Page 1: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

M2 Status &

Near Term Major Milestones

C. Araujo/B. Gressler

1

Page 2: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

2

M2 Status

Oct 2014: M2 substrate received by Exelis (Harris)

Now in Storage @ Harris waiting for optical processing

Page 3: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

3

2015 - Upcoming Reviews

MayOptical Fab. STE design Cell Assy Fab. Readiness / Cell weldment design

JulyOptical Fabrication & Test Readiness - Part1Shipping container modifications/packagingSupport Pad Design & Testing Cell Assembly Handling Equipment (M2 cart and cover)

SeptemberCell Assy final Design Mirror control system Finished M2/cell Assy integration & test readiness

NovemberOptical Fab & test readiness - polish

Page 4: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

4

M2 Schedule Summary

Needed at site by Mar 2018 (60 days float)

Page 5: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

5

M2 Status

Page 6: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

6

M2 Status

Page 7: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

7

Optical Fab STE

7

Fab equipment

Full tool rotation device

Large bridge profilometer

Small bridge profilometer

Swing Arm Profilometry

Full tool polisher

Page 8: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

8

Handling Equipment

Vacuum-lifter

Steel support weldment

Support Ring

Full tool rotation device

Page 9: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

9

M2 processing to begin soon

Page 10: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

10

M2 Grind and Polish

Page 11: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

11

Processing up to ion figuring

Page 12: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

12

M2 Test Set PDR

12

Reduces stitching errors due to high frequency discontinuities between CGHs.

Single CGH 28”x28” (MHAT)

Collimator 40” CA

larger test aperture allows the entire CA of M2 to be measured as a single zone

shorter collimator height will enable the M2 to be tested with a lower ceiling height

3m

New Design •Mount M2 in stationary frame •Rotate interferometric test set components

Page 13: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

13

M2 Test Set

13

Test set modeling CodeV and Zemax

Test Set Hardware

Page 14: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

14

M2 Cell Design Analysis

• FEA performance to support cell weldment long lead procurement

• Mirror correctability confirmed

Page 15: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

15

M2 Surrogate Designed

Page 16: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

16

M2 Cover & Cart previewed

Page 17: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

17

Pad designs reviewed

Page 18: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

18

Container mods reviewed

Page 19: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

19

M2 Issues

• LSST producing ILCs to enable testing of M2 actuators• M2 lifting fixture vs spreader bar• Final details of witness samples for pull tests• Action items from M2 cart design review• Shipping container mods

Page 20: M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

20

Near term

• Prepare for M2 FDR in Sept• Includes M2 Controller Design• Optical Fab & Test RR – mid Oct/Nov• Working to update PMCS