NEA Readiness Assessment And ERC Support Assessment 30 th December 2019 Outreach Event- Delhi, India 1
38

NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Sep 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

NEA Readiness Assessment And

ERC Support Assessment

30th December 2019

Outreach Event- Delhi, India

1

Page 2: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• MCC and the Government of Nepal entered into a Compact to help facilitate

poverty reduction through economic growth in the amount of $500 million USD.

• The Millennium Challenge Account-Nepal (MCA-Nepal) has been established as

the legal and accountable entity in Nepal.

• As such, MCA-Nepal is responsible for implementation of the Compact.

• MCA-Nepal will procure all goods, works, and services funded under the

Compact using the MCC Program Procurement Guidelines, and will enter into

contracts and administer all such contracts.

• All program disbursements must be made within five years of entry- into-force

(EIF) of the Compact, which is scheduled for June 2020. (July 2020 to June end

2025)

Reducing Poverty Through Growth12/27/2019 2

Page 3: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

The overall objective of the MCC Compact with Nepal is“To increase domestic consumption of electricity and to support increased

regional power trade.”

Objective of Electricity Transmission Project (ETP) is “To increase domestic electricity supply for consumption by improving the

availability and reliability of electricity in Nepal’s electricity grid.”

Components of ETP:

• Transmission Line Activity

• Substation Activity

• Power Sector Technical Assistance Activity

• Program Management and Technical Oversight Activity

Page 4: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Outcomes:

•Add 3,920 MW Tx capacity; reduce losses to

1.9%

•Support 3x increase in electricity consumption

per capita Approx. 312 km – 400 kV Tx lines

(~850 towers)

3 x 400 kV substations

4

Page 5: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

The Parties will perform their responsibilities under this Agreement in accordance with the following documents, as amended from time to time (collectively, the “Key Documents”):

1. the Compact (US Government Grant Agreement);

2. the Program Implementation Agreement – addendum to the Compact;

3. the MCC Cost Principles for Government Affiliates Involved in Compact Implementation;

4. the MCC Program Procurement Guidelines.

5

Page 6: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

MCC Technical Directive Nepal-01:

Directives to assess needs for effective operation of newly formed ERC and NEA’s

readiness and ability to respond

MCC Technical Directive Nepal-11:

Directives to assess gaps and areas for TA to NEA including its Environment and Social

Studies Department (ESSD)

6

Page 7: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Aim of the Activity is to Support the Electricity Regulatory Commission (ERC) and Nepal Electricity Authority (NEA)

Project For ERC/NEA- Directive 1 Analyze risks and opportunities to the Nepal Electricity Authority (NEA) presented by the

establishment of an Energy Regulatory Commission (ERC) and assess NEA readiness and ability to

respond.

Support efforts to pre-position Compact to move forward with support to the ERC once

operationalized.

Project For NEA-Directive 11 Helping NEA for improvement in transmission line business in the areas of regulatory cost recovery

and improved grid operation

Training in system and market operation

Financial Management for transmission transactions and assets

Targeted human resources policies and job clarifications7

Page 8: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activity to Support ERC and NEA, MCA is performing NeedsAssessment

Activities:

Consultations with ERC and NEA has been completed

Joint high level workshop with NEA officials, ERC, Line Ministry & Bilateral Organization was completed

Draft report has been circulated to NEA for their comments and observations.

MCA- Nepal is planning to proceed the procurement process after receiving the final report from the consultant.

8

Page 9: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

To provide Technical Assistance (TA) to Nepal Electricity Authority (NEA)MCA is performing Needs Assessment

Activities:

Task 1: Technical Assistance to NEA

Consultations with NEA has been completed

Joint high level workshop with NEA officials, ERC, Line Ministry & Bilateral Organization was

completedMCA- Nepal is planning to proceed the procurement process after receiving the final report

from consultant.

Task 2 Sub-Transmission System Modeling and System Protection

Spatial load forecast, Sub-transmission expansion plan and system protection coordination study

is ongoing

9

Page 10: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

10

Page 11: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Foundation Phase Activities

• Advance Phase Activities

Note: Study is still ongoing and presented activities are based on the draft phase

of the study. Activities may change / modify in the final phase of the Study.

11

Page 12: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

12

Page 13: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Professional and organizational development (capacity building) for Members and senior staff, including,

• Assistance with the further development and implementation of the ERC’s Strategic and

Organizational Plans.

• Service as embedded regulatory expert advisor to Members pending the development of expert

advisors on ERC staff.

• Exposure to regional regulators; membership in regional regulatory organizations;

reciprocal visits with regional regulators. Initial focus will be visits to jurisdictions with

vertically integrated utilities similar to NEA, both successful and not.• Publication, subscriptions and organizational memberships.• Attendance at relevant conferences.

• Support for establishing foundational documents at ERC• Rules of practice and procedure.• Costing and Pricing By-laws, Directives and Cost Models.• Additional substantive rules as needed.

• Hardware and software for basic cost of service models for generation, transmission, distribution

and trading licensees available to Finance, Engineering and Economic staff.13

Page 14: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Infrastructure• ERC Regulatory Information Management System (RIMS).

• Docketing system and Document Management System (DMS).

• Website with electronic filing and reporting, consumer information, access to DMS.

• Hardware/software needs of permanent staff.

• Basic training for employees• Training in regulatory theory and practice for each discipline.

• Training on elements of a tariff filing.

• Training in embedded and marginal cost theories.

• Training on elements of tariff design and evaluation for Generation, Transmission, and Distribution services.

• Establishment of internal training protocols for on boarding new employees; developing in-house trainers.

• Site visits to generation, transmission and distribution facilities.

• International training visits, including travel to jurisdictions that are developing competitive wholesale or retail markets

14

Page 15: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Support in Technical Areas

• Training in basic transmission and distribution grid planning and operations

• Training in technical areas required to evaluate proposed technical codes; support in

designing and evaluating the grid code, other technical codes and cross border

regulations.

• MCA Consultant to assist ERC staff on evaluation of technical filings, including

reliability measures, interconnection standards and similar technical matters.

• Training on the functioning of competitive wholesale electricity markets, transmission

open access regimes, financial transmission rights, compensation for wheeling, etc.

• Training on Open Access and Transmission Charges.

• Training on Cross Border Electricity Trade

15

Page 16: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Management Function

• Assist in developing a system for evaluating employee performance; develop performance indicators; train supervising employees on employee performance evaluations.

• Formalize “3-tier” decision-making process; designate advisory staff and assist in their development.

• Supervise/manage staff of combined interim and permanent employees; advise the Commission Secretary.

• Advisory Function

• Senior MCA Consultant develops and manages team of advisors to fulfill the second tier of the decision-making process.

16

Page 17: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Professional and Organizational Development

• Advanced regulatory training in U.S. for Members.

• Annual commission-wide planning retreats.

• Participation in NARUC Commission international exchange program.

• Commission Information Meetings (CIMs) with industry/consumer presentations.

• Advanced training for permanent staff

• PURC/World Bank training at University of Florida or similar opportunities.

• Ongoing in-house training on advanced technical and financial topics using expert

consultants.

17

Page 18: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Additional Infrastructure• Provision of office automation system (IT-based workstations) in new offices, including

software/hardware/server and other necessary office logistics.• Pickup van and vehicles for ERC members and staff.• E-Court and E-Hearings capability.

• Guidance and capacity building for advanced topics; consultant-led in-house training modules on:• Systematic approaches to reviewing utility filings.• Tariff modeling and analysis.• Open access transmission; developments of rules and tariffs.• Least cost planning• Training on theory of least cost planning• Training on system expansion software• Competitive bidding for IPPs.• Performance-based regulation.• Mitigation of market power with tools such as divestiture and pricing limits.

18

Page 19: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Management Functions

• Support and assist the develop permanent management staff, including

preparation of Terms of Reference and Position Descriptions for use in

recruitment.

• Advise Members on legislative proposals

• Training on E-court and E-hearing system.

19

Page 20: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

20

Page 21: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Technical Assistance

CategoryIllustrative Activities

Regulatory Readiness

Work with NEA management to design a regulatory compliance unit.

Create job descriptions and/or terms of reference for personnel in the regulatory unit.

Recruit or supply regulatory specialists to staff regulatory unit

Support consultant to train and advise regulatory unit staff.

Establish liaison to engage with ERC members and staff.

Regulatory Accounting Supply consultant with experience in regulatory accounting.

Provide liaison to ERC financial technical staff on accounting requirements

Tariff filing

Embed consultant(s) to assist NEA staff in preparing a tariff filing;

As needed, train NEA staff and assist staff in the preparation of a revenue requirements

study;

As needed, train NEA staff and assist in the preparation of a marginal cost of service

study;

As needed, train NEA staff and assist staff in the preparation of a class cost of service

study;

Provide regulatory legal assistance in preparing application for a revised tariff. 21

Page 22: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Technical Assistance

CategoryIllustrative Activities

Rate design

Fund consultant to produce or assist in producing TOU/Seasonal

studies.

Fund possible international visits to utilities for consultation.

Least cost planning

Fund vendor training on software;

consultant to review load forecast;

assist preparation of plan with sensitivity analyses, as required by

ERC.

Energy Efficiency & Demand

Response

Fund EE and DR capacity study;

Design EE program

Identify all cost-effective measures

Analyze impact on Low and Moderate Income (LMI) customers

Integrate EE and DR into least cost planning effort

Seasonal Costing and Pricing

Studies

Fund engineering consultant to provide marginal cost study with

seasonal analysis.22

Page 23: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Technical Assistance

CategoryIllustrative Activities

Data Analysis

Survey all system and customer data currently collected

Assess quality of data

Research use cases for data

Fund consultant to design data use function within NEA

Fund international exposure to utilities with successful data analytics.

Unbundling

Fund consultant to review progress of functional unbundling and to

prepare plan for full unbundling in advance of the creation of a

competitive wholesale market.

23

Page 24: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activity DescriptionProcure Launch

(Expected)

Embedded Regulatory Advisors

• Up to 4 embedded technical and mgmt. advisors at ERC• Capacity building, analysis, guidance & mentoring

Early-2020

Tariff Study • Developing tariff methodology & guidelines• Assessment of subsidies & affordability

Early/mid-2020

Regulatory Info & Docket Mgmt. Systems

• Development of requirements/specs & scoping• Supply & installation of RIMS & DMS w/training

Mid-2020Early/Mid-2021

Technical Code Development Support

• Development of updated Grid Code, planning code• Training & consultations

Early-2021

Social Equity Integration & Consultation

• Study/analysis of key issues on social equity in electricity sector & integration in regulatory requirements

• Training on stakeholder engagement & social equity issues

TBD

Miscellaneous logistical support

• Basic hardware/software & other operational requirements TBD

24

Page 25: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

25

• Establishment of expansion planning & project selection process

• Establishment of competitive bidding process

• Establishment of Market Structure

• Establishment of Power Trade Rules

• Establishment of Open Access/System operation

• Establishment of Least Cost Planning

• Establishment of Document Management System

• Establishment of Rules of Practice & Procedure

• Establishment of Office Automation System

• Establishment of Comprehensive Tariff Study

Page 26: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

26

Page 27: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Achieving investment goals in generation and network expansion

• Meeting network capacity requirements

• Improving system reliability

• Improving financial viability

27

Page 28: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

• Business Operations – Asset Management

• Network Planning

• Network Operation

• Network Maintenance

• Engineering

• Environment & Social Impact Management

• Finance

Note: Study is still ongoing and presented activities are based on the draft phase of the study. Activities may change / modify in the final phase of the Study

28

Page 29: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Business Process

Establishing performance measures and management

Adopting the industry standard Asset Management Model

Activities on Asset Management:

• Asset Management Model and Process Implementation

• Asset Management Information System

• Asset Maintenance Improvement Program

29

Page 30: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activities on Network Planning:

• Electricity Demand Forecasting (spatial demand forecasting) and training

• Upgrading of PSS/E facilities at NEA and training

• Capacity Enhancement of Transmission Network Planning and Function

• Restructuring the system planning function to make it efficient

30

Page 31: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activities on System Operation:

• Upgrade of the Grid Code, technical codes for transmission, distribution, interconnection, etc

• Capability Enhancement

Structured training programs on all aspects of maintenance functions to maintain competency level (off-site and on-job)

Health and safety training

Training in System Operations areas for knowledge development

• INPS Protection Coordination Study

• Implementation of Digital Fault Recorder in substations

31

Page 32: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activities on Network Maintenance:

• Enhanced Geographic Information System (GIS) Application

• Aerial-based Maintenance Program Activities for inspections, restoration and commissioning

• Live Line Maintenance Program Activities for OH line and substation

• UAV-based Maintenance Program Inspection and aerial survey

• Mobile Information Technology Platform Information flow and reporting

• Specialized Testing and Measuring Devices Equipment testing, corona testing, real-time line rating and condition monitoring

32

Page 33: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activities are:

• Consolidating project management function for

• Transmission line projects

• Substation projects

• Improving staff technical skills in

• design requirements and engineering of construction projects

• project management, contract & procurement management

• Establishing centralized project data and drawings management

system

33

Page 34: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activities are:

• Improvement of Social and Environmental Policies and Legal Framework

• Environmental and Social Polices and Program

• Corporate Social Responsibility Program

• Project Communication Plan

• Optimization of ESSD structure and role within NEA

• Revision of the ESSD structure and effective

• Establishment of a ESSD mission and system for interaction with other departments

• Improvement of the ESSD team and performance (personnel and equipment)

• Development of methods and tools for ESIA and monitoring of transmission lines

• Development and implementation of a training program

• Development and implementation of a knowledge management system

• Development and implementation of a simplified mechanism to acquire external consulting services

• Upgrade and modernization of equipment used for data collection and study reports 34

Page 35: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Need Recommendation

Implementation of Fully Integrated ERP

System

Identify and support in areas where additional resources and

capacity could be supplement the ongoing ERP implementation

process

Compliance with Accounting Standards Identify and support in areas where resources and capacity could

be provided in compliance with Accounting Standards

Budget Management and Financial

Forecasting

Review and improve financial forecasting, resource planning and

budget management processes with capacity building and

systems

Investment Analysis, Capital Budgeting

and Funding

Organization-wide review; Development of Policies and

Procedures; Implementation of streamlined and up-to-date

techniques

Implementation of Cost-Reflective and

Regulated Tariffs

Provide additional resources and capacity in ongoing tariff

scheme changes and interface with the Regulator

35

Page 36: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Activity DescriptionProcure Launch

(Expected)

Asset Management Model

Advisor

• Utility experts for analysis, process review & update, capacity

building to introduce asset mgmt. model

Early-2020

Asset Management Info

System

• Software/info system to support asset mgmt. model at NEA

• Scoping & requirements/specs; supply & install

Mid-2020

Training & equipment to

support Utility

Operational Activities

• Network development including design standards/technology,

environmental/social assessment & monitoring, project &

contract management

• Asset maintenance including condition assessment,

monitoring, live-line maintenance,

Mid/Late-2020

System Planning support • Software upgrades & training

• Process strengthening & capacity building

TBD

System Operations • Protection & control coordination updates

• Substation automation strengthening

• Analysis & updates to scheduling, dispatching, settlement

TBD

36

Page 37: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

37

• Increasing pace of investment in required transmission network capacity

• Increasing reliability of the transmission network (availability & quality)

• Increasing financial viability of the power sector

• Increasing efficiency in use of generation resources

• Establishment of Asset Management Model

• Strengthening regulatory & operational framework for power trade

Page 38: NEA Readiness Assessment And ERC Support Assessment … · 2019. 12. 27. · Components of ETP: •Transmission Line ... MCA- Nepal is planning to proceed the procurement process

Thank You

38