Top Banner
Mounting System for new modules Module AIT-PL-6
14

Mounting System for new modules

Jan 14, 2016

Download

Documents

sevita

Mounting System for new modules. Module AIT-PL-6. Mounting way. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Mounting System  for  new modules

Mounting System for new modules

Module AIT-PL-6

Page 2: Mounting System  for  new modules

Mounting wayThe mounting system for new frameless modules AIT PL-6 was designed and is produced by Spanish company – GLOCALIZA SOLAR. It is fast and easy way to install PV modules for roof top systems and for the ground PV plants. The frameless technology allows to put modules very close to each others what saves installation space and improves efficiency of the whole PV plant. Modules are fastened to the structure with specially designed clips, then they are connected together with short cables what reduces electrical looses and improves systems’ efficiency.

Page 3: Mounting System  for  new modules

Connectors

Page 4: Mounting System  for  new modules

CONNECTORS

Connection between modules is performed using specially designed plugs and connectors placed on the front side of modules. This solution allows to keep the backside of module free of any devices (junction box), what makes installation more comfortable and more friendly for building integrated systems. Changing the termination location, reduce cables length and special connectors help to avoid unnecessary connections which can cause electric power looses.

Page 5: Mounting System  for  new modules

CONNECTORS MOUTING

Connectors are screwed into the plug laminated inside the module. After mechanical installation, the cables’ plugs are just to be easily screwed in using box spanner – size „17”.

Page 6: Mounting System  for  new modules

Aluminum constructionAluminum construction is specially designed to facilitate the installation process of new modules. Special clips are mounted to aluminum construction and allow to place modules in two rows. Numbers of rows and columns can be modified by adding more elements.

Page 7: Mounting System  for  new modules

Aluminum construction

Page 8: Mounting System  for  new modules

Aluminum construction

Page 9: Mounting System  for  new modules

MOUNTING CLIPS

Modules are fastened with special clips bolted to aluminum construction, each single module is griped in four points, one single clip joins two modules. Special rubber seal protects modules from mechanical and thermal tension.

Page 10: Mounting System  for  new modules

MOUNTING CLIPSInstalling modules using clips is very fast and easy

Page 11: Mounting System  for  new modules

MOUNTING CLIPS

Page 12: Mounting System  for  new modules
Page 13: Mounting System  for  new modules

Module installation

Page 14: Mounting System  for  new modules

Advantages/Innovations

No junction box: laminated diodes, termination for the positive and negative outputs located in the front side of the module allow for the elimination of a junction box .No connectors: modules connected directly with one short cable, which significantly reduces series resistance losses.Plain rear surface: by changing the termination location the back surface of module stays plain from any devices, making access to connection points easy to reach from the front side of the module.Short cable connection: reduces series resistance losses, no need to mind long wiring, simply bolt two modules together with one short cable.Easy to mount: plain rear area of the module enables  mounting it directly onto  a required surface.