  • 8/13/2019 Material Requirement Planning Bmhs

    1/31

    Project: MISSION SURE

    !"#$%& ' &&(" )% &&

    End User Training Manual

    for

    SAP PP Production Planning & Control

    Process Name: Material Requirement Planning (MRP)(Prerequisites:for running MRP in BMHS)

    Process No: TRF/O2C/4.0

    Control Copy No: TRF/O2C/4.0/

    #*+ #

    Doc Version Description Prepared by Date Reviewed by Approved by

    00 Original Palani Dorai 24.12.2009 AK Anal,Sachin Kumar Rajak,Minu Singh

  • 8/13/2019 Material Requirement Planning Bmhs

    2/31

  • 8/13/2019 Material Requirement Planning Bmhs

    3/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 3of 31

    1. Display of a WBS Element Transaction code CJ20N

    Procedural Steps

    Menu Path

    To access CJ20N Display of a WBS Element, use the following menu path

    SAP Easy Access > SAP menu > Logistics > Project System > Project > CJ20N project Builder

    Transaction Code

    CJ20N

    Procedure

    Enter the Transaction code CJ20N in the command field (as shown in thebelow screen)

    Or go as per the navigation shown below and click CJ20N Project Builder

  • 8/13/2019 Material Requirement Planning Bmhs

    4/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 4of 31

    Press key or click on the check mark icon in the top left side corner of the

    Screen, the following screen Project Builder screen appears.

  • 8/13/2019 Material Requirement Planning Bmhs

    5/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 5of 31

    Click on the Project,a drop down menu appears

    And select (click once on) the Open option. (Refer screen above), the following Openprojectpop up window appears

  • 8/13/2019 Material Requirement Planning Bmhs

    6/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 6of 31

    Key-in the WBS element details (as shown below)

    And click on the check mark button of the pop up window, the following screen appears.

    An expanded view of the above screen is shown below

  • 8/13/2019 Material Requirement Planning Bmhs

    7/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 7of 31

    Expand the nodeup to the last sub-node as shown in the screen below.

    a) For the following Double Roll Crusher (Identification Number 210.2007.5.1.1node,

    Exapandthis node

  • 8/13/2019 Material Requirement Planning Bmhs

    8/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 8of 31

    the following tab screensare available in the right hand side of the screen.

    b) For the following Double Roll Crusher (Identification Number 5000155)node,

    The following tab screensare available in the right hand side of the screen.

  • 8/13/2019 Material Requirement Planning Bmhs

    9/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 9of 31

    c) For the following Double Roll Crusher (Identification Number 5000155 0001)node,

    The following tab screens are available in the right hand side of the screen.

  • 8/13/2019 Material Requirement Planning Bmhs

    10/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 10of 31

    d) For the following Double Roll Crusher (Identification Number 0001 5000001686)node,

    The following tab screens are available in the right hand side of the screen.

  • 8/13/2019 Material Requirement Planning Bmhs

    11/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 11of 31

    From the above screen, we can get the details on the delivery date and the Quantity to besupplied.

    End of document on T-code CJ20N Display of WBS Element

    Delivery Date

    Quantity

  • 8/13/2019 Material Requirement Planning Bmhs

    12/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 12of 31

    2. Multilevel BOM explosion Transaction code CS12

    Procedural Steps

    Menu Path

    To access CS12 Multilevel BOM: Initial Screen, use the following menu path

    SAP Easy Access > SAP menu > Logistics > Production > Master data > Bill ofMaterial > Reporting > BOM Explosion > Material BOM > CS12 Multilevel BOM

    Transaction Code

    CS12

    Procedure

    Enter the Transaction code CS12 in the command field (as shown in the belowscreen)

    Or go as per the navigation shown below and click CS12 Multilevel BOM

  • 8/13/2019 Material Requirement Planning Bmhs

    13/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 13of 31

    Press key or click on the check mark button in the top left corner of the screen,

    the following screen will appear

  • 8/13/2019 Material Requirement Planning Bmhs

    14/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 14of 31

    a) Key in the Sale Order Line item noted down for explosion purpose while displaying and checkingthe Sale Order, using T-code VA03.

    Note: we have noted down the Material number 5000000708

    b) Click once on the Plant field, a drop down icon appears at the end of the field, and

    Click on this drop down icon a drop down list pop up window appears, and select (click once)

    on the required Plant.

    For our example we have selected plant 1000, which is for BMHE

    Refer screen below for the above details.

  • 8/13/2019 Material Requirement Planning Bmhs

    15/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 15of 31

    Click on the check mark icon of the pop up window, to get the value populated on the plantfield in the screen. (Refer screen below)

  • 8/13/2019 Material Requirement Planning Bmhs

    16/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 16of 31

    c) Do not enter any valuein the field

    d) Click once on the BOM Application field, a drop down icon appears at the end of the field,

    and click on this drop down icon a drop down list pop up window appears, and select (clickonce) on the required BOM Application.

    We have selected PP01 Production - general.

    Refer screen below

    Click on the check mark icon of the pop up window, to get the value populated on the plantfield in the screen. (Refer screen below)

  • 8/13/2019 Material Requirement Planning Bmhs

    17/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 17of 31

    e) Leave all other fields as it is.

    Click on the execute button, the following screen appears.

  • 8/13/2019 Material Requirement Planning Bmhs

    18/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 18of 31

    End of document on T-code CS12 Multilevel BOM

    Occurrence of thecomponent in thelevel of explosionthat is componentsat level 1 & 2 of theexplosion

  • 8/13/2019 Material Requirement Planning Bmhs

    19/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 19of 31

    3. Convert Engineering BOM to production BOM - Transaction code CS01

    Procedural Steps

    Menu Path

    To access CS01 Create Material BOM: Initial screen, use the following menu path

    SAP Easy Access > SAP menu > Logistics > Production > Master data > Bill ofMaterial > Material BOM > CS01 Create

    Transaction Code

    CS01

    Procedure

    Enter the Transaction code CS01 in the command field (as shown in the belowscreen)

    Or go as per the navigation shown below and click CS01 - Create

  • 8/13/2019 Material Requirement Planning Bmhs

    20/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 20of 31

    Press key or click on the check mark button key,

    the following screen will appear

  • 8/13/2019 Material Requirement Planning Bmhs

    21/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 21of 31

    a) Key in the material Number in the material field. In our example we have used materialnumber as 5000000708

    Note:we can select the material number by drop down list for this field.

    b) Key-in the Plant number in the Plant field. In our example we have keyed-in 1000 as the Plantnumber.

    Note:we can select the Plant number by drop down list for this field.

    c) Key-in the BOM Usage data in to the BOM Usage field. In our example we have used the BOMUsage value as 2 (Engineering

    Note:we can select the BOM Usage value by drop down list for this field.

    Once the data are keyed-in for the above field, the screen will look as shown below

    Click on the copy button, the following screen appears.

  • 8/13/2019 Material Requirement Planning Bmhs

    22/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 22of 31

    Key-in the same Material Number as that entered above in the screen , in the pop upwindow Material field,

    We have keyed in the same number in the field. That is 5000000708

    And change the value of BOM Usagenumber to 1(Production BOM)

    The screen will look as shown below

  • 8/13/2019 Material Requirement Planning Bmhs

    23/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 23of 31

    Click on the check mark button, the following screen appears.

    Select all the item as shown below (Note: Items can be selected partially also)

  • 8/13/2019 Material Requirement Planning Bmhs

    24/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 24of 31

    And click on the Copy icon, the following screen appears

    An enlarged view of the above screen is shown below.

    Click on the save button to save the data.

    The following screen appears.

  • 8/13/2019 Material Requirement Planning Bmhs

    25/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 25of 31

    Also look for the following message in the status line.

    End of document for transactions CS01

  • 8/13/2019 Material Requirement Planning Bmhs

    26/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 26of 31

    4. Display of a Materials Routing details - Transaction code CA03

    Procedural Steps

    Menu Path

    To access CA03 Display of a Routing details for a material, use the following menu path

    SAP Easy Access > SAP menu > Logistics > Production > Master data >Routings > Standard Routings > CA03 - Display

    Transaction Code

    CA03

    Procedure

    Enter the Transaction code CA03 in the command field (as shown in the belowscreen)

    Or go as per the navigation shown below and click CA03 - Display

  • 8/13/2019 Material Requirement Planning Bmhs

    27/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 27of 31

    Press key or click on the check mark button,,

    the following screen will appear

  • 8/13/2019 Material Requirement Planning Bmhs

    28/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 28of 31

    a) Key in a Material number, In our example we have keyed in material number as 7000002119.

    Note:Material Number can be selected using the drop down list

    b) Key in Plant Number, in our example we have keyed in Plant Number as 1000.

    Note:Material Number can be selected using the drop down list

    The screen will look as below after keying-in the above details.

    Click on the push button, the following pop up window appears,

  • 8/13/2019 Material Requirement Planning Bmhs

    29/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 29of 31

    The above pop up window shows that there are Two Routings are available for this material.

    Select (click once on the line) any one of the routing (refer screen below), and click on the check

    mark button of the pop up window.

    The following screen appears.

    An enlarged view of the above screen is shown below

  • 8/13/2019 Material Requirement Planning Bmhs

    30/31

    Project: MISSION SURE

    TRF/O2C/4.0 ' &&(" )% &&

    Page 30of 31

    Note: Since the line is in Selected, the colour is shown as above, if unselected the line willlook as below

    a) Click on the push button, the following screen appears

    An enlarged view of the above screen is shown below

  • 8/13/2019 Material Requirement Planning Bmhs

    31/31

    Project: MISSION SURE

    In the above screen, the meaning of the Control key parameters, ZP01, ZP02, ZP03 andQM01 is as shown below

    End of document on T-code CA03 Display of Routing

    End of document on Prerequisite: Material requirement Planning (MRP) of BMHS - (TRF/O2C/4.0) 001-2