MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot \\HKGNTS22\ACOUSTIC\ENV\PROJECT\248118\12 REPORTS DELIVERABLES\017 EIA REPORT\04 FINAL\CH4 - NOISE\APPENDIX\WORKING\APPENDIX 4.1B ASR.DOCX Page 1 / 11 Scenario for Phase 1a Population intake after April 2026: The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a SHD Topside Development. According to the current development scheme, there will be 18 residential blocks ranging from 17 – 19 residential storeys high within the SHD Topside Development. A large commercial / retail area, public transport interchange and kindergarten will be also be provided at the Phase 1 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”. North Lantau Highway (NLH) has an Annual Average Daily Traffic (AADT) of 68,930 in Year 2015 and hence it is considered as an Influencing Factor (IF) as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a Population intake, Stage 2 SHD Replanning Works are being conducted while Stage 1 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 3 and 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 3 and 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF. Scenario for Phase 1a to 1b Population intake after October 2026: The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 1b SHD Topside Development. According to the current development scheme, there will be 35 residential blocks ranging from 15 – 19 residential storeys high within the SHD Topside Development. A large commercial / retail area, public transport interchange and kindergarten will be also be provided at the Phase 1 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”. NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 1b Population intake, Stage 2 SHD Replanning Works are being conducted while Stage 1 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 3 and 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 3 and 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF. Scenario for Phase 1a to 1c Population intake after April 2027: The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 1c SHD Topside Development. According to the current development scheme, there will be 49 residential blocks ranging from 15 – 21 residential storeys high within the SHD Topside Development. A large commercial / retail area, public transport interchange and kindergarten will be also be provided at the Phase 1 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”. NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 1c Population intake, Stage 2 SHD Replanning Works are being conducted while Stage 1 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 3 and 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 3 and 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF. Scenario for Phase 1a to 2 Population intake after July 2030: The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 2 SHD Topside Development. According to the current development scheme, there will be 68 residential blocks ranging from 15 – 21 residential storeys high and school within the SHD Topside Development. A large commercial / retail area, public transportation interchange and kindergartens will be also provided at Phase 1 to Phase 2 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”. NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 2 Population intake, Stage 3 SHD Replanning Works are being conducted while Stage 1 and 2 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF. Scenario for Phase 1a to 3 Population intake after July 2034: The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 3 SHD Topside Development. According to the current development scheme, there will be 86 residential blocks ranging from 15 – 22 residential storeys high and schools within the SHD Topside Development. A large commercial / retail area, public transportation interchange and kindergartens will be also provided at Phase 1 to
13
Embed
MTR Corporation Limited Proposed Comprehensive ......MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Scenario for Phase 1a Population intake after April 2026:
The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a SHD Topside Development. According to the current development scheme, there will be 18 residential blocks ranging from 17 – 19 residential storeys high within the SHD Topside Development. A large commercial / retail area, public transport interchange and kindergarten will be also be provided at the Phase 1 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”.
North Lantau Highway (NLH) has an Annual Average Daily Traffic (AADT) of 68,930 in Year 2015 and hence it is considered as an Influencing Factor (IF) as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a Population intake, Stage 2 SHD Replanning Works are being conducted while Stage 1 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 3 and 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 3 and 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF.
Scenario for Phase 1a to 1b Population intake after October 2026:
The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 1b SHD Topside Development. According to the current development scheme, there will be 35 residential blocks ranging from 15 – 19 residential storeys high within the SHD Topside Development. A large commercial / retail area, public transport interchange and kindergarten will be also be provided at the Phase 1 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”.
NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 1b Population intake, Stage 2 SHD Replanning Works are being conducted while Stage 1 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 3 and 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 3 and 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF.
Scenario for Phase 1a to 1c Population intake after April 2027:
The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 1c SHD Topside Development. According to the current development scheme, there will be 49 residential blocks ranging from 15 – 21 residential storeys high within the SHD Topside Development. A large commercial / retail area, public transport interchange and kindergarten will be also be provided at the Phase 1 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”.
NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 1c Population intake, Stage 2 SHD Replanning Works are being conducted while Stage 1 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 3 and 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 3 and 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF.
Scenario for Phase 1a to 2 Population intake after July 2030:
The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 2 SHD Topside Development. According to the current development scheme, there will be 68 residential blocks ranging from 15 – 21 residential storeys high and school within the SHD Topside Development. A large commercial / retail area, public transportation interchange and kindergartens will be also provided at Phase 1 to Phase 2 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”.
NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 2 Population intake, Stage 3 SHD Replanning Works are being conducted while Stage 1 and 2 Reprovisioned SHD is being operated under the podium deck. The industrial operations at the existing SHD at Stage 4 without decking area that is of a significant scale include rail grinding, maintenance works of passenger and engineering trains, train washing, wheel lathe, repairing workshops, etc, and the noise generated from these industrial operations would be one of dominant noise sources affecting the planned NSRs. In view of the significant scale of industrial operation, the existing SHD at Stage 4 area is designated as an industrial area for the purpose of TM-IND and is considered to be an IF.
Scenario for Phase 1a to 3 Population intake after July 2034:
The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 3 SHD Topside Development. According to the current development scheme, there will be 86 residential blocks ranging from 15 – 22 residential storeys high and schools within the SHD Topside Development. A large commercial / retail area, public transportation interchange and kindergartens will be also provided at Phase 1 to
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Phase 3 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”.
NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 3 Population intake, Stage 4 SHD Replanning Works are being conducted while Stage 1 to 3 Reprovisioned SHD is being operated under the podium deck. Thus the only IF affecting the SHD Topside Development would be NLH.
Scenario for Phase 1a to 4 Population intake after July 2038:
The future context of environs at Siu Ho Wan will be changed upon the population intake at Phase 1a to 4 SHD Topside Development. According to the current development scheme, there will be 108 residential blocks ranging from 15 – 22 residential storeys high and schools within the SHD Topside Development. A large commercial / retail area, public transportation interchange and kindergartens will be also provided at Phase 1 to Phase 4 Podium. SHD operation would be maintained during SHD Replanning Works. According to IND–TM, urban area means an area of high density, diverse development including a mixture of such elements as industrial activities, major trade or commercial activities and residential premises. Given the high density and diverse land uses of the proposed development, it is considered that all the area within the site boundary is considered as “Urban”.
NLH has an AADT of 68,930 in Year 2015 and hence it is considered as an IF as its daily traffic flow is greater than 30,000 vehicles. Under Phase 1a to 4 Population intake, SHD Replanning Works and SHD Topside Development will be completed. Thus the only IF affecting the SHD Topside Development would be NLH.
Table A1 Area Sensitivity Rating for fixed noise and rail noise assessment
ID[1] Phase Uses[2]
No. of
Residential
Storey
NAP[3] Type of Area Area with Existing
SHD Operation[4]
SHD Topside
Development Influencing Factor Degree of NSR affected [8] ASR[9]
Development Influencing Factor Degree of NSR affected [8] ASR[9]
802
1a to 2 E 1 802–01 to 802–02 Urban Area[7] Stage 4 area [B] NLH / Existing SHD Indirectly / Not Affected C
1a to 3 E 1 802–01 to 802–02 Urban Area[7] Nil [B] NLH Indirectly Affected C
1a to 4 E 1 802–01 to 802–02 Urban Area[7] Nil [B] NLH Indirectly Affected C
803 1a to 3 E 1 803–01 Urban Area[7] Nil [B] NLH Not Affected B
1a to 4 E 1 803–01 Urban Area[7] Nil [B] NLH Not Affected B
804 1a to 4 E 1 804–01 Urban Area[7] Nil [B] NLH Not Affected B
Remarks:
[A] SHD Topside Development includes residential blocks, commercial / retail area, public transport interchange and kindergarten. Attachment 1A shows the proposed development for podium level.
[B] SHD Topside Development includes residential blocks, commercial / retail area, public transport interchange, school(s) and kindergartens. Attachment 1A shows the proposed development for podium level.
Notes:
[1] Tower number of SHD Topside Development.
[2] R – Residential Premises, E – Educational Institutions (school), C – Country Parks.
[3] NAP equals to Noise Assessment Points. Figure 4.7 and Figure 4.9 show the location of NSRs for fixed noise and rail noise assessment.
[4] The industrial operations at the existing SHD without decking. Attachment 1B shows the proposed stage for SHO and SHD Replanning Works.
[5] These planned assessment points will face directly to the sea, and thus they would not be affected by the IFs.
[6] In accordance with Annex 13 of the EIAO–TM, country parks are considered to be a NSR. However, the EIAO–TM and IND–TM do not provide a specific noise limits for Country Parks.
[7] Refer to the scenario description above for its respective phasing on the definition of urban area.
[8] According to IND–TM, “directly affected” means that the NSR is at such a location that noise generated by the IF is readily noticeable at the NSR and is a dominant feature of the noise climate of the NSR; “indirectly affected” means that the NSR is at such
a location that noise generated by the IF, whilst noticeable at the NSR, is not a dominant feature of the noise climate of the NSR; “not affected” means that the NSR is at such a location that noise generated by the IF is not noticeable at the NSR.
[9] The corresponding ASRs of the NSRs are determined based on the best available information and is for indicative assessment only. The Noise Control Authority shall determine noise impact from concerned noise sources on the basis of prevailing legislation
and practices being in force, and the ASRs determined in this report should not bind the Authority when enforcing the NCO based on the contemporary conditions. The ASR would be reviewed as necessary based on the contemporary conditions/situations