s Occupational Health and

Safety management system from OHSAS

18001:2007 to ISO 45001:2018 standard,

which will be carried out in 2020 to bring

more added values to PV Drilling’s HSEQ

MS.

In the 4th quarter of 2019, besides the ex-

ternal audit conducted by DNV GL, the

subsidiaries of PV Drilling were also au-

Alcohol test on board of PV DRILLING II before moving to Malaysia

DNV GL audited the HSEQ management system of PV Drilling Head Office

Page 3: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

3

nounced inspection of Health - Safety

- Environment (HSE) at the produc-

tion facilities and bases of Subsidiar-

ies, joint ventures of PV Drilling Cor-

poration in Phu My Industrial Park,

Dong Xuyen Industrial Park, Oil

Spill Response Base and PTSC Sup-

ply base in Ba Ria-Vung Tau Prov-

ince. This is the third unannounced

visit in 2019 conducted by HSEQ Di-

vision with the aim to objectively as-

sess the compliance with HSE regula-

tions at Subsidiaries. The inspection

results showed the efforts of most

Subsidiaries in maintaining and im-

proving HSE performance. Although

production activities were quite busy

in most manufacturing workshops at

the time of visit, the HSE inspection

and supervision at the Subsidiaries

have always been effectively main-

tained, thus ensuring workers’ com-

pliance with and raising their aware-

ness about occupational safety.

However, there are still some obser-

vations on: Workplace safety, Fire

prevention – Emergency Response

and PPE usage that need to be im-

proved.

On December 16th 2019, the HSEQ

Division – PV Drilling Corporation

organized the inspection of Occupa-

tional Health – Safety – Environment

(HSE Walkabout) at the bases as

well as production facilities of sub-

sidiaries, located in Phu My and

Dong Xuyen Industrial zones, Oil

Spill Response Base and PTSC Sup-

ply Base in Ba Ria – Vung Tau prov-

ince. This is one of the activities un-

der PV Drilling Corporation’s 2019

HSE Action Plan implemented by

the HSEQ Division, to inspect the

compliance with the Occupational

Health – Safety – Environment regu-

lations at the workshops. According

to the results, the HSE activities in

all inspected areas were confirmed to

be well implemented. The areas that

need to be improved were Fire pre-

vention – Emergency response in-

cluding First Aid, Equipment safety

and Electrical safety.

In 2019, in addition to the inspections

self-performed by subsidiaries, the

HSEQ Division – PV Drilling has

conducted 5 inspections of Occupa-

tional Health – Safety – Environment

at the bases as well as production fa-

cilities of subsidiaries including 3

HSE unannounced visits and 2 HSE

announced ones.

In order to create a green, clean and

beautiful working environment as

well as to prevent dengue spread, in

October 2019, PVD Invest cleaned

and cleared weeds around the work-

ing area at Vung Tau Base.

On December 31, 2019, the Board of

Directors of PVD Tech Company ap-

proved the program and action plan

of "Say no to plastic bags and dispos-

able plastic products". Accordingly,

through hanging banners / slogans,

the Company promoted propaganda

to remind people to gradually restrict

and abandon disposable plastic prod-

ucts. At the same time, the company

has also added some trash bins dedi-

cated to plastic bags, replaced dispos-

able water bottles with large water

jars in meeting rooms.

EMERGENCY RESPONSE

On 28th November, 2019, in collabo-

ration with the Management Board of

Sailing Tower, the subsidiaries of PV

Drilling Corporation having offices at

this building conducted fire drills and

emergency exits. This is an annual

exercise program conducted in ac-

cordance with the law. The subsidiar-

ies participating in the rehearsal in-

clude: PV Drilling Corporation's Of-

fice at Level 3, 4 and 14; PVD Drill-

ing Division Enterprise and PVD

Deepwater on 3rd floor; PVD Log-

ging and PVD - Baker Hughes on the

10th floor. Scenario preparation, as-

signing responsibilities to each mem-

ber of the intramural firefighting

force, medical staffs have been taken

seriously. During the rehearsal, the

members of the intramural fire-

fighting force and the medical staffs

quickly deployed at the standing po-

sitions. All officers and employees of

PV Drilling and Subsidiaries strictly

complied with the requirements of

the fire prevention, firefighting and

escape rehearsal plan which has been

announced before. After hearing the

fire alarm and notification of Sailing

Tower Management Board, all per-

sonnel quickly evacuated following

the staircase exit and concentrated at

Muster Point until the end of the ex-

ercise. Immediately after the end of

the exercise, the subsidiaries con-

ducted analysis, evaluation and

learned from experience to complete

the fire prevention and fighting plan

Idemitsu audited the HSEQ management system of PVD Offshore

Cleaning and clearing weeds at the VT Base of PVD Invest PVD Logging’s meeting to evaluate and select suppliers and subcontractors

HSE Walkabout at PVD Tech

Page 4: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

6 4

Environment – Quality.

On 26th December 2019, PVD Offshore

success-fully organized the Safety-Health-

Environment Conference with the partici-

pation of the Board of Directors, office

staff and representative of offshore person-

nel. The Conference praised and awarded

merit for departments and individuals with

outstanding HSE achievements. Speaking

at the Conference, Director of Company

highlighted great achievements that need to

be promoted and the remaining limitations

and difficulties to be overcome in the com-

ing time.

Internal training activities at PV Drilling

are implemented according to the individu-

al’s career development program, which

determines the training matrix depending

on the competence requirements of each

position to undertake the job. The usual

form of training is through direct instruc-

tion in the process of doing the work (on-

for the following years.

In the fourth quarter of 2019, the deploy-

ment of fire prevention and firefighting

drills was also conducted by other subsidi-

aries; PVD Offshore conducted fire drills

on 11th December 2019 at the Company’s

Head Office, on 13th December 2019 at the

Mechanical Workshop and on 24th Decem-

ber 2019 at the Oil Spill Response Base.

On October 28, 2019, PVD Invest Enter-

prise collaborated with Management

Board of The Manor 2 Building to organ-

ize the fire prevention and firefighting re-

hearsal, with the full participation of em-

ployees present at the Enterprise.

On 30th November 2019, PVD Tech Com-

pany coordinated with the subcontractor

QIS to organize a drill in response to the

incident of the loss of radioactive sources,

with the full participation of relevant em-

ployees. The drill helped members of

Emergency Response Steering Committee

of the subsidiary and all employees partic-

ipating in the drill to master the response

in a timely and effective manner when the

incident on radioactive sources occurred.

CONFERENCE AND TRAINING

On December 17th 2019, HSEQ Division –

PV Drilling Corporation organized the

second Internal Occupational Health –

Safety – Environment – Quality Seminar

in 2019 at the PVD Training’s meeting

room, Vung Tau City with the participa-

tion of HSEQ officials of subsidiaries and

the HSEQ Division. The contents for dis-

cussion at the seminar:

Summary report on the implementa-

tion of Occupational Health and Safety

Management Systems conversion from

OHSAS 18001:2007 to ISO

45001:2018 .

Control of Substances Hazardous to

Health (COSHH) Assessment .

Analyzing the results of PV Drilling

Corporation’s internal audit in 2019 .

Report the results of the second HSE

Walkabout in 2019 (On December 16th

2019).

The presentations at the seminar were en-

thusiastically discussed by the participants

to clarify the issues. Thereby, the seminar

has brought useful information for the

participants, contributing to the improve-

ment of Occupational Health – Safety –

The fire drill at Sailing Tower

Fire drill at the PVD Offshore’s workshop

HSEQ Conference of the 4th quarter 2019

Page 5: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

the-job training), according to the curriculum

and the requirements which have been ap-

proved in advance. In addition, to ensure com-

pliance with legal requirements, customer re-

quirements and other requirements, for some

mandatory safety courses, staff will be sent to

external training.

In five days, from November 4th to 8th, 2019 in

Vung Tau city and on November 11th, 2019 in

Ho Chi Minh city, the HSEQ Division – PV

Drilling Corporation organized a series of train-

ing courses on occupational safety and hygiene

as required by Decree 44/2016/ND-CP for em-

ployees of the Head-Office and all the subsidi-

aries and join-venture companies, belonging to

group No. 1, 2, 3, 4, 5 and 6 as prescribed in

the Decree 44/2016/ND-CP, with the participa-

tion of 1.803 people including managers and

staff. The lecturers were experts of the Center

of Industrial Safety Registration Zone II, under

the Ministry of Labor, War Invalids and Social

Affairs in the southern region. Through the

training course, lecturers explained in detail the

requirements of Decree 44/2016/ND-CP on the

roles and responsibilities of each employees

group. This is a mandatory training course as

legal requirements and is conducted periodical-

ly.

In addition to the mandatory training courses,

the HSEQ Division – PV Drilling Corporation

collaborated with the subsidiaries to organize

the internal training courses to supplement em-

ployees’ professional knowledge as well as im-

prove the culture of safety, specifically for

three days from November 11th to 13th, 2019,

the HSEQ Division – PV Drilling Corporation

conducted training in awareness for HSEQ man-

agement system for PVD Tubulars Manage-

ment’s employees in Phu My Industrial Park be-

fore the Company launched a new project of

providing the casing, tubing service to Idemitsu.

On November 26th, 2019, the Health team of the

HSEQ Division – PV Drilling Corporation orga-

nized First Aid training for all drivers of the

Head-Office and subsidiaries which have office

in Ho Chi Minh city. The training content in-

cludes the principles of first aid, how to treat-

ment with open wounds, trauma, wound dress-

ing techniques, first aid techniques for people

who suffocation, fainting, etc. The goal of the

training is to help participants master the First

Aid skills and be able to handle appropriately in

case of incidents occurring in the workplace as

well as in daily living.

In addition to the courses organized by the

HSEQ Division – PV Drilling Corporation, on

December 5th, 2019, PVD Tech successfully or-

ganized an internal training course about Safety

For Lifting Equipment for 24 employees work-

ing at Vung Tau Base with the theme "Manual

Handling".

On December 9th and 16th, 2019, PVD Well Ser-

vices coordinated with NDT Company to organ-

ize the calibration training of thermal measuring

equipment and pressure measuring equipment

for the staff doing professional work in order to

improve the ability to handle and solve fire and

explosion incidents for the Fire Fighting team,

on December 17th, 2019, PVD Well Services

coordinated with the Fire Prevention and

Fighting Police of Ba Ria-Vung Tau province to

organize a training course for the PVD WS’s

5

Fire Fighting team. Attending the training were

142 people from the Office in Ho Chi Minh

city and Vung Tau Base. Previously, from De-

cember 10th to 12th, 2019, PVD Invest also col-

laborated with the Fire Prevention and Fighting

Police in Ho Chi Minh city to organize a train-

ing course for the PVD Invest’s Fire Fighting

and Emergency Response team. At the end of

the training, the organizers conducted the ex-

amination and evaluation of results for all par-

ticipants to issue certificates in accordance

with the law.

HSEQ Conference of 2019 at PVD Offshore

OHS training for PV Drilling employees as per the Decree 44/2016/NĐ-CP

Awareness training of HSEQ Management System for PVD Tubulars’ employees in Vung Tau

First aid training for drivers of Head Office and drivers of companies based in HCM City.

Page 6: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

Daily check the Forklift

before use: seatbelt,

tires, lights, horn, brake,

hydraulic oil level,

lifting system, condition

of battery…

Always fasten seatbelt and

comply with PPE regulations

at workplace while operating

Forklift.

COUNTERWEIGHT FULCRUM LOAD

CHECK BEFORE OPERATING FASTEN SEATBELT AND WEAR PPE

UNDERSTAND THE BALANCE OF FORKLIFT CG: CENTER OF GRAVITY

6

Page 7: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

UP AND DOWN THE RAMPS CORRECTLY NO PASSENGERS ON FORKLIFT

DRIVE SLOWLY AND DO NOT TURN AT SPEED

ALWAYS OBSERVE SURROUNDINGS

FOR SAFE TRAVELING, SECURE THE LOADS

IF THEY ARE UNSTABLE

UNAUTHORIZED PERSONNEL KEEPS AWAY

FROM FORKLIFT OPERATION AREA

END OF TASK: PARKING IN PROPER PLACE,

LOWER FORK ON DECK, APPLY HANDBRAKE,

POWER OFF AND REMOVE THE KEY

TRAVELING LOADED TRAVELING EMPTY

7

Page 8: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

PV DRILLING I

Customer: Petronas Malaysia

Location: SMDP-B WHP

Zero-LTI: 12 years (10/03/2019)

PV DRILLING VI

Customer: Sapura OMV - Malaysia

Location: SK-408

Zero-LTI: 4 years (28/02/2019)

TAD PV DRILLING V

COLD-STACKED

Zero-LTI: 7 years (03/12/2019)

LAND RIG PV DRILLING 11

COLD-STACKED

Zero-LTI: 3 years

(01/7/2019)

PV DRILLING III

Customer: Repsol Malaysia

Location: PM3 CAA

PV DRILLING II

Customer: Petronas Malaysia

Location: 4Q—21

Zero-LTI: 10 years (15/9/2019)

HSE INDEX YEAR TO DATE 31/12/2019

1 Law No. 44/2019/QH14 of the National Assembly on prevention and control of harmful effects of alcohol and beer; issued on

14/06/2019; effective on 01/01/2020.

2 Resolution No. 99/2019/QH14 of the National Assembly on con-tinuing to improve the effectiveness and efficiency of policies

and law implementation on fire fighting and prevention; approved by the National Assembly on 27/11/2019.

3 Decree No. 100/2019/NĐ-CP of the Government on administra-tive sanctions in the field of road and railway transportation; is-

sued on 30/12/2019; effective on 01/01/2020.

4 Circular No 25/2019/TT-BTNMT of the Ministry of Natural Re-sources and Environment, detailing a number of articles of the

Government’s Degree No. 40/2019/NĐ-CP dated 13/05/2019, amending and supplementing a number of articles of degrees detail-ing and guiding the implementation of the Law on Environmental Protection and the regulation on management of environmental mon-itoring activities; issued on 31/12/2019; effective on 15/02/2020.

5 Circular No. 55/2019/TT-BGTVT of the Ministry of Transport on regulating the list of certificates and documents of ships; pub-

lic service ships, submarines, floating docks, FSO/FPSO, Jack-up drilling rigs; issued on 31/12/2019; effective on 01/03/2020.

6 Circular No. 32/2019/TT-BCT of the Ministry of Industry and Trade on promulgating the National Technical Regulation on

safety in production, testing, pre-acceptance test, preservation, trans-portation, use and destruction of materials industrial explosions and preservation of explosive precursors; issued on 21/11/2019; effective on 01/07/2020.

7Circular No. 43/2019/TT-BGTVT of the Ministry of Transport on amending and supplementing a number of articles of the Circular

No. 17/2017/TT-BGTVT dated 31/05/2017 regulating conditions for foreign crewmen working on Vietnamese marine ships; issued on 07/11/2017; effective on 01/08/2020.

8 Consolidated document No. 13/VBHN-VPQH of the National Assembly on the Law of Environmental Protection; issued on

04/07/2019.

9 Consolidated document No. 03/VBHN-BXD of the Ministry of Construction on labor safety management in construction; issued

on 05/09/2019.

10 Consolidated document No. 09/VBHN-BTNMT of the Minis-try of Natural Resources and Environment on waste and scrap

management; issued on 25/10/2019.

HSEQ LEGAL UPDATE TOTAL

INCIDENTS 14 LOST-TIME INCIDENT 1

Oil/Chemical Spills 0

FIRST-AID CASE 6

PV DRILLING I (2); PV DRILLING III (3); PVD VI (1);

NEARMISS 1

PVD DRILLING I (1); PV DRILLING III (4); PVD DRILLING VI (1).

PROPERTY DAMAGE 6

RECORDABLE INCIDENT0 (MTC/RWTC)

8

MANHOURS

ENVIRONMENT

213 (ton) Solid waste

165 (ton) Hazardous waste

10 130 (m3) Waste water

Electricity consumption Water consumption

4 494 159 Total hours

1 303 712 Office

1 165 454 Base/Workshop

OCCUPATIONAL HEALTH & SAFETY

6 231 HSEQ Training

80 040 PVD Card HSEQ Award

2 896 Award value (mil VND)

2 168

16 661 (m3) 3 158 920(kWh)

2 024 993 Offshore

PV DRILLING I (1);

PV DRILLING III (1)

Page 9: No 27 PV DRILLING’s HSEQ Quarter 4 2019 NEWSLETTER Newsletter No.27 (English).final.pdfPV DRILLING II. On December 02, 2019, at Sapura OMV’s HSSE Forum held in Ma-laysia, the Jack-up

PV DRILLING I

NGO VAN TAO - Mechanic

Card Winner

KANA AWI – Head Roustabout

Card Winner MOUD AZIZEI - Floorman

Card Winner WILSON - Floorman

Card Winner BIN WALIG - Steward

Card Winner

PV DRILLING II

NGUYEN DUY LONG– Roustabout

Card Winner

TRAN NGOC THUY - Crane Opr.

Card Winner

DO MINH THANH - Derrickman

Card Winner

TRAN NGOC KHANH - Head Roustabout

Card Winner

DINH XUAN THIEM - Asst. CO

Card Winner

PVD CARD PROGRAM PVD CARD WINNER

Quarter 4 - 2019

PV DRILLING VI

TRAN QUANG KHAI - Derrickman

Card Winner

ALAN - Welder

Card Winner

DENNIS - Head Roustabout

Card Winner

RAY MARVIN - Roustabout

Card Winner

NGUYEN TRUNG HAU - Utility

Card Winner

TRAN QUOC QUAN - Head RA

Card Winner

PV DRILLING III

JACOB - Deckpusher Card Winner

HAZHAN - Chief Cook

Card Winner

MOHD BIN MAT– Roustabout

Card Winner

RODNEY – WD Card Winner

MAJID - Floorman

Card Winner

CHAO- Asst. Driller

Card Winner

NGUYEN VAN DAI - Pumpman

Card Winner