Top Banner
Modelling the Return of Sydney's Trams Louisa Sorrentino Veitch Lister Consulting
23

Louisa Sorrentino

Jul 08, 2015

Download

Business

JumpingJaq

AITPM presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Louisa Sorrentino

Modelling the Return of Sydney's Trams

Louisa Sorrentino

Veitch Lister Consulting

Page 2: Louisa Sorrentino

Before the mid-twentieth century, trams dominated!

• NSW: Sydney, Newcastle

Page 3: Louisa Sorrentino

• QLD: Brisbane, Rockhampton

Before the mid-twentieth century, trams dominated!

Page 4: Louisa Sorrentino

Before the mid-twentieth century, trams dominated!

• VIC: Melbourne, Geelong

Page 5: Louisa Sorrentino

Before the mid-twentieth century, trams dominated!

• SA: Adelaide

Page 6: Louisa Sorrentino

The Fall of the Trams

• Private vehicles and buses rapidly became popular in the mid-twentieth century

• Trams seen as archaic and taking up road space

• Most networks were decommissioned or downgraded to tourist routes

Page 7: Louisa Sorrentino

Australian Trams Today

• Public transport falling back in favour

• Light rail has recently been introduced / upgraded in:

• Sydney

• Gold Coast

• Adelaide

• Melbourne

• Cities considering light rail systems include:

• ACT

• Perth

• Hobart

Page 8: Louisa Sorrentino

Sydney’s Tram Revival

• Sydney was once one of the largest tram networks in the world

• The city has now:

• Extended the Inner West Light Rail network from the CBD to Dulwich Hill

• Announced the $1.6 billion CBD and South East Light Rail Project

Page 9: Louisa Sorrentino

With this in mind:

What patronage would a re-activated Sydney tram network achieve today?

Page 10: Louisa Sorrentino

Zenith Travel Models

• The Zenith Sydney model is a traditional four-step, strategic model

• It incorporates:

• All existing major roadways

• All existing public transport modes: bus, rail, ferry, monorail and light rail

• Over 4,500 travel zones spanning Sydney, Wollongong, the Blue Mountains, Newcastle, and the Hunter Valley

Page 11: Louisa Sorrentino

Building the Tram Model

Sydney’s tram network of 1947 was encoded into a 2011 Sydney model, as seen on the left

Sydney Trams - 1947

Page 12: Louisa Sorrentino

1947 Sydney Tram Network Statistics

• Approx. 230 km of track

• Over 55 individual routes

Sydney Trams - 1947

Page 13: Louisa Sorrentino

2011 Melbourne Tram Network StatisticsMelbourne Trams –

2011

• Approx. 250km of track

• 30 individual routes

Page 14: Louisa Sorrentino

Tram Network Assumptions

Adopted a conservative approach:

• Perception and accessibility made equal to buses• Services of large tram corridors (i.e. for Broadway, the

Harbour Bridge, Oxford St) capped to the levels of Swanston St, Melbourne

• Dedicated tram lanes only on these heavily trafficked corridors

• This translated to max. 15 min headways for all routes (all day)

• Adopt bus fare system for trams• Deletion of mirrored bus routes

Page 15: Louisa Sorrentino

Initial Model Results

• Trams aren't doing much to relieve patronage levels on buses and trains (8% share of boardings)

• Buses impacted most – competes more with trams

• Rail largely unaffected – services a vastly different market catchment

• Total public transport boardings largely unaffected – negligible shift from cars

Page 16: Louisa Sorrentino
Page 17: Louisa Sorrentino

Sensitivity Tests

• Improve perception and accessibility parameters for tram

• Reduce competition between trams and buses

• Double service frequencies (reduce max. headway from 15mins to 7.5mins)

Page 18: Louisa Sorrentino

Sensitivity Test Results – Improved Perception / Accessibility

• Tram boardings triple

• Balancing out of the bus and rail boardings share

• Big shift away from rail – trams now at same level of attractiveness

• However such favourable parameters may be unrealistic

Page 19: Louisa Sorrentino

Sensitivity Test Results

• 30% increase in tram boardings over initial runs

• Bus boardings decrease sharply – many routes deleted as part of test

• Some previous bus users switching to train rather than trams

Page 20: Louisa Sorrentino

Sensitivity Test Results

• 40% increase in tram boardings over initial run

• Biggest shift away from buses

• Impractically high capacities required to service this level of tram frequency

Page 21: Louisa Sorrentino

Key Messages from Sensitivity Testing

• Perception / accessibility, good service levels and reduced competition for patronage all increase tram patronage

• These may have all occurred to some extent, had the trams been retained

• Replacing one public transport mode with another providing similar coverage, requires significant improvement in overall service levels for any tangible relief / switching to occur from other modes

Page 22: Louisa Sorrentino

Limitations

• The model can account for transport-related benefits (i.e. travel time savings), but can’t capture amenity benefits

• Also limited by our assumptions. To improve modelling outcomes, we could:• Downgrade road capacities where on-road trams exist

• Develop land use scenarios that account for population and employment growth along tram corridors

• On guidance from planning authorities, implement service levels, fares, travel time and stop locations for trams

• Rigorous review of competing / complementing bus routes

• Perform stated preference surveys to calibrate accessibility / perception parameters

Page 23: Louisa Sorrentino

Conclusions

• Sydney has changed significantly since the trams were decommissioned, and transport planning has occurred in their absence

• Tram network offers no new accessibility on top of existing services, and therefore provides little congestion relief with initial conservative assumptions

• Sensitivity tests showed improved perception, frequencies and competition with other public transport modes increased patronage

• These conditions are more likely to have occurred naturally had the trams been retained

• More rigorous modelling could characterise the transport-related benefits with greater detail and precision