LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA AND NEVADA COUNTIES, CALIFORNIA SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT June 2012 Approved for public release; distribution is unlimited
37

LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

Jul 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT

YUBA AND NEVADA COUNTIES, CALIFORNIA

SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT

June 2012

Approved for public release; distribution is unlimited

Page 2: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).
Page 3: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

i

Contents 1.0 Purpose and Need for Action ............................................................................................... 1

1.1 Background .......................................................................................................................... 1

1.2 Proposed Action ............................................................................................................... 1 1.3 Location ............................................................................................................................ 2 1.4 Purpose and Need for the Action ..................................................................................... 2 1.5 Purpose and Scope of the Supplemental Environmental Assessment ............................. 2 1.6 Decision Needed .............................................................................................................. 3 1.7 Project Authority .............................................................................................................. 3

2.0 Alternatives .......................................................................................................................... 3

2.1 No Action ......................................................................................................................... 3 2.2 Gravel Sluicing (Preferred Alternative) ........................................................................... 4

2.2.1 Gravel Placement Process ......................................................................................... 4 2.2.2 Gravel and Cobble .................................................................................................... 5 2.2.3 Gravel and Cobble Placement Location ................................................................... 6 2.2.4 Staging and Stockpiling ............................................................................................ 6 2.2.5 Work Schedule .......................................................................................................... 6 2.2.6 Monitoring Program.................................................................................................. 6

3.0 Affected Environment and Environmental Consequences. ................................................. 7

3.1 Environmental Resources Not Considered in Detail........................................................ 7 3.2 Soils, Topography, and Geomorphology ......................................................................... 7

3.2.1 Existing Conditions, Effects, and Mitigation ............................................................ 7 3.3 Hydrology and Water Quality .......................................................................................... 7

3.3.1 Existing Conditions, Effects, and Mitigation ............................................................ 7 3.4 Traffic ............................................................................................................................... 8

3.4.1 Existing Conditions, Effects, and Mitigation ............................................................ 8 3.5 Hazardous, Toxic, and Radiological Waste ..................................................................... 8

3.5.1 Existing Conditions, Effects, and Mitigation ............................................................ 8 3.6 Aquatic Fauna .................................................................................................................. 8

3.6.1 Existing Conditions, Effects, and Mitigation ............................................................ 8 3.7 Special Status Species ...................................................................................................... 8

3.7.1 Existing Conditions, Effects, and Mitigation ............................................................ 8 3.8 Air Quality........................................................................................................................ 8

3.8.1 Existing Conditions, Effects, and Mitigation ............................................................ 8 3.9 Recreation......................................................................................................................... 9

3.9.1 Existing Conditions, Effects, and Mitigation ............................................................ 9 3.10 Noise................................................................................................................................. 9

3.10.1 Existing Conditions, Effects, and Mitigation ............................................................ 9 3.11 Cultural Resources ........................................................................................................... 9

3.11.1 Existing Conditions, Effects, and Mitigation ............................................................ 9 4.0 Growth-Inducing Effects ..................................................................................................... 9

5.0 Cumulative Effects............................................................................................................... 9

6.0 Compliance with Environmental Laws and Regulations ................................................... 10

Page 4: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

ii

7.0 Agencies Consulted ........................................................................................................... 10

8.0 Public Notice ...................................................................................................................... 10

9.0 Conclusions ........................................................................................................................ 11

10.0 List of Preparers ................................................................................................................. 11

11.0 References .......................................................................................................................... 11

Page 5: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

iii

PLATES

1. Project Area Vicinity Map 2. Project Area Map 3. Lower Yuba River 4. Location of Project Features and Schematic of the Gravel/Cobble Delivery System 5. Design Concept for using gravel augmentation in the Englebright Dam Reach, to possibly

obtain a salmon-spawning riffle with diverse microhabitat features APPENDIX A. June 2012 Amendment Request Letter November and 2010 401 Water Quality Certification.

Page 6: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

1

1.0 Purpose and Need for Action

1.1 Background The Lower Yuba River downstream of Harry L. Englebright Dam and Reservoir

(Englebright) has experienced extensive sediment deposition as a result of the hydraulic gold mining that occurred in the watershed during the mid- to late 1800s. An estimated 685 million cubic yards of mining debris was washed out of the mountains and into the Yuba River (Hagwood 1981). As the sediment migrated downstream, the river bed rose, causing extensive flooding in the Marysville area. To control this sediment movement, the California Debris Commission constructed Daguerre Point Dam in 1906 and Englebright in 1941.

Since its construction, Englebright has continued to fulfill its primary purpose of debris

control with containment of 17,750 acre-feet of sediment (Chiles 2003). The elimination of the upstream supply of sediment, however, has lead to progressive degradation of the downstream channel below Englebright, at least as far downstream as Parks Bar, where the Highway 20 (Plates 1 – 2) bridge footings have been exposed (Musseter Engineering, Inc. 2000). Lack of sediment input and gravel loss within this reach of the Lower Yuba River have greatly reduced the availability of quality spawning gravel for the Central Valley steelhead (Oncorhynchus mykiss) and spring-run Chinook salmon (Oncorhynchus tshawytscha).

Below Parks Barr, sediment sources from tributary input; gravel entrained from bars,

training walls, and hill slopes; and gravel existing in the channel bed continue to provide large areas of suitable spawning habitat (Moir 2006). However, without additional gravel delivery, the existing gravel supply in the bed and usable gravel stored in bars will decrease as it is gradually transported downstream, leading to a net deficit of spawning-caliber sediment.

1.2 Proposed Action The U.S. Army Corps of Engineers (Corps) is proposing to implement a gravel

augmentation project in the summer of 2012, by placing 5,000 short tons of a heterogeneous mix of gravel and cobble (0.25 to 5.0 inches in diameter) directly into the Lower Yuba River channel below Englebright Dam. The material would be monitored after the placement, adding to the understanding of the Lower Yuba River geomorphic processes. The information gathered from the monitoring of the placed gravel will allow the Corps to determine the quantity of additional gravel to be placed within the Lower Yuba River channel below Englebright Dam in future years. The action described herein is identical to that described in the environmental assessment prepared in 2010 with the exception of the date of implementation.

Page 7: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

2

1.3 Location The project area is located on the Lower Yuba River, starting at Englebright Dam (Yuba

River mile 23.9) downstream to Daguerre Point Dam (Yuba River mile 11.4), in Yuba and Nevada Counties, California (Plate 1). The proposed gravel placement site is located 115 feet downstream of the Narrows II Powerhouse. This site is less than one-acre and would be confined to the river channel within the Englebright Dam Reach (EDR), a 0.89-mile long bedrock reach starting at Englebright Dam and ending at the junction with Deer Creek, located in the steep Narrows Canyon off Highway 20, approximately 23 miles east of Marysville, California (Plates 2, 3, and 4).

1.4 Purpose and Need for the Action Englebright Dam plays a crucial role in protecting the downstream region from being

overwhelmed by sedimentary mining waste debris still being eroded off hillsides and stored in long sections of the channel network upstream. Most of the active Lower Yuba River also still has tens of millions of cubic yards of sedimentary mining waste debris in it that pre-date Englebright Dam and are still being re-worked as part of a highly dynamic, meandering gravel-bed river. However, the reach between Englebright Dam and the confluence with Deer Creek is now almost devoid of river-rounded gravel and cobble necessary for salmon spawning. In particular, spring-run Chinook salmon that historically went far upstream would substantially benefit from a gravel augmentation program below Englebright Dam. However, the critical reach is in a narrow canyon that is difficult to access and manage, let alone place thousands of tons of coarse sediment into (Pasternack 2010).

The purpose of the proposed gravel augmentation project is to place suitable-sized

spawning gravel within Englebright Dam reach of the Lower Yuba River. The proposed action would satisfy the Reasonable and Prudent Alternative 4 Gravel Augmentation Program, GAP1 included in the February 29, 2012 Biological Opinion (BO) prepared by National Marine Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.). Additionally, the Corps proposed gravel augmentation as a conservation measure in the January 2012 Biological Assessment.

1.5 Purpose and Scope of the Supplemental Environmental Assessment

The purpose of this Supplemental Environmental Assessment (EA) is to determine

whether the proposed action would result in adverse effects on the environment that were not identified and disclosed in the 2010 Environmental Assessment (2010 EA). The project as described in this EA is identical to that described in the 2010 EA with the exception of the date of implementation.

Page 8: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

3

1.6 Decision Needed The District Engineer, the Commander of the Sacramento District of the Corps, must

decide whether the proposed action described in this Supplemental EA qualifies for a Finding of No Significant Effect or whether an Environmental Impact Statement must be prepared to comply with the National Environmental Policy Act.

1.7 Project Authority

Harry L. Englebright Dam and Lake were authorized by the River and Harbor Act of 1935 (49 Stat. 1028) as a unit of the Sacramento River Debris Control Project. Construction of recreation facilities at Englebright Lake and provision of services to the public by concessionaire is in accordance with Section 4 of the Flood Control Act of 1944 (58 Stat. 887) and subsequent amendments.

2.0 Alternatives A Gravel/Cobble Augmentation Implementation Plan (GAIP) for the Englebright Dam

Reach of the Lower Yuba River, CA was developed to thoroughly assess the results of the 2007 pilot gravel injection project (Corps 2007), analyze the monitoring data collected post-pilot project, and to assess methods and measures that could be utilized in the proposed gravel augmentation project. A GAIP has been drafted, which thoroughly documents a plan for implementing a gravel/cobble augmentation program below Englebright Dam. This plan addresses the biogeomorphic impact of the proposed project on the Lower Yuba River. With the exception of the date of implementation, the preferred alternative in this Supplemental EA is the same alternative from the 2010 EA.

2.1 No Action The No-Action alternative serves as the environmental baseline against which the

proposed action is compared. Under this alternative, the Corps would not implement the gravel augmentation project on the Lower Yuba River immediately downstream of Englebright. If no action is taken, the existing gravel supply in the stream bed and usable gravel stored in current bars would gradually decrease as it is transported downstream, leading to a net deficit of spawning caliber sediment.

There are currently several projects and programs, either in the planning stages or

underway on the Lower Yuba River, that involve various efforts to improve conditions for anadromous fisheries. However, the existing geomorphic processes related to recruitment and transport of suitable spawning gravels below Englebright would essentially remain the same. The Corps may be required to reinitiate consultation with NMFS to determine the appropriate actions to be taken in the absence of a gravel augmentation project, to compensate for the interruption of recruitment gravel caused by the presence of Englebright Dam.

Page 9: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

4

2.2 Gravel Sluicing (Preferred Alternative) The preferred alternative consists of placing 5,000 short tons (18,518.52 cubic yards) of

gravel and cobble directly into the Lower Yuba River channel near the Narrows I Powerhouse via gravel sluicing, which involves drawing water up from a source and into a flexible pipe, where gravel and cobble is added from the top to produce a water, sediment slurry that is then piped down to a site for directed placement by one to two operators. Details of staging, gravel sizes, placement, and monitoring for the alternative are provided below. Project features are provided in Plate 4.

The gravel/cobble mixture would be monitored after placement within the EDR. The

information gathered from the monitoring of the placed material will allow the Corps to determine if it will be necessary to place additional quantities of gravel within the Lower Yuba River channel below Englebright (Pasternack 2010).

2.2.1 Gravel Placement Process The sluicing process involves drawing water up from a source (the reservoir) and into an

8-inch diameter “Yelomine” flexible pipe, where gravel and cobble is added from the top to produce a water, sediment slurry that is then piped down to a site for directed placement by one to two operators. The amount of water used to do the sluicing depends on the pipe and pump configurations, and is typically 1,000 to 1,500 gallons per minute, which is 2.23 to 2.34 cubic feet per second (cfs) (Pasternack 2010). The water pump would be located at the reservoir water’s edge, to push the water uphill in a 6 to 8 inch pipe. The pump inlet would be screened to prevent aquatic fauna from being taken up into the pumping system.

This process is normally a five-person operation: one person would operate the water

pump at the source, one, in a loader, would bring gravel to the feeder, one person would operate the feeder in order to prevent clogs and coordinate communications, and two at the end nozzle, directing gravel placement and to add pipe as needed to periodically move downstream. This approach would have a minimal construction footprint; Plates 4 and 5 illustrate the project design and layout.

The rate of gravel placement via sluicing is approximately 100 to 300 short tons per day,

all dependent upon how frequently the system clogs. This is slow relative to gravel placement by truck-mounted conveyor belt (approximately 500 short tons per day) or truck/front loaders (approximately 1,000 short tons per day) (Pasternack 2010). At an average rate of 150 short tons per day, it would take 33 days to place 5,000 short tons of gravel.

The approach that would be used with gravel sluicing is to start at the water’s edge, build

across the river, and then work downstream. At the outlet of the system, gravel would go into a rigid pipe supported by floating, air-filled barrels. The outlet would be manually directed to the placement point with the aid of ropes as needed. Using this approach, it is possible to place gravel according to a sophisticated design with few constraints.

Page 10: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

5

The water intake pump system, which includes fish screening, would be positioned right on the water’s edge, along the gravel road on the north side of the reservoir that runs close to the dam. From there, the water would be pumped in one or two 6 to 8-inch diameter pipes approximately 1,070-feet up the side of the road to the crest (Plate 4).

The pipes would go over the crest of the hill, and down the side of the paved road,

approximately 300-feet towards the Narrows II powerhouse, until a point at which there is a noticeable slope break favorable to beginning the gravel addition to the pipe. At that location, a screened hopper on the north side of the road would receive sediment from a front loader, transferring the material the short distance from the stockpile. The loader operator would gently bounce the bucket to trickle the sediment into the hopper as the primary control on the flow rate; a hopper operator would be stationed there to ensure no blockages, clean out finger rocks as needed, and communicate conditions with other operation participants by radio.

Under the hopper, the gravel and water would join in a metal pipe that would then

connect to the beginning of the 8-inch diameter, semi-flexible “Yelomine” pipe. This pipe would then run down approximately 1,270-feet down the ditch on the north side of the road to the switchback. From that point, the pipe would go 264-feet straight down the grassy hillside to a terrace level, where an old roadbed and foot-trail are located. From that point, the pipe would make a straight line, 130 feet down to the water’s edge near the upstream end of the gravel placement area (Plate 4).

2.2.2 Gravel and Cobble The Anadromous Fish Restoration Program, a U.S. Fish and Wildlife Service program

that is tasked by the Central Valley Project Improvement Act to make "all reasonable efforts to at least double natural production of anadromous fish in California's Central Valley streams on a long-term, sustainable basis” (USFWS 2010) has recommended gravel specifications to ensure that the placed gravel provide some usable spawning habitat and optimal egg survival rates for the salmonids within the Lower Yuba River. These specifications are showing in Table 1 (Pasternack 2012). This gravel would be obtained from a commercial aggregate source located near the project site, within the Lower Yuba River watershed, and would arrive screened and pre-washed to the placement site.

TABLE 1. Gravel and Cobble Specifications for Salmonid Spawning and Egg Incubation.

Gravel Size (inches) Percent Retained Target % of Total Mix 3.5 to 5 30 30

1.25 to 3.5 80 50 3/4 to 1.25 88 8 1/2 to 3/4 96 8 1/4 to 1/2 100 4

Page 11: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

6

2.2.3 Gravel and Cobble Placement Location The selection of the specific location for focusing gravel and cobble location has been

guided by constraints in powerhouse operations, potential benefits to the river, and feasible delivery methods. Powerhouse operations presently preclude gravel augmentation between Englebright Dam and the Narrows powerhouse. To get the most benefit and longevity from adding gravel to the river, the further upstream it is introduced, the better. To avoid having to fill the scour pool adjacent to the Narrows I facility, and yield riffle habitat for immediate spawning use with the least amount of initial gravel placement during a gravel sluicing operation, the placement should begin approximately 115-feet downstream of the end of the Narrows I powerhouse, where the maximum depth of the pool is under five-feet at 855 cfs of flow (Pasternack 2010).

2.2.4 Staging and Stockpiling There would be one staging area for the project, located at the gravel turnouts along the

paved access road to Narrows II. This area would be used primarily for vehicle parking and temporary storage of truck trailers loaded with gravel. The same turnouts would be used to stock pile the gravel; prior to the start of sluicing operations, the gravel would be stockpiled in the three parking/turnout areas at the overlook on the north side of the dam. This location is behind a locked gate and inaccessible to the public.

The likely truck haul route that would be used to deliver gravel from the commercial

source to the project site is would begin at the intersection of State Route 20 and Peoria Road, and end on the Narrows II access road, at a bench downstream of, and level with, the top of Narrows II (Plate 2).

2.2.5 Work Schedule The proposed work would be conducted over a six week period from July 2012 through

the end of September 2012. Work hours would be limited to normal workdays, from 8:00 a.m. to 5:00 p.m. Any work conducted past September 2012 will also conform to the same time frames, or as approved by the resource agencies.

2.2.6 Monitoring Program Outflow release from the Narrows II powerhouse and spill flows over the top of

Englebright would aid in transporting the gravel placed downstream within the upper Narrows reach of the Lower Yuba River. Gravel placed within the river would be monitored through the fall and fall of 2012 and winter of 2013 by the Lower Yuba River Accord River Management Team for salmonid use, via protocol-level redds surveys.

Data from the monitoring program would be compared with hypothetical quantitative

predictions based on the ecologic, geomorphic, and hydrodynamic conditions present at the placement site. Confirmation of predictions would relate to how much the channel would be

Page 12: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

7

affected and how long the effect would persist, coupled with the potential beneficial qualities of the changes induced, would allow optimization of a the long-term gravel augmentation program design with a more accurate cost/benefit analysis.

3.0 Affected Environment and Environmental Consequences.

3.1 Environmental Resources Not Considered in Detail Initial evaluation of the potential effects of the alternatives indicated that there would not

be any adverse direct, indirect, or cumulative effects on several resources due to the scale, scope, and schedule of the proposed action. Resources not discussed in detail include climate, geology and seismicity, land use, agriculture and prime and unique farm land, socioeconomics and environmental justice, esthetics, and vegetation and wildlife.

3.2 Soils, Topography, and Geomorphology

3.2.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in

the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

3.3 Hydrology and Water Quality

3.3.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in

the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

The proposed action and implementation schedule was discussed with the California

Regional Water Quality Control Board (CRWQCB) on June 11, 2012. The Board recommended preparing an amendment request letter to the existing Water Quality Certification approved in November 2010. At the June 11, 2012 meeting, the Board indicated that approval for an amendment was highly likely. Refer to Appendix A for the ne 2012 Amendment Request Letter November and 2010 401 Water Quality Certification.

Page 13: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

8

3.4 Traffic

3.4.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required

3.5 Hazardous, Toxic, and Radiological Waste

3.5.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in

the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required

3.6 Aquatic Fauna

3.6.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in

the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

3.7 Special Status Species

3.7.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in

the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

3.8 Air Quality

3.8.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

Page 14: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

9

3.9 Recreation

3.9.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

3.10 Noise

3.10.1 Existing Conditions, Effects, and Mitigation The existing conditions would be the same as described in the 2010 EA. The change in the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

3.11 Cultural Resources

3.11.1 Existing Conditions, Effects, and Mitigation

The existing conditions would be the same as described in the 2010 EA. The change in the project implementation date proposed in this Supplemental EA would not result in any new adverse effects. No additional mitigation would be required.

4.0 Growth-Inducing Effects The change in the project implementation date proposed in this Supplemental EA would

have no effect on population growth or densities.

5.0 Cumulative Effects As discussed in the 2010 EA, the proposed gravel augmentation, in combination with

past, present, and potential future actions, would likely contribute to the overall health and vigor of the watershed.

Page 15: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

10

6.0 Compliance with Environmental Laws and Regulations As disclosed in the 2010 EA, the proposed gravel augmentation would be compliant with

the following environmental laws and regulations. Bald Eagle Protection Act of 1940, as amended, 16 U.S.C. 668-668d, 54 Stat. 250. Clean Air Act of 1972, as amended, 42 U.S.C. 7401, et seq.

Clean Water Act of 1972, as amended, 33 U.S.C. 1251, et seq.

Endangered Species Act of 1973, as amended, 16 U.S.C. 1531, et seq.

Executive Order 12989, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations.

Executive Order 13112, Invasive Species.

Farmland Protection Policy Act, 7 U.S.C. 4201 et seq.

Fish and Wildlife Coordination Act of 1958, as amended, 16 U.S.C. 661, et seq. Magnuson-Stevens Fishery Conservation and Management Act.

Migratory Bird Treaty Act of 1936, as amended, 16 U.S.C. 703 et seq

National Environmental Policy Act of 1969, as amended, 42 U.S.C. 4321, et seq. National Historic Preservation Act of 1966, as amended.

Wild and Scenic Rivers Act, 16 U.S.C. 1271 et seq.

7.0 Agencies Consulted The EA was prepared in consultation with the USFWS and NMFS.

8.0 Public Notice In accordance with NEPA regulations and the Corp’s procedures for implementing NEPA, a notice of availability of the FONSI will be sent to concerned agencies, organizations, and the public, as identified in Appendix E of the 2010 EA (40 CFR 1501.4(e)(1); 33 CFR 230.11).

Page 16: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

11

9.0 Conclusions The change in the project implementation date proposed in this Supplemental EA would

not result in any new adverse effects or requirements for new mitigation from those disclosed in the 2010 EA. Based on the findings presented in the 2010 EA and reconsidered in this Supplemental EA, the proposed gravel placement project will not result in a significant adverse effect on the environmental resources in the project area, including threatened and endangered species, and other wildlife and vegetation.

10.0 List of Preparers Brad Johnson, Environmental Manager U.S. Army Corps of Engineers Doug Edwards, PHD, AICP, Senior Environmental Manager U.S. Army Corps of Engineers

11.0 References Chiles, J.R., Snyder, N.P., Hampton, M.A. 2003. Bathymetric and geophysical surveys of

Englebright Lake, Yuba-Nevada Counties, California. U.S. Geological Survey Open-File Report 03-383.

Hagwood, Joseph J. 1981. The California Debris Commission: A History. U.S. Army Corps of

Engineers, Sacramento District. Sacramento, CA. Moir, H. J., Pasternack, G. B. 2006. Implications of a Dynamic Hydromorphic Regime for

Environmental Management on a Disturbed Large Gravel-bed River. EOS, Transactions of the American Geophysical Union 87(52), Fall Meet. Suppl., Abstract H41C-0425.

Mussetter Engineering, Inc. 2000. Letter report regarding geomorphological issues for the

Daguerre Point Dam Fish Passage Study. Prepared for the U.S. Army Corps of Engineers. Pasternack, G. B. 2010. Gravel/cobble Augmentation Implementation Plan for the Englebright

Dam Reach of the Lower Yuba River. University of California, Davis. August 30, 2010. U.S. Army Corps of Engineers (Corps). 2007. Lower Yuba River Pilot Gravel Injection Project,

Yuba and Nevada Counties: Final Environmental Assessment. Sacramento District, Sacramento, CA.

U.S. Fish and Wildlife Service (USFWS). 2010. Species Lists for Smartville and Browns

Valley U.S. Geological Survey 7.5 Minute Quads. Available at: www.fws.gov/sacramento/es/ssp_lists.

Page 17: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

12

Personal Communications

Pasternack, G. B. 2012. University of California, Davis. Email to Doug Grothe , Park Manager, U.S. Corps of Engineers. Subject: 2012 gravel mix concept. June 25, 2012.

Sparks, Genevieve 2012. California Environmental Protection Agency, Regional Water Quality Control Board, 401 Water Quality Certification Program. Meeting with Doug Edwards, Senior Environmental Manager, U.S. Corps of Engineers, June 11 2012. Subject: Amendment to the Approved November 2010, Clean Water Act §401 Technically Conditioned Water Quality Certification for Discharge of Dredged and/or Fill Materials for the Englebright Dam Reach Gravel Injection Project (WDID#5A58CR00081).

Page 18: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

PLATE 1 PROJECT AREA VICINITY MAP

Page 19: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

Plate 1. Project Area Vicinity Map

Englebright Dam

Daguerre Point Dam

Project Area

Page 20: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

PLATE 2 PROJECT AREA MAP

Page 21: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

Gravel Injection Site Below Englebright Dam

Commercial Gravel Source

Daguerre Point Dam

Gravel Haul Route (paved)

Project Area

Plate 2. Project Area Map

Page 22: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

PLATE 3 LOWER YUBA RIVER

Page 23: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).
Page 24: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

PLATE 4 LOCATION OF PROJECT FEATURES AND SCHEMATIC OF THE GRAVEL/COBBLE DELIVERY

SYSTEM

Page 25: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).
L2PDRMMG
Text Box
Narrows I Powerhouse
L2PDRMMG
Text Box
Narrows II Powerhouse
Page 26: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

PLATE 5. DESIGN CONCEPT FOR USING GRAVEL AUGMENTATION IN THE ENGLEBRIGHT DAM REACH,

TO POSSIBLY OBTAIN A SALMON-SPAWNING RIFFLE WITH DIVERSE MICROHABITAT FEATURES

(Pasternack 2010).

Page 27: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).
Page 28: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

APPENDIX A

JUNE 2012 AMENDMENT REQUEST LETTER NOVEMBER &

NOVEMBER 2010 401 WATER QUALITY CERTIFICATION.

Page 29: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).
Page 30: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

,e California Regional Water Quality Control Board Central Valley Region

Katherine Hart, Chair

Arnold Linda S. Adams Secretary for

Environmental Protection

11020 Sun Center Drive #200. Rancho Cordova, California 95670~6114 Phone (916) 464-3291 • FAX (916) 464-4645 http://www.waterboards.ca . gav/centfa Iva Iley

Schwarzenegger Governor

10 November2010

Mitch Stewart U.S. Army Corps of Engineers 1325 J Street Sacramento, CA 95814

CLEAN WATER ACT §401 TECHNICALLY CONDITIONED WATER QUALITY CERTIFICA TlON FOR DISCHARGE OF DREDGED AND/OR FILL MA TERIALS FOR THE ENGLEBRIGHT DAM REACH GRAVEL INJECTION PROJECT (WDID#5A58CR00081), YUBA COUNTY

This Order responds to your 13 October 2010 application submittal for the Water Quality Certification of a gravel augmentation project impacting approximately 0.90 acre of Waters of the United States.

WATER QUALITY CERTIFICATION STANDARD CONDITIONS:

1. This certification action is subject to modification or revocation upon administrative or judicial review, including review and amendment pursuant to §13330 of the California Water Code and §3867 of Title 23 of the Califomia Code of Regulations (23 CCR).

2. This certification action is not intended and shall not be construed to apply to any discharge from any activity involving a hydroelectric facility requiring a Federal Energy Regulatory Commission (FERC) license or an amendment to a FERC license unless the pertinent certification application was filed pursuant to 23 CCR sUbsection 3855(b) and the applicatiori specifically identified that a FERC license or amendment to a FERC license for a hydroelectric facility was being sought.

3. The validity of any non-denial certification action shall be conditioned upon total payment of the full fee required under 23 CCR §3833, unless otherwise stated in writing by the certifying agency.

4. Certification is valid for the duration of the described project. This ce·rtification is no longer valid if the project (as currently described) is modified, or coverage under Section 404 of the Clean Water Act has expired.

5. All reports, notices, or other documents required by this Water Quality Certification or requested by the Central Valley Regional Water Quality Control Board (Central Valley Water Board) shall be signed by a person described below or by a duly authorized representative of that person.

California Environmental Protection Agency

r!JRecyc/ed Paper

L2PDRBCJ
Highlight
Page 31: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

u.s. Army Corps of Engineers - 2 - 10 November 2010 EngJebright Dam Reach GraveJJnjection Project

a. For a corporation: by a responsible corporate officer such as (1) a president, secretary, treasurer, or vice president of the corporation in charge of a principal business function; (2) any other person who performs similar policy or decision­making functions for the corporation; or (3) the manager of one or more manufacturing, production, or operating facilities if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

b. For a partnership or sole proprietorship: by a general partner or the proprietor.

c. For a municipality, State, federal, or other public agency: by either a principal executive officer or ranking elected official.

6. Any person signing a document under Standard Condition number 5 shall make the following certification, whether written or implied:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

ADDITIONAL TECHNICALLY CONDITIONED CERTIFICATION CONDITIONS:

In addition to the above standard conditions, U.S. Army Corps of Engineers shall satisfy the following:

1. U.S. Army Corps of Engineers shall notify the Central Valley Water Board in writing 7 days in advance of the start of any in-water activities.

2. Except for activities permitted by the U.S. Army Corps under §404 of the Clean Water Act, soil, silt, or other organic materials shall not be placed where such materials could pass into surface water or surface water drainage courses.

3. All areas disturbed by project activities shall be protected from washout or erosion.

4. U.S. Army Corps of Engineers shall maintain a copy of this Certification and supporting documentation (Project Information Sheet) at the Project site during construction for review by site personnel and agencies. All personnel (employees, contractors, and subcontractors) performing work on the proposed project shall be adequately informed and trained regarding the conditions of this Certification.

5. An effective combination of erosion and sediment control Best Management Practices (BMPs) must be implemented and adequately working during all phases of construction.

6. All temporarily affected areas will be restored to pre-construction contours and conditions upon completion of construction activities.

Page 32: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

U.S. Army Corps of Engineers -3- lU November ZUlU Englebright Dam Reach Gravel Injection Project

7. U.S. Army Corps of Engineers shall perform surface water sampling: 1) When performing any in-water work; 2) In the event that project activities result in any materials reaching surface waters or; 3) When any activities result in the creation of a visible plume in surface waters. The following monitoring shall be conducted immediately upstream out of the influence of the project and 300 feet downstream of the active work area. Sampling results shall be submitted to this office within two weeks of initiation of sampling and every two weeks thereafter. The sampling frequency may be modified for certain projects with written permission from the Central Valley Water Board.

Parameter Unit Type of

Frequency of Sample Sample

Turbidity NTU Grab Every 4 hours during in

water work

Settleable Material mill Grab Same as above.

. Visible construction Observations

Visible Continuous throughout the related pollutants Inspections construction period

8. Activities shall not cause turbidity increases in surface water to exceed:

(a) where natural turbidity is less than 1 Nephelometric Turbidity Units (NTUs), controllable factors shall not cause downstream turbidity to exceed 2 NTU;

(b) where natural turbidity is between 1 and 5 NTUs, increases shall not exceed 1 NTU; (c) where natural turbidity is between 5 and 50 NTUs, increases shall not exceed 20

percent; (d) where natural turbidity is between 50 and 100 NTUs, increases shall not exceed 10

NTUs; (e) where natural turbidity is greater than 100 NTUs, increases shall not exceed 10

pe~nt. .

Except that these limits will be eased during in-water working periods to allow a turbidity increase of 15 NTU over background turbidity as measured in surface waters 300 feet downstream from the working area. In determining compliance with the above limits, appropriate averaging periods may be applied provided that beneficial uses will be fully protected. Averaging periods may only be assessed by prior permission of the Central Valley Water Board.

9. Activities shall not cause settleable matter to exceed 0.1 mill in surface waters as measured in surface waters 300 feet downstream from the project.

10. The discharge of petroleum products or other excavated materials to surface water is prohibited. Activities shall not cause visible oil, grease, or foam in the work area or downstream. U.S. Army Corps of Engineers shall notify the Central Valley Water Board immediately of any spill of petroleum products or other organic or earthen materials.

11. U.S. Army Corps of Engineers shall notify the Central Valley Water Board immediately if the above criteria for turbidity, settleable matter, oil/grease, or foam are exceeded.

Page 33: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

u.s. Army Corps of Engineers -4- 10 November 2010 Englebright Dam Reach Gravel Injection Project

12. U.S. Army Corps of Engineers shall comply with all California Department of Fish and Game 1600 requirements for the project.

13. U.S. Army Corps of Engineers must obtain coverage under the NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities issued by the State Water Resources Control Board for any project disturbing an area of 1 acre or greater.

14. The Conditions in this water quality certification are based on the information in the attached "Project Information." If the information in the attached Project Information is modified or the project changes, this water quality certification is no longer valid until amended by the Central Valley Water Board.

15. In the event of any violation or threatened violation of the conditions of this Order, the violation or threatened violation shall be subject to any remedies, penalties, process, or sanctions as provided for under State law and section 401 (d) of the federal Clean Water Act. The applicability of any State law authorizing remedies, penalties, process, or sanctions for the violation or threatened violation constitutes a limitation necessary to ensure compliance with this Order.

a. If U.S. Army Corps of Engineers or a duly authorized representative of the project fails or refuses to fumish technical or monitoring reports, as required under this Order, or falsifies any information provided in the monitoring reports, the applicant is subject to civil, for each day of violation, or criminal liability.

b. In response to a suspected violation of any condition of this Order, the Central Valley Water Board may require U.S. Army Corps of Engineers to furnish, under penalty of perjury, any technical or monitoring reports the Central Valley Water Board deems appropriate, provided that the burden, including cost of the reports, shall be in reasonable relationship to the need for the reports and the benefits to be obtained from the reports.

c. U.S. Army Corps of Engineers shall allow the staff(s) of the Central Valley Water Board, or an authorized representative(s), upon the presentation of credentials and other documents, as may be required by law, to enter the project premises for inspection, including taking photographs and securing copies of project-related records, for the purpose of assuring compliance with this certification and determining the ecological success of the project.

16. U.S. Army Corps of Engineers shall provide a Notice of Completion (NOC) no later than 30 days after the project completion. The NOC shall demonstrate that that the project has been carried out in accordance with the project's descripti·on (and any amendments approved). The NOC shall include a map of the project location(s), including final boundaries of any in situ restoration area(s), if appropriate, and representative pre and post construction photographs. Each photograph shall include a descriptive title, date taken, photographic site, and photographic orientation.

17. This project must implement all conservation measures described in the National Marine Fisheries Service's section 7 conSUltation response (2010105132).

Page 34: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

U.S. Army Corps of Engineers - 5-EngJebright Dam Reach GraveJJnjection Project

REGIONAL WATER QUALITY CONTROL BOARD CONTACT PERSON:

Daniel Worth, Environmental Scientist 11020 Sun Center Drive #200 Rancho Cordova, California 95670-6114 [email protected] (916) 464-4709

WATER QUALITY CERTIFICATION:

10 November 2010

I hereby issue an order certifying that any discharge from the U.S. Army Corps of Engineers, Englebright Dam Reach Gravel Injection Project (WDID# 5XXXCROOXXX) will comply with the applicable provisions of §301 ("Effluent Limitations"), §302 ("Water Quality Related Effluent Limitations"), §303 ("Water Quality Standards and Implementation Plans"), §306 ("National Standards of Performance"), and §307 ("Toxic and Pretreatment Effluent Standards") of the Clean Water Act. This discharge is also regulated under State Water Resources Control Board Water Quality Order No. 2003-0017 DWQ "Statewide General Waste Discharge Requirements For Dredged Or Fill Discharges That Have Received State Water Quality Certification (General WDRs)".

Except insofar as may be modified by any preceding conditions, all certification actions are contingent on (a) the discharge being limited and all proposed mitigation being completed in strict compliance with U.S. Army Corps of Engineers' project description and the attached Project Information Sheet, and (b) compliance with all applicable requirements of the Water Quality Control Plan for the Sacramento River and San Joaquin River, Fourth Edition, revised September 2009 .

. , IC-[)~~ .f> Pamela C. Creedon

Executive Officer

Enclosure: Project Information

cc: See enclosure, page 8

Page 35: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

U.';. Army Lorps or t:nglneers -0-

Englebright Dam Reach Gravel Injection Project

PROJECT INFORMATION

Application Date: 13 October 2010

Applicant: Mitch Stewart U.S. Army Corps of Engineers 1325 J Street Sacramento, CA 95814

Project Name: Englebright Dam Reach Gravel Injection Project

Application Number: WDID#5A58CR00081

Type of Project: Gravel Augmentation

10 November 2010

Project Location: Section 14, Township 16 North, Range 6 East, MDB&M. Latitude: 39°14'20.72" and Longitude: 121 °16'1 0.44"

County: Yuba County

Receiving Water(s) (hydrologic unit): Yuba River, Sacramento Hydrologic Basin, Unit #515.30, Lower Yuba River HA

Water Body Type: Streambed

Designated Beneficial Uses: The Water Quality Control Plan for the Sacramento River and San Joaquin River, Fourth Edition, revised September 2009 (Basin Plan) has designated beneficial uses for surface and ground waters within the region. Beneficial uses that could be impacted by the project include, but are not limited to: Municipal and Domestic Water Supply (MUN); Agricultural Supply (AGR); Industrial Supply (IND), Hydropower Generation (POW); Groundwater Recharge, Water Contact Recreation (REC-1); Non-Contact Water Recreation (REC-2); Warm Freshwater Habitat (WARM); Cold Freshwater Habitat (COLD); and Wildlife Habitat (WILD). A comprehensive and specific list of the Beneficial Uses applicable for the project area can be found at: http://www.waterboards.ca.gov/centralvalley/water_issues/ basin_plans/

303(d) List of Water Quality Limited Segments: The project does not impact an already impaired water body. The most recent list of approved water quality limited segments can be found at: http://www.waterboards.ca.gov/wateUssues/programs/tmdl/docs/303dlists2006/ epa/r5 _ 06 _ 303d _reqtmdls.pdf

Project Description (purpose/goal): The Englebright Dam Reach Gravel Injection Project consists of the placement of gravel and cobble into the Lower Yuba River channel to provide suitable substrate for Chinook salmon reproduction. The U.S. Army Corps of Engineers proposes to place 2,000 to 5,000 short tons (7,407 to 18,518 cubic yards) of washed gravel into the Yuba River 300 feet below Englebright Dam during November and December 2010. Gravel will be placed in an area of river approximately 400 feet in length, which is currently void of suitable substrate for salmonid spawning. The gravel will be obtained from a local aggregate producer within the local watershed. To reduce water quality impacts, all gravel will be washed thoroughly before arriving at the project site. The gravel will be placed into the river through a sluice pipe. Water pumped from Englebright Reservoir will be added to the

Page 36: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

U.S. Army Corps of Engineers -7- 10 November 2010 Englebright Dam Reach Gravel Injection Project

uphill end of the pipeline to facilitate the flow of gravel through the pipe. No heavy equipment will enter the river during this project. If all 5,000 tons of gravel cannot be placed in the Yuba River during 2010, the U.S. Army Corps of Engineers intends to place the remaining amount in 2011.

Preliminary Water Quality Concerns: Construction activities may impact surface waters with increased turbidity and settleable matter.

Proposed Mitigation to Address Concerns: U.S. Army Corps of Engineers will implement Best Management Practices (BMPs) to control sedimentation and erosion. All temporary affected areas will be restored to pre-construction contours and conditions upon completion of construction activities. U.S. Army Corps of Engineers will conduct turbidity and settleable matter testing during in-water work, stopping work if the Basin Plan criteria are exceeded or are observed.

Fill/Excavation Area: Approximately 18,518 cubic yards of clean gravel and cobble will be placed into approximately 0.90 acres of waters of the United States.

Dredge Volume: None

U.S. Army Corps File Number: None

U.S. Army Corps of Engineers Permit Number: None

Department of Fish and Game Streambed Alteration Agreement: U.S. Army Corps of Engineers is not required to apply for a Fish and Game permit.

Possible Listed Species: Central Valley steelhead, Chinook salmon

Status of CEQA Compliance: The Central Valley Water Board filed a Notice of Exemption for this project on 10 November 2010 under Section 15333, which exempts small habitat restoration projects less than five acres in size.

Compensatory Mitigation: None

Application Fee Provided: U.S. Army Corps of Engineers has refused to pay fees as required by 23 CCR §3833b(3)(A) and by 23 CCR §2200(e). The State Water Resources Control Board's 4 April 2010 Fee Policies and Procedures memo, that was titled Billing Guidelines For Federal Facilities, suggests that federal dischargers have a legal basis to refuse payment of fees specifically associated with dredge and fill operations.

t. I,

Page 37: LOWER YUBA RIVER GRAVEL AUGMENTATION PROJECT YUBA … · Fisheries Service (NMFS) pursuant to Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.C. 1531 et seq.).

U.S. Army Corps of Engineers - 8 -Englebright Dam Reach Gravel Injection Project

DISTRIBUTION LIST

United States Army Corp of Engineers Sacramento District Office Regulatory Section, Room 1480 1325 J Street Saciamento, CA 95814-2922

United States Fish & Wildlife Service Sacramento Fish & Wildlife Office 2800 Cottage Way Sacramento, CA 95825

Jeff Drongesen Department of Fish and Game 1701 Nimbus Road, Suit€1 A Rancho Cordova, CA 95670

Bill Jennings CA Sportfishing Protection Alliance 3536 Rainier Avenue Stockton, CA 95204

(Electronic copy only) Bill Orme State Water Resources Control Board 401 Certification and Wetlands Unit Chief

(Electronic copy only) Dave Smith Wetlands Section Chief (W-3) United States Environmental Protection Agency

10 November 2010