Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso owner
65

Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Dec 30, 2015

Download

Documents

Angel Jordan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK

Luciana Barrosoowner

Page 2: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• The Project• Project Requirements• Owner Requirements• Architectural Context• Site Context• Alternatives• Preferred Alternative• A-E-C Solutions• A-E-C Interactions• Lessons Learned

Today’s Outline

Page 3: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• Year 2010• Lake Tahoe area• Rebuild 3-story educational building

• Ridge University Engineering School

The Project

Page 4: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• Maintain existing footprints• 36’ height limitation• $5,500,000 budget• One year duration

Project Requirements

Page 5: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• Showpiece building• “Safe” structure within site context• On budget / on time

Owner Requirements

Page 6: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Architectural Context

• South Lake Tahoe• Building style based on

University of California Berkeley Art Museum and I.M. Pei’s NCAR Building

Page 7: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Architectural Desires

• Large curtain wall• Unobstructed seating in

auditorium and lecture rooms• Heavy vs. light

Page 8: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• Boundary conditions• Geological features• Local weather conditions• Local working week

Site Context

Page 9: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 1: Architecture

• Pre-existing structural layout• Privacy increases on vertical and inward motion• Use of internal light wells to unite spaces• Large spaces within to be used for interaction

Page 10: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 1: Engineering and Construction

•Explored structural systems:•Concrete•Steel•Concrete+Steel

•Preferred Structural System:•Concrete+Steel

•Construction Cost: $5,800,000

Page 11: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 2: Architecture

• Programmatic in nature• Separation of function by level• Individuality• Large spaces within to be used for interaction

Page 12: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 2: Engineering and Construction

•Explored structural systems:•Concrete•Steel

•Preferred Structural System:•Steel

•Construction Cost: $5,400,000

Page 13: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 3: Architecture

• Programmatic in nature• Separation of function by level• Individuality• Periphery vs. core• Large spaces within to be used for interaction

Page 14: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 3: Engineering and Construction

•Explored structural systems:•Concrete•Steel

•Preferred Structural System:•Concrete

•Construction Cost: $6,000,000

Page 15: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 4: Architecture

• Auditorium as indoor/outdoor space• 8º shift • Cantilevers hold offices • Glass curtain• Slope roof

Page 16: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Alternative 4: Engineering and Construction

•Explored structural systems:•Concrete•Steel•Concrete+Steel

•Preferred Structural System:•Concrete+Steel

•Construction Cost: $5,700,000

Page 17: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Preferred Solution: Alternative 4

Architectural Elements• Glass curtain walls• Cantilevered offices• Dual purpose auditorium• Open space light well at

lobby• Dynamic spaces that allow

for options

Structural Elements• Challenging cantilever

system• Sound lateral load resisting

system• Structure nicely integrated

into architecture

Owner’s preference

Construction Elements• Tight time scheduling• Challenging cost cut-down

Page 18: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Architecture Final Iteration

Page 19: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Overview

• Based on Alternative 4• Faculty offices along periphery• Student offices in an open environment• Auditorium follows ground

Page 20: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

1st Floor: Circulation

Page 21: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

1st Floor: Egress

Page 22: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

1st Floor: Lecture Rooms

Page 23: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

1st Floor: Lecture Rooms

• The following QuickTime VR movie is representative of the layout and feeling of the lecture rooms within the structure

Page 24: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

1st Floor: Small Classroom

Page 25: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

2nd Floor: Circulation

Page 26: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

2nd Floor: Egress

Page 27: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

2nd Floor: Instructional Facilities

Page 28: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

2nd Floor: Seminar Rooms

Page 29: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

2nd Floor: Student Offices

Page 30: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

3rd Floor: Circulation

Page 31: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

3rd Floor: Egress

Page 32: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

3rd Floor: Faculty Offices

Page 33: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

3rd Floor: Faculty Offices

• The following QuickTime VR movie is representative of the layout and feeling of the dean’s office within the structure

Page 34: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

3rd Floor: Faculty Lounge

Page 35: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

3rd Floor: Secretaries

Page 36: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Architecture Performance

Grand Total Actual Program DifferenceUseable Space 23400 30000Underground Storage/Machines 3000Open Space 1200Total 27600 30000 8.00%

• Planned space is 8% smaller than the program requirements • Total area: 27,600 square feet

• All areas handicap accessible per ADA regulations• At least 2 means of egress on every floor• Centralized plumbing runs• HVAC and Electrical distribution imbedded in walls

Page 37: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Architecture Performance

• Room affinities maintained from initial program• Some room functions combined into larger yet customizable units

•Seminar Rooms•Small Classrooms•Secretaries

• Security increases with levels• 1st Floor: Public• 2nd Floor: Semi-private• 3rd Floor: Private

• No internal stairwell

Page 38: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Engineering Final Iteration

Page 39: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Structural System Description

Classroom + Office Building:•Concrete lateral load resisting system•Concrete plate slab•Steel cantilever system

Auditorium:•Steel braced frames•Truss roof system

Page 40: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Moderate to high seismicity (Zone 3) Heavy snow loads

Live Loads 40psf (Classrooms) 50psf (Offices) 100psf (Storage & Hallways) Snow Load = 125psf

Dead Loads 100psf (Slab + Beams) 25psf (Floor + Partitions) 10psf (Installations)

Structural Considerations

Page 41: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

12x18 Concrete Ring Beam

Steel Cantilever Elements

12” Shear Walls 16x16 Concrete Columns

4” Composite Slab

8” Concrete Plate Slab

Third Floor Slab& Roof Slab Second Floor Slab

Classroom & OfficeBuilding

Page 42: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

UBC Code Seismic Reduction Factor, Rw = 12 Seismic Zone Factor, Z = 0.3 Peak Ground Acceleration , Ao = 0.3 Importance Factor, I = 1.0 Site Coefficient, S = 1.2

Building Weight = 4807 K Design Base Shear = 255 K

(in both directions)

Analysis Parameters

Analysis Results

Page 43: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Vibration Modes

Mode 1:T = 0.23 sec

Mode 2:T = 0.21 sec

Page 44: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Max Disp = 1.70” (0.4% of total height)

Limit Drift Ratio = 0.03/Rw = 0.0025Max Drift Ratio Obtained < 0.0008

DriftsWest Side Frame

Page 45: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Axial Force Diagram

Moment Diagram

Shear Force Diagram

M+ max = 38.47 K-ft

A max = 197.5 KV max = 23.95 K

M- max = 82.04 K-ft

M, V & Axial ForceDiagramsWest Side Frame

Page 46: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Wall Stresses

ShearStresses

VerticalStresses

Max Vertical Stress0.73 Ksi << F’c

Max Shear Stress0.27 Ksi << F’v

Page 47: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

ITERATION16x16 ColumnAs required = min = 1.0% = 2.6sqin

PRELIMINARY SIZE18x18 Column:As req= min = 1.0% = 3.2sqin

Column Sizing Iteration

Page 48: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

ITERATION12x18 Beam:As max req = 1.02sqin (0.60%)

PRELIMINARY SIZE12x20 Beam:As max req = 0.71sqin (0.35%)

Beam Sizing Iteration

Page 49: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Auditorium Iteration

Roof Truss SystemBraced FramesColumns

Secondary Roof Elements

Page 50: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Construction Final Iteration

Page 51: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• Mechanical excavator• Bulldozer• Dump Trucks• Tower crane• Concrete mixers

Machinery

Page 52: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

4D Model loading…

Page 53: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Cost Breakdown

3%

4%

3%

12%

11%

13%2%

40%

3% 9%

Demolition

Foundations

Substructure

Superstructure

Exterior

Interior

Conveying

M&E

Special Construction

Fees

Page 54: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

$5,350,000

$5,400,000

$5,450,000

$5,500,000

$5,550,000

$5,600,000

$5,650,000

$5,700,000

Building Cost Budget Preliminary Cost

Cost Comparison

Page 55: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

•Insulation

•R-30 Batt for roof

•R-19 Batt for walls

•Carpets for added insulation

•Glazing

•Double pane glazing to retain heat

•Conveying

•Pneumatic vs. hydraulic elevator

Life Cycle Considerations

Page 56: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

A-E-C Interactions

Page 57: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Architecturalproposal

Engineeringrationale

Solution

A-E Interaction: Cantilever System, Part 1

Page 58: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Preliminary Engineering Proposal

Final Solution

ArchitecturalRequirements

+ Mentor Feedback

A-E Interaction: Cantilever System, Part 2

Page 59: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Can we afford to lower the Auditorium?

Problem: Cost increase of earthworks by 17%

Solution: Use a site that naturally slopes and create a building that follows it.

A-C Interaction: Auditorium

Page 60: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Preliminary Engineering Proposal

Final Solution

Construction Requirements+ Mentor Feedback

E-C Interaction: From Frame System to Flat Slab

Page 61: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

E-C Interaction:

•Not dependable of weather

•Minimum erection time

•More expensive

•Transportation problems

•Last moment alterations possible

•Productivity rate can be fast

•Labor intensive

Pre-cast vr Cast in-situ

Page 62: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

Lessons Learned

Page 63: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• Applying theory into practice• Iteration, iteration, iteration…• Negotiation is key• When technology doesn’t work it’s

not the end of the world.• Adapt technology to suit your

needs and conditions

Lessons Learned

Page 64: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

• Distance is not a barrier• No one is ever “always right”• Ideas often come from outside

your discipline• Mentor feedback is crucial• Trust your teammates

Lessons Learned

Page 65: Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.

?