Top Banner
Integrated Dynamic Traffic and Transit Assignment Considering Traffic Congestion and a Schedule-Based Transit Network May 8, 2011 (2:45PM~4:30PM) 13 th TRB National Transportation Planning Applications Conference Hyunsoo Noh, Alireza Khani, Mark Hickman, and Yi-Chang Chiu The University of Arizona
19

May 8, 2011 (2:45PM~4:30PM) 13 th TRB National Transportation Planning Applications Conference

Feb 10, 2016

Download

Documents

Marlee

Integrated Dynamic Traffic and Transit Assignment Considering Traffic Congestion and a Schedule-Based Transit Network . May 8, 2011 (2:45PM~4:30PM) 13 th TRB National Transportation Planning Applications Conference Hyunsoo Noh, Alireza Khani , Mark Hickman,  and Yi-Chang Chiu  - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Integrated Dynamic Traffic and Transit Assignment Considering Traffic Congestion and

a Schedule-Based Transit Network 

May 8, 2011 (2:45PM~4:30PM)13th TRB National Transportation Planning Applications Confer-

ence

Hyunsoo Noh, Alireza Khani, Mark Hickman, and Yi-Chang Chiu 

The University of Arizona 

Page 2: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Contents

• Background and Motivation

• Dynamic Traffic Assignment Models

• Transit Assignment Model

• Integration Models

• Application (Rancho Cordova, CA)

• Result

• Conclusion

Page 3: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Background and Motivation

• Activity-based model

• Tour-based model 

• Sequential activity choice model 

• Necessity of time-dependent traveler model

• Necessity of intermodal architecture

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Page 4: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Dynamic Traffic Assignment Model

• DynusT and MALTA*

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

AMS TDSP

DynusTMALTA

Relative-Gap Epoch

Assignment

GUI and Data Analysis

HTDSP

Relative-Gap Assignment

GUI

Transportation Operational PlanningReal-Time Traffic Operations

Postgres

DemandDemand

Network Partitioning and

Load Balance

Evac/Inci

Value Pricing

ITS

Intermodal

Work Zone

Ramp Metering

VISSIM Integration

* MALTA: Multi-resolution Assignment and Loading of Transportation Ac-tivities

Page 5: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Flexible Assignment and Simulation Tool for Transit and Intermodal Passengers (FAST-TrIPs)

• FAST-TrIPs• Frequency-based model• Schedule-based model

• Frequency-based Assignment• “Strategies” assignment approach• Headways for 10 minutes or less, or without the schedule

• Schedule-based Assignment• Route (specifically run) for transit schedule• Preferred arrival time (PAT) • Logit-based SUE model 

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Page 6: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Schedule-based Assignment Model

• Link-Based Time-Expanded (LBTE) Schedule Network

A B C Des

e1

e2 e7

e8

e10

e12

et

[25, 7]

Route 1Route 2

Route 3Route 4

[7, 1] [6, 28]

[4, 11]

[4, 15]

[10, 13]

[cost, departure time]

e3 [8, 5]

e4 [7, 10] e9[5, 16]

e6[6, 19]e5 [6, 8]

e14[10, 43]

e11[4, 21]

[10, 23]e13

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Page 7: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

• Transit Network• Link-based schedule network• Google's General Transit Feed Specification (GTFS)

• Transportation Network• Access link

GTFS Stop Time

Trip IDArrival Time

Departure TimeStop ID

Stop SequenceTrip Headsign

GTFS Stop

Stop LatitudeStop Longitude

Stop CodeStop ID

Transportation Node

Node IDNode Latitude

Node LongitudeNode Type

Link-based Schedule

Link IDNode INode J

Link Type*Link Mode

Dep/Arr Time…

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

* OD, Access, and Transit links

Page 8: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Integration Model 1

• Tour-Based Integration Tour-Based Model(Data: Trip, Tour)

traveler.dat(Auto, Transit,

and Auto-Transit)

DynusT

Auto Assignment

Transit (Intermodal)Assignment

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Intermodal Path

FAST-TrIPs

Auto – Transit

Simulation

PassengerSimulation

Auto, Transit Skim

Page 9: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Integration Model 2 (session 6)

• Activity Choice Model

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Activity-Based Model(O/D, Mode at Time Intv.)

Auto Assignment Transit (or Intermodal) Assignment

MALTAAuto + Transit Vehicle

Simulation

Re-Assignmentfor Missing

Arrival(Auto,Passenger)

Auto SkimTransit

(or Intermodal)Skim

Day-to-Day Day-to-Day

Convergence(Auto Assignment)

Convergence(Transit Assignment)

Auto Path(Intermodal)

FAST-TrIPs

FAST-TrIPs

MALTA

MALTAPassenger Simulation

FAST-TrIPs

Page 10: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Simulation Structure

Simulation of Vehicle

Movements(Auto, Transit) Passenger Simulation

Passenger arrival time, stop, boarding behavior

Passenger experience

Passenger arrival from auto

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

DynusT | MALTA

Transit Passenger Assignment

Activities and travel requestse,g,, OpenAMOS, DaySim

Google GTFS and/or transit line information

Transit and intermodal trips Routes, stops, schedulesAuto trips

Dwell time, Hold

Transit vehiclearrival

Transit Passenger Skims and Statistics

FAST-TrIPs

Bus # 2321Pass. # 12Pass. # 25Pass. # 47

STOP STOPBus # 2322Pass. # 87Pass. # 19

Stop # S21Pass. # 24Pass. # 99

Stop # S33Pass. # 76Pass. # 59Pass. # 41

Transit vehicleapproach

Need to stop

Auto Skims

Auto part of Intermodal

Missing-a-bus New Path

Vehicle Skims

Page 11: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Application

• Auto Network (Rancho Cordova, CA)

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Road Network

Number of NodesNumber of Links

Number of ZonesNumber of Parcels

Number of Park-&-Ride

448 850 12120,486 3 (LRT)

Folsom Blvd & Mather Field Rd(cap.: 235)

Butterfield Way & Folsom Blvd(cap.: 406)

Trade Center Dr & Sunrise Blvd LRT(cap.: 487)

http://www.sacregion511.org/rideshare/parkandride/

Page 12: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

• Transit Network (Rancho Cordova, CA)

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

21

28

72

74

75

(LRT Gold line)

Transit Network

Number of StopsNumber of Trips

Number of Stop TimesNumber of Routes

163 1,20616,1175 Bus + 1 LRT

21

28

507

74

75

72

21 72 74 75 507

74 507

Folsom Blvd & Mather Field Rd

Trade Center Dr & Sunrise Blvd LRT

Butterfield Way & Folsom Blvd

Park-&-Ride Facility

Page 13: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Result

• Scheduled Hyperpath

Mode: Walk-Transit-Walk

75

507

Parcel # 499638PAT: 7:45 ~ 8:00

Parcel # 562770Folsom Blvd & Sunrise Blvd

On: 336347,7:28:00,7066Off: 336347,7:34:00,7069

Folsom Blvd & Mather Field Rd

On: 335305,7:40:00,370Off: 335305,7:48:00,9923/5290

On: 344131,7:44:00,370Off: 344131,7:52:00,5290/9923

9923 | FEMOYER ST & SCHIRRA AVE

MATHER BLVD & BLECKLEY ST | 5290

Access time : 2.92 Mins.

Transfer time : 0.85 Mins.

Background DTA Model FAST-TrIPs Integration Model Application Result f Conclusion

Page 14: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

• Scheduled Intermodal Hyperpath

Mode: Auto-Transit-Walk

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

9923 | FEMOYER ST & SCHIRRA AVE

MATHER BLVD & BLECKLEY ST | 5290

On: 335305,7:40:00,370Off: 335305,7:48:00,5290/9923

On: 344131,7:44:00,370Off: 344131,7:52:00,5290/9923

75

Folsom Blvd & Mather Field Rd

Access time : 4.86 Minutes.

Parcel # 499638PAT: 7:45 ~ 8:00

Parcel # 562770

Page 15: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

• Simulated Passenger Paths

Mode: Walk-Transit-Walk

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Background traffic: 72,501 VehiclesTime: 6~10AM

Parcel # 499638PAT: 7:45 ~ 8:00

Parcel # 562770

Planned path for PassID 102 :444 (7:24AM) - walk - LRT Gold – Transfer at stop 7069 to Bus Route 75 - Alight at 5290

At time 447 (7:27AM)PassID 102 transferred to 7066 and got on 345158

MATHER BLVD & BLECKLEY ST | 5290

At time 453 (7:33AM) vehID 345158 arrived at 7069 passID 102 got off 345158 At time 454 (7:34AM) PassID 102 transferred to 370At time 459 (7:39 AM) PassID 102 got on 335305At time 467 (7:47 AM) vehID 335305 arrived at 5290 PassID 102 got off Arrived at destination

75

Page 16: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

• Simulated Intermodal Hyperpath

Mode: Auto-Transit-Walk

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Parcel # 499638PAT: 7:45 ~ 8:00

Parcel # 562770

Background traffic: 72,501 VehiclesTime: 6~10AM

MATHER BLVD & BLECKLEY ST | 5290

75

At time 458 (7:38AM) PassID 102 transferred to 370At time 459 (7:39 AM) PassID 102 got on 335305At time 467 (7:47 AM) vehID 335305 arrived at 5290 PassID 102 got off Arrived at destination

Planned path for PassID 102 :454 (7:34AM) - Auto – Transfer at stop 7069 to Bus Route 75 - Alight at 5290

Page 17: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Conclusion

• More realized and integrated intermodal transportation among auto, transit vehicles and passengers

• Integration between activity model and DTA model

• On-going Works– “Missing-a-bus” – Convergence between different models– Full integration of transit, auto, and passenger assign-ment with activity models

Background DTA Model FAST-TrIPs Integration Model Application Result Conclusion

Page 18: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Acknowledgement

These projects are funded by • FHWA Exploratory Advanced Research (EAR) Program • SHRP2 C-10BOur collaborators are

FHWA EAR Program SHRP2 C-10B

Page 19: May 8, 2011 (2:45PM~4:30PM) 13 th  TRB National Transportation Planning Applications Conference

Thank you !