Top Banner
1 February 2008 MOL Group Upstream Exploration and Development update * Preliminary average hydrocarbon production in 2007 (boepd) ** Preliminary 2P reserves according to SPE as of 31.12.2007. Final number will be presented in the Annual Report. Exploration and development activities are fundamental in fulfilling our organic strategic objectives. Through finding new prospects for future development, our exploration activity is a significant contributor to the organic growth targets of 2010 and beyond. We have a vast exploration and production experience, initially gained from our Hungarian home base, and later extended to various international operating areas. Our key tasks in Hungary are to maintain our top-European- efficiency *** and to increase further the ultimate recovery factor of our mature fields. In the last two decades, we demonstrated our ability to be able to operate projects in various stages in a professional, competent and effective way to our international and local partners as well as host governments. Our core international exploration and production areas involve Russia, the Middle East-Central Asia region and selected regions of Africa. Our main objective is to develop a strong and balanced portfolio with significant upside at an appropriate risk level, by maximizing the value of existing discovered and producing reserves, acquiring new exploration acreages based on our key capabilities, originating new projects in territories neighbouring our existing fields and exploring Hungary’s unconventional gas potential. For certain projects, partner involvement is preferred to share risks, gain access to leading technological solutions and to extend our portfolio. *** According to surveys of John S. Herold and Harrison Lovegrove MOL had the highest net income among European upstream producers for five consecutive years between 2002 and 2006 Matyushkinskaya Block Production*: 600 bblpd Reserves**: 2.2 MMbbl Pakistan, Margala and Margala-N Blocks Oman, Block 43B Yemen, Block 48 Kazakhstan, Fedorovsky Block Baituganskoye Block Production*: 1,900 bblpd Reserves**: 64.4 MMbbl Russia, Surgut-7 Block Hungary Production*: 62,900 boepd Reserves**: 209.8 MMboe Tal Block Production*: 1,200 boepd Reserves**: 14.8 MMboe Cameroon, Ngosso Permit Block ZMB field Production*: 23,900 bblpd Reserves**: 49.4 MMbbl Kurdistan (Iraq), Akri- Bijeel and Shaikan Blocks
14

MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

May 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

1

February 2008 MOL Group Upstream Exploration and Development update

* Preliminary average hydrocarbon production in 2007 (boepd) ** Preliminary 2P reserves according to SPE as of 31.12.2007. Final number will be presented in the Annual Report. Exploration and development activities are fundamental in fulfilling our organic strategic objectives. Through finding new prospects for future development, our exploration activity is a significant contributor to the organic growth targets of 2010 and beyond. We have a vast exploration and production experience, initially gained from our Hungarian home base, and later extended to various international operating areas. Our key tasks in Hungary are to maintain our top-European-efficiency *** and to increase further the ultimate recovery factor of our mature fields. In the last two decades, we demonstrated our ability to be able to operate projects in various stages in a professional, competent and effective way to our international and local partners as well as host governments. Our core international exploration and production areas involve Russia, the Middle East-Central Asia region and selected regions of Africa. Our main objective is to develop a strong and balanced portfolio with significant upside at an appropriate risk level, by maximizing the value of existing discovered and producing reserves, acquiring new exploration acreages based on our key capabilities, originating new projects in territories neighbouring our existing fields and exploring Hungary’s unconventional gas potential. For certain projects, partner involvement is preferred to share risks, gain access to leading technological solutions and to extend our portfolio. *** According to surveys of John S. Herold and Harrison Lovegrove MOL had the highest net income among European upstream producers for five consecutive years between 2002 and 2006

Matyushkinskaya Block Production*: 600 bblpd Reserves**: 2.2 MMbbl

Pakistan, Margala and Margala-N Blocks

Oman, Block 43B Yemen, Block 48

Kazakhstan, Fedorovsky Block

Baituganskoye Block Production*: 1,900 bblpd Reserves**: 64.4 MMbbl

Russia, Surgut-7 Block

Hungary Production*: 62,900 boepd Reserves**: 209.8 MMboe

Tal Block Production*: 1,200 boepd Reserves**: 14.8 MMboe

Cameroon, Ngosso Permit Block

ZMB field Production*: 23,900 bblpd Reserves**: 49.4 MMbbl

Kurdistan (Iraq), Akri-Bijeel and Shaikan Blocks

Page 2: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

2

Hungarian exploration and development We are the key player in the Hungarian upstream industry with over 70 years experience in exploration and production and the strongest acreage position in Hungary with a total exploration acreage of 33,808 sqkm or 8,353,842 acres at the end of 2007. As our production declines gradually, many of our fields being already in mature phase, our main goal is to moderate the decline of production and to keep the top-European efficiency in terms of unit costs. To achieve this, we intend to work our exploration acreage in a more intensive way, putting ever harder emphasis on partnership and an increasing focus on unconventional gas exploration activities, but at the same time we continuously develop our newly discovered fields as well as work on new projects – exploiting a period of high hydrocarbon prices – which all aim to enhance the brownfield potential of some of our oil and gas fields through enhanced or improved hydrocarbon recovery methods (EOR/IOR/EGR). Some of the partially or fully exploited fields may be turned into cost-effective underground storage facilities, well-located in the heart of one of Europe’s fastest growing gas markets. Field development and improved recovery projects ► We dedicated USD 45 m in 2007 on field development projects (in the Soltvadkert, Hosszúpályi, Földes-East,

Kápolnapuszta, Zalakomár and Öttömös-West fields) and improved recovery projects (in the Csongrád and Üllés fields) in 2007. We expect to bring 20 MMboe reserves into production via these projects, of which 2.7 MMboe (share of oil fields: 0.5 MMboe and 1400 boepd, share of gas fields: 2.2 MMboe and 6000 boepd) is expected to be produced already in 2008.

► We are accelerating our field development activity from 2008, with 25 projects in total (which of 7 are in implementation phase), having a combined capex of USD 270 m between 2008-2010 and targeting 60-80 MMboe from our undeveloped reserve base. The returns for such projects are expected to be strong as transportation infrastructure and gathering systems are available in their proximity.

► We continue the development of the recently discovered oil fields (Gomba and Tóalmás fields) in the Paleogene region and significant investment will be dedicated to the further development of producing gas fields (including Hosszúpályi gas field) in order to sustain natural gas production. Gas caps of existing oil fields are also available for development due to the maturity of oil production (e.g. in Algyő field). Low calorific value gas resources are also evaluated for development and local power plant usage.

► A potential of over 20-25 MM boe of new resource additions (8-10,000 boepd additional peak production) has been identified through Enhanced Oil Recovery/Enhanced Gas Recovery/Improved Oil Recovery (EOR/EGR/IOR) projects. We are now in a preparatory phase after detailed evaluation and prioritisation of such brownfield opportunities, and the development of these opportunities is expected to begin in 2008 with the most attractive, highest return projects.

Strong emphasis on exploration: new concepts, new partners ► While keeping as the backbone of our strategy the focus on testing mid-size, moderate risk prospects from

our inventory, we have also started to drill smaller individual prospects with higher geological probability closer to existing infrastructure as well as the exploration in the relatively under-explored areas of the Hungarian-Croatian border. For such activity, in order to maximize skill-base and operating focus as well as to share risks and costs, we have teamed up with partners on several projects (our strategic partner INA from Croatia and Horizon Hungary Energy, an affiliate of US-based Aspect Energy).

► This dual effort proved to be fairly successful in 2007, when we spent a total of nearly USD 50 m on domestic exploration projects (MOL share). We achieved a strong, over 60% success rate, as we had 8 successful exploration wells out of the total of 13 wells tested this year. 5 further wells were dry or failed to produce commercial quantities of hydrocarbons and there were additional 2 wells under or waiting for testing.

► We expect to spend around USD 150 m on conventional exploration in Hungary between 2008 and 2010, including drilling 10-12 exploration wells annually and further seismic acquisition to identify new prospects in our acreages. This exploration activity will target approximately 40 MMboe of unrisked resources.

► We intend to evaluate and explore the unconventional exploration potential of Hungary, having several hundreds bcm combined original gas-in-place resource potential. Given the costs and significant geological and technical risks and challenges involved, will require a step-by-step approach from MOL, also identifying and involving partners which may add most value to each basin where MOL would not like to operate alone. As a first step, we signed a cooperation agreement with Esso in May 2007 for the joint evaluation of the unconventional potential in the Makó and Békés basins. There are several other geological formations located in the Pannonian basin (in the Derecske, Dráva and Zala basins), where exploration of unconventional hydrocarbon can be pursued. The Berettyóújfalu-1 well (Derecske basin) spudded in 2006 already confirmed the presence of gas in a multi-layered tight reservoir, and will come on stream early 2008, further exploration of the potential of the Derecske basin will follow after carrying out appropriate studies and identifying the most economic production stimulation methods.

Page 3: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

3

International exploration and production Our fifteen years international experience in exploration, field development and production activity is a testament to our ability to operate projects professionally and effectively, also in partnership with local or international partners. Our core international exploration and production areas involve Russia (currently being the second largest production centre of MOL Upstream), the Middle East-Central Asian area as well as selected parts of Africa. Currently we have producing assets in Russia and Pakistan and we continue the development of our acquired Russian assets and the already discovered Pakistani reserves. We carry out exploration activities in a growing number of countries. Finally, we intend to develop a stronger, balanced portfolio with significant upside opportunities at appropriate geologic and technical risk level. This may happen through acquisitions, swaps or entering into new greenfield exploration or brownfield field development or field rehabilitation projects based on our skills and competencies. We intend to allocate an organic capex of USD 600 m in international upstream activities (USD 310 m for field development projects and USD 290 m for exploration projects ) 2008-10, after spending nearly USD 157 m in 2007 (which of 59 % for exploration and 41 % for development including acquisitions).

Field development activities in Russia

► In ZMB field (West Siberia, 50% MOL share) we plan to spend approximately USD 60 m between 2008-10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water injection centre, gathering system and infrastructure.

► In the Baitugan field (Volga-Urals, 100% MOL share) we expect to spend approximately USD 115 m between 2008-2010 for development. In 2008 we plan to drill 14 horizontal re-entries and one new horizontal well and plan to lay the foundations for a new, comprehensive field development plan by carrying out a 3D seismic acquisition on the entire area. The reconstruction and extension of gathering system will also start this year, and from 2009, the development will contain drilling 40-45 production wells, 15-20 injection wells, five water wells; as well as a water injection system, and the reconstruction of the central processing facility.

Russian exploration: focusing on upside potential in core region ► In the Matyuskinshkaya areas (acquired during 2007) between 2008-10 we expect to acquire 590 km2

3D seimic and 600 km 2D seismic, then continue to drill 5 exploration and appraisal wells and build the necessary surface facilities with a total expected capex of around USD 155 m.

► In Surgut-7 block (near ZMB) we have completed the first phase of seismic interpretation and prospect identification. The drilling of the first prospect is planned to be spudded in March 2008, the total work programme in this block between 2008-10 is expected to be completed with a capex of USD 30 m and containing the drilling of 3 exploration and appraisal wells in total.

Field development activities in Pakistan: harvesting the fruits of recent major discoveries, exploring for further upside

► In the major Manzalai gas/condensate field (North-West Frontier Province, 10% MOL share), which was the first discovered field in the MOL-operated Tal block, the completion of surface facilities, a 200 km gas pipeline and drilling of 6 production wells (in total) is in progress in order to produce 250 MMSCFD gas and 4500 boepd condensate by 2009/10. Planned capex for the share of MOL is around USD 20 m between 2008-10.

► The development of our second discovery, the Makori gas, condensate and oil field (same area, same MOL share) includes building the gas treatment plant, other surface facilities, and oil and gas pipelines with an expected capex USD 8 m (MOL share) in 2008-10.

► In the same Tal block areas we forecast expenditures of USD 15-20 m for 2008-10 for a new exploration phase and for the appraisal program of Makori and MamiKhel to identify further upside potential in the block.

► In the two neighbouring Margala blocks (Islamabad area, 70% MOL share) we plan to acquire 600 km of 2D seismic data. Based on results from this new seismic, we expect to identify drillable prospect(s) and (optionally) drill an optional exploration well in each blocks. The planned expenditure for seismic and new exploration wells is USD 20 m (MOL share) for 2008-10 in the two blocks.

Page 4: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

4

Milestones on the way to a stronger more balanced portfolio

► In Kazakhstan we operate with a 27.5% stake in the mid to high-risk Fedorovskoye exploration block (Uralsk area). Based on the proved prospectivity (oil shows in one of the two previous exploration wells) we evaluate the further potential of the block by ongoing Rozhkovsky-U-10 well. We currently plan to spend USD 10 m (MOL share) on exploration between 2008-10.

► We have a 100% stake in the Block 43B in Oman, where we expect to spend USD 35 m on exploration between 2008-10 targeting several TCF of gas potential. This project is in a conceptual phase, testing a high-risk high-reward area. The acquisition of 900 km 2D seismic will start very soon, to be continued with the drilling of one or two exploration wells in 2009.

► In Yemen Block 48 (Mukalla area, 100% MOL share) the approving process of a twenty four-month License Extension is in progress. Based on the previous geological success we prepare further geological/facies studies in 2008 and in case of finding a good drillable prospect we optionally drill a new exploration well in 2009-2010 with partner. Planned CAPEX for 2008-2010 is USD 15 m.

► In Iraqi Kurdistan we acquired participation in 2 blocks in 2007. In Akri Bijeel Block MOL is the operator with an 80% interest. In 2008 we plan G&G studies and 450 km 2D seismic acquisition, in 2009 an exploration well is planned to be drilled which will be tested in 2009/2010. In Shaikan Block the operator is Gulf Keystone Petroleum International LTD. 75%, MOL has 20% interest and other partner is Texas Keystone INC. with 5%. The planned work program is 200 km 2D seismic acquisition and an exploratory well in 2008. Total CAPEX of the 2 projects (MOL share) is USD 50 m.

► MOL has started a purchase transaction for a 40% interest in Ngosso Block, Cameroon at the end of 2007. Completion of the transaction is subject to Camerooni Government’s approval. The operator of the block is Addax with 60% working interest. The planned work program is to drill and test two appraisal wells with USD 60 m CAPEX (MOL share).

Page 5: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

5

Appendix Exploration and development expenses (in USD million) Activities 2007 actual 2008-10 expected Hungarian Exploration & Development

Exploration (conventional) 50 150 Development (conventional) 45 270

International Exploration Russia, Block Surgut-7 2 30

Russia, Block Matyuskinshkaya (incl. acq. in 2007) 49 50 Pakistan, Blocks (Tal, Margala, Margala North) 7 40 Oman, Block 43B 2 35 Kazakhstan, Block Federovskoye 7 10 Yemen, Block 48 24 15 Kurdistan, Blocks Akri-Bijeel and Shaikan 50 Cameroon, Block Ngosso Permit 60

International Development Russia, ZMB 20 60 Russia, Matyuskinshkaya 31 105 Russia, Baitugan (incl. acq. in 2007) 9 115 Pakistan (Manzalai, Makori) 5 30

Planned daily production based on our existing portfolio weighted by geological risk (thboepd)

0

20

40

60

80

100

120

140

2007 2008 2009 2010 2011 2012 2013

thbo

epd

Liquids - Hungary Natural gas - Hungary Liquids - Russia

Natural gas - Pakistan Liquids - other Natural gas - other

Page 6: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

6

Tested wells in 2007

Country Hungary Russia Kazakhstan Pakistan Yemen Total Wells tested 21 26 1 2 2 52

o/w exploration wells 13 0 1 0 2 16 oil producer 0 natural gas producer 8 8 dry/non-commercial 5 1 2 8

o/w appraisal/development wells 8 26 0 2 0 36

oil producer 5 26 31 natural gas producer 1 2 3 dry/non-.commercial 2 2

Further exploration wells (2 in Hungary, 1 in Pakistan and 1 in Kazakhstan) and two development wells (in Russia) were in progress at the end of 2007. Hungary Hungarian exploration activity in 2007

Geoph.meas./ expl.well Status as of end-2007 Test production

MOL Paying/ participating

interest % Partner

Nagykőrös-D-2 Drilled, tested - successful 25,760 m3/day of gas (using 6 mm choke).

6 new gas pools discovered. 100 / 100 -

Léta-1 Drilled, tested - successful

103,800 m3/day gas 4 m3/day condensate (using 8 mm choke).

19 new gas pools discovered

100 /100 -

Álmosd-É-1 Drilled, tested - successful

51,000 m3/day of gas 1.9 m3/day of condensate

(using 6 mm choke) 10 new gas pools discovered.

100 / 100 -

Mp-É-1 Dry - no flow 100 / 100 - Monor-ÉK-2 Dry - water bearing 100 / 100 - Pü-K-1 Dry - water bearing 100 / 100 -

Jászberény-ÉK-1 Dry - absence of reservoiring sequences

100 / 100 -

Földes-ÉK-1 Waiting for test - Q1 2008 100 / 100 - Őrtilos-1 Waiting for test - Q1 2008 100 / 100 -

Zaláta-1 Tested - successful 339,400 m3/day gas

3.3 m3/day of condensate (using 12 mm choke).

50 / 50 INA

Zsadány-É-1 Drilled, tested - successful 40 / 50 HHE Körösújfalu-1 Drilled, tested - successful 40 / 50 HHE Körösújfalu-2 Drilled, tested -successful 40 /50 HHE Okány-1 Tested -successful

46,900-255,000 m3 gas/day 5-72 m3 condensate/day (using 6-11 mm choke).

0 / 50 HHE Zsadány-ÉK-1 Dry - water bearing 40 / 50 HHE Mezőkovácsháza 3D seismic Completed 100 / 100 -

Oresac-Potony 3D seismic In progress 50 /50 INA

Page 7: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

7

Location and results of the exploration wells in Hungary in 2007

Zaláta-1

Kőrösújfalu-1Kőrösújfalu-2Zsádány-ÉK-1Zsádány-É-1Okány-1

Őrtilos-1

Monor-ÉK-2

NK-D-2

Föl-ÉK-1

Léta-1Alm-É-1

MPI-É-1

PÜ-K-1JB-ÉK-1

Activity areas with partners

Waiting for test

Project start in 2007

Commercial Gas-Discovery

Dry

Location of the main finalised and planned developments in 2007-10

Gomba Tóalmás

Öttömös

Soltvadkert

Development of gas caps in Algyõ field phase1

Öttömös-W

Fábiánsebestyén geothermal project

Supply THE with low caloric gas phase 1

Hosszúpályi-S pres. boost up

Vízvár-N

Sávoly-W

Vétyem

Zalakomár

Földes-E

Kápolnapuszta

Algyõ Csongrád-S

Development of gas caps in Algyõ field phase2

Köröstarcsa - BiKe low caloric gas fields

Algyõ Tisza-1’ reserv.

Geotherma l pilot

Gas Oil Geothermal

0-1 MMboe1-5 MMboe5 MMboe<

Projects completed

Projects in progress or new project

Page 8: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

8

Russia

Field development ZMB (Zapadno-Malobalik) Dev. expenditure for 2007 (USD m) 20

Dev. program in 2007 • Drilling of 23 new oil production and water injection wells • Extension of the gathering system and infrastructure

Dev. expenditure for 2008-10 (USD m) 60

Dev. program in 2008-10 • Drilling 70-80 production and injection wells • Drilling 2 horizontal re-entry wells • Extending the water injection centre, gathering system and infrastructure

Field development Baitugan Dev. expenditure for 2007 (USD m) 9

Dev. program in 2007 • Revising the existing development plan • Drilling of one horizontal well and one horizontal re-entry started in November 2007.

Dev. expenditure for 2008-10 (USD m) 115

Dev program in 2008-10

• Drilling 40-45 production wells, 15-20 injection wells, five water wells, 14 horizontal re-entries and one new horizontal well

• Establishing the new Field Development Plan by 3D seismic acquisition • Reconstruction and extension of gathering system, water injection system and the CPS

Exploration Block Matyuskinshkaya

Expenditure for 2007 (USD m) 80 (including acquisition and development)

Work program in 2007 • New production wells were put into operation • Existing wells were successfully fractured • Building of a Central Processing Station (CPS) and a Commercial Access Point

Expenditure for 2008-10 (USD m) 155 (including development)

Work program in 2008-10 • 590 km2 3D and 600 km 2D, drilling 5 exploration wells, production wells, water injection

wells, water producer wells • Building surface facilities

Exploration Block Surgut-7 Expl. expenditure for 2007 (USD m) 2

Expl program in 2007 • Identifying of three promising leads and prospects based on interpretation of seismic • Interpretation of recently acquired 2D seismic data started • Completion of 3D survey: 20%

Expl. expenditure for 2008-10 (USD m) 30

Expl.program in 2008-10 • 300 km2 3D and 80 km 2D seismics • 3 exploration wells

Baytugan

Owners MOL (100%) Reserve in 2007 (MMboe) 64.4 (2P) Production in 2007 (bbl/day) 1.9 thbbl/day ZMB

Owners MOL (50%) Russneft (50%) Reserve in 2007 (MMboe) 49.4 (2P) Production in 2007 (bbl/day) 23.9 thbbl/day Surgut 7 Owners MOL (100%) Reserve in 2007 (MMboe) - Production in 2007 (bbl/day) - Matyuskinshkaya Owners MOL (100%) Reserve in 2007 (MMboe) 2.2 (2P) Production in 2007 (bbl/day) 0.6 thbb/day

Page 9: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

9

Pakistan

ARABIAN SEA

DISPUTED TERRITORY

INDIA

AFGANISTAN

IRAN

P A K I S T A N

150 km

TAL Block

MARGALA andMARGALA-NORTH Blocks

Field development Manzalai, Makori (Tal block) Development expenditure for 2007 (USD m) 5

Development program in 2007

Manzalai: • The Manzalai-4 production well reached its actual final bottom hole depth in May 2007. • The well was re-completed for gas production. • Drilling of the Manzalai-6 well started in June 2007, resent bottom hole depth is 3400 m

at the Patala formation. Development expenditure for 2008-10 (USD m) 30

Development program in 2008-10

Manzalai • The completion of surface facilities and a 200 km gas pipeline • Drilling of 6 production wells (in total) is in progress to in order to produce gas by 2009.

The current recovery ratio of the field is 550-600 bbl. Makori: • Commencing in 2008 including building the gas treatment plant, other surface facilities,

and oil and gas pipelines. • Drilling of Makori-2 appraisal well in 2008, in order to verify the predicted reserve size

Exploration Blocks Tal, Margala, Margala North Expl. expenditure for 2007 (USD m) 7

Expl program in 2007

• 750 km² of 3D seismic measurements in the Makori structure, processing and interpretation of these measurements, determination of the exact location of Makori-2 appraisal well

• Testing of the Mami Khel-1 well in the Lockhart formation and drill a deviated section (sidetrack)

• G&G gravity and magnetic measurements Expl. expenditure for 2008-10 (USD m) 40

Expl program in 2008-10

Margala and Margala North • Two years seismic activity (300 Km 2D) in each blocks • In the third year the drilling of 1 optional exploration well in each blocks Tal • Acquisition of 300-500 sqkm 3D seismic and EWT of MamiKhel-1 in 2008 and drilling of

one appraisal well in 2009 • Continuation of early production of Makori-1well until end 2008 and drilling of one

appraisal well • Reprocessing of 600 km seismic lines in 2008 and drilling of two exploration wells

TAL

Owners MOL (10%), operator Reserve in 2007 (MMboe) 14.8 (P2) Production in 2007 (bbl/day) 1.2 thboe/day Margala, Margala North

Owners MOL (70%) aim to reduce our stake to 50 %

Reserve in 2007 (MMboe) - Production in 2007 (bbl/day) -

Page 10: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

10

Kazakhstan

CHIN

A

ÜZBEKISTANKIRGIZISTAN

TÜRKMENISTAN

300 km

Almaty

Fedorovskiy Block

CA

SP

IAN

SE

A

Aral Lake

Balhas Lake

RUSSIA

CHINAUZBEKISTAN KIRGIZISTAN

TURKMENISTAN

500 km

K A Z A K H S T A N

Exploration Block Fedorovskoye Expl. expenditure for 2007 (USD m) 7

Expl program in 2007

• All prior commitments including two wells and 250 km² of 3D acquisition was fulfilled at the end of 2007

• The focus of exploration activities has shifted to the northern part of the Block –following the partial successes of our original exploration model in two exploration wells in the Southern basinal part of the Block – where more than 1000 km² of 3D acquisitions was made.

• Based on the interpretation of the seismic measurements in the Rozhkovsky structure we have identified the location for drilling the Rozhkovsky U-10 well. The time processing of the 700 sqkm 3D seismic measurements in Zhaik and Rubezhinsky areas was completed. Depth processing started in September.

• The first phase of the seismic re-interpretation of the Fedorovskoye Block started in June 2007 in Uralsk. After completion of the time interpretation, velocity volume is determined for depth conversion.

• Zharsuat U-5 well: the objective was to penetrate a hydrocarbon saturated presalt carbonate reservoirs. The well was qualified as a dry hole on January 9, 2007.

• Rozkovsky-U-10 well: the well is targeting hydrocarbons in a presalt multilayer carbonate reservoir. Drilling operations started at the end of October.

• Chinarevskoye-11 well: the old well was re-entered to reduce pressure developing in the casing. Testing of a reservoir layer was planned to assess possible hydrocarbon saturation. The operation was completed on August 7, but it was unsuccessful due to the unexpectedly difficult technical conditions in the well.

Expl. expenditure for 2008-10 (USD m) 10

Expl program in 2008-10 • Seismic processing and interpretation • 1 exploration well

Federovskoye

Owners

MOL (27.5%), EVL, FIOC UOG is the Operator Company of the Block. MOL is Operating Shareholder. The current Extension of Exploration Period expires on May 11th 2008. Approval by the relevant Authorities of a Second Extension of Phase 2 until 11 May 2010 is ongoing.

Reserve in 2007 (MMboe) -

Production in 2007 (bbl/day) -

Page 11: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

11

Oman

43B BLOCK

O M A N

I S LAMI C RE PUBL I C O F I RAN

GUL F OF OM AN

UNI TE DARAB E MI RATE S

AR

AB

IAN

SE

A

Exploration Block 43-B Expl. expenditure for 2007 (USD m) 2

Expl program in 2007 • Detailed surface geological survey on the block finished • The reprocessing of old seismic data was completed in October • Successful magneto telluric test survey was performed in mid-2007

Expl. expenditure for 2008-10 (USD m) 35

Expl program in 2008-10 • 300 km 2D plus 650 km seismic measurements • Gravity/magnetic and magnetotelluric survey • Drilling of 2 exploration wells

Yemen

Sana'aAl Mukalla

Y E M E N

SAUDI ARABIA

SOMALIA

OM

AN

RED

SEA

GULF OF ADEN

150 km

Block 48

Exploration Block 48 Expl. expenditure for 2007 (USD m) 24

Expl program in 2007

• The first exploration well (Tibela NW-1) was drilled to 3,715m by March, 2007 and was classified as dry

• The second (obligatory) exploration well (Tibela North-1) was drilled in April, 2007 and reached 3,853 m bottom hole depth. The hydrocarbon shows found in the well were favourable but well tests indicated that the gas and light crude oil inflow were not in commercial quantities. The well proved the working hydrocarbon system of the block.

Expl. expenditure for 2008-10 (USD m) 15

Expl program in 2008-10 • Geological/facies studies in 2008 and in case of finding a good drillable prospect drilling an exploratory well with partner

43 B

Owners

MOL (100%) Farming-out up to 60% of our interest on an asset swap basis, prior drilling the first well scheduled for 2009, but retaining operatorship

Reserve in 2007 (MMboe) - Production in 2007 (bbl/day) -

48

Owners MOL (100%) The expiry date of the license is January 15, 2008.

Reserve in 2007 (MMboe) - Production in 2007 (bbl/day) -

Page 12: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

12

Kurdistan (Iraq area)

SYRIA

IRAN

SAUDIARABIA

KUWAIT

Akri-Bijeel BlockMOL

Shaikan BlockGulf Keystone

JORDAN

150 km

I R A Q

Exploration Block Akri-Bijeel and Shaikan Expl. expenditure for 2007 (USD m) -

Expl program in 2007 - Expl. expenditure for 2008-10 (USD m) 50

Expl program in 2008-10

Akri Bijeel Block: • Acquisition of app. 450 km new 2D seismic. As a result of seismic acquisition, processing

and interpretation, in case of finding drillable prospect(s) 1 exploration well Shaikan Block • 200 km new 2D seismic and drill and test an exploration well

Cameroon

NIGERIA

CHAD

C A M E R O O N

CENTRALAFRICANREPUBLIC

EQUATORIALGUINEA

GABON REPUBLICOF CONGO

DoualaYaoundé

NGOSSO Block

150 km

ATLANTICOCEAN

Exploration Block Ngosso Permit Expl. expenditure for 2007 (USD m) -

Expl program in 2007 - Expl. expenditure for 2008-10 (USD m) 60

Expl program in 2008-10 • Drilling of 2 appraisal wells in 2008

Akri-Bijeel and Shaikan

Owners

Akri-Bijeel block: MOL is the operator with an 80% interest and has a partner, Gulf Keystone Petroleum with 20 % share Shaikan Block: MOL acquired a 20% in partnership with Gulf Keystone Petroleum as the operator (75% interest) and Texas Keystone (5%).

Reserve in 2007 (MMboe) - Production in 2007 (bbl/day) -

Ngosso Permit

Owners

MOL (40%) is subject to the approval of the Government of the Republic of Cameroon. The block is operated by Addax Petroleum, a reputable player in West Africa, with significant operational experience in similar environments in Nigeria and Gabon, and a track record of 100% exploration success in the past years.

Reserve in 2007 (MMboe) - Production in 2007 (bbl/day) -

Page 13: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

13

Glossary

CAPEX: Capital Expenditures Choke: A device that is used to control fluid flow rate or downstream system pressure. Depth conversion: The process of transforming seismic data from a scale of time (the domain in which

they are acquired) to a scale of depth to provide a picture of the structure of the subsurface independent of velocity.

Dry well: An investigated borehole which does not confirm the existence of a hydrocarbon site or is not able to profitably produce crude oil or natural gas.

EGR: Enhanced Gas Recovery EOR: Enhanced Oil Recovery. The third stage of hydrocarbon production during which

sophisticated techniques that alter the original properties of the oil are used. Its purpose is not only to restore formation pressure, but also to improve oil displacement or fluid flow in the reservoir.

Field development: Process of implementing surface and sub-surface facilities necessary for the recovery of hydrocarbon reserves.

IOR: Increased Oil Recovery Magneto telluric test: An electromagnetic method used to map the spatial variation of the Earth's resistively

by measuring naturally occurring electric and magnetic fields at the Earth's surface. Proved reserves: Those quantities of petroleum, which by analysis of geoscience and engineering data,

can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations.

Probable reserves: Those additional reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Proved reserves but more certain to be recovered than Possible Reserves.

Resources: Those quantities of petroleum which are estimated, as of a given date, to be potentially recoverable from undiscovered accumulations.

Risked resources: Product of the estimated resources quantity and the associated chance of discovery. SPE: Society of Petroleum Engineers Unconventional gas Unconventional gas is any gas resource discovered in non-traditional geological

structures, where the reservoir is also the source rock. This category includes tight gas, basin centered gas accumulations, gas hydrates, coalbed methane and shale gas. These resources share a common characteristic, namely they typically represent huge volumes of gas-in-place (significantly more than in traditional reservoirs), but production is more capital intensive and flow rates are lower than those of conventional reservoirs

Unrisked resources: Resources without taking into consideration the exploration risk (probability of success) boe: Barrel of crude oil equivalent boepd: Boe per day ktoe Thousand tonnes oil equivalent MM boe: Million boe MMscf: Million standard cubic feet

Page 14: MOL Group Upstream Exploration and Development update · 10 for drilling 70-80 production and injection wells, drilling 2 horizontal re-entry wells as well as extending the water

14

Disclaimer "This drilling update contains forward-looking statements. These statements are naturally subject to uncertainty and changes in circumstances. Those forward-looking statements may include, but are not limited to, those regarding capital employed, capital expenditure, cash flows, costs, savings, debt, demand, depreciation, disposals, dividends, earnings, efficiency, gearing, growth, improvements, investments, margins, performance, prices, production, productivity, profits, reserves, returns, sales, share buy backs, special and exceptional items, strategy, synergies, tax rates, trends, value, volumes, and the effects of MOL merger and acquisition activities. These forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from those expressed or implied by these forward-looking statements. These risks, uncertainties and other factors include, but are not limited to developments in government regulations, foreign exchange rates, crude oil and gas prices, crack spreads, political stability, economic growth and the completion of ongoing transactions. Many of these factors are beyond the Company's ability to control or predict. Given these and other uncertainties, you are cautioned not to place undue reliance on any of the forward-looking statements contained herein or otherwise. The Company does not undertake any obligation to release publicly any revisions to these forward-looking statements (which speak only as of the date hereof) to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except as maybe required under applicable securities laws. Statements and data contained in this material, which relate to the performance of MOL in this and future years, represent plans, targets or projections."