Issue Date: 30.10.2020 REVISION D Gwydir Shire Council Wellness & Interpretive Centre Project No: 1122 Address: Narrabri Road, Bingara, NSW CONSTRUCTION
Issue Date: 30.10.2020 REVISION D
Gwydir Shire Council
Wellness & Interpretive Centre
Project No: 1122
Address: Narrabri Road, Bingara, NSW
CONSTRUCTION
PROJECT CONTACTS: BUILDING DESIGN INTENT: Environmental Sustainability Design decisions and product selections have been undertaken using the following criteria: ENERGY:
CLEAN ENERGY SOURCE: Avoid gas, use electricity & solar power.
ENERGY EFFICIENCY: natural lighting, efficient lighting & power systems.
CLIMATE RESPONSIVE DESIGN: long sides of the building and glazing facing towards northern light for passive heating in winter, rammed earth and concrete for insulation and passive heating and cooling, Roof overhangs for shading in summer.
WATER:
WATER EFFICIENCY: Collection of rainwater for reuse, water efficient tapware and plumbing fittings.
MATERIALS & WASTE:
MINIMISE MATERIALS CONSUMED: Concrete floors, rammed earth walls, minimal tiling in wet areas.
MINIMISE SITE WASTE: Minimal onsite paint finishes, prefabricated lightweight timber trusses, minimal tiling.
DURABLE MATERIALS: Aluminium doors and windows, concrete and steel finishes.
Avoid PVC where possible AIR QUALITY:
LOW OR ZERO VOC: waterbased paint finishes, prefinished materials requiring no additional finishing,
Minimal onsite use of paint and sealants. ADAPTABILITY:
MULTIPLE USES: Buildings are flexible spaces that can be adapted to suit a multitude of uses to meet local needs.
ARCHITECT Skyring Architects Stephanie Skyring: 0401 867 983 [email protected]
ENGINEER Local Government Engineering Services Jacob Tan: 0487 592 001 [email protected]
ARCHITECTURAL DOCUMENT LIST
000 Cover Pages, Notes and Site Information
100
General Arrangement Drawings
200
Elevations and Sections
300
Architectural Details
400
Interior Fitout Drawings
500
Electrical, Internet & Audio Visual Drawings
600 Door & Window Drawings
700 Written Schedules
ASK THE ARCHITECT Before you change anything….please talk to the Architect. Every aspect of these documents has been painstakingly considered with respect to client brief, functionality, budget, environment, climate responsive design, buildability, regional site context and design. Changes may have ramifications across other parts of the design and lead to a disappointing outcome. I am always happy to proactively collaborate on changes to improve ease of construction & save money….. but it pays to talk first. Please call Stephanie Skyring on 0401 867 983 about any questions and I will resolve your query immediately.
NOTES APPROVALS BUILDING APPROVAL: No building work shall be commenced prior to Building Approval by a registered Certifier. FINAL CERTIFICATE: The Builder shall obtain the Final Certificate from the Certifier at the completion of the work. DRAWINGS AND DOCUMENTATION CONSULTANTS: Architect's drawings and documentation shall be read in conjunction with Engineers drawings and documentation. All structural information shall be taken from the Engineer's drawings and documentation. Any discrepancy between the Architect's and Engineer's drawings or documentation shall be confirmed with the Architect prior to any work being undertaken. DIMENSIONS: Do not scale off drawings - use figured dimensions only. Contractor shall verify all dimensions on site prior to construction. Any discrepancies or errors shall be referred to Architect and Client prior to installation / manufacture of any works. Confirm levels & RL's on site prior to commencement of work. DOCUMENTATION: The contractor shall carry out works in accordance with the signed drawings and schedules and anything reasonable inferred, and with the Conditions of Contract, and in accordance with the directions and to the satisfaction of the Architect, whose interpretation of the contract documents shall be final. The drawings and specifications/schedules shall be considered complementary, and any work and/or materials absent from one but present or implied in the other shall be furnished as if they were present in both. Any discrepancy between the drawings and the schedules shall be confirmed with the Architect prior to any work or manufacture being undertaken. CONSTRUCTION SPECIFICATION ALL WORKS shall be carried out in accordance with the Building Code of Australia, Australian Standards, Local Council requirements, Queensland Building Act guidelines and all other relevant bylaws and authorities. In particular refer Australian standards: · site preparation A.S. 3798 · concrete construction A.S. 2870 · timber construction and details A.S. 1684.2 · steelwork AS 4100, AS 1111 and A.S. 1112 . termite protection BCA and A.S. 3660.1 . artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680 . fire safety BCA part 3.7 . smoke alarms BCA part 3.7.2 and A.S. 3786 . glazing BCA part 3.6 and A.S. 1288 and A.S. 2047 EROSION CONTROLS: All building works to comply with local authorities' erosion and sediment control standards . SETOUT: Contractor to confirm exact siting and orientation prior to construction set out. All building set out and confirmation of setbacks and height to be carried out by a Licensed Surveyor. No footing or wall to encroach the title boundary. LICENSED TRADESPERSONS: All services to be installed by licensed tradespersons in accordance with local authority and with current manufacturers specifications. SITE DISCHARGE: All stormwater and sanitary plumbing to be connected to existing council system in accordance with the requirements of the relevant local authority. CONCEALMENT OF SERVICES: All services shall be concealed in walls or ducts. Where services are exposed they must be confirmed by the Architect on site prior to installation unless noted otherwise
GENERAL MATERIALS & EQUIPMENT SPECIFICATION PROPRIETARY ITEMS: Identification of a proprietary item does not necessarily imply exclusive preference for the item so identified, but indicates the necessary properties of the item. If alternatives are proposed, submit samples, available technical information, reasons for proposed substitutions and cost for proposed alternatives ALL PRODUCTS: To be installed to manufacturers’ requirements and to be in accordance with manufacturers requirements for suitable exposure levels. TERMITE PROTECTION: Termite protection by means of Termimesh S.S. mesh physical barrier in accordance with A.S. 3660.1/2000 and installed in strict accordance with current manufacturer's specifications. Provide steel capping plate fully welded and sealed at the base of steel posts to prevent termite ingress. STRUCTURAL STEEL: Unless noted otherwise all exposed structural steel, anchor bolts and other attachments shall be hot dip galvanised. A cold galvanised (painted) finish shall be applied to any field welding to existing or new steelwork. All steel work cast in concrete footings or slab shall have a bitumen finish applied to full extent of cast in concrete steel. Check all dimensions on site prior to fabrication of steelwork. RETAINING WALLS: All retaining walls to Structural Engineers details. Provide rubble backfill and agg drainage to all retaining walls. Builder to provide tanking where required. SLAB & FOOTINGS: All slabs and footings to structural engineer’s details. A polyethylene moisture barrier shall be lapped 200mm and fully taped under any habitable concrete slab and shall extend 100mm onto the perimeter footing. ARTICULATION JOINTS: Provide articulation joints to comply with "Cement and Concrete Association Construction Note TN9". WATERPROOFING: All wet areas and walls to be waterproofed in accordance with the BCA 3.8 & AS 3740. Builder to provide certificate of installation and compliance. ROOF DRAINAGE: All downpipes to be located as noted on the drawings and sizes as scheduled. Allow to connect to in-ground storm water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for I.O.'s at each change of direction and at 6000mm centres. WATER LINES: All hot water lines shall be fully insulated. All domestic hot water to basins, showers and baths to have maximum temperature of 50°C. Allow to supply and install tempering valves where required, as nominated in the BCA and relevant standards. TILES: Expansion joints, walls: 5mm. Floors: 8mm. Fill both with silicone rubber. Grout for wall: Epoxy based mildew resistant. Grout for floors: prepared grout to be acid resistant. INTERNAL PAINTING: Unless noted otherwise use Resene approved 3 coat paint system - low sheen finish. Colours to be supplied by Architect during contract and applied as per manufacturer's recommendations and guidelines. SANITARY COMPARTMENTS: Provide removable hinges to doors of sanitary compartments to comply with BCA 3.8.3.3 and be readily removable from outside unless there is a clear space of at least 1200mm b/w closet pan within the sanitary compartment and the nearest part of the doorway. APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and equipment locations on site and with joiner. Installation and final connection by the contractor. WEATHERSTRIPS: All external doors to contain weather stripping (type to be confirmed with Architect prior to manufacture) .
DRAWING LEGEND
FLOOR FINISHES CONC CONCRETE ELEVATIONS & SECTIONS TMB TIMBER BATTENS FG FIXED GLASS LV LOUVRES PB PLASTERBOARD CS CORRUGATED STEEL SHEETING FC FIBRE CEMENT SHEETING ROOF DP DOWNPIPE SP SPANDEK SHEETING EG EAVES GUTTER MRC METAL ROOF CAPPING MRF METAL ROOF FLASHING VP VENT PIPE APPLIANCES CTP COOKTOP DW DISHWASHER MO MICROWAVE OVEN R REFRIGERATOR RH RANGE HOOD WO WALL OVEN
GENERAL MATERIALS GALV GALVANISED HDWD HARDWOOD INS INSULATION RC REINFORCED CONCRETE RHS RECT. HOLLOW SECTION SHS SQUARE HOLLOW SECTION SS STAINLESS STEEL SC STEEL COLUMN NOTES AND DIMENSIONING COS CHECK ON SITE DAR DRESSED ALL FACES DIA DIAMETER DWG DRAWING E/S EACH SIDE EA EACH ELEV ELEVATION EQ EQUAL EX. EXISTING NTS NOT TO SCALE O/H OVERHANG REF REFERENCE TBA TO BE ADVISED U/S UNDERSIDE SETOUT & LEVELS EX EXISTING LEVEL FCL FINISHED CEILING LEVEL FFL FINISHED FLOOR LEVEL FGL FINISHED GROUND LEVEL PLUMBING FW FLOOR WASTE HC HOSE COCK HWU HOT WATER UNIT S SINK WC WATER CLOSET ORG OVERFLOW RELIEF GULLY RWT RAINWATER TANK
�
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
D
3D Drawings
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-A
Wellness & InterpretiveCentre
CONSTRUCTION
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
A B C D E
5
4
3
1
2
EQ EQ
SETOUT FROM CENTREOF OLIVE GROVE
1220
0
SE
TO
UT
INTERPRETIVE BUILDING
COMMON ROOM
OFFICE
TOILETS
SITE SETOUT
SETOUT SITE FROM CENTRELINEOF AVENUE THROUGH OLIVE GROVE(TO CREATE A VISTA ALONG GRID D)
GRID IS SETOUT TO TRUE NORTH
1:200
520
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 200
D
Site Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-A-010
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 200
Site Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
RL 98600
FFL
RL 101600Top of Glazing
5 4 3 12
3000
RL 98600
FFL
RL 101600Top of Glazing
5431 2
3000
1:200
520
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 200
D
Site Elevations -East & West
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-A-011
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 200
Site Elevation - East1
1 : 200
Site Elevation - West2
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
A B D
3
1
2
AC
200
1
CD-C-300
1
CD-C-305
03
COMMON ROOMPolished Conc. floor
VERANDAHConc.
STOREPolished Conc. floor
VERANDAH POST SETOUT
STORE
OP
EN
ST
OR
EK
ITC
HE
N
KITCHEN
VERANDAH
VERANDAH
VE
RA
ND
AH
PO
ST
S
OUTLINE OF ROOF OVERSHOWN DASHED TO OUTER EDGE OF STRUCTURE
1
CD-C-304
02
1000 1000
4120
1200
2400
02
GLAZING UNIT
TV UNIT
200
HIGH LEVELGLAZING
HIGH LEVELGLAZING
LIN
E O
F C
EIL
ING
OV
ER
SH
OW
N D
AS
HE
D
01 03
FFL98600
1915 1915
04
FFL98600
GATE
12590
2060 4120
90 2090 6135 90
9023
1090
90 6755 6135 90 4275
200
9015
0
1810
CL
18001800
2100 DIATANK
REFER TO KITCHEN DETAILS
REFER TOTV UNIT DETAILS
1
CD-C-302
1
CD-C-303
4120
1CD-I-310
9018
5590
1910
9023
1090
2310
9023
1090
2310
90
90 4575 901100
3000
2CD-C-310
3CD-C-310
TANK PUMPEQUIP.
5080
SE
RV
ICE
DPDP
1
CD-C-301
REF
1CD-I-312 1
CD-C-310
2CD-I-310
9059
75
CO
MM
ON
RO
OM
EXTERIOR EDGE
EXTERIOR EDGE DP
3500 90 4575 90 2090
4950
715
NOTE:DIM TOEX. EDGES
890
DP
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Common Room -Floor Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-C-100
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Common Room - Floor Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
A B D
3
1
2
FFL98600
COMMON ROOMPolished Conc. floor
VERANDAHConc.
KITCHENPolished Conc. floor
STOREPolished Conc. floor
2060 4120
10500
VERANDAH SLAB
VE
RA
ND
AH
PO
ST
S
4120
1200
2400
203500 4755 2090
6845 6245 4255
200
45
5520
5710
5125
KIT
CH
EN
SLA
B
COMMON ROOM SLABCOMMON ROOM SLAB VERANDAH
VERANDAH POSTS
STORE SLAB
2355
200
2400
CO
MM
ON
RO
OM
SLA
B
20
FALL
GLAZING NOTE:
1. CONFIRM SETDOWNS WITH GLAZING SUPPLIER PRIOR TO SLAB SETOUT.2. REFER TO ENGINEERS DRAWINGS FOR STRUCTURAL INFORMATION.3. CONFIRM ANY SETOUT AMBIGUITIES WITH ARCHITECT PRIOR TO CONSTRUCTION.
FALL
200
VE
RA
ND
AH
SLA
B
6020
2100
20
20
100
20
BRING THE FOLLOWINGSERVICES UNDER FLOOR:• MAINS POWER TO METER BOX• CAT 6 CABLE• SECURITY SYSTEM CABLE
4755 8335 4255
KITCHEN COMMON ROOM SLAB VERANDAH SLAB
200
ALLOW DOOR SETDOWNLOW PROFILE SILLFOR DISABLED ACCESS
CONC.
7590
2465
8120
SW
DP
DPDPDP
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Common Room -Slab Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-C-101
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Common Room - Slab Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIOND 30.10.2020 CONSTRUCTION
B D
1
2
HEKA HOOD
HE
KA
HO
OD
1500
1500
CH 3200 APPROX
600 x 600 CEILING GRIDWITH 3D ACOUSTIC CEILING TILES (24no.)
RID
GE
PLA
ST
ER
BO
AR
DB
ULK
HE
AD
3000
HT
RAKING CEILINGPLASTERBOARD
RECESSED PLASTERBOARD CEILINGAROUND CEILING GRID (PAINT BLACK)
BLACK A/C CEILING VENTSLOCATED IN BLACKRECESSED PB CEILING(INDCATIVE LOCATIONS)
BLACK A/C RETURNAIR VENT
RAKING CEILINGPLASTERBOARD
3000
EXPOSED ROOF STRUCTURETO UPPER EAVES
PREFINISHED PLYWOOD VERANDAH CEILING.RANDOM JOINTS.APPLY FINISH TO ALL ENDS PRIOR TO INSTALLATION
PLYWOODLINED SOFFIT
SQUARE SET CEILING / WALL JUNCTION (NO CORNICE)
P
600
1080
ACBULKHEAD
DP
DPDP
DP
RANGE HOODEXHAUST
NOTE:
1. AIRCONDITIONING VENT LOCATIONS INDICATIVE.AIRCONDITIONING CONTRACTOR TO CONFIRMLOCATIONS WITH ARCHITECT ON SITE.
2. LIGHTS & A/C VENTS ON RECESSED CEILINGTO BE BLACK TO MATCH CEILING.
DP
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Common Room -Reflected Ceiling Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-C-102
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Common Room - Reflected Ceiling Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIOND 30.10.2020 CONSTRUCTION
B D
1
2
FALL FALLFALL FALL
FALL
1
CD-C-300
1
CD-C-305
1
CD-C-305
EXTEND PFC & EAVES GUTTERREFER TO DETAIL
EAVES GUTTER
RANGE HOODVENT PIPE &FLASHING
O/H
1
CD-C-304
1
CD-C-304
1500
150012
00
600
600
90
O/H
O/H
600
O/H
O/H
1000
O/H
TV AERIALCONFIRM BEST FIXING LOCATION ON SITE
LOCATION OF TIMBERFRAME WALL UNDER ROOFSHOWN DASHED.
ROOF OVERHANG NOTES:
1. TAPER ALL EAVES GUTTER ENDSREFER TO DETAILS.
2. REFER TO DETAILS FOR PFC O/H LENGTHS.
90
90
1200
1
CD-C-302
1
CD-C-303
1
CD-C-303
EAVES GUTTER DP
----
EA
VE
S G
UT
TE
R
EAVES GUTTER
EAVES GUTTER
EA
VE
S G
UT
TE
R
DP
DP
DP
1200
----
----
----
----
600
RID
GE
CA
PP
ING
VA
LLE
Y F
LAS
HIN
G
CLO/H
CL
CL
CL
CL
CL
3CD-C-306
2CD-C-306
4CD-C-306
1CD-C-306
1CD-C-312
DP
7°27° 10°
5°
8°
FA
CE
FA
LL 7
°
ALIGN ROOFSHEETING WITHANGLE OF GABLE
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Common Room -Roof Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-C-103
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Common Room - Roof Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
RL98600
FFL
RL101600Top of Glazing
3 12
FG
FG
LIGHT
1800
CS
LIG
HT
S
CL
DPDP
1CD-C-306
2CD-C-306
TAPER END TOEAVES GUTTER
VERTICAL CORRUGATED SHEETINGTO BASE OF MAIN BUILDING
PAINTED TIMBER POSTSREFER TO DETAIL
45° DOWN PIPEANGLE
ALIGN ROOF SHEETINGWITH ANGLED GABLETO MAINTAIN WIDTH OF EDGE FLASHING
ENSURE RIDGE & EAVESLINE PARALLEL7°FALL
RL 98600
FFL
RL 101600
Top of Glazing
31 2
FG
HEKA HOODWALL CLADDING TO CONCEALHOOD FIXING PLATEREFER TO DETAIL
CS
45° DOWN PIPEANGLE
TIMBER FEATURE SCREENREFER TO DETAIL
NOTE:
1. TAPER ALL EAVES GUTTER ENDSREFER TO DETAIL
VERTICAL CORRUGATED SHEETINGTO BASE OF MAIN BUILDING
ALIGN ROOF SHEETINGWITH ANGLED GABLETO MAINTAIN WIDTH OF EDGE FLASHINGENSURE RIDGE & EAVES
LINE PARALLEL
7°FALL
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Common Room -Elevations East &West
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-C-200
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Common Room - East Elevation1
1 : 100
Common Room - West Elevation2
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
RL 98600
FFL
RL 101600Top of Glazing
B D
1800
CL
TAPER &EXTEND PFC & EAVES GUTTERREFER TO DETAIL
CS
FGFG FG FG
LIGHT
DP
GATE
LIG
HT
S
4CD-C-306
1CD-C-311
DP
NOTE:
1. TAPER ALL EAVES GUTTER ENDSREFER TO DETAIL
LIGHT
EXPOSED STRUCTURE TOUPPER ROOF EAVES
UNDERSIDE OF STRUCTURAL TIMBER FASCIATO ALIGN ON ALL SIDES OF ROOF
RL 98600FFL
RL 101600
Top of Glazing
BD
3000
CS
FLAT BLACK POWDERCOATEDMETAL COVER OVER STRUCTUREBETWEEN GLAZING UNITSSO THEY READ AS ONE.(INTERIOR & EXTERIOR)
CS
FG
HEKA HOODWALL CLADDING TO CONCEALHOOD FIXING PLATEREFER TO DETAIL RANGEHOOD VENT PIPE
FG FG
SIL
L60
024
00
FG
DPDPDP
45° DOWN PIPEANGLE
3CD-C-306
VERTICAL CORRUGATED SHEETINGTO BASE OF MAIN BUILDING
DP
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Common Room -Elevations North &South
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-C-201
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Common Room - South Elevation2
1 : 100
Common Room - North Elevation1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
(39.3m2)TECH ROOM
Polished Conc. floor
OFFICEPolished Conc. floor
M / WCConc.
AC
AC
RWT2500 Ø
AM
BU
LAN
T
UR
INA
L
RWT2500 Ø
CL
AM
BU
LAN
T11
10
13
14
(90m2)INTERPRETIVE SPACE
Polished Conc. floor
ACCESSWC
Conc.
F / WCConc.
ACAC
A B C D E
5
4
3CL
200
CL
CL
FG
FFL98600
SOUTH VERANDAHConc.
FW
FW
FW
FALL
FALL
20 20
2020
OFFICE
OF
FIC
EF
/ W
CM
/ W
C
UN
I AC
CE
SS
WC
820
820
820
920
20FFL98600
CL.STConc.
NORTH VERANDAHConc.
OP
ER
AB
LE W
ALL
45 45 4190 45
GLAZING GLAZING
FW
FFL98500
SERVICESConc.
FALL
SP
OO
N D
RA
IN
SE
RV
ICE
S
915 915 915
915 915915
FG
12
16
20
17
1
CD-I-307
1
CD-I-306
1
CD-I-304
1
CD-I-304
1
CD-I-303
1
CD-I-303
1
CD-I-301
1
CD-I-301
1
CD-I-300
1
CD-I-300
OUTLINE OF ROOF OVERSHOWN DASHEDTO OUTER EDGE OF STRUCTURAL PFC
10 12
13
1415
11
TANK PUMPEQUIP.
FIXED GLASSCORNER(NO MULLION)
FIXED GLASSCORNER(NO MULLION)
LINE OF CEILING OVERLINE OF CEILING OVER
3002400
3002400
1000 1000LAWN
LANDSCAPE BENCH SEATREFER TO JMLA LANDSCAPE DRAWINGS
10000
SEAT
235
DP
1
CD-I-302
HIGH LEVELGLAZING
TECH C'BD 1REFER TO DETAIL
TECH C'BD 2 - COMMSREFER TO DETAIL
1CD-I-309
1555
CL
CL45
GA
TE
9039
6090
3960
9030
6090
3210
90
9027
5090
2330
9027
5090
2205 90 19110 90
980
950
15
90 19110 90
9071
1090
FG
FG
3000
3000
3000
3000 1500
1
CD-I-305
1
CD-I-305
AW
NIN
GA
WN
ING
9011
6511
6590
1000
115
AW
NIN
GGLAZING
RWT2500 Ø GLAZING
GLAZING
90 8005 11105 90
410
1775
9017
7541
0
GLA
ZIN
G
GLAZING
INTERP SPACETECH ROOM
90 1800 90 2300 90
90 4190 90
OP
EN
12003600
1200
1810
GLA
ZIN
G
1915 1915
90 910 2915 3830
90 910 2915 3830
140
140
140
610
FG
600 2410
FG
410 49590
CONFIRM TANKLOCATIONON SITE TO SITUNDER DP'S
REFER TOWET AREADRAWINGSFOR SETOUT
350
120
1515
2CD-I-312
3CD-I-312
----
SPOON DRAIN
SPOON DRAIN
Conc.
CLCL
2205 2205
I BEAM INCEILINGFOROPERABLEWALL
UC UC
8989
1030
PO
ST
1200
2CD-I-311
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Interp Building -Floor Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-I-100
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Interp Building - Floor Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
A B C D E
5
4
3
INTERP BUILDINGPolished Conc. floor
OFFICEPolished Conc. floor
200
CL
CL
FFL98600
VERANDAHConc. Broom finish
SERVICESConc. Broom finish
FALL
FALL
20 20
2020
FALL
20
FFL98600
FFL98500
1195
FALL
3300
4120 4120
C LC L
4050
ST
RU
CT
UR
AL
PO
ST
S
WC
UW
SW
SW
WC
WC
WC
SW
SW
FFL98600
Conc. Broom finish
2500ØCONC.TANKRING
FFL 98500
FFL 98500
FFL 98500
200
10000
10001000
3125
VE
RA
ND
AH
MAINS POWER FOR METER BOXTO RUN UNDER FLOOR TO METER BOX
4120 2060 2060 200
C L45
10300 2260
1270
45
VERANDAH SLAB
3255
VE
RA
ND
AH
OFFICE
VERANDAH POSTS
VERANDAH SLAB
VERANDAH POSTS
200
P
BRING POWER INTO MAIN BUILDINGFROM SWITCHBOARD UNDER FLOOR TO C'BD
VERANDAHConc. Broom finish
1125
033
90
3040
8210
OF
FIC
E
SE
RV
ICE
SW
ET
AR
EA
S
100
255
5600
2400
2400
300
300
100
BRING POWER& CAT 6 CABLETO C'BD
P
WET AREAS
7290
2045
4370 2205
4370
19290
10300 2260
350
2500ØCONC.TANKRING
2500ØCONC.TANKRING
350
120
1515
TA
NK
45
FW
FW
FW
FW
SINK WASTEIN WALLCAVITY
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALLFALL
FALLFALLFA
LL
FALL
SP
OO
N D
RA
IN
SPOON DRAIN
SPOON DRAIN
UC UC
CL2205
CL2205
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Interp Building -Slab Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-I-101
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Interp Building - Slab Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIOND 30.10.2020 CONSTRUCTION
A B C D E
5
4
3
OP
ER
AB
LE W
ALL
TR
AC
KEXPOSED
ROOFSTRUCTURE
PLYWOODLINED SOFFIT
LINEDCEILING
900
900
C LC L
EXPOSED RAFTERS
CLEAR ROOFSHEETINGOVER
1155
4800
1155
1155
4800
1155
2060
1555
1800
9090
90
APPROX CH 3200CH 3000 APPROX CH 3200
RA
KIN
G C
EIL
ING
90mm RECESSFOR STRIPLIGHTING
SUSPENDED CEILING600x600 CEILING GRID WITH 3D ACOUSTIC CEILING TILES (80no.)
100x100 ROLLER BLIND RECESS
100x100 ROLLER BLIND RECESS
RECESSED PLASTERBOARD CEILINGAROUND CEILING GRID (PAINT BLACK)SQUARE SET CEILING / WALL JUNCTIONS (NO CORNICE)
BLACK PAINT FINISH
SUSPENDED CEILING3D ACOUSTIC CEILING TILES (40no.)
900
900
C LC L
LINEDCEILING
LINEDCEILING
LINEDCEILING
NOTES:
1. REFER TO ELECTRICAL PLAN FOR LIGHTING2. AIR CONDITIONING VENT LOCATIONS INDICATIVE.
AIR CONDITIONING CONTRACTOR TO CONFIRM LOCATIONS.3. A / C VENTS ON RECESSED CEILING TO BE BLACK TO MATCH CEILING.
PB
PBBULKHEAD
PBBULKHEAD
PB
PLYWOODLINED
CEILING
PBRAKINGCEILING
PREFINISHED PLYWOOD VERANDAH CEILINGRANDOM JOINTS.APPLY FINISH TO ALL CUT ENDSPRIOR TO INSTALLATION.
CEILING ACCESS HATCH
CEILING ACCESS HATCH
CE
ILIN
G G
RID CE
ILIN
G G
RID
9090
DP
DP
DP
DP
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Interp Building -Reflected Ceiling Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-I-102
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Interp Building - Reflected Ceiling Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIOND 30.10.2020 CONSTRUCTION
A B C D E
5
4
3
DP
FALL
FALL
EXTEND GUTTERS & CUT ENDAT 30° ANGLEREFER TO DETAIL
FALL
CLEAR SHEETING
FALL
1
CD-I-307
1
CD-I-306
1
CD-I-304
1
CD-I-304
1
CD-I-303
1
CD-I-303
1
CD-I-301
1
CD-I-301
1
CD-I-300
1
CD-I-300
1200
1500
1500
DP
1200
1200
1500
1000
900
900
EAVES GUTTER
EA
VE
S G
UT
TE
R
EAVES GUTTER
SE
TO
UT
RO
OF
HE
IGH
TF
RO
M R
OO
F B
EA
M U
ND
ER
90
90
90
90
90
90
ROOF OVERHANG NOTES:
1. ROOF OVERHANGS TO INTERP BUILDING SETOUT FROM GRID LINES / WALL CENTRELINES.2. OVERHANGS ARE DIMENSIONED TO OUTERMOST POINT OF TIMBER ROOF FRAME
(EXCLUDES PFC FASCIA)3. TAPER ALL EAVES GUTTER ENDS.
TV AERIALCONFIRM BEST FIXING LOCATION ON SITE
1
CD-I-302
1
CD-I-302
----
FALL
1
CD-I-305
1
CD-I-305
ROOFEDGE CAPPING
ROOF EDGE CAPPING
DP
----
1000
PF
C O
/H
EA
VE
S G
UT
TE
R
TAPER END OFALL GUTTERS
DOWN PIPE POPDROPS WATERTO GROUND
250 ROOF SHEET O/H 250 ROOF SHEET & BATTEN O/H
1CD-I-313
4CD-I-313
2CD-I-313
3CD-I-313
2CD-I-312
3CD-I-312
6°
5°
8°
6° 6°
ROOF SECTIONFALLS MORESTEEPLY THANMAIN ROOF
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Interp Building -Roof Plan
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-I-103
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Interp Building - Roof Plan1
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
RL 98600
FFL
RL 101600
Top of Glazing
5 4 3
3000
CS
FG
DP
FLAT BLACK POWDERCOATEDMETAL COVER OVER STRUCTUREBETWEEN GLAZING UNITSSO THEY READ AS ONE(INSIDE & OUTSIDE)
DP
GLASS CORNERTO GLAZING
DOWNPIPE POP DROPSWATER TO GROUND.(CONC. & ROCKS UNDERTO PREVENT EROSION.REFER TO LANDSCAPING DWGS).
VERTICAL CORRUGATED SHEETINGTO BASE OF MAIN BUILDING
----
1CD-I-313
RL 98600FFL
RL 101600
Top of Glazing
543
FG CS
DP
SIL
L
SIL
L
DP
FLAT BLACK POWDERCOATEDMETAL COVER OVER STRUCTUREBETWEEN GLAZING UNITSSO THEY READ AS ONE(INSIDE & OUTSIDE)
TV AERIAL
PAINTED TIMBER BATTEN SCREEN
1500
900
1800
300 SIL
L
1800
300
EXPOSED STRUCTURETO UPPER ROOF
NOTE:
1. TAPER ALL EAVES GUTTER ENDSREFER TO DETAIL
----2
CD-I-313
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Interp Building -Elevations E & W
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-I-200
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Interp Building - East Elevation1
1 : 100
Interp Building - West Elevation2
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION
RL 98600
FFL
RL 101600Top of Glazing
ABCDE
FG
FG FG
FG FG
FG FG
FGCS
CS
CS900
SIL
L
LIGHT
1800
LIG
HT
SLIGHTLIGHT
1CD-I-308 FLAT BLACK POWDERCOATED
METAL COVER OVER STRUCTUREBETWEEN GLAZING UNITSSO THEY READ AS ONE(INSIDE & OUTSIDE)
CS
FLAT BLACK POWDERCOATEDMETAL COVER OVER STRUCTUREBETWEEN GLAZING UNITSSO THEY READ AS ONE(INSIDE & OUTSIDE)
ALI
GN
GLA
ZIN
G
ALI
GN
GLA
ZIN
GGLASS CORNERTO GLAZING
----
VERTICAL CORRUGATED SHEETINGTO BASE OF MAIN BUILDING
TANK ON TANK RING
EXPOSED STRUCTURE TOUPPER ROOF STRUCTURE
UNDERSIDE OF STRUCTURALFASCIAS TO ALIGN ON ALLSIDES OF ROOF
3CD-I-313
RL 98600
FFL
RL 101600
Top of Glazing
A B C D E
FG
FG FG FG FG
FG
CS
1800
LIGHT LIGHT
DP
DP
LIG
HT
S
CS CS
----
NOTE:
1. TAPER ALL EAVES GUTTER ENDSREFER TO DETAIL
LIGHT
TANKS ONTANK RINGS
4CD-I-313
1:100
10 2
TITLE
CHECKED BYDRAWN BY
CLIENT
PROJECT NO.
© Skyring Architects. These designs, drawings & specifications are copyright and must not be used kept or copied by any means without written permission.
PLOT DATE:
SCALE @ A3 :
: :
DO NOT SCALE THE DRAWINGSThe builder shall confirm all dimensions and information on site and verify any errors or omissions with the architect. The Drawings shall not be used for construction purposes unless issued by the architect for construction.
DWG NO. ISSUE
PROJECT NAME
APPROX
ISSUE
1 : 100
D
Interp Building -Elevations N & S
AS
Gwydir Shire Council
30/10/20
SS
1122
CD-I-201
Wellness & InterpretiveCentre
CONSTRUCTION
1 : 100
Interp Building - North Elevation1
1 : 100
Interp Building - South Elevation2
ISSUE DATE DESCRIPTIONA 01.04.19 TENDERB 09.05.19 TENDER REVISIONC 13.05.20 TIMBER FRAMED 30.10.2020 CONSTRUCTION