NIH Total Actual Obligations FY 1983 FY 1984 FY 1985 FY 1986 FY 1987 FY 1988 FY 1989 Actual Actual Actual Actual Actual Actual Actual Mechanism No. Amount No. Amount No. Amount No. Amount No. Amount No. Amount No. Amount Research Grants: Research Proj.: Noncompeting 12,112 $1,509,205 12,480 $1,725,469 12,885 $1,928,877 13,481 $2,101,587 14,103 $2,460,114 15,150 $2,794,941 16,568 $3,258,672 Admin. Supp. (546) 23,205 (577) 25,742 (627) 31,999 (424) 20,662 (591) 32,176 (620) 30,373 (485) 24,516 Competing 5,766 685,900 5,990 788,526 6,825 990,682 6,739 999,531 7,197 1,237,164 6,867 1,203,408 6,157 1,122,457 Subtotal, RPGs 17,878 2,218,310 18,470 2,539,737 19,710 2,951,558 20,220 3,121,780 21,300 3,729,454 22,017 4,028,722 22,725 4,405,645 SBIR/STTR 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal, RPGs 17,878 2,218,310 18,470 2,539,737 19,710 2,951,558 20,220 3,121,780 21,300 3,729,454 22,017 4,028,722 22,725 4,405,645 Research Centers: Spec/Comp. 348 268,263 361 311,930 382 343,065 390 343,658 416 396,613 443 432,321 459 461,681 Clinical Research 74 74,108 75 80,951 78 87,446 78 86,298 78 91,290 78 101,765 78 107,474 Biotechnology 46 20,204 47 26,348 61 34,962 63 33,766 63 35,932 63 36,474 63 38,142 Comparative Med. 42 25,303 44 28,753 46 30,658 42 29,938 42 38,119 49 45,108 51 48,611 RCMI 0 0 0 0 0 0 0 0 0 0 0 0 0 1,859 Subtotal, Research Centers 510 387,878 527 447,982 567 496,131 573 493,660 599 561,954 633 615,668 651 657,767 Other Research: Research Careers 1,380 58,161 1,422 65,149 1,529 88,317 1,558 91,733 1,666 103,524 1,758 109,043 1,745 110,534 Cancer Ed. 58 5,575 50 4,444 45 3,963 56 3,412 38 1,627 43 1,742 44 2,983 Coop. Cl. 288 56,314 309 59,252 314 59,540 254 55,463 264 67,296 255 72,330 255 82,084 BRS 620 59,893 661 67,897 728 96,069 726 91,427 753 92,976 787 90,918 775 88,762 MBRS 71 26,090 79 30,293 95 34,275 98 33,490 98 37,787 95 38,602 98 38,218 Other 499 31,861 568 39,784 648 49,819 729 48,905 1,337 70,948 1,300 82,345 1,470 118,768 Subtotal, Other Research 2,916 237,894 3,089 266,819 3,359 331,983 3,421 324,430 4,156 374,158 4,238 394,980 4,387 441,349 Total, Res. Grants 21,304 2,844,082 22,086 3,254,538 23,636 3,779,672 24,214 3,939,870 26,055 4,665,566 26,888 5,039,370 27,763 5,504,761 Training: FTTPs: FTTPs: FTTPs: FTTPs: FTTPs: FTTPs: FTTPs: Individual 1,753 31,792 1,803 31,624 1,996 44,208 1,914 41,768 2,085 45,292 1,974 43,538 1,870 44,510 Institutional 9,710 150,160 9,646 152,175 9,690 194,257 9,486 191,105 10,326 211,115 10,598 219,403 10,666 238,505 Total, Training 11,463 181,952 11,449 183,799 11,686 238,465 11,400 232,873 12,411 256,407 12,572 262,941 12,536 283,015 R & D Contracts 1,175 331,266 1,156 351,708 1,300 383,263 1,285 358,258 1,383 503,586 1,384 532,446 1,380 583,496 (SBIR/STTR) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) (0) Intramural Research 560,993 604,568 639,451 640,177 748,637 805,417 882,417 Res. Mgmt and Support 248,322 264,470 273,098 256,909 289,925 323,499 356,867 Cancer Control 53,569 63,282 63,794 61,372 67,457 69,682 74,100 Construction 3,000 2,211 13,100 9,439 9,550 0 31,345 Total, All ICs 4,223,184 4,724,576 5,390,843 5,498,898 6,541,128 7,033,355 7,716,001 Library of Medicine 45,980 50,624 55,184 55,206 61,675 67,700 78,798 Office of the Director 25,726 26,976 35,396 114,712 56,917 66,875 74,371 Buildings and Facilities 14,531 25,581 15,675 19,933 25,786 19,029 24,416 NIH Total Actual Obligations 4,309,421 4,827,757 5,497,098 5,688,749 6,685,506 7,186,959 7,893,586 Notes: Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 Diabetes accounts, net of Global AIDS transfers. SBIR/STTR included in RPG summary through FY 1993. Obligations for Library of Medicine and Cancer Control are distributed across the other budget mechanisms starting in FY 2007. Buildings and Facilities obligations includes unobligated balances carried forward from prior fiscal years. As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants. National Institutes of Health Mechanism Detail Actual Obligations, FY 1983 - FY 1999 (Dollars in Thousands)
56
Embed
officeofbudget.od.nih.govofficeofbudget.od.nih.gov/pdfs/FY13/spending list...FY 1986 FY 1987: FY 1988 FY 1989: Actual Actual Actual: Actual Actual: Actual Actual: Mechanism No. Amount:
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
NIH Total 1 of 2
NIH Total Actual ObligationsFY 1983 FY 1984 FY 1985 FY 1986 FY 1987 FY 1988 FY 1989Actual Actual Actual Actual Actual Actual Actual
Intramural Research 560,993 604,568 639,451 640,177 748,637 805,417 882,417Res. Mgmt and Support 248,322 264,470 273,098 256,909 289,925 323,499 356,867Cancer Control 53,569 63,282 63,794 61,372 67,457 69,682 74,100Construction 3,000 2,211 13,100 9,439 9,550 0 31,345 Total, All ICs 4,223,184 4,724,576 5,390,843 5,498,898 6,541,128 7,033,355 7,716,001Library of Medicine 45,980 50,624 55,184 55,206 61,675 67,700 78,798Office of the Director 25,726 26,976 35,396 114,712 56,917 66,875 74,371Buildings and Facilities 14,531 25,581 15,675 19,933 25,786 19,029 24,416NIH Total Actual Obligations 4,309,421 4,827,757 5,497,098 5,688,749 6,685,506 7,186,959 7,893,586Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 Diabetes accounts, net of Global AIDS transfers. SBIR/STTR included in RPG summary through FY 1993.Obligations for Library of Medicine and Cancer Control are distributed across the other budget mechanisms starting in FY 2007.Buildings and Facilities obligations includes unobligated balances carried forward from prior fiscal years. As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
NIH Total 2 of 2
NIH Total Actual ObligationsFY 1990 FY 1991Actual Actual
Intramural Research 975,871 1,048,834 1,132,166 1,160,950 1,201,091 1,222,646 1,294,777 1,346,127 1,434,635 1,564,547Res. Mgmt and Support 405,358 434,706 484,327 493,200 497,886 506,415 479,746 479,297 487,229 542,188Cancer Control 75,433 85,390 107,569 105,293 145,600 192,275 216,187 231,918 249,897 306,734Construction 16,322 7,349 12,000 7,528 23,421 17,946 22,848 22,887 22,891 32,734 Total, All ICs 8,244,408 8,971,514 9,702,448 9,919,955 10,479,807 10,816,046 11,380,147 12,112,823 12,995,623 14,989,821Library of Medicine 81,683 91,182 102,937 103,496 117,783 127,723 139,111 150,107 161,606 181,014Office of the Director 111,729 98,153 143,542 191,935 227,044 239,390 260,432 285,863 295,194 255,584Buildings and Facilities 67,436 57,091 61,441 112,731 86,335 157,682 100,957 221,978 234,436 216,856NIH Total Actual Obligations 8,505,256 9,217,940 10,010,368 10,328,117 10,910,969 11,340,841 11,880,647 12,770,771 13,686,859 15,643,275Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, net of Global AIDS transfers. SBIR/STTR included in RPG summary through FY 1993.Obligations for Library of Medicine and Cancer Control are distributed across the other budget mechanisms starting in FY 2007.Buildings and Facilities obligations includes unobligated balances carried forward from prior fiscal years. As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Actual Actual Actual Actual FY 1994 FY 1995 FY 1998 FY 1999FY 1992 FY 1993
Intramural Research 174,000 185,767 193,978 208,805 244,747 268,251 294,085Res. Mgmt and Support 53,081 58,123 58,649 56,781 64,042 70,825 72,405Cancer Control 53,569 63,282 63,794 61,372 67,457 69,682 74,100Construction 3,000 2,211 6,500 3,114 5,050 0 2,470Total, NCI Actual Obligations 986,811 1,081,460 1,177,853 1,210,284 1,402,790 1,468,435 1,570,342Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NCI Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
FY 1983Actual
FY 1984 FY 1985 FY 1986 FY 1987 FY 1988 FY 1989Actual Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 316,464 326,160 359,508 363,525 374,724 373,063 406,891 412,517 437,754 470,981Res. Mgmt and Support 80,420 83,684 96,562 95,675 96,422 96,442 100,831 100,788 101,829 108,933Cancer Control 75,433 85,390 107,569 105,293 145,600 192,275 216,187 231,918 249,897 306,734Construction 15,135 7,348 12,000 7,528 16,499 8,000 3,000 3,000 2,961 3,000Total, NCI Actual Obligations 1,644,330 1,712,669 1,947,571 1,978,340 2,076,218 2,129,369 2,254,940 2,389,041 2,551,281 2,918,050Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NCI-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
FY 1995Actual
FY 1996Actual
FY 1990 FY 1997ActualActual
FY 1993Actual
FY 1994Actual
FY 1992Actual
FY 1991Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 52,221 57,619 59,182 59,490 63,559 67,963 76,995Res. Mgmt and Support 34,346 35,245 37,275 35,699 38,954 42,135 46,107Cancer Control 0 0 0 0 0 0 0Construction 0 0 3,300 3,158 2,250 0 0Total, NHLBI Actual Obligations 624,065 705,064 803,810 821,901 929,981 965,283 1,045,508Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NHLBI Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
FY 1983Actual Actual Actual Actual Actual Actual Actual
Intramural Research 85,495 93,662 97,060 98,162 101,760 98,877 101,753 104,441 111,562 119,492Res. Mgmt and Support 52,766 52,886 58,208 59,446 58,389 59,512 54,848 54,627 57,620 63,903Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 655 0 0 0 0 0 0 0 0 0Total, NHLBI Actual Obligations 1,070,683 1,125,915 1,190,070 1,214,693 1,277,852 1,314,969 1,351,422 1,431,821 1,526,276 1,788,008Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NHLBI-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual FY 1997 FY 1998 FY 1996
ActualActual Actual Actual Actual Actual ActualActual FY 1999 FY 1993FY 1992
Mechanism Detail
FY 1990 FY 1991 FY 1994 FY 1995
National Institutes of Health
(Dollars in Thousands)Actual Obligations, FY 1983 - FY 1999
Intramural Research 16,358 18,903 19,770 19,536 24,301 24,161 25,567Res. Mgmt and Support 8,040 5,845 6,684 6,686 7,016 7,785 8,495Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIDCR Actual Obligations 79,272 88,380 100,414 98,755 117,926 126,216 130,689Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIDCR Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 27,032 28,844 31,305 32,394 32,546 32,567 34,461 36,215 38,734 40,615Res. Mgmt and Support 9,127 9,812 9,635 10,244 10,098 10,266 9,581 9,578 9,774 13,948Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIDCR Actual Obligations 135,432 148,691 158,900 161,116 169,490 174,021 183,478 197,063 210,172 233,605Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIDCR-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 52,714 55,384 58,873 49,854 57,529 58,556 63,829Res. Mgmt and Support 15,565 17,084 17,283 14,741 16,228 18,386 19,741Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIDDK Actual Obligations 413,440 463,664 539,499 436,037 510,880 534,359 559,274Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIDDK Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 68,988 75,279 80,443 83,476 83,038 84,479 87,469 93,004 100,342 106,657Res. Mgmt and Support 22,666 21,295 24,468 24,052 25,159 25,363 23,981 24,028 24,177 26,097Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIDDK Actual Obligations 579,984 615,262 661,446 680,514 715,622 737,043 768,353 813,064 896,686 1,018,063Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIDDK-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 43,198 47,483 50,122 47,719 54,902 57,748 58,042Res. Mgmt and Support 16,796 17,401 17,954 16,300 18,034 18,757 19,443Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NINDS Actual Obligations 296,251 335,952 396,170 414,406 490,136 458,792 471,632Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NINDS Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 64,439 72,575 75,754 77,475 76,692 75,768 81,014 82,814 86,082 93,943Res. Mgmt and Support 21,386 24,395 25,841 26,552 25,825 26,758 24,735 24,767 25,009 26,705Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NINDS Actual Obligations 489,348 542,313 580,790 599,466 630,584 649,121 683,504 729,249 778,432 900,245Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NINDS-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 50,402 55,255 58,806 57,942 72,262 77,604 90,753Res. Mgmt and Support 13,952 16,220 16,384 15,919 22,306 27,823 36,357Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIAID Actual Obligations 278,939 319,593 370,047 367,142 545,433 638,521 740,239Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIAID Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 107,502 114,215 119,906 123,404 129,677 131,497 141,883 149,894 164,283 176,846Res. Mgmt and Support 42,349 46,568 51,672 52,677 55,823 56,785 52,218 52,213 52,736 56,432Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIAID Actual Obligations 831,181 906,003 960,082 984,114 1,063,696 1,092,507 1,171,160 1,257,793 1,352,119 1,565,201Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIAID-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 601 624 616 748 794 788 951Res. Mgmt and Support 11,426 12,179 12,393 13,154 14,738 16,785 19,393Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIGMS Actual Obligations 369,810 415,896 480,975 493,535 570,867 627,465 682,134Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIGMS Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 1,068 1,080 1,109 1,176 1,136 967 987 922 818 1,088Res. Mgmt and Support 21,245 22,667 25,037 25,403 25,934 26,255 24,858 24,838 25,002 26,786Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIGMS Actual Obligations 680,305 761,231 814,297 832,191 875,495 904,738 944,312 995,389 1,061,505 1,203,079Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIGMS-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 30,967 34,549 37,880 34,705 40,855 46,244 50,107Res. Mgmt and Support 13,800 14,735 15,111 14,406 16,571 19,417 20,859Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NICHD Actual Obligations 254,323 275,550 312,578 308,211 366,651 396,584 425,268Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NICHD Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 53,929 61,170 68,344 71,853 75,308 75,668 76,250 79,481 84,840 95,827Res. Mgmt and Support 24,061 24,410 28,610 27,609 29,441 29,540 27,432 27,424 28,198 30,172Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NICHD Actual Obligations 441,955 478,947 518,577 527,767 554,836 570,309 592,971 631,262 672,073 748,626Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NICHD-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 14,686 16,174 18,075 14,813 18,549 19,723 22,249Res. Mgmt and Support 5,692 5,893 6,060 5,727 6,400 7,804 8,276Cancer Control 0 0 0 0 0 0 0Construction 0 0 3,300 3,167 2,250 0 0Total, NEI Actual Obligations 141,643 154,970 181,298 186,343 216,528 224,835 230,999Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NEI Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 24,345 26,506 29,454 28,973 29,665 30,081 31,557 33,662 35,370 38,181Res. Mgmt and Support 9,680 9,821 11,022 11,391 11,081 11,263 10,585 10,590 10,787 11,567Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 481 0 0 0 0 0 0 11 0 0Total, NEI Actual Obligations 236,456 253,354 269,766 275,368 289,906 299,383 313,008 331,587 354,153 394,601Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NEI-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 46,426 48,643 54,077 51,906 57,991 59,521 61,908Res. Mgmt and Support 6,347 6,595 6,275 5,582 6,331 6,950 7,368Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIEHS Actual Obligations 164,631 180,418 194,486 188,819 209,251 215,439 223,309Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIEHS Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 64,804 67,903 70,933 73,238 71,627 71,688 74,715 80,691 84,859 93,149Res. Mgmt and Support 8,100 8,188 9,214 9,138 9,639 9,760 9,037 9,022 9,110 9,755Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIEHS Actual Obligations 228,725 240,606 251,484 251,047 264,111 272,012 287,614 307,555 328,711 374,527Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIEHS-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 16,637 19,113 20,216 19,789 22,935 23,526 25,488Res. Mgmt and Support 6,882 7,721 8,465 8,276 8,979 10,767 11,543Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIA Actual Obligations 93,946 115,216 142,968 150,910 177,461 194,548 222,545Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIA Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 28,511 33,718 37,378 38,991 37,945 38,361 40,924 43,610 46,087 54,460Res. Mgmt and Support 14,460 19,121 21,723 23,090 22,439 22,421 20,646 20,595 20,038 21,441Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIA Actual Obligations 238,927 323,791 382,882 399,523 420,266 433,288 453,492 484,318 517,082 594,556Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIA-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 6,295 6,887 8,756 9,572Res. Mgmt and Support 0 0 0 2,105 3,840 5,110 5,754Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIAMS Actual Obligations 0 0 0 111,336 138,675 147,543 159,886Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIAMS Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 12,062 14,474 15,606 17,649 18,279 18,864 19,480 22,201 23,843 29,288Res. Mgmt and Support 7,486 9,080 9,782 10,064 10,169 10,414 9,644 9,592 9,747 10,721Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIAMS Actual Obligations 168,538 193,449 203,516 212,208 223,160 230,816 243,014 256,192 273,879 307,160Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIAMS-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 2,198 2,638Res. Mgmt and Support 0 0 0 0 0 761 3,129Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIDCD Actual Obligations 0 0 0 0 0 75,691 94,275Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIDCD Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 5,159 6,850 8,168 9,223 9,451 11,241 12,177 13,285 15,156 17,132Res. Mgmt and Support 5,002 6,332 7,368 7,240 7,346 8,246 7,432 7,375 7,474 9,141Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIDCD Actual Obligations 117,283 134,957 148,748 154,655 162,782 168,006 175,864 188,217 199,786 229,162Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIDCD-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 49,985 49,235 53,724 53,628 60,193 66,355 70,054Res. Mgmt and Support 25,221 26,108 26,900 26,291 28,479 30,579 32,679Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIMH Actual Obligations 191,544 208,279 232,734 242,066 287,804 327,514 384,928Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIMH Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 76,109 84,073 92,622 95,321 93,548 93,135 96,129 97,747 104,545 112,758Res. Mgmt and Support 28,788 30,824 33,602 35,881 35,177 35,319 32,384 32,367 32,703 34,992Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIMH Actual Obligations 440,222 511,967 560,285 582,851 613,352 631,060 659,941 700,757 748,329 858,520Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIMH-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 4,478 5,655 5,958 6,536 12,316 12,214 15,224Res. Mgmt and Support 13,312 14,667 15,310 11,322 10,881 12,214 16,219Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIDA Actual Obligations 61,704 71,098 81,130 83,311 139,307 156,252 228,131Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIDA Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 21,397 23,029 24,027 23,978 24,191 24,554 25,319 29,772 30,552 35,896Res. Mgmt and Support 22,667 27,009 29,369 30,101 29,660 30,437 27,757 27,784 28,702 30,711Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIDA Actual Obligations 329,560 383,656 399,100 403,065 424,315 436,726 458,231 499,313 536,852 611,061Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIDA-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 8,320 10,164 8,174 8,411 10,817 11,809 14,955Res. Mgmt and Support 8,852 10,669 11,578 10,773 11,483 9,259 9,215Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIAAA Actual Obligations 43,038 54,827 61,677 66,395 83,357 92,763 120,051Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIAAA Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 18,336 18,746 19,824 21,086 20,889 20,730 20,775 20,916 21,978 24,634Res. Mgmt and Support 10,706 11,334 12,100 13,204 13,226 13,343 12,247 12,255 12,375 13,252Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIAAA Actual Obligations 149,194 158,141 171,481 176,128 185,538 190,548 198,480 211,193 226,224 258,874Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIAAA-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 578 1,274 2,017 2,437Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NINR Actual Obligations 0 0 0 16,193 19,924 23,361 29,118Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NINR Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 231 550 725 1,026 1,215 1,204 1,252 1,233 1,037 1,305Res. Mgmt and Support 2,815 3,541 4,291 4,751 4,724 4,791 4,417 4,416 4,565 4,462Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NINR Actual Obligations 33,508 39,892 44,925 48,477 51,002 52,689 55,671 59,551 63,340 69,600Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NINR-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NHGRI Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NHGRI Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 19,400 39,902 41,741 43,722 46,793 52,295Res. Mgmt and Support 2,802 3,708 4,920 5,578 6,147 6,414 5,887 5,877 5,936 6,875Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NHGRI Actual Obligations 59,527 87,389 104,756 106,095 127,017 153,789 169,286 188,909 218,340 279,030Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NHGRI-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIBIB Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIBIB Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIBIB Actual Obligations 0 0 0 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIBIB-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NIMHD Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NIMHD Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NIMHD Actual Obligations 0 0 0 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NIMHD-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural ResearchRes. Mgmt and SupportCancer ControlConstructionTotal, NCATS Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NCI Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural ResearchRes. Mgmt and SupportCancer ControlConstructionTotal, NCATS Actual Obligations 0 0 0 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NCI-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 6,695 6,721 7,213 8,209 9,711 10,891 12,248Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 28,875Total, NCRR Actual Obligations 213,652 243,046 303,641 292,388 322,781 344,150 381,934Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NCRR Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 13,401 13,362 13,760 14,005 13,932 15,724 14,365 14,322 14,479 15,400Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 51 1 0 0 6,922 9,946 19,848 19,876 19,930 29,734Total, NCRR Actual Obligations 353,771 335,776 314,198 312,635 332,903 351,923 390,163 414,049 452,193 562,082Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NCRR-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NCCAM Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NCCAM Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0 0 0 13,362Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NCCAM Actual Obligations 0 0 0 0 0 0 0 0 0 40,464Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NCCAM-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 8,315 9,264 9,564 4,360 4,658 5,234 5,199Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, FIC Actual Obligations 10,115 11,163 11,563 10,866 11,376 15,604 15,739Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the FIC Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 5,431 6,669 7,143 7,099 7,255 7,362 6,861 6,839 6,968 7,533Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, FIC Actual Obligations 15,479 17,505 19,574 19,702 21,662 23,729 25,243 26,500 28,190 35,307Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the FIC-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, NLM Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the NLM Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, NLM Actual Obligations 0 0 0 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the NLM-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, Bridge Awards Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the Bridge Awards Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, Bridge Awards Actual Obligations 0 0 0 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the Bridge Awards-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)
Intramural Research 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0Total, Common Fund Actual Obligations 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Obligations for the Roadmap Construction (Extramural) are reported separate from the Buildings and Facilities mechanism where improvement/repair costs are budgeted.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Intramural Research 0 0 0 0 0 0 0 0 0 0Res. Mgmt and Support 0 0 0 0 0 0 0 0 0 0Cancer Control 0 0 0 0 0 0 0 0 0 0Construction 0 0 0 0 0 0 0 0 0 0Total, Common Fund Actual Obligations 0 0 0 0 0 0 0 0 0 0Notes:Totals obligations derive from budget authority received from discretionary and mandatory appropriations, including Superfund Research and Type 1 diabetes accounts, if applicable to the IC. SBIR/STTR included in RPG summary through FY 1993.Amounts reported for the Roadmap-Federally Funded R&D Center in Frederick, MD are displayed in Construction (Extramural). Facility repair and improvements are, however, budgeted within the Buildings and Facilities mechanism.As of FY 2007, the number of grants reflected in the RPG total line includes R56 one or two-year short-term project grants.
Actual Actual ActualActual Actual FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999
Actual Actual Actual Actual Actual
National Institutes of HealthMechanism Detail
Actual Obligations, FY 1983 - FY 1999(Dollars in Thousands)