London CityHallCase Study

Page 2: London city final

Key facts:

Appointment: 1998Construction start: 2000Completion: 2002Area: 19 814 m²Height: 45 mClient: More London Development Ltd.

Structural Engineer: Arup Quantity Surveyor: Davis Langdon & EverestM+E Engineer: Arup Landscape Architect: Townshend Landscape ArchitectsLighting Engineer: Claude Engle Lighting

Additional Consultants: Montagu EvansAwardInstitution of Civil Engineers London Association Merit Award – City HallRelated Press ReleasesCity Hall officially opened by Her Majesty the Queen23.07.2002City Hall handed over to Government Office for London on time and on budget17.05.2002New Headquarters for the Greater London Authority submitted for Planning08.06.1999Foster building chosen for the New Headquarters for the GLA26.02.1999

Page 3: London city final

Index

1. INTRO 2. AIR 3. LIGHT 4. EARTH 5. WATER 6. ENERGY 7. RE-USE

Page 4: London city final

1. Intro

The London City Hall is ranked to be one of the country’s most reputable buildings as it has a protrusive stature as well it is a building that embodies high ecological strategies which benefit the environment tremendously and are imperative in the building profession practice. The ecological building aimed to lower the carbon dioxide emission by decreasing the usage of energy . The  Sophisticated structure also known as ‘glass gonald’, London City Hall symbolizes modernism,futurism and progress of a modern city and government.Situated in south side of the river Thames the centre of London, at London Borough of Southwark, the city hall was designed by an English 77 year old, 190 awards winner Architecture phenomenon Norman   Foster and partners whom are remarkably recognized worldwide for the simplicity on detail in their complex designs. This structure which begun to be executed in 2000 and inaugurated by Queen Elizabeth II in 2002 was mainly designed because the GLA authority needed a place to congregate. Highly recognized for its controversial shape, the structure often described as bulbs shaped, is part of a development called ‘’more London’’ and it was constructed at a cost of 65 million pounds.Foster opted for this particular shape because it reduces the surface area exposed to direct sunlight therefore it augments the efficiency of the energy of the structure as it  was designed to save and reduce the energy load by 75 percent unlike other buildings of the same calibre.The London City hall  contains 17,000 meters of interior space which  is subdivided in various departments ranging from  public facilities(Unicorn Theatre, Ernst and Young, Red Bull, TNS Research International), spacious offices, committee rooms and a meeting chamber with seating that can accommodate  250 members of the public.

Page 5: London city final

Location: This Map shows the situation of the city hall and the its surroundings .

Tower bridge of London

London Bridge station

1.AIR

Page 6: London city final

There are several crucial factors that influence the ventilation system used by the city hall such as, The position of the building on site, the shape, facades, and the cold ground system.

Position:

The London City hall is position in what we can call heating islands

City hall

Page 7: London city final

Double skin ( façade):

Skin is the interface between organism and environment. People have skin, buildings have skin, and even our planet Earth has a skin. Skin regulates temperature and moisture, it protects from the outer elements (or the vacuum of outer space); it allows the internal system to function in a regulated environment.

The city Hall ‘s skin system is one prominent factor to its ventilations system as the city hall is mostly covered by glass. The skin of the building plays a major role in the temperament of the building as

Page 8: London city final

Ventilation:

The London city hall has a spherical shape which means that the surface area is less than a cube of the same volume thus the less surface the less gain of cooling or heating in the building.

The city hall is naturally ventilated with open windows in all office spaces and the heating is generated by computers. Natural ventilation minimises the energy consumption of the building . Natural air enters the office space through grills on the floor allowing the structure to be more ecological and economical .

Facade vents were incorporated in the external offices for natural ventilation.Local cooling and heating systems are deactivated When the windows are opened.

Page 9: London city final

Cold ground water system : Natural air enters the office space through grills on the floor. Vents in the façade are provided in external offices for natural ventilation.When the windows are opened local cooling and heating systems are deactivated. During winter a device called Hygroscopic Thermal wheels is used to recover heat and moisture from the outgoing air and use it to condition incoming ventilation.When heating is needed the ground water is heated by two gas-fired boilers for use in convector heaters in the offices, the water undergoes through heating coils in the airhandling units, warming up incoming air.

Floor Heating :

The system used in the city hall is a simple system yet very efficient and

Page 10: London city final

environmental beneficial, Foster opted to use the system because of its environmental efficiency and beneficial features of recycling energy and use of other sources of energy which contribute for the environmental theme of the project.

How it works:

The heating features or pipes are placed underneath the floor, which is termed as dry process. In the meantime, the sub-floor procedure utilizes heating things hooked up directly towards the wooden sub-floor. Moist system occurs when the heating components are forged in ground slab. The heating method will not be turned on all day long given that it expenses substantially vitality. Some business properties, which utilize the floor heating method, turn on the program all through off peak hour. The method is turned off all through the working day. Flooring heating programs consist of hydraulic process and electric programs. The hydraulic flooring heating systems use only h2o or combination of drinking water and anti-freeze substance these types of as propylene glycol. The chemical is utilised given that the heat transfer fluid to flow into in between the floor and boiler. Qualified designers are essential to setup this hydraulic system. The designers ought to be capable during the process of ground heating and familiar with circulators, boilers, and temperature and fluid pressures. This heating program employs electrical power or oil as its electricity sources of heater. The warmth

Fig.3 This is a section of Floor Heating Systems written piece

which is listed within Home Design, floor heating systems

reviews, floor heating systems cost, floor heating systems

for concrete and published at December 22nd, 2013

11:15:51 AM by Debbie Hockley.

Page 11: London city final

pumps use electrical energy which in the city hall comes from the Photovoltaic system which because of its position in relation to the sun, the photovoltaic solar panels are directly facing the sun thus more energy is recycled into the building

Source: Debbie Hockley, Design Ideas website

Radiation The source of radiation of radiation in the city hall is mainly light and heat as the building was specifically built facing direct sunlight. The london city hall’s babulous shape is a great contributer for the natural heating of the building as it is a shape favourable for the building is naturally heating and light.

The diagram bellow explains the levels and distribution of radiation within the build

 

Fig.3 This is a section of Floor Heating Systems written piece

which is listed within Home Design, floor heating systems

reviews, floor heating systems cost, floor heating systems

for concrete and published at December 22nd, 2013

11:15:51 AM by Debbie Hockley.

Page 12: London city final

This diagram represent the distribution of radiation in this building, that is directly proportional to the amount of sunlight reaching it.

Convenction :

This Diagram explains the movemnet of heat surroundings the city hall

Page 13: London city final

2.LIGHT:

This building represents a radical rethink of architectural form. Its shape achieves optimum energy performance by maximising shading and minimizing the surface area exposed to direct sunlight. The city hall is mostly naturally light as it is surrounded by glass through the main façade that faces the sun.

Page 14: London city final
Page 15: London city final
Page 16: London city final

The city hall artificial lighting

Natural Lighting Artificial Lighting Layout

THIS PICTURE SHOWS THE INTENSITY OF THE LIGHT RAYS IN THE BUILDING

Page 17: London city final

Fig.1

Page 18: London city final
Page 19: London city final

DIAGRAM SHOWING HOW THE LIGHT REFRACTS THROUGH THE GLASS AND THE DIFFERENT TIPES OF GLASSES NORMAN USED TO ACHIEVE THE BALANCE BETWEEN INTENSE NATURAL LIGHTING AND DIM LIGHTINING

Page 20: London city final

DIAGRAM SHOWING SUN PATH THROUGHOUT DIFERENT SEAONS OF THE YEAR AND HOW DOES IT AFFECT THE SHADING OF THE BUILDING

Page 21: London city final
Page 22: London city final

3.EARTH

The london city hall consits on a diagrid system which is a system that abides of vertical beams parted longitudinally witithout any vertical columns for support.A substantial part of the london city hall is constructed with concrete, steel and glass

Concrete

The concrete is vital to the inner design of the London city hall as it formed 13,100 sq m of the inner core of the building as it shows in fig1, Further more concretre features prevalently in separation of walls and supporting structure of the ramps .

Page 23: London city final

STEEL

Steel is in mainly used in the structural frame of the London city hall. The Strong bars of steel are very vital to the structure as it holds the structure together.The London city hall contains 2100 tons of structural frame steel work and 1950 tons of reinforced steelwork.                

FIG.1

Page 24: London city final

GLASS:

The city hall is covered with7300 SQ M of triple glazed/ double glazed low emissivity coated clear glass, incorporating shading devices in façade.For the facade in this building is used three separate glazing packages:

, Norman and foster opted to use a triple glazed Low-E glass type because it is a low-emissivity glass, which prevents the ultraviolet light to enter the building and heat the

Page 25: London city final

surfaces. It is covered with thin-film coating which is design to allow only certain wavelengths to pass through while restricting others.

4.WATER:

The GLA uses a cold-water ground system to cool and heat the building. This is system uses energy conserved by the solar panels to pump the water that circulate through the 130 m boreholes that are pierced to the ground which heat and cool the buildingThis system is incorporated into the structure of the building too which acts in saving space and materials because it works as part of the framework. The water is pumped out of the ground at 53-57°F and then runs through the structural beams in the City Hall. There is a highly technical side to the pumping system, which acts to save energy and resources. They have the ability to work at multiple speeds and functions. This allows for them to pump exactly how much water is needed depending on how hot or cold the structure is. This means that water is not needlessly pumped around the building and isn’t wasting energy on heating excess water. After

Page 26: London city final

heating the building, the water is then moved and not wasted by being used for the plumbing systems and in the toilets and urinals of the building.

ENERGYBecause of the frontal positioning facing the sun and having 25% less surface Area than a cube of the same volume The London city hall conserves major amounts energy as the building is naturally ventilated, heated and also naturally light.

The london city hall uses Photovoltaic system has been specially designed to complement the rounded shape of the Foster and Partners designed building. The panels will provide 70kW of renewable energy, generating 3.1million kWh of renewable electricity over their lifetime. The panels will reduce the CO2 emissions of City Hall by 3,000 tonnes in its lifetime – enough to fill 3,000 hot air balloons.

Page 27: London city final

ELECTRICAL CONSUMPTION

As a result of using the Cold-water ground system the electrical consumption has considerably decreased as the graph bellow shows.

Page 28: London city final

Furthermore in areas of artificial lighting Norman and foster implemented censored lighting as it automatically switches off when not habited. The buildings reuses the water that’s is used to climate the building as toilet flashing water which also contributes to the ecological efficient building’s aim to re-use recycle and save. Also, the boiler plant lagging improved to help minimise heat loss.

Reference: http://www.london.gov.uk

RECYCLING

Water

One of The London city halls mains recycling method the recycling of water as the water is reused in many areas and manners.The water extracted from the river and the rain is pumped into the boreholes that climate the building and then this water is then used as flashable water for the toilets and afterwards it’s used outside as water fountains .

This diagram shows The rain water path passes through the plumbs, how it is purified throughout the building and where it is utilised.

Page 29: London city final

Reducing carbon emissions

Reducing carbon emissions was another recycling method used by the GLA.

‘’ The Mayor committed to reducing carbon emissions from City Hall.

The CO2 emissions in the city hall

In 2009/10 City Hall emitted 2,100 tonnes of carbon. This is from City Hall’s consumption of electricity and gas. In 2010, City Hall achieved the Carbon Trust Standard (external website).What we're doing to reduce our CO2 emissions

The Mayor has signed-up City Hall to the 10:10 initiative (external website), committing to reduce its carbon emissions by 10 per cent in 2010. City Hall has already undertaken a number of activities to achieve this goal, and plans to do even more.Progress to date

In 2007, solar photovoltaic panels were installed, generating energy for City Hall with zero carbon emissions.

This diagram shows The rain water path passes through the plumbs, how it is purified throughout the building and where it is utilised.

Page 30: London city final

Voltage optimisation technology has been installed to reduce the voltage requirements for City Hall’s equipment and reduce its energy use.

Lighting improvements have been carried out. Movement sensors on all floors at City Hall help ensure lights are switched off when not occupied.   Occupation times of the building have been reviewed to ensure optimal plant operation timings. Boiler plant lagging improved to help minimise heat loss.

Further activities

Our Environment Champions programme encourages staff to save energy at work, with teams competing against each other to reduce their energy use.

Smart meters are being installed which will allow energy use at City Hall to be measured on a floor-by-floor basis, helping to target further energy efficiency improvements.”

Page 31: London city final

SOURCE: http://london.gov.uk/city-hall/the-building/structure

Synopsys:

The london city hall is a great demonstration of making it possible, what I meant by that is the fact that a building the such a calibre is able to function such a great ecological system, reserving re-using or recycling.To me its not just a building with remarkable architecture but it is also a building that represents the the new London, it’s a building that steps away from the obsolete ways of traditional English architecture and design .