DACWte-c-eg-oe23 Permanent Water Supply, ·superfund· Site I•land conver•ation of 13 November 1ggo inforainC you that touch-up paintinC and the correction of on tbe inapection report by dated 28 September 1ggo are to be.in on oontinue throuch 1g November 1ggo. Your encineerinC review con•ultant, Dufre•ne-Benry, Inc. view the corrective work. Comment• made by time of corrective action will be thi• office. The paintinC •ubcontractor'• teohnical in•pector will be 18 November 1ggo to tn•pect the oi/P. E. lnU•••• Authori&ed Bepre•entative ot tbe Oontractinl Officer Burrlllville Project Office r I I I -I 7./. DEPARTMENT OF THE ARMY FILE COPY NEW ENGlAND DIVISION, CORPS OF ENGINEERS 424 TRAPELO ROAD WALTHAM. MASSACHUSETTS 02264·9149 14 November 1ggo SubJect: Contract No. Con•truction of We•tern Sand & Grav•l Burrillville, Rhode Mr. William Plana.an Na•onville Water Di•trict 23 Pola•ki load Harriaville, B. I. 02830 Dear Mr. Planacan. Thi• ia to confirm our the deficient paint ite.. noted R. L. Merithew, Inc. 14 November 1ggo and i• welcome to your con•ultant made at entertained a• advi•ory the to on the 81te, Tbur•day, corrective work.