3/16/2010 1
May 25, 2015
3/16/2010
1
3/16/2010
2
3/16/2010
3
3/16/2010
4
UNCHANGEDFAMILY OF RATING SYSTEMS
CREDITS AND PREREQUISITESCOMPREHENSIVE CATEGORIES
SS WE EA MR EQ ID
MPR’SMINIMUM PROJECT
REQUIREMENTS
3/16/2010
5
MPR’SCOMPLY WITH ENVIRONMENTAL LAWS
COMPLETE, PERMANENT BUILDING/SPACEREASONABLE SITE BOUNDARY
MINIMUM FLOOR AREA REQUIREMENTSMINIMUM OCCUPANCY RATES
MINIMUM BUILDING:SITE RATIO
COMMIT TO SHARING WHOLE-BUILDING ENERGY AND WATER DATE
3/16/2010
6
CONSOLIDATEDINCORPORATED CIRs
3/16/2010
7
3/16/2010
8
3/16/2010
9
20%
7%
25%19%
22%
7%
LEED 2.2
SSWEEAMREQID
25%
9%
33%
13%
14%6%
LEED 2009
MORE EMPHASIS ON ENERGYAND TRANSPORTATION
3/16/2010
10
THRESHOLDSCERTIFIED: FROM 38% TO 36%
SILVER: FROM 48% TO 45%
GOLD: FROM 57% TO 55%
PLATINUM: FROM 75% TO 73%
3/16/2010
11
6 OPTIONS 4 POINTS
3/16/2010
12
ALBUQUERQUE 87109DEVELOPMENT DENSITY/COMMUNITY CONNECTIVITYBIKE STORAGE AND CHANGING ROOMSSTORMWATER QUANTITYHEAT ISLANDS: NONROOFHEAT ISLANDS: ROOFWATER EFFICIENT LANDSCAPING
SILVER CITY 88062PROTECT OR RESTORE HABITATMAXIMIZE OPEN SPACEWATER EFFICIENT LANDSCAPINGONSITE RENEWABLE ENERGYCONSTRUCTION WASTE MANAGEMENTINCREASED VENTILATION
CREDITCHANGES
3/16/2010
13
ASHRAE 90.1-2007 ENERGY STANDARD
ASHRAE 90.1-2007 ENERGY STANDARD
HIGHER EFFICIENCY EQUIPMENTSOME ENVELOPE INCREASES
NEW BASELINE FOR PROJECTS <75,000SF
3/16/2010
14
WATER BASELINE
20% SAVINGS PREREQUISITECOMMERCIAL LAVS FROM 2.5GPM TO 0.5GPM
MINOR CHANGES
FLOORSCORE FOR HARD SURFACES55% LEVEL FOR BUILDING REUSE
NEW METHOD FOR DAYLIGHT CALCULATIONS
3/16/2010
15
3/16/2010
16
LEED ONLINEHELP WITH SYSTEM SELECTION
MID-REVIEW CLARIFICATIONSDATA LINKAGE
ERROR MESSAGES
3/16/2010
17
FEE CHANGESINCREASE OF 1 CENT/SF
REGISTRATION = $900/1200CERTIFICATION = 4.5/5.5 CENTS/SF
MINIMUM $2,250MAXIMUM $27,500
3/16/2010
18
NON-TECHNICAL EXPERTISE
PROJECT EXPERIENCE, RELATED EMPLOYMENT, OR EDUCATION
2 HOUR EXAM + CMP
www.usgbcnm.org