© 2012 Tieto Corporation Business Driven IT Erase boarders between Business and IT Roman Šmiřák Manager of Consultants Tieto [email protected]
© 2
012
Tie
to C
orpo
ratio
n
Business Driven ITErase boarders between Business and IT
Roman Šmiřák
Manager of [email protected]
© 2
012
Tie
to C
orpo
ratio
n
Over 10 years of Lean & Agile
3500+ people enjoying results of coaching
Conference speakers and cross industry collaboration e.g. TiViT, ITEA2
Tieto Lean / Agile coaches
• Finland, Sweden, Czech
• Technology and Management background
• Enthusiasts as well as proffesional consultants
Lean Business Improvements
Where do I come from?
© 2
012
Tie
to C
orpo
ratio
n
IT reality
Outside – in perspective
120
100
80
60
40
20
02011 2012 2013
Build
Business dynamics
IT change pace
External dynamics
% of IT cost reducing
Unfavorable cost split
Operational project portfolio
Alignment with Business
Run
© 2
012
Tie
to C
orpo
ratio
n
IT reality
IT perspective inside
© 2012 Tieto Corporation5
IT reality
Collaboration or blame game?
Business vs. IT
IT is always a problem; I doubt we get all the return on investment!
Why we have to wait several months even for small enhancement of a system!
This is third major incident this year already! Guys do you really have things under control?
Guys, you force us to constantly switch between the tasks since you due to constant escalation mode!
What shall I do if you shrink our budget every year? We simply need more people!
This deadline was impossible from the beginning – I told you so! Now we are in complete mess due to it!
© 2012 Tieto Corporation
Customer Tieto
Our scope covering E2E valuestream incl. stakeholders, internal development and operations and Tieto
IT
Frictionpoint at the boarder Tieto (supplier) and customer
Frictionpoint at the boarder Business and IT
Frictionpointat the boarder Management and Operational level
Frictionpoint at the boarders
6
© 2
012
Tie
to C
orpo
ratio
n
Success story
Lean@Tieto
Carsten Henke
Director, Solution Area
Currently we have in average doubled Productivity per month than in average of 2011!
Lean@Tieto significantly contributed by:• Cross-functional, cross-country Lean workshops providing brand new
perspective on improvements, pulling people out of their boxes.
• Sharing experience and providing on-job coaching.
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 50
200
400
600
800
1000
1200
Number of errors
2011 2012
© 2
012
Tie
to C
orpo
ratio
n
Com
pany
con
fiden
tial
Thank You!
Roman Šmiřák
Manager of [email protected]