Top Banner
Page 1 HUAWEI TECHNOLOGIES CO., LTD. Page 1 Drive Test KPI PRE-Drive Test Results POST-Drive Test Results PRE-Drive Test Results POST-Drive Test Results RSRP > -90 dBm (%) > -90 dBm (%) PRE-Avg POST-Avg 58.85% 56.47% -89.16 -89.06 SINR >12<=30 >12<=30 PRE-Avg POST-Avg 70.40% 71.21% 15.01 15.18 DL Throughput (HTTP) >10 Mbps (%) >10 Mbps (%) PRE-Avg POST-Avg 75.78% 89.01% 28.71Mbps 31.45Mbps Summary LTE Locked Mode PS Down Load State PRE-Drive Test POST-DRIVE TEST Status Count Count ERAB Success Ratio 73.17% (30/41) 62.5% (5/8) RRC Setup Success Ratio 97.29% (36/37) 100% (7/7) Intra-frequency HO Success Ratio (%) 100%(72/72 100%(71/71) Intra-frequency HO Time Delay Avg (ms) 15.49 15.54 Optimization Zone SIDAB
14

Network Performance Enhancement RF

Dec 17, 2015

Download

Documents

Zeeshan Zia

Network Performance Enhancement RF
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Presentation

Page 1Drive Test KPIPRE-Drive Test ResultsPOST-Drive Test Results PRE-Drive Test ResultsPOST-Drive Test Results RSRP> -90 dBm (%)> -90 dBm (%) PRE-Avg POST-Avg 58.85%56.47%-89.16-89.06SINR>121210 Mbps (%)>10 Mbps (%) PRE-Avg POST-Avg 75.78%89.01%28.71Mbps 31.45Mbps Summary LTE Locked ModePS Down Load StatePRE-Drive TestPOST-DRIVE TESTStatusCountCountERAB Success Ratio73.17% (30/41) 62.5% (5/8) RRC Setup Success Ratio97.29% (36/37)100% (7/7) Intra-frequency HO Success Ratio (%)100%(72/72 100%(71/71) Intra-frequency HO Time Delay Avg (ms)15.4915.54RF Optimization Zone SIDABPage #HUAWEI TECHNOLOGIES CO., LTD.1

Page 21RF Optimization Results_case zone SIDAB263ZONE : SIDABSITE : 5CELL : 14

45Page #HUAWEI TECHNOLOGIES CO., LTD.2

Page 3Case 1: MUSCAT_EXCH_4G Coverage Issue POST RSRP1PROBLEM DESCRIPTION : Weak coverage & SINR due to blocking by mountain at 310 deg & 270 deg and LTE site is not there.

PERMANENT SOLUTION: Need to plan new site co-located with existing 3G sites KALBOOH_3G and RIAM_PARK_3G.When new site is ON Air coverage will be improved in the effected area.

POST SINR1ZoneSite_Name LatitudeLongitudeDetailed_CategoryJustificationProgess RemarksSIDABKALBOOH_4G23.6202958.58492New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (40,160,300)SIDABRIAM_PARK_4G23.6204358.57732New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (25,120,320)

Page #HUAWEI TECHNOLOGIES CO., LTD.3

Page 4Case2: MUSCAT_2_4G Coverage Issue POST RSRP2PROBLEM DESCRIPTION : Weak coverage & SINR due to blocking by mountain at 220deg.UE going on no service mode because in this area no LTE site.

PERMANENT SOLUTION: Need to plan new site co-located with existing 3G sites MUSCAT_MOI_2_3G. When new site is ON Air coverage will come in the effected area.

POST SINR2ZoneSite_NameLatitudeLongitudeDetailed_CategoryJustificationProgess RemarksSIDABMUSCAT_MOI_2_4G23.6092758.5837New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (50,150,330)

Page #HUAWEI TECHNOLOGIES CO., LTD.4

Page 5Case3: SIDAB_VILLAGE2_4G Coverage Issue POST RSRPPROBLEM DESCRIPTION : No LTE site in this area UE going on no service mode due to blocking by mountain at 180, 150 & 210deg. PERMANENT SOLUTION: Need to plan new site co-located with existing 3G sites SIDAB_HILL_3G, HARAMIL_1_3G & SIDAB_GSM_3G. When new site is ON Air coverage will come in the effected area. area.

POST SINR33ZoneSite_Name LatitudeLongitudeDetailed_CategoryJustificationProgess RemarksSIDABSIDAB_HILL_4G23.594658.59711New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (0,170,250)SIDABHARAMIL_1_4G23.5940958.601838New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (85,165,300)SIDABSIDAB_GSM_4G23.591958.5919New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (40,260)Page #HUAWEI TECHNOLOGIES CO., LTD.5

Page 6Case4: SIDAB_VILLAGE2_4G Coverage Issue POST RSRPPROBLEM DESCRIPTION :

In this area no LTE site.UE going on no service mode.

PERMANENT SOLUTION:

Need to plan new site co-located with existing 3G sites MARINA_3G & HARAMIL_2_3G. When new site is ON Air coverage will be come in this effected areas.

POST SINR4ZoneSite_Name LatitudeLongitudeDetailed_CategoryJustificationProgess RemarksSIDABMARINA_4G23.5805958.606143New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (20,110,310)SIDABHARAMIL_2_4G23.5884158.600778New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (160,300)4Page #HUAWEI TECHNOLOGIES CO., LTD.6

Page 7Case5: AL_BUSTAN_2_4G Coverage Issue POST RSRPPROBLEM DESCRIPTION : Weak coverage & SINR due to blocking by mountain

PERMANENT SOLUTION: Need to plan new site co-located with existing 3G sites AL_BUSTAN_3G. When new site is ON Air coverage will be improved in the effected area.

POST SINR5ZoneSite_Name LatitudeLongitudeDetailed_CategoryJustificationProgess RemarksSIDABAL_BUSTAN_4G23.5657358.607306New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (330,90)5Page #HUAWEI TECHNOLOGIES CO., LTD.7

Page 8SIDAB Zones RSRP OverviewPRE RSRPPOST RSRPPage #HUAWEI TECHNOLOGIES CO., LTD.8

Page 9SIDAB Zones RSRP OverviewPRE RSRPPOST RSRPPage #HUAWEI TECHNOLOGIES CO., LTD.9

Page 10SIDAB Zones SINR OverviewPRE SINRPOST SINRPage #HUAWEI TECHNOLOGIES CO., LTD.10

Page 11SIDAB Zones SINR OverviewPRE SINRPOST SINRPage #HUAWEI TECHNOLOGIES CO., LTD.11

Page 12SIDAB Zones DL Throughput OverviewPRE DL THROUGHPUTPOST DL THROUGHPUTPage #HUAWEI TECHNOLOGIES CO., LTD.12

Page 13SIDAB Zones DL Throughput OverviewPRE DL THROUGHPUTPOST DL THROUGHPUTPage #HUAWEI TECHNOLOGIES CO., LTD.13Page 14RF Optimization Results_case zone SIDABRF requirement:ZoneSite Name LatitudeLongitudeDetailed_CategoryJustificationProgess RemarksSIDABAL_BUSTAN_4G23.5657358.60731New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (330,90)SIDABMARINA_4G23.5805958.60614New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (20,110,310)SIDABHARAMIL_2_4G23.5884158.60078New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (160,300)SIDABSIDAB_HILL_4G23.594658.59711New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (0,170,250)SIDABHARAMIL_1_4G23.5940958.60184New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (85,165,300)SIDABSIDAB_GSM_4G23.591958.5919New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (40,260)SIDABMUSCAT_MOI_2_4G 23.6092758.5837New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (50,150,330)SIDABKALBOOH_4G23.6202958.58492New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (40,160,300)SIDABRIAM_PARK_4G23.6204358.57732New SiteFor Coverage Enhancementto be finalized with OT planningAzimuth (25,120,320)Page #HUAWEI TECHNOLOGIES CO., LTD.14