Top Banner
NFI kits Standard distribution Improved distribution - Relevance to the sector’s life-saving, emergency mandate, and conformity with international standards; - Appropriateness across North-East Nigeria, in a wide variety of contexts; - Logistics and cost considerations, given the scale of need. e standard kit is light, mobile and easily transported – both for humanitarians and for the people who receive the assistance. e items meet the core life-saving needs most e improved kit includes additional items for greater dignity and protection with the associated higher logistics cost. e standard kit costs USD 90 e improved kit costs USD 150 3 x Sleeping Mats 3 x Blankets 1 x Jerry Can (10lts) 2 x Jerry Can (20lts) 7 bars x Laundry detergent 7 x Bath Soap 150 x NaDCC Disinfection Tablets Kitchen set 1 x Cooking Pot (7l) 1 x Cooking Pot (5l) 6 x Plates 2/6 x Cup (0,3l) 2/0 x Cup (0,4) 2/0 x Cup (0,5l) 6 x Table Spoon 1 x Kitchen Knife 3 x Synthetic Mat 3 x Blanket 2 x Mosquito Net 2 x Foldable Mattress 5 x Sachets of Aqua tabs (50 pcs) 2 x 2L Kettle 1 x 10L Basin 7 x Laundry Soaps 7 x Bathing Soaps 2 x Sanitary Pads 2 x 10L Jerry Can 1 x 20L Jerry Can 1 x Solar Lamp Kitchen set 2 x 10L Bucket 3 x Cooking Pots (7”5” litters) 6 x Stainless Plates 6 x Stainless Cups 6 x Table Spoons 1 x Kitchen Knife 1 x Serving Spoon NFI kit contents were harmonized by the sector in June 2016. Kit contents were selected for a household of 7, based on: Available post-distribution monitoring informed the selection. NIGERIA
5

NFI kits - HumanitarianResponse...Compacted Earth View A A GL GL View B B 0,5 1 2 1 0,5 3 1 0,3 Right SIDE Door SIDE View Foundation Plan 0,7 0,3 1 1 1 1 1.2 1.2 1.2 1.2 1.2 1.2 Temporary

Jun 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NFI kits - HumanitarianResponse...Compacted Earth View A A GL GL View B B 0,5 1 2 1 0,5 3 1 0,3 Right SIDE Door SIDE View Foundation Plan 0,7 0,3 1 1 1 1 1.2 1.2 1.2 1.2 1.2 1.2 Temporary

NFI kits

Standard distribution Improved distribution

- Relevance to the sector’s life-saving, emergency mandate, and conformity with international standards;

- Appropriateness across North-East Nigeria, in a wide variety of contexts;

- Logistics and cost considerations, given the scale of need.

The standard kit is light, mobile and easily transported – both for humanitarians and for the people who receive the assistance. The items meet the core life-saving needs most

The improved kit includes additional items for greater dignity and protection with the associated higher logistics cost.

• The standard kit costs USD 90 • The improved kit costs USD 150

• 3 x Sleeping Mats

• 3 x Blankets

• 1 x Jerry Can (10lts)

• 2 x Jerry Can (20lts)

• 7 bars x Laundry detergent

• 7 x Bath Soap

• 150 x NaDCC Disinfection Tablets

Kitchen set

• 1 x Cooking Pot (7l)

• 1 x Cooking Pot (5l)

• 6 x Plates

• 2/6 x Cup (0,3l)

• 2/0 x Cup (0,4)

• 2/0 x Cup (0,5l)

• 6 x Table Spoon

• 1 x Kitchen Knife

• 3 x Synthetic Mat

• 3 x Blanket

• 2 x Mosquito Net

• 2 x Foldable Mattress

• 5 x Sachets of Aqua tabs (50 pcs)

• 2 x 2L Kettle

• 1 x 10L Basin

• 7 x Laundry Soaps

• 7 x Bathing Soaps

• 2 x Sanitary Pads

• 2 x 10L Jerry Can

• 1 x 20L Jerry Can

• 1 x Solar Lamp

Kitchen set

• 2 x 10L Bucket

• 3 x Cooking Pots (7”5” litters)

• 6 x Stainless Plates

• 6 x Stainless Cups

• 6 x Table Spoons

• 1 x Kitchen Knife

• 1 x Serving Spoon

NFI kit contents were harmonized by the sector in June 2016. Kit contents were selected for a household of 7, based on:

Available post-distribution monitoring informed the selection.

NIGERIA

Page 2: NFI kits - HumanitarianResponse...Compacted Earth View A A GL GL View B B 0,5 1 2 1 0,5 3 1 0,3 Right SIDE Door SIDE View Foundation Plan 0,7 0,3 1 1 1 1 1.2 1.2 1.2 1.2 1.2 1.2 Temporary

Emergency shelter kitEmergency shelter kit contents were harmonized by the sector in June 2016.

The kit is designed for distribution to relieve immediate, life-saving shelter need for new or secondary displacement, or people on the

move – to tide people over until a better solution can be found.

Light and mobile kit that can be easily transported and delivered quickly, at scale, as well as relatively easily carried by people to their

next destinations if they are on the move.

The kit includes 2 tarpaulins, 6 poles for basic framing and an assortment of fixings and tools

The kit has an intended life-span of 3 – 6 months.

The kit costs USD 65.

Unit Cost(NGN)

Total Cost(NGN)

Unit Cost(USD)

Total Cost(USD)

1 Platic Sheeting (4m x 5m) with holes on 4 sides at 1m intervals aluminium reinforced, labeled with IOM Logo Pcs 2.00 6,100.00 12,200.00 19.37 38.73

2 Rope (10mm diameter) Mtr 20.00 55.00 1,100.00 0.17 3.49

3 Tie/Galvanized Wire (1.5mm diameter) Mtr 25.00 60.00 1,500.00 0.19 4.76

4 Umbrella nails (75x3.6mm, head diameter 20mm, thickness 2mm) Packet 0.50 1,750.00 875.00 5.56 2.78

5 Iron Nails 3" Lbs 2.00 200.00 400.00 0.63 1.27

6 Shovels (round pt with Y handle presses carbon steel) Pcs 0.20 1,500.00 300.00 4.76 0.95

7 Claw hammer (high carbon steel head with claw and flat side) Pcs 0.20 1,100.00 220.00 3.49 0.70

8 Handsaw (18” – 20”) Pcs 0.20 1,000.00 200.00 3.17 0.63

9 Lumber poles (2x4 hardwood timber; Obeche) Pcs 6.00 650.00 3,900.00 2.06 12.38

Total 20,695.00 65.70

No. Description Unit Quantity

Bill of Quantities - Emergency Shelter Kit

Estimated Cost (NGN) Estimated Cost (USD)

Plastic Sheeting

Iron nails

Timber

Shovel

Rope

Hand saw

Tie/Galanized Wire Umberella nails

Claw hammer

NIGERIA

Page 3: NFI kits - HumanitarianResponse...Compacted Earth View A A GL GL View B B 0,5 1 2 1 0,5 3 1 0,3 Right SIDE Door SIDE View Foundation Plan 0,7 0,3 1 1 1 1 1.2 1.2 1.2 1.2 1.2 1.2 Temporary

Unit Cost(NGN)

Total Cost(NGN)

Unit Cost(USD)

Total Cost(USD)

1 Platic Sheeting (4m x 5m) with holes on 4 sides at 1m intervals aluminium reinforced, labeled with IOM Logo Pcs 3.05 6,100.00 18,605.00 19.37 59.07

2 Obeche Wooden poles, 2x4 inches - 280 cm length Pcs 2.00 600.00 1,200.00 1.90 3.813 Wooden poles, 2x4 inches - 210 cm length Pcs 6.00 600.00 3,600.00 1.90 11.434 Wooden poles, 2x3 inches - 250 cm length Pcs 4.00 400.00 1,600.00 1.27 5.085 Wooden poles, 2x3 inches - 250 cm length Pcs 4.00 400.00 1,600.00 1.27 5.086 Wooden poles, 2x3 inches - 180 cm length Pcs 4.00 400.00 1,600.00 1.27 5.087 Wooden poles, 2x3 inches - 240 cm length Pcs 2.00 400.00 800.00 1.27 2.548 Wooden poles, 2x3 inches - 220 cm length Pcs 10.00 400.00 4,000.00 1.27 12.709 Wooden poles, 2x4 inches - 190 cm length Pcs 2.00 600.00 1,200.00 1.90 3.8110 Wooden poles, 2x4 inches - 100 cm length Pcs 3.00 140.00 420.00 0.44 1.3311 Wooden poles, 2x4 inches - 260 cm length Pcs 2.00 600.00 1,200.00 1.90 3.8112 Wooden poles, 2x4 inches - 50 cm length Pcs 18.00 0.00 0.00 0.00 0.0013 Wooden poles, 2x3 inches - 135 cm length Pcs 2.00 140.00 280.00 0.44 0.8914 Nails - 3 inch Lbs 2.00 260.00 520.00 0.83 1.6515 Cap nails Packet 1.00 1,750.00 1,750.00 5.56 5.5616 Rope 10 mm th. - 30m length Pcs 1.00 1,600.00 1,600.00 5.08 5.0817 Hinges Pair 3.00 220.00 660.00 0.70 2.1018 Claw hammer Pcs 1.00 1,100.00 1,100.00 3.49 3.4919 Hand saw Pcs 1.00 1,000.00 1,000.00 3.17 3.1720 Showel Pcs 1.00 1,500.00 1,500.00 4.76 4.7621 PVC Pail 12 Pcs 1.00 600.00 600.00 1.90 1.9022 Packing bags Pcs 1.00 400.00 400.00 1.27 1.2724 Labour LS 1.00 3,500.00 3,500.00 11.11 11.1125 Transport LS 1.00 1,000.00 1,000.00 3.17 3.17

Total 49,735.00 157.89

Bill of Quantities - Emergency Shelter (Bama Type)

No. Description Unit QuantityEstimated Cost (NGN) Estimated Cost (USD)

Emergency Shelter _ Bama modelThe Bama shelter was agreed by the sector in mid-2016, when Bama was first accessed by the international response, to adequately cover shelter need at scale, and quickly.

The emergency shelter is designed for peri-urban and rural areas outside of Maiduguri Metropolitan Area, with more difficult and unstable

access, and associated higher logistics cost – but where people are expected to remain for some time.

As it is relatively space efficient, it is appropriate for settlements with limited space and large flux in numbers.

The emergency shelter consists of a robust but basic frame with requisite fixings and tools, covered by 3 tarpaulins.

Construction should be overseen throughout the project, ideally beneficiary or community driven construction, with adequate training and

monitoring. However, if time and conditions do not allow for the requisite level of community engagement and mobilisation, the shelter

construction can and has been contractor driven.

The emergency shelter has an intended life-span of 1 year

(though plastic sheeting may need more frequent replacement depending on conditions).

The emergency shelter has a cost band of USD 150 - 200.

NIGERIA

Page 4: NFI kits - HumanitarianResponse...Compacted Earth View A A GL GL View B B 0,5 1 2 1 0,5 3 1 0,3 Right SIDE Door SIDE View Foundation Plan 0,7 0,3 1 1 1 1 1.2 1.2 1.2 1.2 1.2 1.2 Temporary

Foundation Plan

0,7 0,3

1 1 1 1

1.2

1.2

1.2

1.2

1.2

1.2

GL

View B B

0,5

31

0,3

Right SIDE

A A

BB

1 1 1 1

Plan View

Temporary Shelter Design:2 Small Families with partition

Door SIDE View

View A A

GL

0,5

12

1

Mud block (optional)

0,3

side drain

Compacted Earth

Foundation Plan

0,7 0,3

1 1 1 1

1.2

1.2

1.2

1.2

1.2

1.2

GL

View B B

0,5

31

0,3

Right SIDE

A A

BB

1 1 1 1

Plan View

Temporary Shelter Design:2 Small Families with partition

Door SIDE View

View A A

GL

0,5

12

1

Mud block (optional)

0,3

side drain

Compacted Earth

Foundation Plan

0,7 0,3

1 1 1 1

1.2

1.2

1.2

1.2

1.2

1.2

GL

View B B

0,5

31

0,3

Right SIDE

A A

BB

1 1 1 1

Plan View

Temporary Shelter Design:2 Small Families with partition

Door SIDE View

View A A

GL

0,5

12

1

Mud block (optional)

0,3

side drain

Compacted Earth

View A A

GL

GL

View B B

0,5

12

1

0,5

31

0,3

Right SIDE

Door SIDE View

Foundation Plan

0,7 0,3

1 1 1 1

1.2

1.2

1.2

1.2

1.2

1.2

Temporary Shelter Design: Large Family with Partition

Mud block (optional)

0,3

side drain

Roofing Sheet, CGI (zinc) Mosquito net

A A

BB

1 1 1 1

Plan View

Compacted Earth

7,2M

4M

Unit Cost(NGN)

Total Cost(NGN)

Unit Cost(USD)

Total Cost(USD)

1 4”X2”X12’ Obeche Pcs 25.00 715.00 17,875.00 2.27 56.752 3"X2"X12' Oro Pcs 64.00 495.00 31,680.00 1.57 100.573 2"X2"X12' Oro Pcs 20.00 330.00 6,600.00 1.05 20.954 1"X4"X12' Oro Pcs 8.00 660.00 5,280.00 2.10 16.765 Battens 12' Bundle 2.00 3,500.00 7,000.00 11.11 22.226 Galvanized iron (zinc) 1'X10'X0.15mm (ridge cap) Pcs 2.00 800.00 1,600.00 2.54 5.087 Galvanized iron (zinc) Roofing sheet 2'X8'X0.15mm Bundle 2.00 24,000.00 48,000.00 76.19 152.398 Mosquito net (33MX1.2M) Roll 0.25 10,450.00 2,612.50 33.18 8.299 Nails 4" Lbs. 19.00 220.00 4,180.00 0.70 13.2710 Nails 3" Lbs. 10.00 220.00 2,200.00 0.70 6.9811 Nails 2" Lbs. 5.00 220.00 1,100.00 0.70 3.4912 Nails 1 1/2" Lbs. 4.00 250.00 1,000.00 0.79 3.1713 Cap nails Packet 2.00 1,870.00 3,740.00 5.94 11.8714 Hinges 4"X4" Pair 2.00 165.00 330.00 0.52 1.0515 Hinges 3"X3" Pair 4.00 110.00 440.00 0.35 1.4016 Sand for masonary work Cu M 0.60 1,265.00 759.00 4.02 2.4117 Cement brick 18'X6"X6' Pcs 45.00 132.00 5,940.00 0.42 18.8618 Cement 50 kg.Bag Bag 2.00 2,640.00 5,280.00 8.38 16.7619 3/4" Matels for concreet Cu M 0.60 16,500.00 9,900.00 52.38 31.4320 4 Lts cans Can 1.00 3,850.00 3,850.00 12.22 12.2221 Tarpaulin Pcs 6.00 6,930.00 41,580.00 22.00 132.0022 Wind security (Langa langa) - 1.5m length Pcs 4.00 220.00 880.00 0.70 2.7923 Water and miscellanies LS 1.00 3,850.00 3,850.00 12.22 12.2224 Backfilling sand truck 2.00 13,200.00 26,400.00 41.91 83.8125 Labour charges Job 1.00 34,000.00 34,000.00 107.94 107.94

Total 266,076.50 844.71

Bill of Quantities - Reinforced Emergency Shelter (Bakassi Type)

No. Description Unit QuantityEstimated Cost (NGN) Estimated Cost (USD)

Transitional Shelter _ Bakasi modelThe Bakasi shelter was agreed by the sector in late 2015. The design was originally conceived for a relocation project on a clean site (Bakasi Camp), and to inform a wider drive for

raising and harmonizing shelter standards across Maiduguri’s camps.

The reinforced shelter is designed for use in the urban areas of the Maiduguri Metropolitan Area, where there is easy and stable access, and

where people are expected to remain for some time.

The shelter has a robust frame with doors and windows, requisite fixings and tools, concrete foundations and CGI roofing and tarpaulin

wall covering.

Construction should be overseen throughout the project, ideally beneficiary or community driven construction, with adequate training and

monitoring. However, if time and conditions do not allow for the requisite level of community engagement and mobilisation, the shelter

construction can and has been contractor driven.

The shelter has an intended life-span of 2 - 3 years (with maintenance and periodic replacement of walls, which are tarpaulin).

The reinforced shelter has a cost band of USD 800 - 950.

Key design considerations included suitability for urban environment; climate suitability for the heat and the rains; durability.

NIGERIA

Page 5: NFI kits - HumanitarianResponse...Compacted Earth View A A GL GL View B B 0,5 1 2 1 0,5 3 1 0,3 Right SIDE Door SIDE View Foundation Plan 0,7 0,3 1 1 1 1 1.2 1.2 1.2 1.2 1.2 1.2 Temporary

Transitional shelter kit

Unit Cost(NGN)

Total Cost(NGN)

Unit Cost(USD)

Total Cost(USD)

Shelter Repair Kit:1 CGI Sheet (6 feet long - 0.35mm thick) Bundle 2.00 26,450.00 52,900.00 83.97 167.942 GI Plain sheet for ridge cover (12 feet x 0.35mm thick) Pcs 3.00 920.00 2,760.00 2.92 8.763 2"x3"x12' Treated Timber Pcs 25.00 1,035.00 25,875.00 3.29 82.154 2"x4"x12' Treated Timber Pcs 25.00 1,150.00 28,750.00 3.65 91.276 4"x4"x12' Treated Timber Pcs 4.00 4,025.00 16,100.00 12.78 51.116 Umbrella Nails for CGI sheet (75x3.6mm) Pckt 2.00 2,070.00 4,140.00 6.57 13.147 Nails for timber 3 inch (75x3.6mm) Kg 2.00 345.00 690.00 1.10 2.198 Nails for timber 4 inch (98x3.6mm) Kg 2.00 345.00 690.00 1.10 2.199 Langa langa Pcs 15.00 172.50 2,587.50 0.55 8.2110 Cement Bag 4.00 3,105.00 12,420.00 9.86 39.43

Tool Kit (Shared for a community of 5 households, shared between fewer in dispersed settlements):1 Shovel Pcs 0.20 1,725.00 345.00 5.48 1.102 Hand saw Pcs 0.20 1,150.00 230.00 3.65 0.733 Claw hammer Pcs 0.20 1,265.00 253.00 4.02 0.804 Pliers Pcs 0.20 600.00 120.00 1.90 0.385 PVC Pail Pcs 0.20 724.50 144.90 2.30 0.46

Cash Grant:

1 Each HH receiving cash grants to be used where its most needed LS 1.00 30,000.00 30,000.00 95.24 95.24

2 Transaction fee LS 5% 1,500.00 1,500.00 4.76 4.76Total 179,505.40 569.88

Bill of Quantities - Return Shelter Kit

No. Description Unit QuantityEstimated Cost (NGN) Estimated Cost (USD)

Timber

Nails

Shovel

GI Plain sheet, ridge cover

Langa langa (Steel strap)

Hand saw

CGI Sheet Cash Grant

Cement

Pilers

PVC Pail

Claw hammer

The transitional shelter kit is still under consideration as a solution for

Rebuilding homes that have sustained major damage, or

Extending available shelter in host community settings.

It should provide sufficient materials for a substantial beginning, which can be built upon, including also a

small cash grant to allow some flexibility for people to supplement according to their specific requirements.

The transitional shelter kit should be accompanied with strong community engagement, including technical

support where required and monitoring to ensure adequate and safe shelter.

Close collaboration with the Protection Sector should ensure Housing, Land and Property support.

The kit has a cost band of USD 400 – 600.

NIGERIA