Manuel Cabello de Alba

[email protected]

Solar Energy&Urban Planning

Renewables Energies

Civil Engineering

Thermal Engineering

Environmental Engineering

Construction

Structural Engineering

Process Engineering

Food Factories Engineering Design

Hydraulic Engineering

Plants Engineering

Page 2: Linkedin

SINGULAR PROJECTS IN GIBRALTAR (UK)

Page 3: Linkedin

Mid Harbour

Buena Vista

Tunnel

Airport

Waterport

Terraces

Aerial Farm

Page 4: Linkedin

537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT

TERRACES. GIBRALTAR (UK). BUILDING CONTRACT.

Budget: $83M

Position: Construction Project Manager/Project Engineer

The scheme comprises of 537 apartments in 10 blocks, varying

in height from 4 to 9 storey’s.Car parking for 550 cars, roads,

infrastructure services, podiums and landscaped areas are also

to be provided for the use of the residents, along with the

supporting ancillary accommodation in the form of meter rooms,

waste collection areas, generators, substations, transformers,

etc.

Page 5: Linkedin
Page 6: Linkedin
Page 7: Linkedin
Page 8: Linkedin
Page 9: Linkedin
Page 10: Linkedin
Page 11: Linkedin
Page 12: Linkedin
Page 13: Linkedin
Page 14: Linkedin
Page 15: Linkedin
Page 16: Linkedin
Page 17: Linkedin
Page 18: Linkedin
Page 19: Linkedin
Page 20: Linkedin
Page 21: Linkedin
Page 22: Linkedin
Page 23: Linkedin
Page 24: Linkedin
Page 25: Linkedin
Page 26: Linkedin
Page 27: Linkedin
Page 28: Linkedin
Page 29: Linkedin
Page 30: Linkedin
Page 31: Linkedin
Page 32: Linkedin

492 DWELLINGS. NEW RENTAL HOUSES. MID HARBOUR.

GIBRALTAR (UK). DESING&BUILDING CONTRACT.

Budget: $100M

Position: Engineering/Construction Project Manager

The scheme comprises of 492 apartments in 6 blocks, varying in

height from 6 to 8 storey’s.Car parking for 500 cars, roads,

infrastructure services, electrical distribution center, podiums

and landscaped areas are also to be provided for the use of the

residents, along with the supporting ancillary accommodation in

the form of meter rooms, waste collection areas, generators,

substations, transformers, etc

Page 33: Linkedin
Page 34: Linkedin
Page 35: Linkedin
Page 36: Linkedin
Page 37: Linkedin
Page 38: Linkedin
Page 39: Linkedin
Page 40: Linkedin
Page 41: Linkedin
Page 42: Linkedin
Page 43: Linkedin
Page 44: Linkedin
Page 45: Linkedin
Page 46: Linkedin
Page 47: Linkedin
Page 48: Linkedin
Page 49: Linkedin
Page 50: Linkedin
Page 51: Linkedin
Page 52: Linkedin
Page 53: Linkedin
Page 54: Linkedin
Page 55: Linkedin

GIBRALTAR AIRPORT TUNNEL AND FRONTIER ACCESS ROAD. 2011-2012

Budget: $80M

Position: Engineering/Construction Project Manager

The contract include the construction of a tunnel below sea level fortraffic and another for pedestrians under the airport runway, and a roadbetween the frontier and Eastern Beach. The aim of the investment isto address the problem of traffic decongestion at the airport whenaircraft land or take off.The contract includes design and construction of the following: (1) a dual carriage way (four lanes) from the commercial gate at the frontierto the junction of Eastern Beach Road and Devil’s Tower Road (viaEastern Beach). (2) A tunnel under the eastern end of the runwayconsisting of four traffic lanes and a separate tunnel for pedestriansand a cycle path including dewatering and treatment water plant. Therewill also be a tunnel control centre. (3) An aviation fuel storage tanksfarm buried underground on the north side of the runway. (4) Anoffshore structure (around 100 metres off the eastern end of therunway) to provide aircraft approach lighting required by modernaviation practices and procedures.

Page 56: Linkedin
Page 57: Linkedin
Page 58: Linkedin
Page 59: Linkedin
Page 60: Linkedin
Page 61: Linkedin
Page 62: Linkedin

GIBRALTAR AIRPORT. 2011

Position: Site Engineering Manager

Page 63: Linkedin
Page 64: Linkedin
Page 65: Linkedin
Page 66: Linkedin
Page 67: Linkedin
Page 68: Linkedin
Page 69: Linkedin
Page 70: Linkedin
Page 71: Linkedin

BUENA VISTA. GIBRALTAR 2012

Position: Project Manager/Project Engineer

Page 72: Linkedin
Page 73: Linkedin
Page 74: Linkedin
Page 75: Linkedin
Page 76: Linkedin
Page 77: Linkedin
Page 78: Linkedin
Page 79: Linkedin
Page 80: Linkedin
Page 81: Linkedin
Page 82: Linkedin
Page 83: Linkedin

AERIAL FARM HOUSING PROJECT; 564 AFFORDABLE HOUSING SCHEME

Budget: $125M. Design&Build

Position: Senior Engineering/Construction Project Manager