Top Banner

of 8

New Enhancements for the 9FA Gas Turbine

Apr 06, 2018

Download

Documents

Prakash Chinnii
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    1/8

    GE Energy

    New enhancements for

    the 9FA Gas Turbine

    Delivering higher perormance and greater operational fexibility

  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    2/8

    2 9FA NEW ENHANCEMENTS

    GE was the frst to:

    introduceF-classtechnologytothe

    industry

    record100%reliabilityoranF-class

    turbineoveran108-dayperiodo

    continuousoperation

    reach99.4%reliabilityonanF-class

    turbine

    record28millionfredhoursonan

    F-classturbineinworldwideservice

    shipmorethan1,000F-class

    turbines

    reach55%thermalefciencyin

    F-classcommercialcombinedcycle

    operation

    achieve40%loadwithsingledigit

    NOxandCOonanF-classturbine

    constructanF-classturbineoran

    IGCC application

    GEEnergysF-classgasturbinessetthestandard.

  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    3/8

    Meetingcustomerneeds

    9FA NEW ENHANCEMENTS 3

    Customersarecontinuallyseekingwaystodelivergreater

    operationalexibilityandhigherlevelsoperormance,

    availabilityandreliabilitywhileminimizingoperatingcosts

    andmeetingincreasinglyrigorousenvironmentalcriteria.By

    accumulatingdataromtheworldslargestFgasturbineeet

    andusingourperormancedatabaseromGEsmonitoring

    anddiagnosticcenter,GEengineersarecontinuallyfnding

    newwaystoprovideenhancedperormanceandoperational

    exibilityortodayandtomorrow.

  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    4/8

    Improved Perormance

    GEEnergyhasengineeredaCoolingOptimizationPackage

    thatisnowavailableasaretroftpackageor9FA.03models

    andasanoptionalpackageonallnew9FAs.Providing

    improvedheatrateandoutput,thispackagemaintainsthe

    9FAsunmatchedlevelsoreliabilityandavailability.Benefts

    otheCoolingOptimizationPackagetranslateintolower

    operatingcostsandimprovedrevenuesor9FAusersinboth

    simple-cycleandcombined-cycleoperation.

    TheCoolingOptimizationPackageincorporates

    GEsadvancedtechnologywhichisbasedonakeen

    understandingothephysicsotheentire9FAgasturbine

    coolingsystem.GEengineersromaroundtheworldocused

    ontheturbinesoperationalenvironment,whichincludes

    ambientconditions,loadrangesandstartsequencing,to

    developthisnewpackage.Thepackageoerscustomers

    improvedoutputandefciencybymoreeectivelymanaging

    thetemperatureandvolumeocoolingairow,minimizing

    pressuredropsanddiminishingtheeectoturbine

    clearances.

    ReducedEmissionsEconomicandregulatoryrequirementsareplacinggreater

    pressureontheoperationogasturbines.Higheruelpricesaredrivingagreatercyclicoperationandincreasingemission

    requirementsarepressuringtheamountotimeaturbine

    mayoperate.

    Sinceitsfrstinstallationin2006theDLN2.6+Combustion

    SystemromGEEnergyhasprovidedcustomersincreased

    operationalexibilityatareducedcostooperation.This

    enhancedsystembuildsupondecadesoGEcombustion

    Advancingtechnologyoeringadditionalcustomervalue

    technologyleadership.Withmorethan28millionF-class

    hoursosuccessulDLNoperationandoverfteenmillion

    hoursatorbelow9ppmNOx,GEhastheexperience

    andtechnologyleadershiptohelpmeetcustomer

    emissionobjectives.GEsDLN2.6+CombustionSystemis

    ecomaginationcertifedandisenabledthroughGEsMark*

    VIecontrolplatorm.

    TheDLN2.6+CombustionSystemoerstheollowing

    customerbeneftsandeatures.

    Lowergasturbineemissionscapableo20mg/Nm3 or

    bothNOx(@15%O2) and CO

    Improvedturndowncapabilitydownto35%oullload

    lowersuelcostsandreducescyclingrequirements

    duringo-peakhours,resultinginewerstartsandaster

    dispatchcapabilityunitsremainonlineandullload

    capacitycanbereachedmorequickly

    Enhanceduelexibilityorvaryinguelcompositions

    IncreasedrevenuepotentialromdevelopingNOx credit

    tradingmarkets

    Improvedsystemavailabilitythrough24,000hourextended

    combustioninspectioninterval

    TheDLN2.6+CombustionSystemcanbeinstalledata

    combustion,hotgaspathormajorinspection.Continuous

    dynamicsmonitoringandremoteDLNtuningareavailable

    asanadditionalpackagebeneft/eature.Thissystemisalso

    availableasanoptiononnewunits.

    IncreasedOperationalFlexibility

    Powergenerationindustrychangesaredrivingtheneedormoreoperationalexibility.Varyingbusinessmodel

    operationalproflesaretransitioningromtraditional

    baseloadoperationtomid/cyclic-operation,withnearly50%

    ooperatinghours

  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    5/8

    9FA NEW ENHANCEMENTS 5

    OpFlexExtendedTurndownprovidinglowemissionoperationalexibility

    TheOpFlexExtendedTurndownPackageextendsthe

    operatingrangeatwhichemissionslevelscanbemaintained

    atlowerloadlevelsbyincreasinggasturbineturndown

    capability.Byreducingtheminimumturndownlevel,

    operatorsareabletoreducetheamountouelconsumed

    duringo-peakhoursandavoidshutdown/start-upcosts.

    Thepackagealsominimizesmaintenancerequirements

    associatedwithshutdownsandallowsthecustomerto

    respondtoshortdemandsorelectricity.

    Benefts

    Reduceduelconsumptiontoremainon-lineduringo-

    peakhoursduetolowerturndownlevel

    Increasedrevenueresultingromimproveddispatch

    prioritybystayingonlineandeliminatingstartupsand

    shutdowns

    Lowergreenhousegasemissionsduetoreduceduel

    consumption

    Increasedpotentialospinningreservecredits

    Minimizedmaintenanceassociatedwithcyclicoperation

    OpFlexAutoTunereal-timetuningandboundarycontrolorgreaterfexibility

    Asuelavailabilityandvariabilitybecomesmore

    commonplace,customerswilllooktomoreexiblesolutions.

    OpFlexAutoTune,GEslatestoperationalexibility

    enhancement,minimizestheneedorseasonalcombustor

    tuninginordertomaintainemissionscompliance.OpFlex

    AutoTunewillprovidecustomerswiththeabilitytooperate

    theirunitswithintheircurrentuelspecifcationwithoutthe

    needormanualcombustorretuning.Thisenhancement

    usesthenext-generationoGEsModelBasedControl.The

    newControlSystemprovidesmorestabilizedcombustion

    characteristicssocustomerscancapitalizeonawiderangeoambientconditionsanduelvariationswithoutanysystem

    instabilities,maintenanceimpactsorincreaseinemissions.

    Thisenhancementprovidestheollowingkeybenefts.

    Eliminatescombustionretuningduetochangesinambient

    conditionsanduelvariation

    Enablescontinuousreliableoperationotheunitwithupto

    +/-7.5%variationinmodifedWobbeindex

    Removesunplannedtuning,combustiondynamicandnon-

    compliance NOxandCOevents

    Increasesreliabilitythroughimproveddynamicsstability

    anduelmarketleverage

    Reducesuelcostsbyeliminatingmanualtuning

    Enhancesturbineperormancebymaintainingfring

    temperaturetarget

    Improvesconfdencethatturbineoperationcanbe

    maintainedwithinemissionlimits

    Increasesuelsupplyexibilityleadingtolowernegotiated

    uelprices

    Applicability

    OpFlexAutoTuneisorGE9FAgasturbineswithDLN2.6+

    combustors,MarkVeorVIControlSystemswithCombustion

    DynamicsMonitoringSystems.

    20 mg/Nm3

    Baseload

    50%GT Load

    40%GT Load

    35%GT LoadOpFlex*

    ExtendedTurndown

    30 mg/Nm3

    9FA

    30 mg/Nm3

    to50 mg/Nm3

    Baseload

    38%GT Load

    9FB

  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    6/8

    6 9FANEWENHANCEMENTS

    GEEnergyswiderangeoexiblepowergeneration

    applicationsorthe9FAgasturbineincludecombined-cycle,

    cogenerationandsimple-cyclepeakinginbothcyclicand

    baseloadoperationusingawiderangeouels.

    IWPPwaterdesalination

    Aluminumenergyorsmelters

    Refneriesuseoprocessgasandaregas

    orO&Gupstream

    DistrictHeatinguseoCHP(combinedheat&power)

    SteeluseoblastgasorCorexgas

    PulpandPapermanuacturingprocess

    9FAApplicationsPoweringmorethanthegrid

    9FA eet 200+ units sold, 170+ inoperation in more than 25 countriesDataasoApril2009

    More than 7 million fred hours and

    74,000 eet startsDataasoApril2009

    GE is a leader in industrial

    application experience

    supporting alternate fuel choices and

    enabling customer sel generation

    GT Equipment Reliability(July 07-June 08)

    Served 2.3 daysmore per year of

    required operation

    Available 8 daysmore per yearGT Equipment Availability

    (July 07-June 08)

    %

    %

    2007

    2007

    2Q08

    2Q08

    Systemreliabilityandavailabilityleadingtheindustry,maximizingcustomeroperationaltime

    Throughanindependentthirdpartydatasource,ORAP*

    indicatesthatGEsF-classcontinuestoleadF-technologygas

    turbinesinreliabilityandavailability.Thishighreliabilityand

    availabilityratetranslatestoincreasedoperabilityandreduc-

    tioninlie-cyclecostorourcustomers.

    Source:ORAP;Allrightsreserved:SPS

  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    7/8

    9FANEWENHANCEMENTS 7

  • 8/3/2019 New Enhancements for the 9FA Gas Turbine

    8/8

    2009GeneralElectricCompany.Allrightsreserved.

    GEA17570(05/09)

    Tolearnmoreaboutthisoering,contact

    yourGEEnergysalesrepresentativeorvisit

    www.ge-energy.com