Top Banner
NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2 nd Edition Status of Ongoing Research Projects April 2017
14

NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Apr 08, 2018

Download

Documents

truonghanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

NCHRP 17-71Proposed AASHTO Highway Safety Manual, 2nd Edition

Status of Ongoing Research Projects

April 2017

Page 2: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Overview

Timeline

Project Monitoring Objectives

Ongoing Project Status

Closure

2

Page 3: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Time Table (11/2016)

3

2015 2016 2017 2018 2019

Phase 1 Phase 4Phase 3Phase 2

Draft 1 Draft 3Draft 2 Final

Draft

Page 4: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Time Table (Current?)

4

2015 2016 2017 2018 2019

Phase 1

Phase 4Phase 3

Phase 2

Draft 1

Draft 3Draft 2 Final

Draft

• Review and comments on Draft 1 is still on-going

• Issues impacting Draft 2 & 3 being resolved

• To what extent can Phase 3 be compressed?

Page 5: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Time Table (Current?)

5

2015 2016 2017 2018 2019

Phase 1

Phase 4Phase 3

Phase 2

Draft 1

Draft 3Draft 2 Final

Draft

Page 6: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Timeline

Inclusion of New Research Findings

Establishing the Latest Delivery Date

Deadline by which...

Projects must be completed,

Results available to Project 17-71 team, and

If producing HSM text results, approved for inclusion in HSM

Date established to ensure on-time completion of Project 17-71 and HSM 2nd Edition

Originally September 30, 2017; need to discuss with the 17-71 Panel

6

Page 7: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Project Monitoring Objectives

7

Objectives

Monitor ongoing projects

Focus: projects planned for incorporation in HSM2

Inform HSPC of ongoing project status

Define 17-71-related priorities

Identify potential incorporation-related challenges

Facilitate communication with 17-71 panel

Anticipate HSPC will provide their input to panel

Page 8: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Research Project Status

8

Part A

NCHRP Project 17-50, Lead States Initiative for Implementing the HSM

Completion date: 4th quarter of 2016

Developed potential HSM content

17-71 creating text using elements of User Guide

Part B

NCHRP Project 17-73, Systemic Pedestrian Safety Analysis

Completion date: 3rd quarter of 2017

Not developing HSM content (17-71 may create text)

Page 9: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Research Project Status

9

Part C

NCHRP Project 17-58, Safety Prediction Models for Six-Lane and One-Way Urban/Suburban Arterials

Project extended to 10/2016, developed HSM text

17-71 team plans to incorporate into updated Part C

NCHRP Project 17-62, Improved Prediction Models for Crash Types and Severities

Completion date: 3rd quarter of 2017

Developing HSM text

On-going questions regarding anticipated results that will impact Part C

Page 10: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Research Project Status

10

Part C

NCHRP Project 17-68, Intersection Crash Prediction Methods for the HSM

Completion date: 3rd quarter of 2017

Currently drafting their HSM text

NCHRP Project 17-70, Roundabout Crash Prediction Models and Methods for the HSM

Completion date: 3rd quarter of 2017

To begin drafting their HSM text in Summer 2017

Page 11: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Research Project Status

11

Part D

NCHRP Project 17-56, Development of Crash Reduction Factors for Uncontrolled Pedestrian Crossing Treatments

Completion date: 2nd quarter of 2016

Published as NCHRP Report 841

To be in FHWA CMF Clearinghouse

Anticipate NCHRP 17-72 to determine if AASHTO-approved

Page 12: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Research Project Status

12

Part D

NCHRP Project 17-59, Safety Impacts of Intersection Sight Distance

Completion date: 1st quarter of 2017

Developing potential HSM content (not HSM text)

17-71 has not received final report at this time

NCHRP Project 17-63, Guidance for Development and Application of Crash Modification Factors

Completion date: 1st quarter of 2017

Developing potential HSM content (not HSM text)

17-71 has not received final report at this time

Page 13: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Research Project Status

13

Part D

NCHRP Project 17-72, Update of Crash Modification Factors for the HSM

Completion date: 4th quarter of 2017

Late date relative to 17-71 production timeline

Developing the guidance for practitioners regarding use of CMFs – 17-71 anticipates including this in the updated Part D content for the 2nd edition

Page 14: NCHRP 17-71 Proposed AASHTO Highway Safety Manual…scohts.transportation.org/Documents/Safety Leadership Award/NCHRP... · NCHRP 17-71 Proposed AASHTO Highway Safety Manual, 2nd

Closure

14

Timeline

Need to improve review process for future drafts

Need to work with Panel to establish deadline for inclusion of research findings

Need to resolve issues impacting future drafts

Research Project Status

Concern continues with some projects

Continue to work with Program Managers