INSG Environmental & Economics Session
Bruce Wedderburn
27th April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
AgendaAgenda
Laterite hydromet options
HPAL
Heap leaching
Capital and operating costs
Economics
Technology trends
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL ProcessHPAL Process
Existing Operations• Moa Bay (Sherritt)• Murrin Murrin (Minara)• Cawse & Bulong (S/D) (Norilsk)• Coral Bay (SMMC)• Ravensthorpe (S/D) (BHPB)
Planned Projects• Gladstone, Vermelho, Weda Bay, Moa Bay expansion
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Heap LeachHeap Leach
Committed Projects• None
Well Advanced Projects (Demonstration Plants)• Yuanjiang - China (Yunnan Tin Group)
• Çaldag - Turkey (European Nickel)
• Murrin Murrin (Minara)
• Niquel do Piauí (Vale)
• NTUA – Greece (Larco)
• Acoje – Philippines (Rusina)
Early Development ProjectsAt least 10 projects in early stages of development
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL FailuresHPAL Failures
Bulong • Never achieved design throughput of 9 ktpa• Significant gypsum scaling• Operating costs exceeded sales revenues• Operating costs - 300% over initial estimates• Capital costs - 100% over budget
Comments:• Was a demonstration plant and never
commercially viable• Direct SX technology was a failure
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL FailuresHPAL Failures
Cawse • Never achieved design production of 9.2 ktpa• Beneficiation circuit was a failure• Operating costs exceeded sales revenues• Operating costs - 200% over initial estimates• Capital costs - 100% over budget
Comments:• Was a demonstration plant and never
commercially viable• Simplest flowsheet failed due to ore upgrading
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL FailuresHPAL Failures
Murrin Murrin• Never achieved design production of 45 ktpa• Actual capacity probably 32 to 34 ktpa Ni• Major plant modifications required• Operating costs - 400% over initial estimates• Capital costs - 100% over budget
Comments:• Cash flow positive at opex of US$4.97/lb Ni • Write-off of capital and Glencore support • Brownfield expansion via heap leaching
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL FailuresHPAL Failures
Ravensthorpe• Never achieved design production of 50 ktpa• Only achieved 35% of design (BHPB - May 08)• Major failure of beneficiation circuit• Operating costs – never disclosed• Capital costs - 100% over budget
Comments:• HPAL, AL & back-end circuit never proven• Major modifications required to front-end• Plant sold to First Quantum Minerals
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL SuccessesHPAL Successes
Coral Bay• Achieved design rates within 14 months• Expanded plant capacity to 22 ktpa in Apr 09• Operating costs – never disclosed• Capital costs <10% over budget
Comments:• Low capital intensity of US$10/lb Ni• No acid plant and mixed sulphide production• Engineering undertaken by SNC Lavalin• SMMC has good in-house nickel experience• Learnt from mistakes made in WA
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL CostsHPAL Costs
* HPAL costs to intermediate product
Project CountryPlant
Capacity tpa Ni
Capital Costs US$m
Capital Intensity US$/lb Ni
Operating Costs
US$/lb Ni
Moa Bay Cuba 30,000 N/A N/A $3.12/lb
Murrin Murrin WA 32,000 $1,300m $18/lb $4.97/lb
Taganito * Phil 30,000 $1,300m $20/lb N/A
Ramu * PNG 30,000 $1,430m $22/lb N/A
Ravensthorpe WA 50,000 $2,800m $28/lb N/A
Goro NC 60,000 $4,300m $33/lb $1.15/lb
Ambatovy Madag 60,000 $4,500m $34/lb $0.77/lb
All public domain costs
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
HPAL Costs (Normalised)HPAL Costs (Normalised)
All HPAL costs to LME nickel
Project CountryPlant
Capacity tpa Ni
Capital Costs US$m
Capital Intensity US$/lb Ni
Operating Costs
US$/lb Ni
Moa Bay Cuba 60,000 N/A N/A $3 - 4/lb
Murrin Murrin WA 60,000 $2,000m $15/lb $4 - 5/lb
Taganito Phil 60,000 $3,100m $24/lb $4 - 5/lb
Ramu PNG 60,000 $3,400m $26/lb $4 - 5/lb
Ravensthorpe WA 60,000 $3,200m $24/lb $4 - 5/lb
Goro NC 60,000 $4,300m $33/lb $4 - 5/lb
Ambatovy Madag 60,000 $4,500m $34/lb $4 - 5/lb
All public domain costs
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Heap LeachHeap Leach
Why heap leaching?
Brief history
Demonstration plants
HL capital and operating costs
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Why Heap Leaching?Why Heap Leaching?
Positives• Process both limonite & saprolite
• Process far less complex than HPAL or AL
• Lower capital intensity
Negatives• Heap permeability is critical
• Sensitive to mineralogy
• Iron chemistry
• Acid consumption
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Heap Leach HistoryHeap Leach History
• Nickel laterite heap leaching R&D commenced in early 1990’s at NTUA in Greece
• NTUA undertook column leaches on Greek laterites
• Greek laterites consist mainly of hematite and the nickel is contained in chlorite
• Amenable to heap leaching with minimal acid consumption
• BHP, WMC and others undertook R&D commencing in mid to late 1990’s
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
NTUA - GreeceNTUA - Greece
Demonstration Plant• Built a small demonstration plant at Larco mines
• Process consists of:
• Heap leaching of laterite ore at ambient temperature
• Purification of the leach liquor by hydrolytic precipitation
• Removal of Fe, Al and Cr
• Simultaneous SX of Ni and Co using the Cyanex 301
• Stripping of the loaded organic by Ni spent electrolyte
• Co extraction over Ni and Co using the Cyanex 272
• Stripping of the loaded organic by Co spent electrolyte
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Balkan Laterites (Greece)Balkan Laterites (Greece)Balkan Laterites (Greece)Balkan Laterites (Greece)
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Balkan Laterites (Albania)Balkan Laterites (Albania)Balkan Laterites (Albania)Balkan Laterites (Albania)
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Balkan Laterites (Turkey)Balkan Laterites (Turkey)Balkan Laterites (Turkey)Balkan Laterites (Turkey)
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Commercial Operation
• Infrastructure development commenced in 2006
• Forestry permits approved in February 2009
• Heap leaching expected to commence in mid 2010
• Full production of 20 Ktpa Ni & 1.2 Ktpa Co in 2011
• Capital cost of US$428m
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
All mixed hydroxides to be sold to JXTC, following termination of theBHPB off-take agreement, to facilitate 100% debt financing byChinese banks
Nickel product
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Economics 2006 2010
Production (Ni in mixed hydroxide) tpa 20,400 20,400
Construction Cost US$m 238 277
Long-term Ni Price US$/lb 4.25 6.00
Capital Intensity US$/lb 5.57 6.12
Cash Operating Cost US$/lb 1.41 3.49
NPV (10% discount) US$m 180 207
IRR % 23 20
Total Capital Cost US$m 300 428
Source: European Nickel Updated: AGM Presentation – 29 Mar 10
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Demonstration Heap
• Ore crushing completed by end Dec 09
• Mix of saprolite & limonite
• 3,000 tonne heaps to be constructed
• Heap to be stacked to commercial heights
• Rain coats to be installed to control water balance
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Economics 2010
Production (Ni in mixed hydroxide) tpa 24,500 Ni
Construction Cost US$m 423
Long-term Ni Price US$/lb 6.00
Capital Intensity US$/lb 7.84
Cash Operating Cost US$/lb 3.10
NPV (10% discount) US$m 375
IRR % 28
Total Capital Cost US$m 498
Source: European Nickel Updated: AGM Presentation – 29 Mar 10
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Murrin MurrinMurrin Murrin
Growth Targets
• 400,000 tpa of scats under leach
• Ore is being leached together with scats
• Current pad capacity yields 2,000 tpa Ni
• Heap Leach infrastructure sized for 10,000 tpa Ni
• Currently reviewing growth plans including HL
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Níquel do Piauí - BrazilNíquel do Piauí - Brazil
Demonstration Plant• Vale constructed a demonstration plant in northern state of Piauí in
Brazil
• GRD Minproc awarded contract in 2008 for front end engineering study comprising
• Flowsheet development,
• Engineering for crushing, infrastructure and
• Nickel bearing solution metallurgy,
• Capital and operating cost estimates.
• Completion of basic engineering planned for 2009
• Commercial production estimated for 2012 with a capacity of
36,000 tpa Ni
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Níquel do Piauí - BrazilNíquel do Piauí - Brazil
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Níquel do Piauí - BrazilNíquel do Piauí - Brazil
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Heap Leach CostsHeap Leach Costs
Heap leach capital costs to intermediate product
Project Country
Plant Capacity
tpa Ni
Capital Costs
US$m
Capital Intensity
US$/lb Ni
Operating Costs
US$/lb Ni
Acoje Philippines 24,500 $498m $9.20/lb $3.10/lb
Çaldag Turkey 20,400 $428m $9.50/lb $3.49/lb
NiWest WA 13,100 $340m $11.80/lb $2.49/lb
Canegrass WA 20,000 $650m $14.70/lb $2.67/lb
Wowo Gap PNG 20,000 $860m $19.50/lb $2.74/lb
Jump-up Dam WA 10,000 $510m $23.10/lb $6.39/lb
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Economic ComparisonEconomic Comparison
ParameterParameter HPALHPAL HLHL
Nickel Production (LOM) tpa 55,700 32,800
Cobalt Production (LOM) tpa 4,100 640
Capital Cost US$m $3,750m $950m
Capital Intensity US$/lb Ni $30.5/lb $13.1/lb
Cash Cost (exclude by-products) US$/lb Ni $4.59/lb $3.58/lb
Cash Cost (include by-products) US$/lb Ni $3.86/lb $3.39/lb
NPV (10% real, non geared) US$m ($2,160)m $220m
IRR (real, post tax) % 1.6% 17%
Capital Payback (from free cash) Years N/A 7 years
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Technology TrendsTechnology Trends
FeNi Smelting• Well proven & low risk technology• Capital costs - recent escalation• Operating costs – energy dependent• Requires high grade ore feed
Ore Calcining• Been considered previously• Not demonstrated or proven • Roasting / magnetic separation of interest• Unlikely to compete with Ni pig iron• Ore upgrade for smelter - possible application
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Technology TrendsTechnology Trends
Ni Pig Iron
• Well proven & low risk technology
• Environmental emissions – major concern
• Low capital cost – access by small players
• High operating costs
• Switch from blast to electric furnaces
• Ore suppliers under cost pressure
• Export of ore from Indonesia to cease
• To remain a swing producer – Ni price dependent
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Technology TrendsTechnology Trends
HPAL• Proven technology but high technical risk
• Commercial risk – high capital exposure
• Operating costs – significantly higher
• Capital costs – rapid escalation
• Only affordable by major companies
• Project economics questionable
• Future developments will be influenced by success of Goro, Ramu, Ambatovy & Taganito
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Technology TrendsTechnology Trends
Atmospheric Leach• Technology has not been demonstrated
• Possible niche applications
• Combined HPAL & AL possible
• Capital costs are high ~80% of HPAL
• Operating costs are similar to HPAL
• Project economics questionable
• Unlikely to succeed unless there is a step change in costs
Malachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingMalachite Process ConsultingINSG April 2010INSG April 2010INSG April 2010INSG April 2010
Technology TrendsTechnology Trends
Heap Leach• Technology is currently being demonstrated
• Ore type critical for heap permeability
• Site specific conditions important
• Acid – key capital and operating cost driver
• Operating costs – lower than HPAL
• Capital costs – significantly lower than HPAL
• Offers market entry by small companies
• Will take time to achieve widespread acceptance