Zura Hall Refresh Site Logistics and Safety Plan 03-14-2014 Trim tree to allow for scaffold - possibly remove completely - Neil to verify through grounds ALL VINES TO REMAIN IN TRELLIS PLANTER, TYP. Remove 2 columns along with wood trellis and vines. trellis to be re-installed at completion of project. Remove and replace existing concrete paving in this area along with 2 trees. Remove, store and reinstall 3 benches and 1 table in this area. Remove and replace existing 3x3 steel fence embedded in concrete, 2 pine trees and 1 bollard. AC Patch curb with pipe Staging/Laydown Area LEGEND: Construction Vehicle Path Emergency Vehicle Path Pedestrian Walkway Limit of Work (Fence w/ privacy screen) Staging/Laydown Area Construction Gates Manlifts Trash Chutes (during Demo) Covered Pedestrian Tunnel Wood Fence OLMECA HALL MAYA HALL ZURA HALL N TULA HALL TENOCHCA HALL EAST CAMPUS DRIVE MONTEZUMA ROAD EAST CAMPUS DRIVE ZURA WAY COLLEGE AVENUE COLLEGE AVENUE COLLEGE AVENUE LINDO PASEO 4 WAY GATE FOR CONSTRUCTION & PED ACCESS Basement Vent for material removal and new equipment Remove wood roof trellis, vines and wood door/gate at enclosure Tower C Tower B Removal of palm trees to be stored on campus and reinstalled after construction for access to material/man lift and trash shoot Wood fence Possible area for storing 12 existing palm trees for re-installation Tower A BBC TRAILER Toilets and handwash station Mangate Vehicle Entrance Vehicle Entrance Shade and Lunch Area Employee Parking Upper Level Only FIRST AID Fire Extinguisher EVACUATION ZONE WASTE / RECYCLING Fence relocation during student move in of adjacent dorms (8/11 thru 8/24)