AMACC Pasig Cisco room pictures room pictures
Aug 02, 2015
AMACC Pasig Cisco
room picturesroom pictures
Exposed
Exhibit A
Exposed
Exhibit B
Exposed
Exhibit C
Exposed
Exhibit D
Exhibit E
Exhibit F
Need to have Cable
Manager in-
between.
Patch Cord coming
form PC’s MUST
NOT directly
connected to
Exhibit G
Additional patch
panel for proper
administration.
connected to
Switch.
Connection from
Patch Panel to
Switch must be
done by patch cord.
Exhibit H
Exposed
Exhibit I
Pictures from
other Cisco other Cisco
Campus
Plastic
molding
Exhibit J
Plastic
molding
Plastic
molding
Exhibit K
Cable
Manager
Exhibit L
Patch Panel
Duplex
faceplate
Exhibit M