MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection to HV trunk line P.A. MONFILS, Jean-Louis LILIEN, A. OMBOUA
18

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

Jan 11, 2016

Download

Documents

Gyles Beasley
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

One phase rural distribution installation with direct connection to

HV trunk line

P.A. MONFILS, Jean-Louis LILIEN, A. OMBOUA

Page 2: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

2MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

• Scope of the project

• Local conditions

• Makola application

• Load

• Reliability aspects

SUMMARY

Page 3: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

3MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Scope of the project

The problem The solution

Page 4: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

4MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Typical low load user (Makola)

Page 5: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

5MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Refrigerators 3 kVA

Human health center 3

TV and video 2

Private lighting 24

Public lighting 7

Water pumping 3

TOTAL 42 kVA

One 500 people village:Estimated load (UNESCO)

Typical low load user (Makola)

Conclusion: 50 kVA is OK

!

Page 6: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

6MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Local conditions

Page 7: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

7MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Local conditions

• 846 km from the main power supply

• Very low short-circuit level: 360 A

• Very low load: – Frequent over-voltages– Important power availability

50 kVA = 3.10-4 SIL (Surge impedance loading)

• Very high keraunic level (lightning activity)

Page 8: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

8MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Local conditions

• High soil resistivity: > 3000 .m– HV earth resistance: 35– Risks for the inhabitants

• in case of line-to-earth fault• in case of lightning on the HV line

– Needs deep analysis of earthing system

Page 9: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

9MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

F ig 5 -5 : C o nfig ura tion du c ircu it A : terre du p ylône B : terre du poste H T C : terre du réseau B T

R T 3

A B C

• Schematic diagram

Makola application

Page 10: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

10MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

• SF6 VT technology: high reliability

• Limited maintenance• Limited weight: easy to

transport/handle• Limited cost (no switch

bay)• Direct from 245 kV to

230 V (50 kVA)

Makola application

Page 11: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

11MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Makola application

Page 12: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

12MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Makola application

Page 13: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

13MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Makola application

Page 14: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

14MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Load recording

Page 15: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

15MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Load recording

Page 16: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

16MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Reliability aspects

• Improved technology (SF6 VT) with very limited maintenance

• Immediate protection by ZnO surge arrester• One year experiment: the reliability of the

equipment is much higher than the HV system (min 5 power outages per month)

• Possible improvement by use of HV fuses

Page 17: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

17MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

• Improvement of the quality of life of rural populations (< 3% of peoples access electrical power in Congo)

• Electrical energy gives access to drinking water, food preservation, lighting.

• Electrical energy may help starting development of local activities

• Our solution is cost effective, easy to handle and reliable

Conclusions

Page 18: MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14

Barcelona 12-15 May 2003

Thank you for your attention !