LIBERALIZATION OF THE CHILEAN ELECTRICITY SYSTEM AND ITS EFFECTS ON ENVIRONMENTAL PERFORMANCE nick, P.Universidad Católica de Chile, Departamento de Ingeniería E úl O’Ryan, Universidad de Chile, Departamento de Ingeniería Industri rigo Bravo, Universidad de Chile, Departamento de Ingeniería Industr GRENELEM PROJECT Santiago, Chile, September 2001 Universidad de Chile Pontificia Universidad Católica de Chile
28
Embed
LIBERALIZATION OF THE CHILEAN ELECTRICITY SYSTEM AND ITS EFFECTS ON ENVIRONMENTAL PERFORMANCE Hugh Rudnick, P.Universidad Católica de Chile, Departamento.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
LIBERALIZATION OF THE CHILEAN ELECTRICITY SYSTEM AND ITS EFFECTS ON
ENVIRONMENTAL PERFORMANCE
Hugh Rudnick, P.Universidad Católica de Chile, Departamento de Ingeniería Eléctrica.Raúl O’Ryan, Universidad de Chile, Departamento de Ingeniería Industrial.
Rodrigo Bravo, Universidad de Chile, Departamento de Ingeniería Industrial.
GRENELEM PROJECT
Santiago, Chile, September 2001
Universidad de Chile Pontificia Universidad Católica de Chile
SING(800 km)
SIC(2200 km)
AISEN
MAGALLANES
Universidad de Chile Pontificia Universidad Católica de Chile
Main Characteristics (2000):
• Continental surface : 756626 km²• Population : 15 millions
• National Consumption : 39142 GWh
• Peak Demand : 5800 MW
• Installed Capacity : 10080 MW
• Frequency : 50 Hz• Transmission Systems : 66 kV, 110 kV, 154 kV, 220 kV y 500 kV• Interconnected Systems: (SING, SIC, AISEN, MAGALLANES)
CHILE’S ELECTRICAL MARKET
CHILE’S ELECTRICAL SYSTEMS
• SIC (Sistema Interconectado Central)• Maximum demand 2000: 4.576 MW• Installed generation capacity: 6.646 MW• Percentage of thermal generation: 36%• 93% population, industrial and domestic consumption
SING (Sistema Interconectado Norte Grande)• Maximum demand 2000: 1.211 MW• Installed generation capacity : 3.352 MW• Percentage of thermal generation : 99,6%• Large consumers (10 correspond to 75% of demand, largest client 25% total demand)
Universidad de Chile Pontificia Universidad Católica de Chile
COLOMBIA
1994
PERU
1993
BOLIVIA
1994
CHILE
1982
ARGENTINA
1992
BRAZIL
1998
CENTRAL AMERICA & PANAMA
1997-9
Pioneering regulatory changes in the electrical sector
Universidad de Chile Pontificia Universidad Católica de Chile
1992
1994
1993
1991
1991
1999
>1992
1987
1996
1995
1994
1994
1995
1995
EU
19951989
1996
1995
1998
1982
Sistemas competitivos
Procesos de reestructuraciónavanzadosPrimeras etapas deprocesos de reestructuración
Fuente: R. Palma, U.Ch.
Universidad de Chile Pontificia Universidad Católica de Chile
Fuelco Gasco
Genco Genco
Sellco Sellco
Gridco
Waterco Fuelco
Genco Genco
Sellco Sellco
Gridco
Brokeco Brokeco
Buyco Buyco
Lineco Lineco
Brokeco Brokeco
Buyco Buyco
Lineco Lineco
Disco Disco
Cons Cons Cons Cons Cons Cons
Disco Disco
SEGMENTATION OF THE INDUSTRY competitive and regulated (William Hogan, Harvard)
DIS
TR
IBU
TIO
N
Poolco/Marketco
GE
NE
RA
TIO
NT
RA
NS
MIS
SIO
N
Universidad de Chile Pontificia Universidad Católica de Chile
*wholesale market deregulation (unregulated prices for large consumers)
*competition at generation level with centralized generation dispatch (Poolco model)
-Chile, Bolivia, Peru, Brazil, Central America - audited costs
-Argentina- bids with caps-Colombia- unrestricted bids
*short term marginal cost based schemes
ELECTRICITY MARKET REFORMS
Universidad de Chile Pontificia Universidad Católica de Chile
*two part price scheme
-short term energy marginal cost-capacity pricing (adequacy signal)
Universidad de Chile Pontificia Universidad Católica de Chile
*regulation in transmission and distribution
*transmission open access regulation, global allocation of network costs, use of system approach, concession required
*incentive based regulation in distribution (yard stick competition, price cap), concession required, obligation to serve, quality of service regulated
ELECTRICITY MARKET REFORMS
Universidad de Chile Pontificia Universidad Católica de Chile
GovernanceGovernance
CDECGenerators
Transmiters
DistribuitorsLarge users
Ministry Economy
Environmental body
Local governmentsSmall users
Antitrust body
SEC
CNE
Universidad de Chile Pontificia Universidad Católica de Chile
ESSENTIAL ISSUES THAT LINK THE ENVIRONMENT AND THE DEREGULATED ELECTRICAL SECTOR
Development of the generation infrastructure
• Plant technology
• Thermal plant location
• Hydro plant development
• Thermal plant fuels
• System operation
Universidad de Chile Pontificia Universidad Católica de Chile
PLANT LOCATION: THE BIO BIO BASIN
Universidad de Chile Pontificia Universidad Católica de Chile
ESSENTIAL ISSUES THAT LINK THE ENVIRONMENT AND THE DEREGULATED
ELECTRICAL SECTOR
Efficient Energy Use and the Electric Sector
New Trends in Generation
• Nuclear Energy
• Clean Energy
• Embedded Generation or Distributed Generation
Universidad de Chile Pontificia Universidad Católica de Chile
IN CONCLUSION
Universidad de Chile Pontificia Universidad Católica de Chile
•CHILE’S ELECTRICAL SYSTEM HAS EXPANDED VERY STRONGLY IN RESPONSE TO THE HIGH ECONOMIC GROWTH RATES OF THE DECADE
•EMISSIONS OF ALL GASES IS INCREASING SIGNIFICANTLY, DESPITE SWITCH TO NATURAL GAS.
•TREND IN GROWTH AND EMISSIONS IS EXPECTED TO CONTINUE.
•TO REDUCE EMISSIONS THERMAL PLANTS MUST BE REPLACED BY LESS POLLUTING SOURCES SUCH AS HYDROELECTRIC POWER PLANTS, OR MORE RADICAL NUCLEAR SOURCES.
IN CONCLUSION
Universidad de Chile Pontificia Universidad Católica de Chile
•A STRONG PUSH IN ENERGY EFFICIENCY MAY HELP, HOWEVER THE POLICIES APPLIED IN THIS LINE OF ACTION HAVE BEEN WEAK.
•CLEAN ENERGIES AND DISTRIBUTED SOURCES CAN HELP TO REDUCE EMISSIONS BUT WILLNOT BE SIGNIFICANT.
•MOREOVER, THE TREND IN THIS DEREGULATED SECTOR SEEMS TO BE GOING IN A DIFFERENT DIRECTION: NATURAL GAS COMBINED CYCLE PLANTS HAVE ACTUALLY DISPLACED SOME HYDROELECTRIC PLANTS.
•DECISIONS ARE BEING TAKEN ON GENERATING TECHNOLOGY,
WITHOUT DUE CONSIDERATION OF SOCIAL COSTS.
IN CONCLUSION
Universidad de Chile Pontificia Universidad Católica de Chile
•THE ENVIRONMENTAL STAKES ARE STILL OUT:•NEW GAS PIPELINES ALSO FEED THE INDUSTRIAL AND DOMESTIC SECTORS. •NATURAL GAS PLANTS HAVE REPLACED COAL PLANTS.
•DISPATCH BY MARGINAL COSTING DOES NOT HELP MUCH, IT IS DIFFICULT TO INCORPORATE ALL SOCIAL COSTS
•COMPANIES SEEKING COMPETITIVE ADVANTAGES ARE EXPLORING THE USE OF CHEAPER MORE POLLUTING FUELS SUCH AS PET-COKE.
•THE AUTHORITY MUST BALANCE EXTRA ENVIRONMENTAL REQUIREMENTS WITH THE ENSUING INCREASE IN ENERGY PRICES. THIS IS NOT AN EASY EQUATION.