This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
The contract include the construction of a tunnel below sea level fortraffic and another for pedestrians under the airport runway, and a roadbetween the frontier and Eastern Beach. The aim of the investment isto address the problem of traffic decongestion at the airport whenaircraft land or take off.The contract includes design and construction of the following: (1) a dual carriage way (four lanes) from the commercial gate at the frontierto the junction of Eastern Beach Road and Devil’s Tower Road (viaEastern Beach). (2) A tunnel under the eastern end of the runwayconsisting of four traffic lanes and a separate tunnel for pedestriansand a cycle path including dewatering and treatment water plant. Therewill also be a tunnel control centre. (3) An aviation fuel storage tanksfarm buried underground on the north side of the runway. (4) Anoffshore structure (around 100 metres off the eastern end of therunway) to provide aircraft approach lighting required by modernaviation practices and procedures.