Drilling Gas Wells: Beginning to End
34
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Drilling Gas Wells: Beginning to End

Page 2: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Seismic Exploration

Page 3: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Vibroseis Truck

Page 4: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Geophones

Page 5: Drilling Gas Wells: Beginning to End. Seismic Exploration.

LOTS of geophones

Page 6: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Seismic exploration: How it works

Page 7: Drilling Gas Wells: Beginning to End. Seismic Exploration.

3D Seismic Imaging

Page 8: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Building a Well Pad

• Survey – Typically 1.5 to 2.0 acres.• Ready Roads – Gravel or pave as needed• Remove Topsoil – For replacement later• Grade – To level• Gravel – Brought in to build a solid base• Compact and Grade• Erosion Control

Page 9: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Well Pad: Ready for the rig

Page 10: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Rig Up

Page 11: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Drilling the Well

Page 12: Drilling Gas Wells: Beginning to End. Seismic Exploration.

During the Drilling Process

• Truck traffic: Up to several trips per day, bringing water, drilling mud, pipe, and supplies

• 24x7: Because well control must be maintained, and because the drill rig is expensive, once the rig arrives operations run around the clock.

• Drilling Time: Typically the actual drilling takes about a week, sometimes less.

• Total Time: From rig up to rig down, about a month.

Page 13: Drilling Gas Wells: Beginning to End. Seismic Exploration.

During Drilling: How are we protective ?IDAPA 20.07.02.001:03. Other Laws. Owners or operators engaged in the exploration and extraction of crude oil and natural

gas resources shall comply with all applicable laws and rules of the state of Idaho including, but not limited to the following: (3-29-12)

a. Idaho water quality standards and waste water treatment requirements established in Title 39, Chapter 1, Idaho Code; IDAPA 58.01.02, “Water Quality Standards”; IDAPA 58.01.16, “Wastewater Rules”; and IDAPA 58.01.11, “Ground Water Quality Rule,” administered by the IDEQ. (3-29-12)

b. Idaho air quality standards established in Title 39, Chapter 1, Idaho Code and IDAPA 58.01.01 “Rules for the Control of Air Pollution in Idaho,” administered by the IDEQ. (3-29-12)

c. Requirements and procedures for hazardous and solid waste management, as established in Title 39, Chapter 44, Idaho Code, and rules promulgated thereunder including IDAPA 58.01.05, “Rules and Standards for Hazardous Waste”; IDAPA 58.01.06, “Solid Waste Management Rules”; and IDAPA 58.01.10, “Rules Regulating the Disposal of Radioactive Materials Not Regulated Under the Atomic Energy Act of 1954, As Amended,” administered by the IDEQ. (3-29-12)

d. Idaho Stream Channel Protection Act, Title 42, Chapter 38, Idaho Code, and rules promulgated thereunder including IDAPA 37.03.07, “Stream Channel Alteration Rules,” administered by the IDWR. (3-29-12)

e. Injection Well Act, Title 42, Chapter 39, Idaho Code and rules promulgated thereunder including IDAPA 37.03.03, “Rules and Minimum Standards for the Construction and Use of Injection Wells,” administered by the IDWR. (3-29-12)

f. Department of Water Resources – Water Resource Board Act, Title 42, Chapter 17, Idaho Code and rules promulgated thereunder including IDAPA 37.03.06, “Safety of Dams Rules,” administered by the IDWR.

IDAPA 20.07.02.001:03. Other Laws. Owners or operators engaged in the exploration and extraction of crude oil and natural

gas resources shall comply with all applicable laws and rules of the state of Idaho including, but not limited to the following: (3-29-12)

a. Idaho water quality standards and waste water treatment requirements established in Title 39, Chapter 1, Idaho Code; IDAPA 58.01.02, “Water Quality Standards”; IDAPA 58.01.16, “Wastewater Rules”; and IDAPA 58.01.11, “Ground Water Quality Rule,” administered by the IDEQ. (3-29-12)

b. Idaho air quality standards established in Title 39, Chapter 1, Idaho Code and IDAPA 58.01.01 “Rules for the Control of Air Pollution in Idaho,” administered by the IDEQ. (3-29-12)

c. Requirements and procedures for hazardous and solid waste management, as established in Title 39, Chapter 44, Idaho Code, and rules promulgated thereunder including IDAPA 58.01.05, “Rules and Standards for Hazardous Waste”; IDAPA 58.01.06, “Solid Waste Management Rules”; and IDAPA 58.01.10, “Rules Regulating the Disposal of Radioactive Materials Not Regulated Under the Atomic Energy Act of 1954, As Amended,” administered by the IDEQ. (3-29-12)

d. Idaho Stream Channel Protection Act, Title 42, Chapter 38, Idaho Code, and rules promulgated thereunder including IDAPA 37.03.07, “Stream Channel Alteration Rules,” administered by the IDWR. (3-29-12)

e. Injection Well Act, Title 42, Chapter 39, Idaho Code and rules promulgated thereunder including IDAPA 37.03.03, “Rules and Minimum Standards for the Construction and Use of Injection Wells,” administered by the IDWR. (3-29-12)

f. Department of Water Resources – Water Resource Board Act, Title 42, Chapter 17, Idaho Code and rules promulgated thereunder including IDAPA 37.03.06, “Safety of Dams Rules,” administered by the IDWR.

Page 14: Drilling Gas Wells: Beginning to End. Seismic Exploration.

During Drilling: How are we protective?

Page 15: Drilling Gas Wells: Beginning to End. Seismic Exploration.

During Drilling: How are we protective?

• IDAPA 20.07.02.056: Must perform mechanical integrity testing and pressure monitoring before and after well stimulation.

• IDAPA 20.07.02.070: Bond of $10k plus $1 per foot for each well, or up to $150k for blanket bond. No blanket bonding for inactive wells. IDL may require additional bonding.

• IDAPA 20.07.02.075: Surface owner protections; bonding and requirement to attempt negotiation of Surface Use Agreement.

• IDAPA 20.07.02.080: Drilling rules: Conductor to 40’; surface casing to minimum of 10% of TD; casing “The casing must be seated through a sufficient series of low permeability, competent lithologic units such as claystone, siltstone, basalt, etc., to insure a solid anchor for blow out prevention equipment and to protect usable ground water from contamination”; intermediate and production casing must overlap by at least 100’.

• Others: Ongoing mechanical integrity testing, well plugging, pit construction standards, surface reclamation.

Page 16: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Rig Down

• The rig up process in reverse• A wellhead will be in place• Reclamation of the well pad may begin• Owners may decide to keep the well pad in

place for their own use

Page 17: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Flare Testing

Page 18: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pad Reclamation: Removing the gravel base

Page 19: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pad Reclamation:Removing the gravel base

Page 20: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pad Reclamation:Returning the topsoil

Page 21: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pad Reclamation:Returning the surface contour

Page 22: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pad Reclamation:Returning the surface contour

Page 23: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pad Reclamation:Seeding…..

Page 24: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Or planting

Page 25: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Reclaimed Pad

Page 26: Drilling Gas Wells: Beginning to End. Seismic Exploration.

What if the well is a success?

• Flow lines will be installed underground from the well to the gathering line, which will connect to the Northwest Pipeline

• A few pieces of equipment may be placed at the well pad, to separate liquids (water or condensate) so the gas may be sent downstream for further processing

• Small tanks may be placed at the well pad, to store liquids that are removed at the well for periodic loading and removal by truck

Page 27: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Liquids Storage

Page 28: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Separation/Dehydration

Page 29: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Compression

Page 30: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pigging

Page 31: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Pigging

Page 32: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Cooling

Page 33: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Line Heater

Page 34: Drilling Gas Wells: Beginning to End. Seismic Exploration.

Tesoro Terminal, Boise

• St. Alphonsus RMC is to the northwest• Formerly West Jr. High across Curtis to the west.