C270 (HK BIODIESEL PLANT) Safety Report C270 Monthly Safety Report – July 2013
15
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Monthly Safety Report 2013 07_Jul

C270 (HK BIODIESEL PLANT) Safety Report

C270 Monthly Safety Report – July 2013

Page 2: Monthly Safety Report 2013 07_Jul

Safety :Contribution from All Level ( Top to Shop )

SAFETY STATISTICS

Jun 2013 Jul 2013

Accumulated Man-hour 724,254 772,884

Days worked from Commencement

599 630

Accumulated Man-day Lost 1357 1446

Cumulative Accident Frequency Rate

0.69 0.78

C270 Monthly Safety Report – July 2013

Page 3: Monthly Safety Report 2013 07_Jul

SAFETY INSPECTION / MEETINGPhysical site safety walks

C270 Monthly Safety Report – July 2013

Page 4: Monthly Safety Report 2013 07_Jul

SAFETY INSPECTION / MEETING

Weekly Safety Meetings with Safety Representatives of Subcontractors

C270 Monthly Safety Report – July 2013

Page 5: Monthly Safety Report 2013 07_Jul

AREA NEED IMPROVEMENT

FALL FROM HEIGHT– Insufficient fencing at floor

edge

PROMPT RECTIFICATION

Improvement – Continuous barriers erected at

floor edge

C270 Monthly Safety Report – July 2013

Page 6: Monthly Safety Report 2013 07_Jul

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

Improvement – Permanent concrete strip

cover installed

HOUSEKEEPING– Floor opening not properly

covered

C270 Monthly Safety Report – July 2013

Page 7: Monthly Safety Report 2013 07_Jul

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

Improvement – Outrigger of crane lorry fully

extended in lifting operation

LIFTING SAFETY– Outriggers of crane lorry not

fully extended

C270 Monthly Safety Report – July 2013

Page 8: Monthly Safety Report 2013 07_Jul

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

HOUSEKEEPING– Temporary site luminous

facility failure

Improvement – Temporary site luminous

facility restored

C270 Monthly Safety Report – July 2013

Page 9: Monthly Safety Report 2013 07_Jul

POSITIVE SAFETY ATTITUDE

PRE-WORK MEETING

Installation of Chimney– Site Specific Safety Meeting prior to lifting operation

C270 Monthly Safety Report – July 2013

Page 10: Monthly Safety Report 2013 07_Jul

POSITIVE SAFETY ATTITUDE

PRE-WORK MEETING

Removing Steam Boiler– Site Specific Safety Meeting prior to lifting operation

C270 Monthly Safety Report – July 2013

Page 11: Monthly Safety Report 2013 07_Jul

POSITIVE SAFETY ATTITUDE

Inspection by Labour Department

QUALITY, SAFETY and ENVIRONMENT Inspection by Government Department

C270 Monthly Safety Report – July 2013

Page 12: Monthly Safety Report 2013 07_Jul

SAFETY TRAINING

Site Specific Safety Induction

Current MonthAccumulate (Oct 2011 –

Jul 2013)

No. of class 19 448

No. of Attendee 48 1883

INDUCTIONTRAINING

C270 Monthly Safety Report – July 2013

Page 13: Monthly Safety Report 2013 07_Jul

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendee

Safety Lifting safety 13

Safety Safe Use of Ladder 10

Environment Dust Control 86

Safety Inclement Weather 86

Safety General Duties 86

Safety Slip & Trip 89

Current Month Total 344 nos.

Accumulated Total :6,724 nos.

C270 Monthly Safety Report – July 2013

Page 14: Monthly Safety Report 2013 07_Jul

SAFETY Promotion

9 nos. Very Hot Weather Warning

8 nos. Thunderstorm Warning

1 no. Tropical Cyclone Warning

4 nos. Safety News Sharing

20 nos.EC claim communications (HRD/subcontractors)

7 nos.Safety & Health Interface – other main contractors

18 nos.Safety & Health Advice to CHEC

subcontractors

3 nos. Safety & Health Advice - internal

5 nos. Communication with CHEC Safety

Safety Circulation

C270 Monthly Safety Report – July 2013