Page 1: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese

Status ReportSectors, Rings, Frame

December 2002

Page 2: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese2

Sectors Since the Last Pixel Week• Laser welding of about 40 sector tubes to fittings was

completed with about 90% yield for two good fittings on tube.• One sector fabricated for initial system tests.• But recognition that fault pressure in evaporative cooling

system may be about 16 bar(abs), much greater than we had assumed before.

• Extensive testing of baseline sector tubes(aluminum 1060) and work hardening of same

• “Destructive” testing of sector made with 1060 tubes to 16 bar(abs)

• Extensive testing of stronger tubes(aluminum 3003) and work hardening of same.

• Fabrication of 3003 samples to test laser welding to existing coolant fittings. Laser welding ???

Page 3: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese3

Aluminum1060 Tubes

Page 4: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese4

Tube Deflection Tests• Measure tube deflections under pressure, with and without

work hardening. Also some testing of bent sector tubes.

Measure deflectionUnder pressure

Page 5: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese5

Test Sector to 16 bar(abs)

Page 6: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese6

Summary of Deflections

1060 tubes only

3003 tubes only

Sector with 1060 tube

Page 7: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese7

Sector(1060 tube) after 16 bar• No catastrophic failure. Tube on edges expands inelastically.

Most of region not affected. Sector construction prevents tube from expanding except on edges.

Page 8: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese8

Other Pressure Tests

• We have tested about 10 samples of the fittings welded to the sector tubes up to 20 bar without any evidence for leaks => fittings OK.

• We have also tested one welded tube(1060) with laser welded fittings to 20 bar and no leaks were found => welding probably OK.

Page 9: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese9

Sectors Conclusion• Sectors with 1060 tubes might survive up to 16 bar but would have to test

more sectors and with silicon(does silicon break?). Issue is potential for damage to other sectors.

• If we go to work hardened 3003(we do the hardening by internal(up to 20 bar) and external pressure to flatten), then for sure no problems at 16 bar(or even higher). This is the safe way to go.

• We have 3003 tubes on hand although they are a few mm shorter. Bending of these tubes started.

• Laser welding ??

• Going to 3003 will cause some delay and some extra cost(for the additional laser welding). But looks like we can still meet schedule for delivery of sectors when production modules ready.

• Sectors for system tests not affected – will use 1060 tubes.

Page 10: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese10

Reminder

Disk Rings

Endplate

Endcone

Disk Frame

Barrel Frame

Disk Ring Mounts

Disk Sectors

Page 11: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese11

Disk Ring Fabrication Complete

Page 12: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese12

Dry Fit of 1st Disk Frame Section

December 5, 2002

Page 13: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese13

Dry Fit of 1st Endcone

December 5, 2002

Page 14: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese14

Global Support Status

• No significant problems so far.

• Bonding of 1st disk section this week, followed by 1st endcone before Xmas.

• Most of parts for other sections ready or ready very soon.

• Dry fit -> bond -> inspect other sections starting in January.

• We remain on track to complete the fabrication by April 2003.

Page 15: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese15

Miscellaneous Items

• Custom “bolts” for mounting disk sectors to rings. – Delayed by work on sector tubes but will order in January

• Disk ring mounts– Fabrication underway for delivery by mid-January

• Tooling for drilling disk frames and inserting rings– Prototype completed long ago(with larger frame size)– Update delayed by work on PP1(and other parts of

ATLAS).– Also realize will take some time to (re)survey rings with

actual mounts.– Will be February before we start on drilling end section of

frames.

Page 16: M. Gilchriese Status Report Sectors, Rings, Frame December 2002.

M. Gilchriese16

Welding of Transition Pieces• Insertion of cables at PP0 greatly aided(only possible?) by

making transition from 8mm to 4mm tubing outboard(larger Z) of PP0 connectors. 4mm pipes pass between connectors.

• Laser welded various types of transition pieces to find best.