Top Banner
NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) TRANSMISSION DIRECTORATE Electricity Transmission Expansion and Supply Improvement Project TAMAKOSHI – KATHMANDU 220/400 KV TRANSMISSION LINE PROJECT BIDDING DOCUMENT FOR Procurement of Plant for Barhabise – Kathmandu 400/220 kV and 132 kV Transmission Line (Design, Supply and Install) Single-Stage, Two-Envelope Bidding Procedure Issued on: …………………. Invitation for Bids No.: ICB-TD-TKTLP–073/74 - 01 ICB No.: ICB-TD-TKTLP–073/74 - 01 Employer: Nepal Electricity Authority Country: Nepal VOLUME –III OF III August 2016 Tamakoshi-Kathmandu 220/400 kV Transmission Line Project Transmission Directorate, NEA Training Center Complex Kharipati, Bhaktapur, Nepal Telephone: +977-1-6620016 Fax: +977-1-6620016
37

NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

Mar 29, 2018

Download

Documents

truongthuan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)

TRANSMISSION DIRECTORATE

Electricity Transmission Expansion and Supply Improvement

Project

TAMAKOSHI – KATHMANDU 220/400 KV TRANSMISSION LINE PROJECT

BIDDING DOCUMENT

FOR

Procurement of Plant for Barhabise – Kathmandu 400/220 kV and 132 kV Transmission Line (Design, Supply and Install)

Single-Stage, Two-Envelope

Bidding Procedure

Issued on: …………………. Invitation for Bids No.: ICB-TD-TKTLP–073/74 - 01 ICB No.: ICB-TD-TKTLP–073/74 - 01 Employer: Nepal Electricity Authority Country: Nepal

VOLUME –III OF III

August 2016

Contract.

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project Transmission Directorate, NEA Training Center Complex Kharipati, Bhaktapur, Nepal Telephone: +977-1-6620016 Fax: +977-1-6620016

Page 2: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 1 OF 10

Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad

FC: Foreign Currency LC: Local Currency

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

I 400 kV Quad Barhabise - Lapsephedi Transmission

Line

1.1Design, fabrication & supply of following types of

towers & tower extension parts complete with stubs,

step bolts, hangers, D-shackles, bolts & nuts etc but

excluding tower accessories such as danger plates,

number plates, phase plates, anti-climbing devices

1.1.1 Suspension Tower DA

a) Basic tower 42 Nos.

b) -4.5 m Leg Extension 6 Nos.

c) -3 m Leg Extension 4 Nos.

d) -1.5 m Leg Extension 7 Nos.

e) +/- 0 m Leg Extension 128 Nos.

f) +1.5 m Leg Extension 5 Nos.

g) +3 m Leg Extension 18 Nos.

h) +4.5 m Leg Extension 6 Nos.

i) +6 m Leg Extension 20 Nos.

Country of

origin

FCQuantity

Item

No.Item description

Estimated

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400kV Transmission Line Project

Unit

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV

Transmission Line

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Page 3: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 2 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

j) +7.5 m Leg Extension 10 Nos.

k) +9 m Leg Extension 24 Nos.

1.1.2 Tension Tower DB

a) Basic tower 31 Nos.

b) -4.5 m Leg Extension 4 Nos.

c) -3 m Leg Extension 3 Nos.

d) -1.5 m Leg Extension 5 Nos.

e) +/- 0 m Leg Extension 96 Nos.

f) +1.5 m Leg Extension 4 Nos.

g) +3 m Leg Extension 12 Nos.

h) +4.5 m Leg Extension 4 Nos.

i) +6 m Leg Extension 16 Nos.

j) +7.5 m Leg Extension 8 Nos.

k) +9 m Leg Extension 20 Nos.

1.1.3 Tension Tower DC

a) Basic tower 21 Nos.

b) -4.5 m Leg Extension 3 Nos.

c) -3 m Leg Extension 2 Nos.

d) -1.5 m Leg Extension 3 Nos.

e) +/- 0 m Leg Extension 64 Nos.

f) +1.5 m Leg Extension 3 Nos.

g) +3 m Leg Extension 9 Nos.

h) +4.5 m Leg Extension 3 Nos.

i) +6 m Leg Extension 10 Nos.

j) +7.5 m Leg Extension 5 Nos.

k) +9 m Leg Extension 12 Nos.

Page 4: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 3 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

1.1.4 Tension Tower DD

a) Basic tower 42 Nos.

b) -4.5 m Leg Extension 5 Nos.

c) -3 m Leg Extension 3 Nos.

d) -1.5 m Leg Extension 6 Nos.

e) +/- 0 m Leg Extension 126 Nos.

f) +1.5 m Leg Extension 4 Nos.

g) +3 m Leg Extension 14 Nos.

h) +4.5 m Leg Extension 5 Nos.

i) +6 m Leg Extension 18 Nos.

j) +7.5 m Leg Extension 9 Nos.

k) +9 m Leg Extension 16 Nos.

l) +18 m Leg Extension 12

m) +25 m Leg Extension 12 Nos.

1.1.5 Tension Tower DDS

a) Basic tower 2 Nos.

b) +9 m Leg Extension 4 Nos.

c) +35m Leg Extension 4 Nos.

2 Supply of Earthing of towers

i. Pipe Type 48 Nos.

ii. Counterpoise Type 90 Nos.

Page 5: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 4 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

3 Supply of following tower accessories

i. Danger Plate 138 Nos.

ii. Number Plate 138 Nos.

iii. Phase Plate ( Set of three) 276 Sets

iv. Circuit Plate(Set of two) 138 Sets

v. Anti climbimg device 138 Nos.

vi. Bird Guard (set of three) 84 Sets

4 Supply of following Line Materials

4.1 Conductor

i) ACSR MOOSE Conductor 1088 KM

ii) AACSR MOOSE Conductor 27 KM

4.2 GS Earthwire

i) 7/3.66mm Earthwire 47 KM

ii) AACSR Eartwire 1.2 KM

4.3 Insulators

Disc Insulators

(i) 120kN Disc Insulator 19125 Nos

(ii 160kN Disc Insulator 115200 Nos

(iii) 320kN Disc Insulator 1200 Nos

Page 6: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 5 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

4.4 Hardware Fittings

i) Double Suspension 'I' Insulator String ( Suitable for 2x25,

120 KN Type Disc Insulators)255 Sets

ii) Single Suspension Pilot Insulator String (suitable for 1x25,

120 KN Type Disc Insulators)255 Sets

iii) Quadruple Tension Insulator String (suitable for 4x25, 160

KN Type Disc Insulators)1152 Sets

iv) Quadruple Tension Insulator String (suitable for 4x23, 320

KN Type Disc Insulators)12 Sets

4.5 Conductor and Earthwire Accessories

i) Mid span compression joint for ACSR Moose 675 Nos

ii) Mid span compression joint for 7/3.66mm GS earthwire 26 Nos

iii) Repair Sleeve for ACSR Moose Conductor 203 Nos

iv) Flexible Copper Bond for 7/3.66mm GS Earthwire 469 Nos

v) Vibration Damper for for 7/3.66mm GS Earthwire 937 Nos

vi) Quadruple Bundle spacer damper for ACSR/AACSR

Moose Conductor5812 Nos

vii)

Quadruple Rigid Spacer for ACSR/AACSR Moose

Conductor1709 Nos

viii)

Earthwire suspension Clamp for 7/3.66mm GS Earthwire85 Nos

ix) Earthwire Tension Clamp for 7/3.66mm GS Earthwire 384 Nos

x) Mid span compression joint for AACSR Moose 17 Nos

xi) Mid span compression joint for AACSR earthwire 1 Nos

xii) Repair Sleeve for AACSR Moose Conductor 1 Nos

xiii) Flexible Copper Bond for AACSR Earthwire 4 Nos

xiv) Vibration Damper for AACSR Earthwire 8 Nos

xv) Earthwire Tension Clamp for AACSR Earthwire 4 Nos

Page 7: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 6 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

4.6 Fibre Cable & Accessories

4.6.1 OPGW cable & Accessories

i) 24 Fibre (DWSM) OPGW fibre optic cable 73 km

ii) Installation Hardware set for above 24 Fibre OPGW Fibre

Optic cabling including all cable fittings & accessories as

per below :

73 Sets

iii) Joint Box 25 No.

4.6.2 FODP

i) FODP 48F : Indoor Type, rack mounted with FCPC

coupling and pig tails (5 mtrs each). 5 No.

4.6.3 Fibre Optic approach cable

i) 24 Fibre (DWSM) 4 Km.

ii) Installation hardware set for above 24 Fibre, Fibre Optic

Approach Cable4 Set

4.7 Mandatory Spares of OPGW Cabling

4.7.1 OPGW cable & Accessoriesi) 24 Fibre (DWSM) OPGW fibre optic cable 5 Km.

ii) Installation Hardware set for above 24 Fibre OPGW Fibre

Optic cabling including all cable fittings & accessories as

per below :

5 Sets

iii) Joint Box (24 fibre) 3 No.

4.7.2 Fibre Optic approach cablei) 24 Fibre (DWSM) 2 Km.

ii) Installation hardware set for above 24 Fibre, Approach

Fibre Optic Cable2 Set

Page 8: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 7 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

II 132 kV Lapsephedi - Changunarayan & LILO

Transmission Line

1.1Design, fabrication & supply of following types of

towers & tower extension parts complete with stubs,

step bolts, hangers, D-shackles, bolts & nuts etc but

excluding tower accessories such as danger plates,

number plates, phase plates, anti-climbing devices

1.1.1 Suspension Tower DA

a) Basic tower 21 Nos.

b) -3 m Leg Extension 4 Nos.

c) -1.5 m Leg Extension 4 Nos.

d) +/- 0 m Leg Extension 72 Nos.

e) +1.5 m Leg Extension 4 Nos.

f) +3 m Leg Extension 8 Nos.

g) +4.5 m Leg Extension 2 Nos.

h) +6 m Leg Extension 8 Nos.

i) +7.5 m Leg Extension 2 Nos.

j) +9 m Leg Extension 8 Nos.

Page 9: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 8 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

1.1.2 Tension Tower DD

a) Basic tower 21 Nos.

b) -3 m Leg Extension 4 Nos.

c) -1.5 m Leg Extension 4 Nos.

d) +/- 0 m Leg Extension 72 Nos.

e) +1.5 m Leg Extension 4 Nos.

f) +3 m Leg Extension 10 Nos.

g) +4.5 m Leg Extension 2 Nos.

h) +6 m Leg Extension 10 Nos.

i) +7.5 m Leg Extension 2 Nos.

j) +9 m Leg Extension 12 Nos.

k) +18 m Leg Extension 4 Nos.

l) +25 m Leg Extension 4 Nos.

1.1.3 Suspension Tower QA Multi circuit

a) Basic tower 8 Nos.

b) +0 m Leg Extension 32 Nos.

1.1.4 Tension Tower QD Multi circuit

a) Basic tower 6 Nos.

b) +0 m Leg Extension 24 Nos.

2 Supply of Earthing of towers

i. Pipe Type 36 Nos.

ii. Counterpoise Type 20 Nos.

3 Supply of following tower accessories

i. Danger Plate 56 Nos.

ii. Number Plate 56 Nos.

Page 10: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 9 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

iii. Phase Plate ( Set of three) 140 Sets

iv. Circuit Plate(Set of two) 70 Sets

v. Anti climbimg device 56 Nos.

vi. Bird Guard (set of three) 74 Sets

4 Supply of following Line Materials

4.1 Conductor

i) ACSR BEAR Conductor 110 KM

4.2 GS Earthwire

i) 7/3.15mm Earthwire 0 KM

4.3 Insulators

Option-1: Disc Insulators

(i) 70 kN Disc Insulator 2250 Nos

(ii) 120 kN Disc Insulator 4554 Nos

4.4 Hardware Fittings

i) Single Suspension 'I' Insulator String ( Suitable for 1x10,

70 KN Disc Insulators )225 Sets

ii) Single Tension Insulator String (suitable for 1x11, 120 KN

Disc Insulators)388 Sets

iii) Double Tension Insulator String ( suitable for 2x11,120

KN Disc Insulators )13 Sets

Page 11: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 1 PAGE 10 OF 10

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

Country of

origin

FCQuantity

Item

No.Item description

Estimated

Unit

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

4.5 Conductor Accessories

i) Mid span compression joint for ACSR BEAR conductor 99 Nos

ii) Repair Sleeve for ACSR BEAR Conductor 40 Nos

iii) Vibration Damper for ACSR BEAR conductor 1273 Nos

TOTAL (Total of column 11 and 12 to be carried

forward to Schedule No. 5: Grand Summary)

Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.

#

* Strike-out whichever is not applicable.

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

3.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during

detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements.

Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.

2.) The Prices of equipments are inclusive of type test charges except towers, conductors and earthwires.

Page 12: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 2 PAGE 1 OF 7

All prices in local currency, NRsTotal Amount

(Excluding Taxes)VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11

I 400 kV Quad Barhabise - Lapsephedi Transmission Line

1.1Design, fabrication & supply of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices

1.1.1 Suspension Tower DAa) Basic tower 42 Nos.

b) -4.5 m Leg Extension 6 Nos.

c) -3 m Leg Extension 4 Nos.

d) -1.5 m Leg Extension 7 Nos.

e) +/- 0 m Leg Extension 128 Nos.

f) +1.5 m Leg Extension 5 Nos.

g) +3 m Leg Extension 18 Nos.

h) +4.5 m Leg Extension 6 Nos.

i) +6 m Leg Extension 20 Nos.

j) +7.5 m Leg Extension 10 Nos.

k) +9 m Leg Extension 24 Nos.

1.1.2 Tension Tower DBa) Basic tower 31 Nos.

b) -4.5 m Leg Extension 4 Nos.

c) -3 m Leg Extension 3 Nos.

d) -1.5 m Leg Extension 5 Nos.

e) +/- 0 m Leg Extension 96 Nos.

f) +1.5 m Leg Extension 4 Nos.

Item No. Item Description UnitQuantity

NEPAL ELECTRICITY AUTHORITY

TRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400kV Transmission Line Project

Schedule No. 2: Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal including Type Test Charges

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

Ex Faxtory Price (Excluding VAT)

Inland Transportation up to Site

Page 13: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 2 PAGE 2 OF 7

Total Amount (Excluding Taxes)

VAT and other taxes

Total Amount

Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11

Item No. Item Description UnitQuantityEx Faxtory Price (Excluding

VAT)Inland Transportation up to Site

g) +3 m Leg Extension 12 Nos.

h) +4.5 m Leg Extension 4 Nos.

i) +6 m Leg Extension 16 Nos.

j) +7.5 m Leg Extension 8 Nos.

k) +9 m Leg Extension 20 Nos.

1.1.3 Tension Tower DCa) Basic tower 21 Nos.

b) -4.5 m Leg Extension 3 Nos.

c) -3 m Leg Extension 2 Nos.

d) -1.5 m Leg Extension 3 Nos.

e) +/- 0 m Leg Extension 64 Nos.

f) +1.5 m Leg Extension 3 Nos.

g) +3 m Leg Extension 9 Nos.

h) +4.5 m Leg Extension 3 Nos.

i) +6 m Leg Extension 10 Nos.

j) +7.5 m Leg Extension 5 Nos.

k) +9 m Leg Extension 12 Nos.

1.1.4 Tension Tower DDa) Basic tower 42 Nos.

b) -4.5 m Leg Extension 5 Nos.

c) -3 m Leg Extension 3 Nos.

d) -1.5 m Leg Extension 6 Nos.

e) +/- 0 m Leg Extension 126 Nos.

f) +1.5 m Leg Extension 4 Nos.

g) +3 m Leg Extension 14 Nos.

h) +4.5 m Leg Extension 5 Nos.

i) +6 m Leg Extension 18 Nos.

j) +7.5 m Leg Extension 9 Nos.

k) +9 m Leg Extension 16 Nos.

l) +18 m Leg Extension 12

m) +25 m Leg Extension 12 Nos.

Page 14: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 2 PAGE 3 OF 7

Total Amount (Excluding Taxes)

VAT and other taxes

Total Amount

Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11

Item No. Item Description UnitQuantityEx Faxtory Price (Excluding

VAT)Inland Transportation up to Site

1.1.5 Tension Tower DDSa) Basic tower 2 Nos.

b) +9 m Leg Extension 4 Nos.

c) +35m Leg Extension 4 Nos.

2 Supply of Earthing of towersi. Pipe Type 48 Nos.

ii. Counterpoise Type 90 Nos.

3 Supply of following tower accessoriesi. Danger Plate 138 Nos.

ii. Number Plate 138 Nos.

iii. Phase Plate ( Set of three) 276 Sets

iv. Circuit Plate(Set of two) 138 Sets

v. Anti climbimg device 138 Nos.

vi. Bird Guard (set of three) 84 Sets

4 Supply of following Line Materials4.1 Conductori) ACSR MOOSE Conductor 1088 KM

ii) AACSR MOOSE Conductor 27 KM

4.2 GS Earthwirei) 7/3.66mm Earthwire 47 KM

ii) AACSR Eartwire 1.2 KM

4.3 InsulatorsDisc Insulators

(i) 120kN Disc Insulator 19125 Nos

(ii 160kN Disc Insulator 115200 Nos

(iii) 320kN Disc Insulator 1200 Nos

4.4 Hardware Fittingsi) Double Suspension 'I' Insulator String ( Suitable for

2x25, 120 KN Type Disc Insulators)255 Sets

ii) Single Suspension Pilot Insulator String (suitable for 1x25, 120 KN Type Disc Insulators)

255 Sets

Page 15: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 2 PAGE 4 OF 7

Total Amount (Excluding Taxes)

VAT and other taxes

Total Amount

Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11

Item No. Item Description UnitQuantityEx Faxtory Price (Excluding

VAT)Inland Transportation up to Site

iii) Quadruple Tension Insulator String (suitable for 4x25, 160 KN Type Disc Insulators)

1152 Sets

iv) Quadruple Tension Insulator String (suitable for 4x23, 320 KN Type Disc Insulators)

12 Sets

4.5 Conductor and Earthwire Accessoriesi) Mid span compression joint for ACSR Moose 675 Nos

ii) Mid span compression joint for 7/3.66mm GS earthwire

26 Nos

iii) Repair Sleeve for ACSR Moose Conductor 203 Nos

iv) Flexible Copper Bond for 7/3.66mm GS Earthwire 469 Nos

v) Vibration Damper for for 7/3.66mm GS Earthwire 937 Nos

vi) Quadruple Bundle spacer damper for ACSR/AACSR Moose Conductor

5812 Nos

vii)Quadruple Rigid Spacer for ACSR/AACSR Moose Conductor

1709 Nos

viii)Earthwire suspension Clamp for 7/3.66mm GS Earthwire

85 Nos

ix)Earthwire Tension Clamp for 7/3.66mm GS Earthwire

384 Nos

x) Mid span compression joint for AACSR Moose 17 Nos

xi) Mid span compression joint for AACSR earthwire 1 Nos

xii) Repair Sleeve for AACSR Moose Conductor 1 Nos

xiii) Flexible Copper Bond for AACSR Earthwire 4 Nos

xiv) Vibration Damper for AACSR Earthwire 8 Nos

xv) Earthwire Tension Clamp for AACSR Earthwire 4 Nos

4.6 Fibre Cable & Accessories 4.6.1 OPGW cable & Accessories

i) 24 Fibre (DWSM) OPGW fibre optic cable 73 km

ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories as per below :

73 Sets

iii) Joint Box 25 No.

4.6.2 FODPi) FODP 48F : Indoor Type, rack mounted with FCPC

coupling and pig tails (5 mtrs each). 5 No.

Page 16: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 2 PAGE 5 OF 7

Total Amount (Excluding Taxes)

VAT and other taxes

Total Amount

Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11

Item No. Item Description UnitQuantityEx Faxtory Price (Excluding

VAT)Inland Transportation up to Site

4.6.3 Fibre Optic approach cablei) 24 Fibre (DWSM) 4 Km.

ii) Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable

4 Set

4.7 Mandatory Spares of OPGW Cabling4.7.1 OPGW cable & Accessories

i) 24 Fibre (DWSM) OPGW fibre optic cable 5 Km.

ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories as per below :

5 Sets

iii) Joint Box (24 fibre) 3 No.

4.7.2 Fibre Optic approach cablei) 24 Fibre (DWSM) 2 Km.

ii) Installation hardware set for above 24 Fibre, Approach Fibre Optic Cable

2 Set

II 132 kV Lapsephedi - Changunarayan & LILO Transmission Line

1.1Design, fabrication & supply of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices

1.1.1 Suspension Tower DAa) Basic tower 21 Nos.

b) -3 m Leg Extension 4 Nos.

c) -1.5 m Leg Extension 4 Nos.

d) +/- 0 m Leg Extension 72 Nos.

e) +1.5 m Leg Extension 4 Nos.

f) +3 m Leg Extension 8 Nos.

g) +4.5 m Leg Extension 2 Nos.

h) +6 m Leg Extension 8 Nos.

i) +7.5 m Leg Extension 2 Nos.

j) +9 m Leg Extension 8 Nos.

Page 17: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 2 PAGE 6 OF 7

Total Amount (Excluding Taxes)

VAT and other taxes

Total Amount

Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11

Item No. Item Description UnitQuantityEx Faxtory Price (Excluding

VAT)Inland Transportation up to Site

1.1.2 Tension Tower DDa) Basic tower 21 Nos.

b) -3 m Leg Extension 4 Nos.

c) -1.5 m Leg Extension 4 Nos.

d) +/- 0 m Leg Extension 72 Nos.

e) +1.5 m Leg Extension 4 Nos.

f) +3 m Leg Extension 10 Nos.

g) +4.5 m Leg Extension 2 Nos.

h) +6 m Leg Extension 10 Nos.

i) +7.5 m Leg Extension 2 Nos.

j) +9 m Leg Extension 12 Nos.

k) +18 m Leg Extension 4 Nos.

l) +25 m Leg Extension 4 Nos.

1.1.3 Suspension Tower QA Multi circuit a) Basic tower 8 Nos.

b) +0 m Leg Extension 32 Nos.

1.1.4 Tension Tower QD Multi circuit a) Basic tower 6 Nos.

b) +0 m Leg Extension 24 Nos.

2 Supply of Earthing of towersi. Pipe Type 36 Nos.

ii. Counterpoise Type 20 Nos.

3 Supply of following tower accessoriesi. Danger Plate 56 Nos.

ii. Number Plate 56 Nos.

iii. Phase Plate ( Set of three) 140 Sets

iv. Circuit Plate(Set of two) 70 Sets

v. Anti climbimg device 56 Nos.

vi. Bird Guard (set of three) 74 Sets

4 Supply of following Line Materials4.1 Conductori) ACSR BEAR Conductor 110 KM

Page 18: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 2 PAGE 7 OF 7

Total Amount (Excluding Taxes)

VAT and other taxes

Total Amount

Unit Rate Amount Unit Rate Amount 1 2 3 4 5 6 7 8 9 10 11

Item No. Item Description UnitQuantityEx Faxtory Price (Excluding

VAT)Inland Transportation up to Site

4.2 GS Earthwirei) 7/3.15mm Earthwire 0 KM

4.3 InsulatorsOption-1: Disc Insulators

(i) 70 kN Disc Insulator 2250 Nos

(ii) 120 kN Disc Insulator 4554 Nos

4.4 Hardware Fittingsi) Single Suspension 'I' Insulator String ( Suitable for

1x10, 70 KN Disc Insulators )225 Sets

ii) Single Tension Insulator String (suitable for 1x11, 120 KN Disc Insulators)

388 Sets

iii) Double Tension Insulator String ( suitable for 2x11,120 KN Disc Insulators )

13 Sets

4.5 Conductor Accessoriesi) Mid span compression joint for ACSR BEAR conductor 99 Nos

ii) Repair Sleeve for ACSR BEAR Conductor 40 Nos

iii) Vibration Damper for ACSR BEAR conductor 1273 Nos

Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.

#

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

2.) The Prices of equipment are inclusive of type test charges except towers, conductors and earthwires.3.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements.

4) For Bought out items, all applicable taxes, duties and levies except Octroi/Entry tax are to be included in the Ex Works Price (Col 7.)

Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.

Total Ex-works Price ( Total of column 9 to be carried forward to Schedule No. 5A: Grand Summary)

Page 19: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 3 PAGE 1 OF 1

Local Currency portion Foreign Currency Portion

Quantity Unit NRs Currency LC FC1 2 3 4 5 6 7=3x5 8=3x6

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

Schedule 3: Design Services : NOT APPLICABLE

Estimated Unit Prices Total Prices

Item No.

Item Description

1 NOT APPLICABLE

NEPAL ELECTRICITY AUTHORITY

TRANSMISSION DIRECTORATETamakoshi-Kathmandu 220/400kV Transmission Line Project

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

Page 20: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 1 OF 11

Schedule No. 4: Installation Services(a): Installation and Construction Charges

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

I 400 kV Quad Barhabise - Lapsephedi Transmission Line

1 Surveyi) Detailed survey including route alignment, profiling, tower spotting KM 46ii) Check Survey including tower spotting KM 46

2 Detailed soil Investigationi) All kind of soil except FR & HR Loc. 4ii) Fissured/soft rock Loc. 8iii) Hard rock Loc. 4iv) River Crossing locations Loc.

3 Benchingi) All kind of soil except FR & HR Cum. 3200ii) Fissured Rock Cum. 8000iii) Hard Rock Cum. 2500

4 Work associated with tower foundations. 4.1 Suspension Tower DA

a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Extension)

i) Dry Foundation Nos. 4ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 4b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m

i) Dry Foundation Nos. 4

Unit

Installation Charges

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

Sl. No. Qty.Item Description

NEPAL ELECTRICITY AUTHORITY

TRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400kV Transmission Line Project

Portion in Nepaln Currency (in NRs)

Portion in Foreign Currency

Page 21: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 2 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 4

4.2 Tension Tower DBa) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m

Extension)i) Dry Foundation Nos. 1ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 5vi) Wet Fissured Rock Nos. 3vii) Sandy Soil Foundation Nos. 1b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m

Extensioni) Dry Foundation Nos. 1ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 6vi) Wet Fissured Rock Nos. 3vii) Sandy Soil Foundation Nos. 1

4.3 Tension Tower DC

a) Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Extension)

i) Dry Foundation Nos. 3ii) Wet Foundation Nos. 1iii) Partially Submerged Foundation Nos. 1iv) Dry Fissured Rock Nos. 5v) Wet Fissured Rock Nos. 1

Page 22: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 3 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

b) Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension

i) Dry Foundation Nos. 2ii) Wet Foundation Nos. 1iii) Partially Submerged Foundation Nos. 1iv) Dry Fissured Rock Nos. 4v) Wet Fissured Rock Nos. 2

4.4 Tension Tower DD

a)Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m Extension)

i) Dry Foundation Nos. 2ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 1iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 2vii) Sandy Soil Foundation Nos. 1

b)Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension

i) Dry Foundation Nos. 3ii) Wet Foundation Nos. 2iii) Fully Submerged Foundation Nos. 2iv) Partially Submerged Foundation Nos. 1v) Dry Fissured Rock Nos. 8vi) Wet Fissured Rock Nos. 2vii) Sandy Soil Foundation Nos. 1

Page 23: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 4 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

4.5 Tension Tower DD+ 18/25

i) Dry Foundation Nos. 2

ii) Partially Submerged Foundation Nos. 1

iii) Dry Fissured Rock Nos. 3

4.6 Tension Tower DDS

a) Foundation for +9 m Extension

i) Dry Fissured Rock Nos. 1

b) Foundation for +35 m Extension

i) Dry Fissured Rock Nos. 1

5 Erection of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc, tack welding and supply and application of enamel & zinc rich paint but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices

5.1 Suspension Tower DA

a) Basic tower Nos. 42b) -4.5 m Leg Extension Nos. 6c) -3 m Leg Extension Nos. 4d) -1.5 m Leg Extension Nos. 7e) +/- 0 m Leg Extension Nos. 128f) +1.5 m Leg Extension Nos. 5g) +3 m Leg Extension Nos. 18h) +4.5 m Leg Extension Nos. 6i) +6 m Leg Extension Nos. 20j) +7.5 m Leg Extension Nos. 10k) +9 m Leg Extension Nos. 24

Page 24: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 5 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

5.2 Tension Tower DBa) Basic tower Nos. 31b) -4.5 m Leg Extension Nos. 4c) -3 m Leg Extension Nos. 3d) -1.5 m Leg Extension Nos. 5e) +/- 0 m Leg Extension Nos. 96f) +1.5 m Leg Extension Nos. 4g) +3 m Leg Extension Nos. 12

h) +4.5 m Leg Extension Nos. 4i) +6 m Leg Extension Nos. 16j) +7.5 m Leg Extension Nos. 8k) +9 m Leg Extension Nos. 20

5.3 Tension Tower DCa) Basic tower Nos. 21b) -4.5 m Leg Extension Nos. 3c) -3 m Leg Extension Nos. 2d) -1.5 m Leg Extension Nos. 3e) +/- 0 m Leg Extension Nos. 64f) +1.5 m Leg Extension Nos. 3g) +3 m Leg Extension Nos. 9h) +4.5 m Leg Extension Nos. 3i) +6 m Leg Extension Nos. 10j) +7.5 m Leg Extension Nos. 5k) +9 m Leg Extension Nos. 12

5.4 Tension Tower DDa) Basic tower Nos. 42b) -4.5 m Leg Extension Nos. 5c) -3 m Leg Extension Nos. 3d) -1.5 m Leg Extension Nos. 6e) +/- 0 m Leg Extension Nos. 126f) +1.5 m Leg Extension Nos. 4g) +3 m Leg Extension Nos. 14h) +4.5 m Leg Extension Nos. 5i) +6 m Leg Extension Nos. 18j) +7.5 m Leg Extension Nos. 9

Page 25: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 6 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

k) +9 m Leg Extension Nos. 16l) +18 m Leg Extension Nos. 12

m) +25 m Leg Extension Nos. 12

5.5 Tension Tower DDSa) Basic tower Nos. 2b) +9 m Leg Extension Nos. 4c) +35m Leg Extension Nos. 4

6 Installation of Earthing of towers

i. Pipe Type Nos. 48ii. Counterpoise Type Nos. 90

7 Installation of following tower accessoriesi. Danger Plate Nos. 138ii. Number Plate Nos. 138iii. Phase Plate ( Set of three) Sets 276iv. Circuit Plate(Set of two) Sets 138v. Anti climbimg device Nos. 138vi. Bird Guard (set of three) Sets 84

8 Protection of tower footingi) Random rubble stone masonary including excavation (1:5 cement concrete) Cu.m.

3200

ii) Stone bound in galvanising wire netting including excavation Cu.m. 1800iii) Back filling and levelling of volumes enclosed by revetment for All kind of soil

except wet soil, fissured rock & hard rock Cu.m. 3100

iv) M15 Conc. Nominal Mix 1:2:4 for top seal cover Cu.m. 200

Page 26: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 7 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

9 Installation of insulator strings complete with arcing horns & necessary hardware, installing & stringing of bundle conductor including fixing of conductor accessories, installing & stringing of earthwire including fixing of earthwire accessories (Quad bundle Conductor) in Double Ckt Line.

i) Normal Stretch (Double Ckt. Portion) kms 46

10 Installation of Optical Fibre Cable & Accessories for 400 KV Barhabise -Haledi,132 KV Haledi-Changunarayan&LILO of Bhaktapur-Chapali line at Changunarayan

A. OPGW cable & Accessories

i) 24 Fibre (DWSM) OPGW fibre optic cable (OFFLINE) km 61ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling

including all cable fittings & accessories except joint boxSets

61

iii) 24 Fibre (DWSM) OPGW fibre optic cable (Live Line 132 KV) km 12iv) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling

including all cable fittings & accessories except joint boxSets

12

iv) Joint box (24 Fibres) No. 25B. FODPi) FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig tails (5 mtrs

each)No. 5

C. Fibre Optic approach cablei) 24 Fibre (DWSM) km 4ii) Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable Sets

4

II 132 kV Lapsephedi - Changunarayan & LILO Transmission Line

1 Survey

i) Detailed survey including route alignment, profiling, tower spotting km 14

ii)Check Survey &identification of right of way and Land Parcel including tower spotting

km 14

2 Detailed soil Investigation

i) All kind of soil except FR & HR Loc. 3

ii) Fissured/soft rock Loc. 4

iii) Hard rock Loc. 3

iv) River Crossing locations Loc. 0

3 Benching

i) All kind of soil except FR & HR Cum. 850

Page 27: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 8 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

ii) Fissured Rock Cum. 2500

iii) Hard Rock Cum. 700

4 Work associated with tower foundations.

4.1 Suspension Tower DA

a) Foundation for Basic Body (including -3m, -1.5m, +/- 0m Extension)

i) Dry Foundation Nos. 2

ii) Wet Foundation Nos. 3

iii) Fully Submerged Foundation Nos. 1

iv) Partially Submerged Foundation Nos. 2

v) Dry Fissured Rock Nos. 4

vi) Wet Fissured Rock Nos. 1

vii) Sandy Soil Foundation Nos. 1

b)Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension

i) Dry Foundation Nos. 1

ii) Wet Foundation Nos. 1

iii) Partially Submerged Foundation Nos. 1

iv) Dry Fissured Rock Nos. 4

4.2 Tension Tower DD

a) Foundation for Basic Body (including -3m, -1.5m, +/- 0m Extension)

i) Dry Foundation Nos. 1

ii) Wet Foundation Nos. 2

iii) Fully Submerged Foundation Nos. 1

iv) Partially Submerged Foundation Nos. 1

v) Dry Fissured Rock Nos. 5

b)Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m Extension

i) Dry Foundation Nos. 2

ii) Wet Foundation Nos. 1

iii) Fully Submerged Foundation Nos. 1

Page 28: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 9 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

iv) Partially Submerged Foundation Nos. 1

v) Dry Fissured Rock Nos. 3

vi) Wet Fissured Rock Nos. 1

4.3 Tension Tower DD+ 18/25

i) Wet Foundation Nos. 1

ii) Dry Fissured Rock Nos. 1

4.4 Suspension Tower QA Multi circuit

a) Foundation for +0 m Extension

i) Dry Foundation Nos. 1

ii) Wet Foundation Nos. 2

iii) Partially Submerged Foundation Nos. 2

iii) Dry Fissured Rock Nos. 3

4.5 Tension Tower QD Multi circuit

a) Foundation for +0 m Extension

i) Dry Foundation Nos. 1

ii) Wet Foundation Nos. 2

iii) Partially Submerged Foundation Nos. 1

iv) Dry Fissured Rock Nos. 2

5

Erection of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc, tack welding and supply and application of enamel & zinc rich paint but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing devices

5.1 Suspension Tower DA

i) Basic tower Nos. 21

ii) -3 m Leg Extension Nos. 4

iii) -1.5 m Leg Extension Nos. 4

iv) +/- 0 m Leg Extension Nos. 72

v) +1.5 m Leg Extension Nos. 4

vi) +3 m Leg Extension Nos. 8

Page 29: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 10 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

vii) +4.5 m Leg Extension Nos. 2

viii) +6 m Leg Extension Nos. 8

ix) +7.5 m Leg Extension Nos. 2

x) +9 m Leg Extension Nos. 8

5.2 Tension Tower DD

i) Basic tower Nos. 21

ii) -3 m Leg Extension Nos. 4

iii) -1.5 m Leg Extension Nos. 4

iv) +/- 0 m Leg Extension Nos. 72

v) +1.5 m Leg Extension Nos. 4

vi) +3 m Leg Extension Nos. 10

vii) +4.5 m Leg Extension Nos. 2

viii) +6 m Leg Extension Nos. 10

ix) +7.5 m Leg Extension Nos. 2

x) +9 m Leg Extension Nos. 12

xi) +18 m Leg Extension Nos. 4

xii) +25 m Leg Extension Nos. 4

5.3 Suspension Tower QA Multi circuit

i) Basic tower Nos. 8

ii) +0 m Leg Extension Nos. 32

5.4 Tension Tower QD Multi circuit

i) Basic tower Nos. 6

ii) +0 m Leg Extension Nos. 24

6 Installation of Earthing of towers

i. Pipe Type Nos. 36

ii. Counterpoise Type Nos. 20

7 Installation of following tower accessories

i) Danger Plate Nos. 56

ii) Number Plate Nos. 56

Page 30: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (a) PAGE 11 OF 11

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

Unit

Installation Charges

Sl. No. Qty.Item DescriptionPortion in Nepaln Currency

(in NRs)Portion in Foreign Currency

iii) Phase Plate ( Set of three) Sets 140

iv) Circuit Plate(Set of two) Sets 70

v) Anti climbimg device Nos. 56

vi) Bird Guard (set of three) Sets 74

8 Protection of tower footing

i) Random rubble stone masonary including excavation (1:5 cement concrete) Cu.m. 900

ii) Stone bound in galvanising wire netting including excavation Cu.m. 500

iii) Back filling and levelling of volumes enclosed by revetment

a) All kind of soil except wet soil, fissured rock & hard rock Cu.m. 800

iv) M15 Conc. Nominal Mix 1:2:4 for top seal cover Cu.m. 60

9Installation of insulator strings complete with arcing horns & necessary hardware, installing & stringing of bundle conductor including fixing of conductor accessories, (Single Bear Conductor) in Double Ckt Line.

(i) Normal Stretch (Double Ckt. Portion) kms 10

(i) Normal Stretch (Multi Ckt. Portion) kms 4

Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.

*Φ Strike out if not applicable

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

TOTAL INSTALATION SERVICES (Total of column 7 and 9 to be carried forward to Schedule No. 5: Grand Summary)

Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.

2.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope of work defined in Employer's Requirements.

Page 31: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

Schedule-4 (b) Page 1 of 1

Schedule No. 4 : Installation and Other Services(b):Training Charges for training to be imparted abroad

Currency Total Training Charges

1 2 3 4 5 6 7 = 4x5 x 6

Total for Training Charges (Total of column 7 to be carried forward to Schedule No. 5: Grand Summary)

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

NOT APPLICABLE

Sl. No.

Total Training Charges

Training to Owners personnel on Design , testing and Maintenance aspect as per Section Project, Technical Specification at manufacturer's works

Description

Country where

training is to be imparted

Nos. of Trainee

Item for which training is to be imparted.

NEPAL ELECTRICITY AUTHORITY

TRANSMISSION DIRECTORATETamakoshi-Kathmandu 220/400kV Transmission Line Project

A

Training duration in

days

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

Page 32: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

Schedule 4 (c) Page 1 of 1

Schedule No. 4 : Installation and Other Services(c):Training Charges for training to be imparted to Employer's Personnel by Bidder's Instructor in Nepal

Item for which training is to be imparted. Currency Total Training Charges

1 2 3 4 5 6 = 4x 5

Total for Training Charges ( total of column 6 To be carried forward to Schedule 5: Grand Summary)

Date: Signature:

Printed Name:

Designation:

Common Seal:

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

a)

Sl. No.Description of the Test

Training duration in

days

Training Charges for Contractors

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400kV Transmission Line Project

On Job training on operation, maintenance and testing & commissioning aspectat at one Location in Nepal as per section Project, Technical Specification

NOT APPLICABLE

Page 33: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

Schedule 4 (d) Page 1 of 1

Schedule No. 4 : Installation and Other Services(d): Maintenance Charges

Currency Total Maintenance Charges

12

Total Maintenance Charges (To be carriedforward to Schedule 5: Grand Summary)

Date: Signature:

Printed Name:

Designation:

Common Seal:

Total Maintenance Charges

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

NOT APPLICABLE

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400kV Transmission Line Project

Sl No Description Unit Qty.

Page 34: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (e) PAGE 1 OF 2

Schedule No. 4 : Installation and Other Services(e): Type Test charges for Type Tests to be conducted abroad

(1) (2) (3) (4) (5) (6) (7)=(5) x (6)I 400 kV Quad Barhabise - Lapsephedi Transmission Line

1 Proto Type Testing of towers1.1 Tower Type DA with extension No. 11.2 Tower Type DB with extension No. 11.3 Tower Type DC with extension No. 11.4 Tower Type DD with extension No. 1

2 ACSR MOOSE Conductor2.1 UTS Test No. 12.2 DC Resistance Test No. 12.3 Corona & RIV Test No. 1

3 AACSR MOOSE Conductor3.1 UTS Test No. 13.2 DC Resistance Test No. 13.3 Corona & RIV Test No. 1

4 7/3.66 mm GS Earthwire3.1 UTS Test No. 13.2 D.C. Resistance Test No. 1

Country of Testing Unit Qty.

Tamakoshi-Kathmandu 220/400kV Transmission Line ProjectTRANSMISSION DIRECTORATE

Currency # AmountSl. No. Description of Tests

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

Page 35: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 4 (e) PAGE 2 OF 2

(1) (2) (3) (4) (5) (6) (7)=(5) x (6)

Country of Testing Unit Qty. Currency # AmountSl. No. Description of Tests

II 132 kV Lapsephedi - Changunarayan & LILO Transmission Line

1 Proto Type Testing of towers1.1 Tower Type DA with extension No. 11.2 Tower Type DD with extension No. 11.3 Tower Type QA with extension No. 11.4 Tower Type QD with extension No. 1

2 ACSR BEAR Conductor2.1 UTS Test No. 12.2 DC Resistance Test No. 1

TOTAL (Total of column 7 to be carried forward to Schedule No. 5: Grand Summary)

#

Name of Bidder: Date:Signature of Bidder: (Printed Name)

(Designation) (Common Seal)

Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.

Page 36: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

Schedule 5 Page 1 of 1

Schedule No. 5: Grand Summary

1 TOTAL SCHEDULE NO. 1Plant and Equipment including Mandatory Spares tobe supplied from abroad.

2 TOTAL SCHEDULE NO. 2Plant and Equipment including Mandatory SparesParts to be supplied from within Nepal

3 TOTAL SCHEDULE NO. 3Design Services

4 TOTAL SCHEDULE NO. 4(a) Installation and construction charges(b) Training charges for training to be imparted abroad( c) Training charges for training to be imparted in Nepal(d) Maintenance charges(e) Type Tests charges for type Tests to be conducted abroad

GRAND TOTAL FOR PART A [1+2+3+4]

Date: Signature:

Printed Name:

Designation:

Common Seal:

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400kV Transmission Line Project

Sl. No. DescriptionTotal Price Foreign

( )Total Price Local

( )

IFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and 132 kV Transmission Line

Page 37: NEPAL ELECTRICITY AUTHORITY ELECTRICITY AUTHORITY ... Bidding Procedure ... OPGW fibre optic cable 73 km ii) Installation Hardware set for above 24 Fibre OPGW Fibre

SCHEDULE - 6 PAGE 1 OF 1

Item No. Name & Description of Parts

Name of Original Manufacturer

Part No. Number of Units in each set

Total No. of Sets to be provided

Unit Price Total Price Remarks

Name of Bidder: Date: Signature of Bidder: (Printed Name) (Designation) (Common Seal)

Schedule No. 6: Recommended Availability/Optional Spares parts and Recommended Test Equipment (in line with Technical Specifications)

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400kV Transmission Line ProjectIFB No. : ICB-TD-TKTLP-073/74-01: Design, Supply, Install and Commission of Barhabise-Kathmandu 400/220 kV and

132 kV Transmission Line