1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 03-01-2014 dze- la- S. No. vkbZVe dk uke Name of items vkosnd dk uke Name of applicant vkosnu fnukad Date of applicati on orZeku fLFkfr Current status pkyu 'kfDr& cszsd vkbZVe Motive Power Brake items 1. Air Dryer M/s Associated Tools, Howrah 13-08-13 Firm has been advised to submit legal documents on 23.08.13. Legal document received on 24.09.13 and sent to legal cell for scrutiny on 09.10.13. 2. Lube oil pump (gear type) M/s Chandimata Metal Works, Howrah 29.03.11 Capability assessment done on 10.05.12. Since firm has already supplied LOP to Zonal Railways whenever it is ZR controlled items, hence, letters send to Railways on 07.06.12 for performance. Performance feedback received from some Railways. Again performance asks from rest Rlys. dt. 13.08.12. Further investigation report & corrective & preventive action taken asked from firm. Firm’s reply received and under scrutiny. Changes in hardness and material of gear & shaft have been asked from OEM dt.15.03.13. Again clarification asked from OEMs on 23.04.13. Remarks received from OEMs and under study. Firm has been advised to submit legal documents on 25.07.13. Legal documents received on 06.08.13 and send to legal cell on 12.08.13 for scrutiny. Performance asked from Pune shed on 19.08.13. Performance received through AME. Again asked from Pune signed by JAG level on 20.09.13. Also comments offer from OEM dt. 16.08.13. Firm clarification on legal document received and sent to legal cell on 07.11.13 for scrutiny. 3. Liner (LP) M/s Cooper, Satara. 21.11.09 Firm has sent 04 nos. of samples for fitment at AMV/DSL shed for field trials. Trial scheme issued on 06.07.11. Trial period is two year and has been started in Aug.11. Firm has been advised to submit legal documents on 25.07.13. Letter sent to AMV/DSL shed to submit performance on 02.08.13. 4. Rubber components, Air brake, ALCo locomotives M/s Crown gasket (India), Delhi 29.04.13 Comments on application form sent to firm vide this office letter no. SD.Dev.RBC dt. 24.05.13. Reminder has been issued to firm on 09.07.13. Firm’s reply awaited. 5. CCB (with advance feature) M/s FTRTIL, Hosur. 12.01.11 Firm has been advised for further clarifications vide this office letter no. SD.DEV.CCB dt. 25.05.11. Reminder sent to firm on 05.12.11 & 13.03.12. Reply received on dated 03.07.12. Firm asked for further information vide letter no. SD.DEV.CCB dt. 28.08.12. Firm’s reply received on 08.10.12. Letter written to firm on 29.10.12 for meeting at RDSO on 09.11.12. Meeting held on 04.01.13 at RDSO.
48

layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

Oct 02, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

1

layXud % ,

Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu dh fLFkfr

CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 03-01-2014

dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu

fnukad

Date of applicati

on

orZeku fLFkfr

Current status

pkyu 'kfDr& cszsd vkbZVe

Motive Power – Brake items

1. Air Dryer M/s Associated Tools, Howrah

13-08-13 Firm has been advised to submit legal documents on 23.08.13. Legal document received on 24.09.13 and sent to legal cell for scrutiny on 09.10.13.

2. Lube oil pump (gear type)

M/s Chandimata Metal Works, Howrah

29.03.11 Capability assessment done on 10.05.12. Since firm has already supplied LOP to Zonal Railways whenever it is ZR controlled items, hence, letters send to Railways on 07.06.12 for performance. Performance feedback received from some Railways. Again performance asks from rest Rlys. dt. 13.08.12. Further investigation report & corrective & preventive action taken asked from firm. Firm’s reply received and under scrutiny. Changes in hardness and material of gear & shaft have been asked from OEM dt.15.03.13. Again clarification asked from OEMs on 23.04.13. Remarks received from OEMs and under study. Firm has been advised to submit legal documents on 25.07.13. Legal documents received on 06.08.13 and send to legal cell on 12.08.13 for scrutiny. Performance asked from Pune shed on 19.08.13. Performance received through AME. Again asked from Pune signed by JAG level on 20.09.13. Also comments offer from OEM dt. 16.08.13. Firm clarification on legal document received and sent to legal cell on 07.11.13 for scrutiny.

3. Liner (LP) M/s Cooper, Satara.

21.11.09 Firm has sent 04 nos. of samples for fitment at AMV/DSL shed for field trials. Trial scheme issued on 06.07.11. Trial period is two year and has been started in Aug.11. Firm has been advised to submit legal documents on 25.07.13. Letter sent to AMV/DSL shed to submit performance on 02.08.13.

4. Rubber components, Air brake, ALCo locomotives

M/s Crown gasket (India), Delhi

29.04.13 Comments on application form sent to firm vide this office letter no. SD.Dev.RBC dt. 24.05.13. Reminder has been issued to firm on 09.07.13. Firm’s reply awaited.

5. CCB (with advance feature)

M/s FTRTIL, Hosur.

12.01.11 Firm has been advised for further clarifications vide this office letter no. SD.DEV.CCB dt. 25.05.11. Reminder sent to firm on 05.12.11 & 13.03.12. Reply received on dated 03.07.12. Firm asked for further information vide letter no. SD.DEV.CCB dt. 28.08.12. Firm’s reply received on 08.10.12. Letter written to firm on 29.10.12 for meeting at RDSO on 09.11.12. Meeting held on 04.01.13 at RDSO.

Page 2: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

2

Subsequent to meeting, firm’s reply received on 22.01.13. Letter written to firm on 09.04.13 for further quarries. Reply received on 13.05.13. Firm has been advised on 11.07.13 to submit additional information for capacity & capability assessment. Reply received on 23.07.13. Letter written to RA/Berlin, Germany on 07.08.13 for capacity & capability assessment. Firm has also been advised to submit legal documents on 11.07.13. Firm reply received on 10.09.13. Note written to Electrical Dte. regarding legal documents requirements on 25.09.13. Capacity & capability assessment carried out on 20.11.13 & 21.11.13 for Hosur works. Assessment report from RA Berlin awaited for FT, Italy.

6. High friction brake block

M/s HCL, Mumbai 27.06.13 The firm has been cleared for field trials vide this office letter no. SD.DFM.A.5 dt. 15.11.11. Firm has been advised to submit legal documents, QAP, self compliance of spec. etc. on 23.08.13. Reply along with QAP received on 20.09.13 and shortcomings with QAP comments advised to firm on 27.11.13. Reply received on 03.12.13 and under scrutiny. Legal document sent to legal cell for legal scrutiny on 11.12.13. Revised QAP received and under scrutiny.

7. High friction brake block

M/s ILPL, Mumbai

15.07.09 The firm has been cleared for field trials vide this office letter no. SD.DFM.A.5 dt. 12.04.10. Trial has started at Silliguri Diesel shed from 30.05.11 & BGKT shed from 08.06.11. Legal documents sent to legal cell on 22.07.07 for scrutiny. Firm has been advised to improve their product. Legal scrutiny done and shortcomings advised to the firm on 12.09.13. Reply awaited.

8. Air Compressor (Water cooled) for WDG4/WDP4 locomotives

M/s KPCL, Pune 07.11.12 Manufacturing 3 nos. of prototype air compressor has been cleared vide letter no. SD.Dev.GM.Compressor dt. 21.01.13. Firm informed that they will submit internal test of prototype in Sep. 13. Firm has been advised to submit legal documents on 25.07.13.

9. Auto Drain Valve

M/s Midland Co., Kolkata

12.10.10 As per DLW P.O. No. 031270010.12159268 dt. 23.10.13 & M.A. No. 031270010/ 03130100/1 dt. 20.03.13, 5 nos. prototype inspection for auto drain valve of M/s Midland has been done and Dispatch memo & I.C has been issued. letter has been issued to DLW to fit auto drain valve on diesel loco & furnish fitment details for field trial vide this office letter no. SD.Dev.28LAV-1 dt. 08.05.13. It is informed by DLW that details of fitment to be forward to RDSO vide letter no. dlw.m.65.24.1.1 dt. 22.05.13. Firm has been advised on 10.07.13 to submit legal documents. Legal documents received from firm on 07.08.13 and sent to legal cell on 14.08.13 for scrutiny. It is informed by DLW that 2 nos. auto drain valve are fitted on WDG4 locomotive having road no. 12804 homed to GY shed vide DLW letter no.

Page 3: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

3

dlw.m.65.24.1.1 dt. 03.08.13. Legal scrutiny done on 21.10.13 and shortcoming advised to firm on 23.10.13. Firm’s reply received on 30.10.13 and sent to legal cell on 07.11.13 for scrutiny. As per DLW P.O., firm submitted inspection call on 08.10.13. Inspection has done on 06.12.13. Report is under preparation.

10. Air gauge complex

M/s Midland Co., Kolkata

12.07.11 Capability assessment has been done 13.12.12. Shortcomings advised to the firm vide dt. 11.01.13. Reminder issued to firm dt 06.03.13. Firm has been advised to submit legal documents on 10.07.13. QAP approved and firm has advised to manufacture sample for prototype testing on 26.07.13. Legal documents received from firm on 07.08.13 and sent to legal cell on 14.08.13 for scrutiny. Firm has sent internal test result and inspection call on 14/26.08.13. Internal test result is under scrutiny. Legal scrutiny done and shortcoming advised to firm on 24.10.13. Firm’s reply received on 30.10.13 and sent to legal cell on 07.11.13 for scrutiny.

11. Connecting Rod Big End Bearings Upper Half Lower Half

M/s Patel Brass Works Pvt. Ltd., Gujarat

23.09.11 Deficiencies advised to firm vide letter no. SD.WDM.2.3.2 dt. 03.11.11. Firm's reply along with revised QAP received on 22.11.11. Shortcoming has been again advised to the firm on 08.02.12. QAP approved. Firm has been advised to manufacture 15 sets connecting rod big end bearing dated 28.01.13. Firm has been advised to submit legal documents on 25.07.13. Again firm wants clearance of alternate material as SAE.14 in place of Fg820.

12. Lube oil pump (gear type)

M/s Rajhans Ind. Pvt. Ltd., Jodhpur

04-07-13 Legal documents sent to legal cell on 25.07.07 for scrutiny. Legal scrutiny done and shortcomings advised to the firm on 11.09.13. Reply received on 23.09.13 and sent to legal cell for scrutiny on 09.10.13. Reply received on 25.10.13 & under scrutiny.

13. Air Dryer M/s SKF, USA 02.04.12 Shortcomings advised to the firm vide letter no. SD.DFM.A.4.7.1.3 dt 01.05.2012. Firm’s reply received on 09.07.12 & again shortcoming advised to firm 25.07.12. Reply received on 17.08.12. Advised to firm to submit cost benefit analysis vide letter dt. 31.10.12. Reminder send to firm vide letter dt. 06.12.12. One more reminder send to firm vide letter dt. 25/29.04.13, wherein it has been mentioned that the application form will be closed in absence of satisfactory reply. Firm has requested for granting time till 31-05-13. Request has accepted by this office letter dt. 22.05.13. Nothing has been submitted by the firm till date. 1 month notice (i.e. 14.09.13) issued for closure of form on 14.08.13.

14. CCB M/s Solid State System Pvt. Ltd.

20-08-13 Clarification asked from firm on 02.09.13. Reply awaited.

Page 4: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

4

dze-

la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZlh vkbZVe

Motive Power – EC items

1.

8 V, 500 Ah LM Lead Acid Battery

M/s Aegan Batteries Ltd No26/1,27/3, Chudagondanahalli Village,Hosakote,Lakkur Hobli,Malur Taluk , Kolar District-563160

16.07.13

Letter issued and Deficiencies advised to firm on 03/08/12. Firm complied. Capability assessment carried out. Type Test under progress at firm's premises from 17.12.12.and type testing in under process. Vibration Test report submitted by firm dated 19.03.2013 and approved for trial on loco in diesel shed KJM. And one set (8units) of 8v, 500Ah LM Lead acid battery Commissioned in loco no.12636 on date 15.05.2013. Battery is under field trial.

2.

8 V, 450 Ah LM Lead Acid Battery

M/s Aegan Batteries Ltd No26/1,27/3, Chudagondanahalli Village,Hosakote,Lakkur Hobli,Malur Taluk , Kolar District-563160

12.08.13 Application received on 19.08.13. Case file sent to legal cell on 17.09.2013 for scrutiny.

3. Speed recorder-indicator, Micro Controller Based for ALCo locomotives (Spec. No. MP.0.3700-07 Rev. 05, Aug. 08)

M/s Advance Instrumentation 'n' Control Systems

25.07.13

A letter issued to firm vide our letter No.SD. DFM.M.1.3 (Advance Instrumentation) on 01/08/2013 regarding submission of documents for legal scrutiny. Firm has again Reminded by mail on 19/09/13 for submission of documents for legal scrutiny. 2nd time reminded by mail on 22.11.13. Documents received and scrutinised, The case is under process for legal scrutiny.

4.

Electromagnetic contactors (including FP/GF/RF/FS/CK/CKC contactors)

M/s Balin & Co 2A Ramkrishna Road, Sardapally, Barrackpore, PO Nonchandanpukur, Kolkata-22

04.03.11

Capacity assessment has been done and found some discrepancies and intimated to the firm for complying the same. Firm requested for Re-Capacity assessment. The same was completed on 07.07.11. Type test is under process. Letter has been issued for endurance/balance test on 17/21.02.12. Letter received from the firm for Type test in piecemeal, The firm has been advised on 22.03.12 for type test of all EM contactors altogether. The reminder for type test of all EM contactors sent on 24.05.12. Again on 25.05.12 the firm has requested for type test in piecemeal.

Page 5: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

5

In reply, The firm has been requested for type test of all EM contactors on 14.6.12. Vide letter dated 22.06.12, the firm informed type test on all EM contactors by Dec'12. Again the firm has been asked about the status of prototype of EM contactors vide our letter dated 28.12.12.. Reminder has been sent on 22.02.2013. The firm has again requested for tests in piecemeal of CKC, RFC and FPC by letter dt. 26.02.2013. A letter regarding QAP and internal test results has been issued on 12.04.2013. .A letter regarding QAP and internal test results has been issued on 19/20.06.2013. The firm has submitted QAP in one copy. The internal tests report is still awaited. Letter regarding deficiencies in QAP sent to the firm on 06.09.2013. Again a letter citing the early deficiencies sent to the firm on 31 Oct/01 Nov/2013.

5.

Classification Light (LED based) for EMD locomotives

M/s Balin & Co 2A Ramkrishna Road, Sardapally, Barrackpore, PO Nonchandanpukur,Kolkata-22

13.03.12

After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply-awaited, mail received from firm on 26-06-12, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e-mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13 .Capability and capacity assessment has been planned on 23-05-13 &24-05-13 After scrutiny, letter issued to firm on 23.03.12. Reply received on 2-06-12, e- mailed to firm on 14-06-2012 for submitting complete reply-awaited, mail received from firm on 26-06-12, letter issued for clarification on 6/9-07-12 and reply received on 20-07-12 through e-mail and firm is again asked clarification through e-mail on 30-07-12 for address mismatch. Reply received on 9-08-11 & letter issued for clarification on 6-09-12, reply received on 01-11-12 and letter issued again to firm on 28-12-12 for reply. Reply received on 5-02-13. Capability and capacity assessment has been carried out from 4 -7 July 13 and under process. Documents received on 12-08-13 and sent to Legal Cell for scrutiny on 27-08-13. File received from Legal cell with remarks on 28-10-13. Letter issued to firm on 08-11-13 for compliance the legal cell remarks and reply awaited. Reply received on 2-12-13 and again sent to Legal Cell for scrutiny on 11-12-13.

6.

Flasher light (LED based)

M/s Balin & Company, 2/A, Ramkrishna Road, Saradaoally (JRR RD) Barrackpur, Kolkata-

31.05.04

After Type testing, recommended for field trial on 03.02.2009. Performance evaluation carried out. FRPCPY is very high, letter sent to firm on 18.11.11 for root cause analysis. Reply received through e-mail on 22.11.11 & further performance is under watch. Letter issued again for performance feedback on 29-06-12 and awaited. Mailed to firm on 28-12-12 about corrective and preventive action against the failure reported by

Page 6: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

6

700122 Maulali shed. Reply received on 8-1-13 and FRPCPY calculated and letter issued to firm on 8/11-03-13 for root cause analysis and preventive action, reply received on 25.03.13. Letter issued to Maulali Diesel Shed for performance feedback after attending on 10.09.2013, reply awaited. Letter issued to GY, GTL, UDL, KZJ, MLY and KGP Sheds, for performence feedback on 03.01.2014, reply awited.

7.

Sensor, Fuel Level

M/s BAYHAM INDIA PVT LTD

14.02.13

Application received on 14.02.13 and Letter issued to firm on 15.03.13 Reply received from M/s Bayham through Mail on 01-04-13. Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7. Reply received on 08-08-13 and send for Legal cell /RDSO scrutiny on 27-08-13.

8.

8V, 500 Ah LM Lead Acid Battery

M/s Beacon battery enterprises/ hoppecke battery systems Beacon :172 Sector 23 Gurgaon 122017

14.07.11

Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on 18.10.2011. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11. Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Document paper not completed by Notary attested till date. Document papers submitted by firm and file sent to Legal cell on date 22.11.13.

9.

6V, 150Ah Ni-Cd Battery Storage Unit

M/s Beacon battery enterprises/ hoppecke battery systems Beacon :172 Sector 23 Gurgaon 122017

13.05.11

Application scrutinised. Documents not found as per RDSO Spec. Joint meeting held with firm on 19.07.11 and advised to comply the same. Firm agreed to modify the design and document. Reply received on 18.10.11. Letter issued for manufacture of Ni-Cd Battery Sample on 03.11.2011. Visit to firm on 23.11.11.Testing facility and samples not available. Firm has given the assurance by Feb 2012. Reply received and letter issued to firm on 06.07.12 for deficiencies. Reminder letter issued on 06.03.2013. Letter issued on 02-07-13 for submitting documents as per vendor guideline. Documents received on July 19, 2013 against reminder. Case file sent to legal cell on 17.09.2013 for scrutiny.

10.

General Purpose Relay

M/s Bhopal Electrical Insulation Pvt Ltd, Plot no 82-B, Sector-H, Industrial Area, Govindpura, Bhopal-23

15.06.10

Re Endurance test to be done & ETDC report awaited. Letters & Reminders have been sent to firm on 30.08.11, 24.10.11, 16.11.11, 13.12.11, 28.12.11 & 16.01.12. Re-endurance test started on 16.03.12. Mechanical and electrical endurance test completed on 19.04.12 and 01.5.12 respectively. The firm has to get vibration & shock test completed at some NABL accredited/Gov. Lab. for getting shock and vibration test conducted, letter sent to the firm on 21.06.12 and 04.07.12. 6th reminder sent to the firm on 22.02.13. The report of vibration & shock test submitted by the firm on

Page 7: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

7

16.04.2013. The QAP as per new format is still awaited. Letter for compliance of QAP as Per RDSO format sent to firm on 31.05.13. QAP after complying all points of deficiencies is awaited. QAP dated 30.07.2013 in one copy received on 06.08.2013 and is under scrutiny. Letter of deficiencies sent to the firm on 23.08.2013. A reminder citing the early deficiencies sent to the firm on 31 Oct/01 Nov/2013. After overcoming the deficiencies, QAP dated 04.12.2013 received from the firm. An e-mail dated 09.12.2013 sent to the firm for submitting required documents before approval.

11.

Head light for EMD locomotives

M/s DELCO Switch gear Pvt Ltd, H-4, RICCO Industrial Area, Mansarovar, Jaipur-302020

10.02.12

Application Received on 10.02.12 & Proto type clearance given on 28.03.12 to firm against DLW developmental order. Letter sent to DLW for fitment and homing shed detail on 17-12-12. Letter issued for performance feedback to SGUJ/NFR on 12-2-13, reminder letter issued again to shed for performance feedback on 19-08-13. Letter issued to firm on 07.10.2013 for submission of documents. Firm has submitted document on 27-11-13 and sent to legal cell on 5-12-13 for scrutiny.

12.

Sensor, Fuel Level

M/s Elixir Engineering, #6, SFHS Shopping Area, Nandini Lay out, Bangalore – 560 096

13.06.13

Letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7, Reply received on 13-08-13 and under process. Letter issued to firm on 20-08-13 for compliance of Legal Cell Observation. reply received and sent to legal Cell on 19-09-13 for Scrutiny.

13.

Improved stick type Master Controller with sealed action snap switch

M/s Inder Engineering Industries,12-F, Industrial Area, Govindpura, Bhopal - 462 023

01.12.11

After scrutiny, letter sent to firm vide our letter no. SD.ALCO MASTER CONTROLLER dated 05/12/11. Reply received. Visited the firm and advised to upload the QAP on the Website. Hard copy of QAP Received on 16-04-12 and scrutinised. Letter issued for shortcomings found in QAP on 04.05.12. Reply still awaited. Reminder issued to firm on 11/09/12. Reminder issued to firm on 12-04-13. A letter issued to firm vide our letter No.SD. ALCo Master Controller (Inder) on 30/07/2013 regarding submission of documents for legal scrutiny. Firm has again been reminded by mail on 19/09/13 for submission of documents for legal scrutiny.

14.

Master Controller of EMD locomotive (Dynamic Control Assembly)

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

30.04.11

Load Life test is completed. The firm has submitted vibration test report issued from ERTL New Delhi on 09/02/12. Letter issued to DLW vide our letter SD. EMD. Master Controller (Inspros) on 02/03/12 for extension of P.O. issued to M/s Inspros. IC issued on 23.03.12. Prototype clearance for field trial has been issued to M/s lnspros Engineers Pvt. Ltd, Bhopal on 19-04-12. Letter to SBI and GY Shed sent for Performance feedback of the EMD Master Controller under field trial. Technical Audit with DLW conducted on 23rd and 24th May’13. Audit report prepared and issued to DLW and Firm for complying the issue raised in the report. Audit

Page 8: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

8

verification is still pending, however this office has reminded by letter on 08.11.2013.

15.

Conventional stick type Master controller BHEL model MC03802B

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

03.01.12

After scrutiny, letter sent to firm vide our letter no. SD.ALCO MASTER CONTROLLER on 19/01/12 for submitting the QAP.The firm has submitted QAP on 09/02/12 and scrutinised. Intimated on Phone and e-mail also to M/s Inspros for offer the type test. Reply received on 21.06.12. BHEL type test programme sent to firm by e-mail on 18.07.12 and asked to submit the internal test result as per the BHEL test programme. The firm again advised by e-mail to offer for type test on 01/08/2012. Reminder issued to firm on 11/09/12.The capability assessment waived off. Prototype Type Test started. In-house test done at 6th and 7th feb` 2013 at the firm premises. Vibration test completed. Test report scrutinised. Letter issued to DMW/Patiala with a copy to firm for field trial on 14/08/2013 vide this office letter no. SD.DFM.ALCo MASTER CONTROLLER (Inspros) dt. 14.08.13.

16.

EP/EM contactor and 6M BKT/Reverser

M/s Jaysree Supply agency (Kolkata) Pvt Ltd 118, Garha Road, Kolkata-700075

21.09.11

Vendor registration form scrutinized and letter sent to the firm on 17.11.2011 for overcoming observed deficiency. Specification has been sent on Dec 5, 2011.Another letter sent on 17.02.12 for compliance to the observed deficiencies. Letter received from the firm, again the firm has been advised on 21.03.12 and on 09.04.12 for compliance to the observed deficiencies. Firm has complied with the letter dated 09.04.12. E-mail from the firm has been received on 15.05.12. It has partially complied to letter sent to the firm on 04/07.05.12. Letter to firm to fully comply has been sent on 01.6.12. Letter received from the firm on 27.06.12, complying the entire requirement before capacity/ capability assessment. A letter requesting a call to RDSO from the firm, for capacity/capability assessment of the firm sent through E-mail on 29.06.2012. A letter for capacity/capability assessment received from the firm on 04.07.12. Capacity /capability assessment completed and letter of deficiency sent to the firm on 30.08.12. Letter received from the firm to reconsider their case for continuing the process of approval. Again the reply to the firm for complying the points raised earlier has been sent on 26.11.12. An agreement paper of M/s Jayshree supply agency and M/s. N.U Industries for being sister concern has been received vide letter dated 05.12.2012 (letter was received on 02.01.2013. A letter asking new QAP and process flow chart, has been sent to the firm on 24.01.2013.again reminder for the Same has been sent to the firm on March 08, 2013. A letter with incomplete QAP has been received on 02.04.2013 from the firm. The letter regarding QAP has been mailed to the firm on 05.04.2013. Again a letter with incomplete QAP has been received on 12.04.2013 from the firm and again a letter regarding complete QAP has been sent to the firm as on 23/25.04.2013. A

Page 9: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

9

letter dated 24.06.2013 of the firm regarding early submission of QAP has been received on June 27, 2013. QAP dated 05.08.2013 received on 08.08.2013 and is under scrutiny. Letter of deficiencies sent to the firm on 23.08.2013. QAP received and under scrutiny. A letter and QAP dated 21.09.2013, complying the deficiencies received from the firm on 26.09.2013. Again a letter citing one of the early deficiencies sent to the firm on 31.12.13. Letter dated 11/11/2013 and amended QAP's of the firm received on 18/11/2013

17.

Flasher light (LED based)

M/s Kaysons Electrical Pvt Ltd, SH 15/79, Shivpur Varanasi 221003

24.02.11

Reminder uploaded for reply on 05-05-2011, till date reply not uploaded by firm. Letter issued again on 02.09.11 for same. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 17.11.11. Wave soldering certificate received on 02.12.11. Verified at firm by RDSO representative on 17.03.2012, Firm was asked to send compliance with Vendor guidelines on 1-05-12, firm is advised on 08-06-2012 through email to send the QAP as per Latest Format., reminder letter dated 5-10-12 mailed and reply received on 01-11-12 and letter issued to firm for reply on 07-12-12 and QAP revived on 28-1-2013 and under process. Capacity Assessment and type test is carried out from 26-2-13 to 2-03-13. Corrected copy of QAP received on 05-04-13, Inspection call not received for remaining type test, letter issued for type test inspection call on 26-06-13. Further Type test has been carried out from 22 to 26-07-13 & 12-08-13 at firm premises Letter issued for remaining test from outside lab on 23-08-13. Results awaited.

18.

Marker light (LED Type)

M/s Kay sons Electrical Pvt Ltd,SH 15/79, Shivpur Varanasi 221003

19.02.11

Reminder uploaded for reply on 05-05-2011, till date reply not uploaded by firm. Letter issued again on 02.09.11 for same. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 17.11.11. Wave soldering certificate received on 02.12.11. Verified at firm by RDSO representative on 17.03.2012, Firm was asked to send compliance with Vendor guidelines on 1-05-12, reply received on 19-05-12 after scrutiny, firm is advised on 08-06-12 through email to send the QAP as per Latest Format. Reminder letter dated 05-10-12 mailed and letter issued to firm for reply on 07-12-12 and QAP received on 28-1-2013 and under process. Capacity Assessment and type test is carried out from 26-2-13 to 2-03-13. Corrected copy of QAP received on 05-04-13. Inspection call not received for remaining type test, letter issued for type Test inspection call on 26-06-13. Further Type test has been carried out from 22-07-13 to 26-07-13 & 12-08-13 and Letter issued for remaining test from outside lab on 23-08-13. Results awaited.

Page 10: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

10

19. Control System, AC- AC control system, AC-AC Traction for 4500HP EMD locomotives & its sub-assemblies Locomotives & its sub-assemblies

M/s K K IRON INDUSTRIES

24.09.13

Vendor registration form has been received & it is under scrutiny.

20.

Intelligent Low Idling Equipment

M/s Laxven Systems,Plot No 188/A, Sector-III,Lane-1, IDA, Phase-II, Cherlapally Hyderabad- 500 051

18.04.12

Letter issued after scrutiny on 4-5-12. Reply received on 17-05-12. After scrutiny, firm is advised on 04-06-12 through email to send the QAP as per revised format. Reply received on 14.06.12 through email and hard copy received on 21.06.12. Prototype testing (In-house) has been carried out on 29.08.12 to 30.09.12 and ETDC /ERTL test completed. Loco validation test has been done on 01/10/2012 at KZJ. Firm has submitted the original copy of test reports. Letter issued to firm and Sr.DME(D)/KZJ on 04/12/2012 vide our letter no. SD.LOW IDLE (Laxven) dt. 04.12.12 reg. field trial clearance. Letter issued to MLY shed for field performance on 05.06.13.

21.

Micro-Controller based governor for ALCO / DLW / DMW 16 & 6 Cylinder 251 Series Diesel / Electric Locomotives

M/s Laxven Systems,Plot No 188/a, Sector-III,Lane-1, IDA, Phase-II, Cherlapally Hyderabad- 500 051

18.04.12

Application received on 19.04.2012. Letter written to the firm date 02.05.2012 for details. Letter received from the firm vide letter no. LAX/RDSO/MCBG-048/12-13 date 15.05.12. Deficiencies advised to firm on 19.06.12 by email. Reply received on 04.07.12 by email and case is under process. Latest Digital Signature submitted and uploaded on RDSO website by firm on 31st July12.Further credentials have been sought from the vendor as per the vendor guideline on 7/8th Aug2012. Letter sent to firm on 8th Oct'2012 for compliance of infrastructure. Firm sent mail on 06.02.13 regarding the compliance of infrastructure. Check sheet has been prepared. Further, on 18th Feb'13, firm has been asked to submit Plant & Machinery list in non-judicial stamp of Rs. 100. And self-declaration form of allied sister concern. Firm has submitted self-declaration form of allied sister concern. Firm has submitted Plant & Machinery list in non-judicial stamp. MCBG test schedule under Scrutiny as per Rev 03. Testing at the firms premises planned in April 2013. Firm has been asked to send the OGA drg for MCBG. Capacity Assessment and functional testing of prototype conducted on 9th and 10th May 2013. Firm has to carry out further testing at the Govt. recognised lab. Letter issued on 13/08/2013. Firm has submitted ETDC test report and the same is under study. MCBG unit is planned to be tested on engine test bed at DMW. Letter issued on 08.10.13 to DMW for testing.

22. Marker light (LED Type)

M/s Malika Internationa

25.04.12 Letter issued after scrutiny on 04-05-12 and reply received on 24-05-12, shortcoming advised to firm

Page 11: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

11

l A-16, Sector-10, Noida-201301

on 15-06-12 through email. Reply received on 21-06-12. Capability & Capacity assessment carried out on 24-07-12 & 25-07-12. Deficiency advised to the firm on 14.09.12.Reply received on 10-10-12 , Deficiency advised to the firm on 22-10-12 , reply received on 30-10-12 and Letter issued to firm for prototype development on 07-12-12. Internal test report received on 28.03.13 further queries called trough mail on 10-04-13 and reply received on 23-04-13 and under process, QAP compliance will be ascertained in June 13 however letter issued on 21-06-13 for submitting documents as per vendor guideline ver.7. Reply received on 28-06-13 but documents are not as per guideline and informed to firm through phone on 08-07-13. Reply received on 16-07-13 and processed for Legal cell scrutiny. Letter issued to firm on 23-08-13 for compliance of Legal cell observation. Reply received on 02.09.2013 and send to legal cell on 04-09-13 for scrutiny of documents, Scrutinized document received on 05-09-13. Capability & capacity assessment has been carried out 04-10-13 & 05-10-13. Firm is advised to comply the observation before type test on 31-10-13. Reply awaited.

23.

Flasher Light, LED type for ALCO Locomotives- Spec No. ELRS/Spec/LFL/0017 Rev. 01, Sep 04

M/s Malika International A-16, Sector-10, Noida-201301

18.01.13

Letter issued to Firm for further clarification on 8/11-02-13, Firm reply received on 25-02-13 and further reply of firm received on 08-03-13 As per revised vendor guideline documents sought vide letter dt. 21.06.13. Reply received on 28-06-13 but documents are not as per guideline and informed to firm through phone on 08-07-13. Reply received on 16-07-13 and processed for Legal cell scrutiny. Letter issued to firm on 23-08-13 for compliance of Legal cell observation. Reply received on 02.09.2013 and send to legal cell on 4-09-13.Scrutinized document received on 05-09-13. Capability & capacity assessment has been carried out on 04-10-13, 05-10-13. Firm is advised to comply the observation before type test on 31-10-13. Reply awaited.

24.

Flasher light (LED based)

M/s Mechtronics, 16/2, Mathura Road, Karkhana Bagh, Faridabad, Hariyana-121002

23.09.08

After type testing, recommended for field trial on 19.03.2010 and performance feedback, sought vide letter no. SD.LED. Flasher light, Dt: 13.06.2011. Letter issued on 02.09.11 to firm for supply details & failure reported to firm. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 23.11.11. A letter issued to firm for Current status of digital signature certificate and IPR undertaking. Reply received on 21-02-2012 .Letter issued to all Zonal Railway for performance again on 4-05-12 and awaited. Letter to DLW on 17-12-12 for exact homing shed details. Repeat (reminder1) letter to DLW on 21-02-13 for exact homing shed details. Repeat (Reminder 1) letter to DLW on 21-02-13 for exact homing Shed details. Reply received from DLW on 13-03-2013 and under process. Clarification from firm regarding address change has been asked vide this office letter dated 09-07-13. Reply received vide firm letter dt. 19-07-13 and Letter issued to firm on

Page 12: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

12

03.09.2013 for submit all the documents with new work address & QAP. Reply awaited.

25.

Marker light (LED Type)

M/s Mechtronics, 16/2, Mathura Road, Karkhana Bagh, Faridabad, Hariyana-121002

06.08.09

After type testing, recommended for field trial on 19.03.2010. Letter issued on 02.09.11 to firm for supply details & failure reported to firm. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 23.11.11.A letter issued to firm for Current status of digital signature certificate and IPR undertaking. Reply received on 21-02-2012. Letter issued to all Zonal Railway for performance again on 4-05-12 and awaited. Letter to DLW on 21-02-13 for exact homing shed details. Reply received from DLW on 13-03-13, mean while firm has changed works address to sahibabad, informed on 03-05-13 and case is under process as per vendor guideline. Clarification from firm regarding address change has been asked vide this office letter dated 09-07-13. Reply received last week and under process. Reply received vide firm letter dt. 19-07-13 and under process. Letter issued to firm on 03.09.2013 for submit all the documents with new work address & QAP. Reply awaited.

26.

Classification Light (LED based) for EMD locomotives

M/s Mechtronics, 16/2, Mathura Road, Karkhana Bagh, Faridabad, Hariyana-121002

06.08.09

After type testing, recommended for field trial on 19.03.2010. Letter issued on 02.09.11 to firm for supply details & failure reported to firm. Reminder sent through e-mail on 15.11.11. Reply received through e-mail on 23.11.11.A letter issued to firm for Current status of digital signature certificate and IPR undertaking. Reply received on 21-02-2012 Letter issued to all Zonal Railway for performance again on 4-05-12 and Letter issued to DLW on 14-12-12 for getting exact homing shed and fitment details for all supplied classification light. Repeat (Reminder 1) letter to DLW on 21-02-13 for exact homing Shed details. Reply received from DLW on 13-03-13 and under process. Clarification from firm regarding address change has been asked vide this office letter dated 09-07-13. Reply received last week and under process. Reply received vide firm letter dt. 19-07-13 and under process. Letter issued to firm on 03.09.2013 for submit all the documents with new work address & QAP. Reply awaited.

27.

Micro Controller Based speed recorder-indicator

M/s Stesalit Ltd, Park Plaza (N) 71, Park Street, K O L K A T A – 700 016

12.09.07

Prototype approval is issued for field trials on 15.05.09 vide letter no.SD. DFM. M.1.3 (Stesalit). Letter issued to firm vide our letter even no. SD. DFM. M.1.3 (Stesalit) on 21/07/11 regarding status of field trial. Firm response received. Letter issued to DLW regarding to know the dispatch details of trial equipment. Reply from DLW received. As per the DLW letter, trial equipment is lying at the central dispatch at DLW and it is ready to dispatch. A request letter issued to DLW in this regard on 03/02/12. Firm has requested to include in Part-II Category. Reply issued to firm on 28.03.12 for completing the field trial in response to up gradation to part-II. A letter issued to DMW vides our letter of even no. SD. DFM. M.1.3 (Stesalit) on 18/07/2013 for providing the fitment details.

Page 13: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

13

28.

DC-DC converter (1000 W) Head light assembly (twin beam)

M/s Topgrip Indus Instruments Pvt Ltd, 37C, Jheel Road, Dhakuria, Kolkata- 700 031

21.04.12

Letter issued after scrutiny on 04-05-12 and reply awaited, reminder issued on 13-07-12 and reply received on 05-10-12, shortcomings advised to firm through mail on 19-10-12 and reply awaited Reminder letter issued on 04-1-13.Reminder emailed/Faxed to firm on 15-03-13 firm asked to submit documents as per revised vendor guideline on 22/07/13 and reminder emailed on 20-09-13. Reply awaited.

29.

Master Controller of EMD locomotive (Dynamic Control Assembly )

M/s Topgrip Indus Instruments Pvt Ltd, 37C, Jheel Road, Dhakuria, Kolkata- 700 031

13.04.12

Application received on 16-04-2012. The firm has been advised on 18.04.12 & 04.05.12 to comply for the observed deficiencies. Reminder issued to firm on 11/09/12. Partial reply received on 17/10/12 by email. Firm has explained that the work is under progress and will intimate shortly, on their visit to RDSO on 21/02/13. A letter issued to firm vide our letter No.SD. No.SD. EMD Master Controller (Top Grip) on 30/07/2013 regarding submission of documents for legal scrutiny.

30.

Flasher light LED type for ALCo locomotives

M/s Electronic Equipment Co. Pvt. Ltd, 544 Rabindrapally, brahmapur kolkata

15.04.13

Scrutiny of Online form & letter issued on 06 may 2013.Reply received through mail on 21-05-13 and letter issued to firm for sending documents as per Version 7 of the guideline on 21-06-13.Documents received from firm on 08-07-13 and sent to Legal cell for scrutiny on 11-07-13. After legal scrutiny letter issued to firm on 23-08-13 .Document submitted on 18-09-13 and send to Legal cell on 19-09-13 for scrutiny. After legal scrutiny, letter issued to firm on 30.09.13 to provide suitable date for the capacity assessment. Capacity assessment has been planned in month of December.

31.

Battery-8V, 500Ah lead acid

M/s United Leadoxide Products Pvt. Ltd.

12.06.13

Application received on 18.06.13 and as per revised vendor guideline fresh documents sought vide letter dt. 21.06.13. Documents received as on 19 July 2013. Documents with original case file sent to legal cell on for scrutiny. Observation raised by legal cell communicated to the firm vide letter dt. 17.09.2013. Firm has submitted documents on 05.12.13 and file sent to Legal cell for scrutiny on 05.12.13.

32. AC-AC Traction system for 4500hp HHP locomotives

Trainelec, S.L.

23.07.12

M/s Trainelec Spain had applied for ac-ac traction system of HHP locomotive on 23.07.12. Shortcomings were advised to the firm on 19.09.12. Reply of short coming from the firm was received vide letter dated-09.11.12. After scrutiny of the documents, remaining short comings were advised to the firm on 21.03.13. Response is awaited.

dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu

fnukad

Date of applicati

on

orZeku fLFkfr

Current status

pkyu 'kfDr& bZe vkbZVe

Motive Power – EM items

A. Traction Motors Items --- 1. Conductor

copper M/s Cosmos Conductors Pvt.

02.01.13 Reply received on 18.3.13. On 06.05.13, assessment done by RDSO officer.

Page 14: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

14

Heat sealed kapton covered

Ltd., Tumkur

2. Conductor copper Heat sealed kapton covered

M/s Mahendra Industries, Bangalore

16.07.12 On 08.0513, assessment done by RDSO officer. On 21.10.13, received legal documents.

3. Conductor copper Heat sealed kapton covered

M/s Malwa Strips Pvt. Ltd., Dewas

05.10.10 On 07.07.11, firm cleared for placement of developmental order by DMW. On 03.12.13, asked status of dev. P.O. from DMW.

4. Glass tape, Silicon elastomer

M/s Bells Organic (P) Ltd., Kolkata

31.07.08 On 24.09.10, firm cleared for placement of developmental order by DMW. On 03.12.13, asked status of dev. P.O. from DMW.

5. Holder Brush M/s Power Mica Insulators, Kolkata

03.12.12 On 04.02.13, capacity assessment carried out. From 28.05.13 to 29.05.13, type test carried out. On 24.10.13, cleared for developmental order to DMW.

6. Holder Brush (Constant Pressure type)

M/s Mersen India Pvt. Ltd., Bangalore.

20.01.12 Type test carried out from 19.07.11 to 20.07.11 for AG3101 and from 13.12.12 to 15.12.12 for TM4907. Firm supplied 500Nos. of AG3101 to BHEL and 180 Nos. to NR/AMV & KJM sheds. Firm also supplied 24Nos.BH for TM4907 to SWR/Hubli. Performance from various sheds found satisfactory and under process for Part-II. On 09.11.12, global EOI for both BHs done.

7. Insulating material kit, Class 200 (Glass Mica Tape)

M/s Ruby Mica Company Lld., Giridih, Jharkhand.

23.04.12 Assessment and type test completed on 20.08.12. On 16.01.13, firm cleared for placement of developmental order by DMW. On 12.08.13, cleared for supply of rest qty. of Glass Mica Tape.

8. Insulating material kit, Class 200 (Kapton Mica Tape)

M/s Ruby Mica Company Lld, Giridih, Jharkhand.

20.04.12 Assessment and type test completed on 20.08.12. On 16.01.13, firm cleared for placement of developmental order by DMW. On 12.08.13, cleared for supply of rest qty. of Kapton Mica Tape.

9. Insulating material Kit, Class 200 (Glass Mica Tape)

M/s MICAPLY, Bhopal

05.06.13 On 22.10.13, assessment done by officer. On 03.12.13, clarification on shortcomings of legal documents received and under scrutiny. From 26.12.13 to28.12.13, type test conducted at firm’s premises. Results of TGA & FTIR from NABL are awaited.

10. Insulating material Kit, Class 200 (Including Inter Turn Ceramic Sheet )

M/s Ruby Mica Company Lld., Giridih, Jharkhand.

06.12.13 Vendor form under scrutiny.

11. Insulating material kit, Class 200 (Inter Turn Ceramic Sheet)

M/s MICAPLY, Bhopal

13.05.13 On 22.10.13, assessment done by officer. On 03.12.13, clarification on shortcomings of legal documents received and under scrutiny.

12. Insulating material kit, Class 200 (Kapton Mica

M/s MICAPLY, Bhopal

20.03.13 On 22.10.13, assessment done by officer. On 03.12.13, clarification on shortcomings of legal documents received and under scrutiny.

Page 15: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

15

Tape) 13. Insulating

material kit, Class 200 (Slot Liner Nomex Tape)

M/s MICAPLY, Bhopal

20.03.13 On 22.10.13, assessment done by officer. On 03.12.13, clarification on shortcomings of legal documents received and under scrutiny.

14. Insulating material kit, Class 200 (Slot Liner Nomex Tape)

M/s Ruby Mica Company Lld., Giridih, Jharkhand.

22.10.13 Vendor form under scrutiny.

15. Motor Armature, DC Traction for ALCo

M/s Daulat Ram Engineering Services (P) Ltd. Raisen

14.08.12 On 13.09.12, clearance given for fitment trial at DMW. On 16.04.13, cleared to supply balance quantity to DMW.

16. Motor Commutating field coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

13.06.13 On 02.07.13, asked for legal documents.

17. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

13.04.12 On 29.04.13, type test completed and 02 nos. cleared for fitment & field trial at DLW.

18. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A Armature B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame machined)

M/s Saini Electrical & Engineering Works, Navi Mumbai

08.05.12 Type test completed. On 20.07.12, advised for fitment at DMW for field trial. On 04.12.12, 04 TMs cleared for trial at DMW.

19. Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A Armature B. Commutator, C. Commutating field coils

M/s Rotomac Electricals Pvt. Ltd., Kolkata

06.06.13 On 08.08.13, legal documents sent to legal cell for scrutiny and reply awaited. On 05.09.13, assessment of Kolkata premises done by RDSO officer. On 23.09.13, assessment of M/s Sahibabad premises done by RDSO officer.

Page 16: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

16

assembly, D. Main field coils assembly, E. Magnet frame (machined)

20. Motor Complete, DC Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined) (TM 4907)

M/s Integrated Electric Co. Pvt. Ltd., Bengaluru.

19.12.11 On 27.03.13 & 22.11.13 (again), advised shortcomings. On 04.05.13, assessment done by RDSO officer.

21. Motor Complete, DC Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame(machined)- (TM 5002)

M/s Integrated Electric Co. Pvt. Ltd., Bangalore

27.04.10 On 02.03.12, recommended for developmental order to DMW. Letter sent to DMW/PTA on 22.11.13 for status of P.O.

22. Motor Magnet frame (machined), DC Traction for ALCo

M/s Laxmi Machine Tools Meerut Road., Ghaziabad

15.09.11 On 08.08.12, compliance of shortcomings received and under scrutiny.

23. Motor Main Field Coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

19.07.13 Vendor form under scrutiny.

24. Motor Main field coils assembly, DC Traction for ALCo

M/s Stesalit Ltd., Solan (H.P.)

27.04.12 On 22.02.13, provisional approval of drg. of main field coils given.

25. Motors Traction AC, for EMD locomotives

M/s BHEL, Bhopal 19.11.13 Vendor form under scrutiny.

26. Motors Traction AC, for EMD locomotives

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

21.12.10 On 18.01.11, recommended for developmental order.

27. Motors Traction AC, for EMD locomotives

M/s Medha Traction Equipment Pvt. Ltd., Ranga Reddy Dist.,

27.02.13 On 20.11.13, revised legal documents received and under scrutiny.

28. Motors Traction AC, for EMD locomotives

M/s Saini Electrical & Engineering Works, Navi Mumbai

04.01.11 On 18.01.11, recommended for developmental order. Also advised shortcomings on 04.02.11.

Page 17: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

17

29. Motors Traction AC, for EMD locomotives

M/s CSR ZHUZHOU Electric CO., LTD

04.07.13 On 24.09.13, legal documents received and under scrutiny. On 14.11.13, asked to submit design details of AC TM. On17.12.13, design detail received and under scrutiny.

30. Tape, Kapton adhesive

M/s MICAPLY, Bhopal

30.09.13 On 22.10.13, assessment done by officer.

31. Tape, Resi-glass banding

M/s Rotomac Electricals Pvt Ltd., Kolkata

03.12.12 On 02.05.13, assessment done by RDSO officer. On 19.08.13, advised DMW for placement of developmental order.

32. Tape, Resi-glass banding

M/s Nashik Insulations Pvt. Ltd., Nashik

13.05.13 On 02.07.13, asked for legal documents.

B. Gears & Pinions Items ---- 1. Gears & pinion

(Case hardened) Traction for EMD locomotives

M/s Elecon Engineering Company Ltd., Anand Sojitra Road

14.08.12 On 14-15.12.12, capacity assessment carried out. On 22.01.13, recommended for developmental order to DLW for both items. Again on 03.07.13 and 04.10.13, advised DLW for placement of dev. order.

2. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s G. G. Automotive Gears Ltd., Dewas

19.02.11 On 26-27.03.12, capacity-cum-capability assessment done and on 02.05.12, cleared for developmental order for both items. On 03.07.13, again advised DLW for placement of dev. order. On 24.10.11, firm got P.O. for 10 nos. of 77 teeth gears from DLW.

3. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.09.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to DLW for both items.

4. Gears & pinion (Case hardened) Traction for EMD locomotives

M/s Research Dev & Mfg Corporation, Bangalore

13.09.11 On 15.03.12, advised DLW for developmental order for both items. On 05.03.13, I.C. for 90 teeth bull gear issued. Firm got 6 Nos. 17 teeth pinions order from DLW.

5. Gears & Pinions, Traction, Case hardened for DEMU

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

29.01.13 On 02.05.13, recommended for developmental order to CDE/Chennai for both items. Firm informed that they got 10 sets order from M/s CGL.

6. Gears & Pinions, Traction, Case hardened for DEMU

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to CDE/ICF, Chennai for both items.

7. Gears & pinions, Traction, Case hardened, for ALCo

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

28.01.13 On 02.05.13 and again on 04.10.13, recommended for developmental order for both items to DMW/PTA. On 16.10.13, firm got P.O. for 10 Nos. of 18 teeth pinions from CGL.

8. Gears & pinions, Traction, Case hardened, for ALCo

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for developmental order to DMW for both items.

9. Gears & pinions, M/s Trina Quebec 04.03.13 Pending due to not comply of

Page 18: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

18

Traction, Case hardened, for ALCo

Gears Ltd., New Delhi

shortcomings. On 22.11.13, advised firm to give latest status of shortcomings.

10. Traction Gears, (Case hardened) for ALCo

M/s Vinir Engineering Pvt. Ltd., Bangalore

25.07.13 On 06.08.13, advised shortcomings. On 04.11.13, reminder-I issued.

11. Traction Gears, (Case hardened) for EMD

M/s Shanthi Gears Ltd., Coimbatore.

07.03.11 On 17.06.11, cleared for developmental order for both items. Under process for manufacturing of traction gears.

12. Traction Gears, (Case hardened) for EMD

M/S Kissan Steels Pvt. Ltd., Ghaziabad

22.11.13 On 02.12.13, advised shortcomings.

13. Traction Pinions, (Case hardened) for ALCo

M/s Research Development & Manufacturing Corpn, Banglore.

11.10.10 On 29.11.10, advised DMW for developmental order for both items. On 17.04.13, I.C. for 18 teeth pinions for ALCo issued.

14. Traction Pinions, (Case hardened) for EMD

M/s Trina Quebec Gears Ltd., New Delhi

26.09.09 Under process for manufacturing of traction pinions.

C. Bearings & Susp. Tube Items --- 1. Bearing,

suspension, Traction motor for EMD locomotives

M/s FAG Bearings India Ltd., Vadodara

01.06.12 On 21.08.12, cleared for developmental order. On 06.02.13, assessment carried out. From 20.11.13 to 22.11.13, prototype inspection against DLW PO carried out. On 02.01.14, IC issued.

2. Bearing, suspension, Traction motor for EMD locomotives

M/s SKF Technologies (India) Private Limited., Ahmedabad.

29.06.12 On 21.08.12, cleared for developmental order. On 10.01.13, assessment carried out. Prototype inspection carried out from 22.05.2013 to 24.05.2013 against DLW PO. On 26.06.13, IC issued.

3. Bearing, Traction Motor- TM Drive end & TM Non-drive end for EMD locos

M/s FAG (Germany / Italy)

29.05.13 On 17.06.13, advised shortcomings of vendor form and legal documents. On 23.12.13, reminder-I issued for reply of letter, dtd: 17.06.13.

4. Bearings for Traction Motor Suspension, for ALCo locomotives (Roller type)

M/s FAG Bearings India Ltd., Vadodara

13.06.12 On 29.10.12, cleared for developmental order. On 06.02.13, assessment carried out. IC issued against DMW P.O. on 07.06.13.

5. Bearings for Traction Motor Suspension, for ALCo locomotives (Roller type)

M/s SKF Technologies (India) Private Limited., Ahmedabad.

28.06.12 On 03.12.12, cleared for developmental order. On 04.03.13, I.C. issued against DLW P.O.

6. Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s FAG Bearings India Ltd., Vadodara

31.07.12 On 06.02.13, assessment carried out. On 23.10.13, asked legal documents.

7. Bearings for Traction motor, ALCo locomotives -

M/s SKF Technologies (India) Pvt. Ltd., Ahmedabad.

30.09.13 On 22.10.13, legal documents sent to legal Cell for scrutiny.

Page 19: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

19

(NU328 & NH 318 rivetless)

8. Seal, Gear Case TPU for Alco Locomotives

M/s Quadrant EPP Surlon India Ltd., Dehradun

19.02.11 In Sept.’12, cleared for developmental order. On 02.07.13, asked performance from Rlys.

9. Tube Suspension: Housing bearing kit (consisting 11 items)

M/s Indore Nitriders, Indore.

26.03.09 Cleared for developmental order on 07.04.10. On 29.11.12, IC issued. On 28.11.13, asked performance report from Rlys.

10. Tube Suspension: Housing bearing kit (consisting 11 items)

M/s PD Steels, Mohali.

17.12.12 On 22.08.13, advised shortcomings of legal documents. On 18.10.13, assessment carried out and under scrutiny.

11. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Saurabh Metal Pvt. Ltd., Bhopal

03.06.09 On 05.08.09, advised to manufacture 3 sets of tubes & call for inspection. Reminder issued on 06.06.13 for development of tubes. Firm informed tentative date 14.08.13 to offer for prototype inspection. On 19.12.13, reminder-I issued to offer for prototype inspection.

12. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

23.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.2013 cleared for developmental order.

13. Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Bhilai Engineering Corporation Limited, Dist Durg, Chhattisgarh.

30.09.13 On 08.10.13, advised shortcomings of vendor form and legal documents.

14. Tube Suspension: Housing bearing kit (consisting 4 items)

M/s Kharagpur Metal Reforming Industries Pvt. Ltd., Howrah

11.06.11 Inspection Certification issued on 01.08.11 as per P.O. of DLW. On 10.07.13, advised to submit supply details against DLW P.O. On 23.10.13, reminder given to submit details against DLW P.O. On 26.12.13, firm informed that they are not in position to manufacture this item.

15. Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Bhilai Engineering Corporation Limited, Dist Durg, Chhattisgarh.

30.09.13 On 08.10.13, advised shortcomings of vendor form and legal documents.

16. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Alert Engineering Enterprises, Bhopal

21.12.11 On 20.03.13 assessment again carried out. On 04.07.13, firm cleared for placement of developmental order by DMW.

17. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s PD Steels, Mohali.

17.12.12 On 22.08.13, advised shortcomings of legal documents. On 18.10.13, assessment carried out and under scrutiny.

18. Tubes & M/s Simplex Engg. & 12.03.07 Cleared for developmental order on

Page 20: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

20

accessories, Suspension bearing (10 components) of ALCo

Foundry works (P) Ltd., Bhilai,

06.07.09.

19. Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

13.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.2013 cleared for developmental order.

D. Cables & Cleaning Solvent Items 1. Cables, control

Electron beam irradiation

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 16.08.13, legal documents sent to legal cell. Internal test results yet to be received.

2. Cables, Fluoro elastomeric

M/s Siechem Technologies Pvt. Ltd., Pondicherry

21.01.13 On 03.06.13, capability cum capacity assessment and type testing completed. On 19.08.13, advised for fitment trial at DMW on 2 TMs.

3. Cables, Fluoro elastomeric

M/s United cables Industries, Noida.

13.07.10 On 11.08.11, advised DMW for placement of developmental order & to conduct fitment trial. On 20.08.13, asked for legal documents. On 21.10.13, advised for fitment trial at DMW on 2 TMs.

4. Cables, power Electron beam irradiation

M/s NICCO Corporation, Shyamnagar, West Bengal

12.01.11 On 29.07.11, cleared for developmental order. On 01.11.13, fitment details of 2161.25 mtrs. cables from DLW received.

5. Cables, power Electron beam irradiation

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 16.08.13, legal documents sent to legal cell. Internal test results yet to be received.

6. Solvent Cleaning for Electrical Machines

M/s Chem-Verse Consultants (India) Private Ltd., Mumbai

27.05.11 On 12.07.12, assessment carried out. On 05.02.13, test results from M&C Dte. received. From 04.12.13 to 13.12.13, field trial completed at CB/Charbagh.

7. Solvent Cleaning for Electrical Machines

M/s Olivine Mercantiles (P) Ltd., Kolkata.

05.02.08 On 27.01.11, cleared for developmental order. On 13.06.13, asked performance report from Diesel shed/Samstipur. On 20.08.13, asked for legal documents. On 23.10.13, reminder given for legal documents and QAP. On 23.10.13, reminder issued for performance report to Diesel shed/Samstipur.

8. Wires Lead for Brush Gear Connectors and main lead cables (outgoing) for TM

M/s Siechem Technologies Pvt. Ltd., Pondicherry

05.06.13 On 16.08.13, legal documents sent to legal cell. On 19.08.13, advised for fitment trial at DMW on 2 TMs.

E. TM Blower & Duct Items --- 1. Bellows-

(Moulded rubber without fabric), TM for ALCo locomotives

M/s Abelasto Products Pvt. Ltd., Kolkata.

19.10.09 On 24.08.11, advised to DMW & DLW for developmental order. On 27.12.11, advised to all CMPEs for dev. order. On 30.04.12 & 16.05.13, advised DMW for developmental order.

2. Bellows- (Moulded rubber without

M/s Waidhan Engg. & Industries Pvt. Ltd., Singrauli (MP)

07.12.09 On 09.12.11, advised to DMW & DLW for developmental order. On 30.04.12, advised DMW & all CMPEs for developmental

Page 21: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

21

fabric), TM for ALCo

order.

3. Blower of Traction motor for EMD locomotives

M/s Laxmi air control Limited, Mumbai

03.11.11 On 01.06.12, clearance given for fitment at DLW. On 18.07.12, one unit fitted on loco no. 12618 & dispatched to GOC. On 24.12.13, advised DLW to send fitment details of item supplied against dev. order.

F. Alternator & DB Items ---- 1. Alternator,

Traction & sub-assemblies for ALCo locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

22.10.13 On 19.11.13, advised shortcomings of vendor form. Reply awaited.

2. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s BHEL, Bhopal 13.05.13 On 19.06.13, advised shortcomings of vendor form. On 19.12.13, legal documents sent to legal cell for scrutiny.

3. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s TD Power Systems Limited, Bangalore

27.06.13 On 08.11.13, asked to submit technical details of proposed TA. Reply awaited. On 19.12.13, legal documents sent to legal cell for scrutiny.

4. Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Saini Electrical and Engineering Works, Navi Mumbai

03.09.13 On 11.10.13, advised shortcomings of vendor form. Reply awaited.

5. Alternator-Rectifier Traction, for EMD locomotives for alternator

M/s Medha Traction Equipment Pvt. Ltd., Ghatkesar

14.11.13 On 21.11.13, advised shortcomings of vendor form. Reply awaited. On 19.12.13, legal documents sent to legal cell for scrutiny.

6. Alternator-Rectifier Traction, for EMD locomotives for alternator (for Alternator & Rectifier)

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

20.08.13 On 08.11.13, asked to submit technical details of proposed TA. On 14.11.13, details received and under scrutiny. On 19.12.13, legal documents sent to legal cell for scrutiny.

7. Auxiliary machines & sub-assemblies for ALCo locomotives

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

09.10.12 On 11.01.13, prototype clearance granted.

8. Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s BHEL, Bhopal 18.11.13 On 28.11.13, asked Legal documents, QAP and compliance of STR.

Page 22: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

22

9. Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s BLA Engg. Pvt. Ltd., Kolkata.

23.06.11

On 17.01.12, cleared for developmental order. On 30.08.13, documents sent to legal cell for checking. Capability assessment done on 07.09.13. Advised shortcomings on 13.12.13.

10. Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD

M/s Kaptronics Pvt. Ltd., Bangalore

05.09.08 On 05.09.11, clearance given to firm for fitment of one unit at DLW. On 05.08.13, I.C. issued for one set.

11. Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s Resistance Alloys India Ltd., Mahadev, Jaunpur.

25.09.12 Capability assessment carried out on 28.08.13. Legal documents sent to legal cell on 02.09.13. Shortcomings advised to firm on 18.09.13.

12. Dynamic Brake Hatch assembly (Complete assembly including grid, motor & fan) for EMD locomotives

M/s Resitech Electricals Pvt. Ltd., Kolkata

10.05.12 Capability assessment done on 3-4.09.13. Shortcomings advised on 23.09.13. Shortcomings of legal documents advised on 10.10.13.

13. Dynamic Brake Hatch Assembly (Complete assembly including grid, motor & fan) for EMD Locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

06.06.13 On 01.08.13, legal documents sent to legal cell for checking. Capability assessment done on 28.09.13. Shortcomings advised to firm on 03.12.13.

14. Dynamic Brake Hatch Assembly (Complete assembly including grid, motor & fan) for EMD Locomotives

M/s Escorts Ltd. (RED), Faridabad

27.06.13 On 19.07.13, asked legal documents and compliance of STR. Legal doc. and compliance of STR received on 12.12.13.

15. Dynamic Brake Hatch Assembly (Complete assembly including grid, motor & fan) for EMD

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

01.08.13 Legal documents sent to Legal Cell on 16.09.13. Prototype inspection of grid only done on 18 & 19.11.13 and report under scrutiny. Report from Govt. approved lab. received on 18.12.13. On 02.01.14, dispatch clearance for one set DB Grid assembly given for temp. rise test and field trial.

Page 23: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

23

Locomotives 16. Dynamic

braking fan assembly for EMD locomotives

M/s Standard Electrical Industries, Coimbatore

06.06.13 Capacity assessment conducted on 08.08.13. Prototype testing carried out from 19.10.13 to 24.10.13. Justification regarding wind tunnel setup and traceability information of motor & their sub-assemblies asked on 25.11.13. Reply received on 06.12.13.

17. Dynamic Braking Grid, (i) Fan tap & (ii) Non Fan tap for EMD

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

26.02.13 On 19-03-13, capacity assessment done On 15.04.13, cleared for developmental order.

18. Dynamic Braking Grid, (i) Fan tap & (ii) Non Fan tap for EMD

M/s Resitech Electricals Private Ltd., Kolkata

14.11.13 Vendor form under scrutiny.

19. Fan assembly (54"), Cooling for EMD locomotives

M/s TCF-NADI Industrial Fans Pvt Ltd., Chennai

01.08.13 On 01.11.13, shortcomings of vendor form advised.

20. Fan assembly, Cooling for EMD locomotives

M/s Fedders Lloyd Corporation Ltd., Bharuch

28.12.12 On 25.02.13, advised shortcomings of vendor form. On 03.09.13, reminder issued. Again on 01.11.13, reminder issued for closing.

21. Fan assembly, Cooling for EMD locomotives

M/s Kaptronics Pvt. Ltd., Bangalore

02.04.12 On 13.04.12, cleared for developmental order. On 27.08.12, advised to update manufacturing facilities.

22. Fan assembly, Cooling for EMD locomotives

M/s Saini Electrical & Engineering Works, Navi Mumbai

10.04.12 On 02.08.13, advised shortcomings of clarification submitted by the firm. Capability assessment done on 28.09.13.

23. Generator Auxiliary for EMD locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

13.12.13 Vendor form under scrutiny.

24. Generator Auxillary for EMD locomotives

M/s Integrated Electric Co. Pvt. Ltd., Bangalore

26.07.12 On 04.05.13, capacity assessment carried out. On 02.09.13, advised to submit compliance of draft STR and legal documents as per guidelines. On 12.11.13, reminder issued.

25. Generator Auxillary for EMD locomotives

M/s Kerala Electrical and Allied Engg., Kerala

21.10.09 On 25.06.12, shortcoming advised. Reminder sent on 18-03-13. On 29.07.13, firm requested for some more time to reply.

G. DEMU items --- 1. Bearings

Traction Motor & Alternator for DEMU

M/s National Engg. Industries Ltd., Jaipur

05.09.13 On 30.10.13, advised shortcomings of Vendor form.

2. Machines Auxiliary & its sub-assemblies for DEMU

M/s BHEL Electrical Machines Ltd., Kasaragod

14.11.13 Advised shortcomings on 19.12.13.

3. Motor Armature, DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 25.10.13, reminder issued for clarification on shortcomings.

Page 24: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

24

4. Motor Commutating field coils assembly, DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 25.10.13, reminder issued for clarification on shortcomings.

5. Motor Complete, DC Traction for DEMU with following sub-assembly: A. Armature, B. Commutator, C. Commutating field coils assembly, D.Main field coils assembly, E. Magnetframe-machined

M/s Saini Electrical and Engg. Works, Mumbai

13.05.13 On 24.06.13, advised shortcomings. On 25.10.13, reminder issued for clarification on shortcomings.

6. Motor Magnet frame (machined), DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 25.10.13, reminder issued for clarification on shortcomings.

7. Motor Main field coils assembly, DC Traction for DEMU

M/s Saini Electrical and Engg. Works, Mumbai

13.06.13 On 24.06.13, advised shortcomings. On 25.10.13, reminder issued for clarification on shortcomings.

H. Starter Motor Items --- 1. Motor Starter

for EMD locomotives

M/s Auto Ignition Ltd., Faridabad

30.03.11 On 17.06.11, cleared for developmental order. In Aug.’12, 20 nos. fitted on loco at DLW. On 11.11.13, advised to submit QAP and legal documents. Reminder issued on 20.12.13.

2. Motor Starter for EMD locomotives

M/s Illinois Auto Eletric Company, Illinois

10.10.11 Capacity assessment & testing report submitted by RITES on 12.12.13 and under scrutiny. On 31.12.13, asked for authorization for supply of spares and servicing of starter motor.

3. Motor Starter for EMD locomotives

M/s Lucas TVS Limited, PADI

05.10.11 On 28.03.12, cleared for developmental order.

4. Motor Starter for EMD locomotives

M/s REIL Electrical India Ltd., Pondicherry

10.09.12 On 12.12.12, capacity assessment carried out. On 12.02.13, cleared for developmental order. On 19.02.13, fitment trial carried out and performance under monitoring. On 21-22.08.13, prototype inspection against DLW P.O. carried out. Test result from ETDC received on 07.11.13. On 01.01.14, prototype clearance against DLW P.O. given.

dze- la- vkbZVe dk uke os.Mj dk uke vkosnu orZeku fLFkfr

Page 25: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

25

S. No. Name of items

Name of Vendor

fnukad Date of

application

Current status

pkyu 'kfDr& batu vkbZVe ,oa batu flLVe vkbZVe

Motive Power – Engine & Engine System items

(A) Engine Items

1. EMD Piston M/s AMW-MGM FORGINGS PVT LTD, Mysore.

21.01.11 Deficiencies viz. Undertaking for infringement of IPR, digital signature, QAP etc. advised to the firm on 21.04.11. Reminder sent to firm on 12.07.11, 09.11.11, 15.03.12, 29.06.12, 21.09.2012, 01.03.2013 & 16.08.2013. Reply awaited.

2. Cylinder Head Stud Assembly

M/s Ashok Iron Work’s Pvt. Ltd. Karnataka

05.06.13 Deficiency viz. Undertaking for infringement of IPR, Declaration for sister concerns, digital signature, QAP etc advised on 21.06.2013 & 16.08.2013 Reply awaited.

3. Cylinder Head (251 Plus) Less valve Assembly With 27 Components

M/s Ashok Iron Works, Belgaum

11.02.11 Deficiencies viz. Undertaking for infringement of IPR, digital signature, QAP advised to the firm on 21.04.11. Reminder sent to firm on 12.7.11, 09.11.11, 12.03.12, 29.06.12, 21.09.2012, 01.03.2013 & 16.08.2013. Reply awaited.

4. Bearing Shell Connecting rod for Alco Locomotive

M/s Benara Automotives Pvt. Ltd., Agra-282007

30.05.13 Deficiencies viz. Undertaking for infringement of IPR, digital signature, QAP, declaration of confidentially etc., advised to the firm on 13.06.13. Reminder send to firm on 26.07.2013.Reply received on 13.08.2013. Deficiencies advised to firm on 23.08.2013 and reminder sent to firm on 04.10.2013. Reply received on 14.10.2013. Document sent to Legal Cell/RDSO for scrutiny.

5. Crank Shaft-16 Cylinder ALCO Engine

M/s Bharat Forge Ltd., Pune

16.02.12 Clarifications about registration form asked on 24.02.2012. Deficiencies advised on 16.03.2012 and last reminder sent to firm on 16.11.2012, 18/19.12.2012 & 21.01.2013. Reply received from firm on 20.02.2013. Some documents asked from firm through e-mail on 22.02.2013. Firm was asked on 05.03.2013 to expedite manufacturing

and offer prototypes for inspection. Firm is yet to offer prototypes for inspection. Induction hardening pattern was inspected by RDSO at firm wef 05.09.2013 to 06.09.2013. Report of M&C Dte. received on 16.09.2013. Firm has been advised on 19.09.2013 to offer prototypes for inspection. Firm vide letter no. nil dated 10.12.2013 has provided advice for forging inspection which has been conveyed to M&C Dte. Advice of M&C Dte for fixing date is awaited.

6. Crank Shaft-16 Cylinder for EMD Engine

M/s Bharat Forge Ltd., Pune

16.02.12 Clarifications about registration form asked on 24.02.2012. Deficiencies advised on 16.03.2012 and last reminder sent to firm on 23.10.2012. Reply received from firm on 23.11.2012. On receipt of documents, firm has been advised to supply prototype crankshaft to DLW. RDSO personnel visited DLW to witness the fitment of one no. crankshaft on WDG4 engine no. 860 on 31.12.2012. The fitment was conducted successfully and fitment report received from

Page 26: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

26

DLW on 10.01.2013. 1St. stage inspection call received from firm on 05.02.2013 for remaining four crankshaft forging. Following inspections and clearance, it is awaited that firm will offer machined crankshafts, vide letter dt. 01.03.2013. Inspection of 5 prototypes has been undertaken. Report from M&C Dte. received on 12.06.2013. IC issued on 12.06.2013. Fitment report received from DLW vide letter no. dlw.m.65.1G dt. 09.10.2013 & 29.11.2013. Performance monitoring underway.

7. EMD Piston M/s Cooper Corporation Pvt. Ltd, Satara

22.02.12 Deficiency conveyed to the firm on 02.03.2012. Deficiencies last advised to firm on 30.03.12. Firm reply received on 13.04.2012. Further deficiencies advised to firm on 20.04.2012. Reply received on 14.06.12. Capacity & capability assessment and prototype inspection done on 19.07.2012 to 21.07.2012. Report of M&C Dte. received on 11.10.2012. IC issued on 22.10.2012. One loco set has been fitted at DLW. Performance monitoring in progress.

8. Cylinder Head for EMD locomotives

M/s Cooper Corporation Pvt. Ltd, Satara

16.07.12 Deficiencies like QAP, infringement of IPR, ISO Certificate, declaration of confidentiality & Balance sheet etc. Deficiency advised to firm on 26.07.2012. Further last deficiencies advised to firm on 11.01.2013. Reply received from firm on 29.01.2013. Firm ca pacity assessment completed from 10.02.2013 to 11.02.2013. Prototype sample inspection call received from firm on 13.06.2013. Advice has been sent to M&C Dte. on 14.06.2013 for the deputing Personnel for conducting inspection. Prototype inspection has been

done on 05.07.2013 to 07.07.2013. Metallurgical reports from the M&C dte received on 29.08.2013. IC issued on 03.09.2013.

9. Piston Rings for EMD locomotives

M/s CSR Qishuyan, China-213011

15.11.12 Deficiencies like QAP, Balance sheet and undertaking infringement of IPR etc. Deficiencies advised to firm on 23.11.2012. Reminder sent to firm on 28.01.2013, 26.04.2013, 23.08.2013 & 02.12.2013. Reply awaited.

10. Crank Shaft-16 Cylinder EMD Engine

M/s CSR Ziyang Co. Ltd. China.

26.12.11 Deficiency conveyed to the firm on 10.01.2012. Reply received on 01.03.2012 by email. Further deficiency communicated to the firm on 12-03-2012. Reply received from firm on 16-03-2012. DLW advised on 17.04.2012 about suitability of offer. Developmental order of 10 nos.have been placed on firm by DLW. Inspection of steel source done by RDSO team from 07.01.2013 to 16.01.2013. Personnel have been deputed for prototype inspection at firm premises from 17.06.2013 to 26.06.2013. Prototype inspection has been done. IC has been issued to firm for supplying 5 crankshafts by 02.07.13. Firm has supplied prototype crankshafts to DLW for fitment. Fitment report received from DLW vide letter no. dlw.m.65.1G dt. 19.11.2013. Performance monitoring underway.

11. Main Bearings for EMD locomotives

M/s Daido Metal Europe Ltd., UK

27.07.12 Deficiencies like QAP, Digital signature certificate & Factory License etc. Deficiencies advised to firm on 09.08.2012. Reply received from firm on 05.04.2013. Last deficiencies

Page 27: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

27

advised to firm on 12.04.2013. Reply received from firm on 02.05.2013. Documents send to Legal Cell/RDSO for Legal scrutiny. Deficiencies advised to firm on 30.05.2013 & 07.06.2013. Reminder send to firm on 26.07.2013, 27.09.2013 & 01.11.2013. Reply awaited.

12. Piston for EMD locomotive

M/s Federal Mogul Goetz (India) Ltd., Gurgaon

07.08.12 Deficiencies like QAP, Digital signature certificate ISO certificate & Factory License etc. Deficiencies advised to firm on 16.08.2012 and reminder on 12.10.2012, 01.03.2013, 31.05.2013 & 23.08.2013. Reply received on 01.10.2013. Legal Documents sent to Legal Cell/RDSO on 08.10.2013 for legal scrutiny.

13. Carrier Piston Pin for EMD Locomotive

M/s Flash Forge Pvt. Ltd. Mumbai

05.07.12 Deficiencies like QAP, Digital Signature Certificate and Balance sheet, etc. advised to firm on 13.07.12. Reply received from firm on 21.01.2013. Further last deficiencies advised to firm on 01.02.2013 and reminder sent to firm on 10.05.2013, 16.08.2013 & 26.12.2013. Reply awaited.

14. EMD Piston M/s GETS, New Delhi.

29.02.12 Deficiency conveyed to the firm on 13.03.12 and reminder sent to firm on 20.04.2012 and 29.06.12. Reminder sent to firm on 14.09.2012, 29.11.2012, 11.04.2013, 23.08.2013 & 26.12.2013. Reply awaited.

15. Cylinder Head stud Assembly for EMD locomotives

M/s H.K. Engine Component LLc, USA.

17.05.13 Deficiencies advised to firm on 31.05.2013 & 23.08.2013. Reply received from firm on 25.11.2013. Further deficiency advised to firm on 29.11.2013. Reply awaited.

16. EMD Piston Ring

M/s IGI, Rajkot 23.05.11 The firm applied a fresh correction to 6 ring configuration. Capacity and capability assessment done on 28-30.06.11. Some queries have been asked during Capacity and capability assessment to firm. Vide letter dated 09.12.11, the firm was reminded to advice this office after having developed the necessary facility needed for manufacturing of all 6 piston rings. Reminders sent to firm on 27.04.2012 & 13.07.2012. Reply received from firm. DLW has been advised on 04.03.2013 to place dev. order on firm.

17. Piston ring pack (FE type with Moly Coated Top Ring)

M/s India Piston Ltd. Chennai

11.11.11 Deficiencies viz. ISO Certificate, QAP, factory license, digital signature, etc. advised to firm on 18.11.11. Reply received from firm on 23.04.2013. Last deficiencies advised to firm on 10.05.2013. M/s IPL is yet to give inspection call for conducting prototype inspection.

18. Ring, Pack, Piston (FE type with Moly Coated Top Ring), for Alco Locomotives

M/s Indo German Industries, Rajkot

19.03.13 Deficiencies like QAP, registration with IREPs, Proof of calibration by Gov. test house, self-compliance of specification, declaration in respect of classified sister concern etc. Deficiencies advised to firm on 02.04.2013. Reply received from firm on 26.04.2013. Further deficiencies advised to firm on 03.05.2013. Reply received from the firm on 23.05.2013. Reply received from the firm on 12-08-2013. Further deficiencies advised to firm on 14-08-2013. Reply received from firm on 30.10.2013. Further deficiency advised to

Page 28: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

28

firm on 07.11.2013. Reply received from firm on 19.11.2013. Legal documents sent to legal cell/RDSO on 27.11.2013 for legal scrutiny.

19. Cylinder Head (251 Plus), fully machined with 7 components & Less valve assembly with 27 components

M/s Jai Guru Engineering Industries, Ajmer

12.03.12 Deficiency conveyed to the firm on 21.03.2012. Reply received from firm on 06.05.2013. Further last deficiencies advised to firm on 16.05.2013. Reply received from firm on 05.06.2013. Further deficiencies advised on 20.06.2013. Reply received from firm on 10.07.2013. Further deficiencies advised to firm on 12.07.2013 & reminder sent to firm on 26.12.2013. Reply awaited.

20. Piston Rings for EMD locomotives

M/s JSC Klintcy Piston Rings Plant Russia

24.09.12 Deficiencies like QAP, Balance sheet, Income tax return, ISO certificate and undertaking infringement of IPR etc. Deficiencies advised to firm on 05.10.2012. Reply received from firm on 15.01.2013. Further last deficiencies advised to firm on 24.01.2013. Reminder sent to firm on 26.04.2013, 23.08.2013 & 02.12.2013. Reply awaited.

21. Liner, Kit Cylinder, 3RV for Alco Locomotives

M/s Lohia Corp Ltd., Kanpur

17.05.13 Deficiencies advised to firm on 28.05.2013. Reminder sent to firm on 20.09.2013 & 02.12.2013. Reply awaited.

22. Cylinder Head (251 Plus), fully machined with 7 components & Less valve assembly with 27 components

M/s Lohia Corp Ltd., Kanpur

17.05.13 Deficiencies like QAP, IREPS registration certificate & Income tax return etc. Advised to firm on 24.05.2013. Reply received on 18.06.13. Capability assessment has been done on 08.07.2013 & 09.07.2013. DLW & DMW have been advised on 29.07.2013 to place developmental order on the firm.

23. Cylinder Head for EMD locomotives

M/s Lohia Starlinger Ltd. Kanpur

30.01.13 Deficiencies like QAP, Balance sheet, Proof of registration with IREPS, Declaration in respect of classifying Allied/Sister Concerns, undertaking infringement of IPR, Income Tax return, Factory License for SSINSIC etc. Deficiencies advised to firm on 01.02.2013. Reply received from firm on 28.02.2013. Further deficiencies advised to firm on 08.03.2013. Reply received from the firm on 20.05.2013. Further deficiencies advised to firm on 24.05.2013. Reply received from firm on 07.06.2013. Under scrutiny. Documents sent to Legal Cell/RDSO for Legal scrutiny on 12.06.2013. Reply received on 21.06.13. Capability assessment has been done on 08.07.2013 to 09.07.2013. DLW & DMW have been advised on 29.07.2013 to place developmental order on the firm.

24. EMD Piston M/s National Railway Equipment Co. USA

13.10.11 Deficiencies viz. Undertaking for infringement of IPR, QAP not made as per guidelines, etc. advised to firm on 25.10.11. Reply received from firm on 11.10.2012. Further last deficiencies advised to firm on 26.10.2012, 01.03.2013, 31.05.2013 & 18.10.2013. Reply awaited.

25. Cylinder Head Stud Assembly

M/s National Railway

13.10.11 Deficiencies viz. Undertaking for infringement of IPR, QAP not made as per guidelines, ISO

Page 29: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

29

For EMD Locomotive

Equipment Co. USA

Certificate, factory license, digital signature, etc. advised to firm on 25.10.11, 12.03.2012 and 29.06.12. Reply received on 03.08.2012. Further last deficiencies advised to firm on 26.10.2012, 01.03.2013, 31.05.2013 & 18.10.2013. Reply awaited.

26. Connecting Rod Bearing for EMD Locomotive

M/s PBW Pvt. Ltd., Rajkot

21.09.11 Deficiencies viz. QAP not made as per guidelines, Digital Certificate, etc. advised to firm on 04.10.11. Deficiencies advised again on 17.11.11. Reply received through email on 05/01/12. Deficiencies advised to firm on 18.01.2012 & 31.01.2012. Reply received on 06/02/2012. Further deficiencies advised to firm on 06.02.2012. Firm’s reply received on 13.02.2012. Deficiencies advised to firm on 24.02.2012. Reply received on 15.03.12. Deficiencies last advised to firm on 16.03.2012. Reply received on 21.03.2012. Capacity assessment done on 01.05.12. Prototype inspection done and IC issued for con rod bearing lower only. Letter sent to DLW on 26.09.2012 for fitment details of con rod bearing lower. Letter sent to Zonal Rlys on 21.12.2012 & 22.02.2013 for monitoring of performance. Legal scrutiny of the documents have been done. Firm is yet to offer prototype upper con rod bearings.

27. Cylinder Liner Kit Cylinder (i) Liner(Non

Chrome Plate fully Finish)

(ii) Fire Ring (iii) Liner

sleeve

M/s Pefco Foundry, A division of Kores (India) Ltd. Pune

06.09.12 Deficiencies like QAP, Balance sheet, Income tax return, STR, ISO certificate and undertaking infringement of IPR etc. Deficiencies advised to firm on 19.09.2012 and reminder sent to firm on 27.11.12. Reply received from firm on 03.01.2013. Firm has been asked to advised suitable date for the visit of RDSO officials for capability assessment. Reply received from firm on 28.01.2013. Firm capacity assessment completed from 04.02.2013 to 05.02.2013. DLW & DMW have been advised on 08.03.2013 to place dev. Order on the firm. Prototype sample inspection call received from firm on 01.05.2013. Advice has been sent to M&C Dte. on date 04.06.2013 for deputing personnel for conducting inspections. Prototype inspection has been done on 02.07.2013 to 04.07.2013 at firm premises. IC issued to firm on 22.07.2013. One loco set has already been fitted at DMW and dispatched to Abu Road Shed. Performance monitoring underway.

28. 3 RV liner M/s Perfect Engg., Pune

14.01.11 Deficiencies viz. Undertaking for infringement of IPR, digital signature, QAP advised to the firm on 29.03.11. Reminder sent to firm on 12.7.11. Reply received on 18.07.11. Again some deficiencies viz. Registration status Digital signature certificate with IREP & QAP not as per guideline advised to the firm on 25.07.11. Last reminder sent to firm on 26.10.2012 & 08.01.2013. Reply received from firm on 28.01.2013. Firm Capacity Assessment completed from 06.02.2013 to 07.02.2013.

Page 30: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

30

DLW & DMW have been advised on 08.03.2013 to place dev. Order on the firm.

29. Carrier Piston Pin

M/s Pioneer Fil Med Ltd, New Delhi

22.12.10 Deficiencies viz. Undertaking for infringement of IPR, digital signature, Clarification on QAP advised to the firm on 30.03.11. The firm is seeking some clarification from DLW vide its letter dt. 01.06.11 and final advice from the firm regarding inspection received on 11.07.2012 & 31.10.2012. I.C. issued on 11.02.2013.

30. Carrier Piston Pin for EMD locomotive

M/s Rajshi Technologies India Pvt. Ltd. Rae Bareli

29.04.13 Deficiencies like QAP, Digital signature certificate, undertaking for infringement of IPR, Factory License & declaration of confidentiality etc. Advised to firm on 10.05.2013. Reply received from firm on 18.07.2013. Legal Document sent to Legal Cell/RDSO on 24.07.2013 for legal scrutiny of document. Firm’s Capacity Assessment completed from 01.09.2013 to 02.09.2013. Reply received from Legal Cell/RDSO on 16.09.2013. DLW has been advised on 24.09.2013 to place developmental order on the firm.

31. Piston, Steel Cap Piston 11.75 CR & Piston, Steel Cap Piston 3RV for ALCo locos a)Steel Cap

Piston 11.75 CR, 23.2+ 0.1Kg

b) 3RV Steel Cap Piston

M/s Changjhou CSR Diesel Engine Component Co. Ltd., China

04.07.13 Deficiencies like QAP, Digital signature certificate, & declaration of confidentiality etc. Advised to firm on 18.07.2013 & 08.11.2013. Reply awaited.

32. EMD Piston M/s Dalian Hellon Keben Piston Technology Development Co. Ltd., China.

12.07.13 Deficiencies like QAP, Digital signature certificate, & declaration of confidentiality etc. Advised to firm on 26.07.2013 & 08.11.2013. Reply awaited.

33. Cylinder Head Stud Assembly for EMD

M/s GE India Industrial Pvt. Ltd., Gurgaon 122009, Harayana

25.07.13 Deficiencies like Digital signature certificate, declaration of confidentiality & Income tax return etc. Advised to firm on 12.08.2013 & reminder sent to firm on 26.12.2013. Reply awaited.

34. Bearing shell, Main for EMD Locos

M/s Zollern BHW Gleitlager GmbH & Co., Germany

05.09.13 Deficiencies like QAP, self compliance of the STR, Annexure to STR, Self compliance of specification advised to firm on 12.09.2013. Reply received on 08.10.13. Further deficiencies advised to firm on 30.10.13 & 20.11.2013. Reminder sent to firm on 26.12.2013. Reply awaited.

35. EMD Piston M/s CSR Changzhou Diesel Engine Components Co., Ltd., China

14.11.13 Deficiencies like QAP, registration with IREPs, Proof of calibration by Gov. test house, and declarations etc. advised to firm on 18.11.2013. Reply awaited.

36. Piston Rings for EMD Locomotive

M/s CSR Qishuyan Institute Co. Ltd. China

03.12.13 Under scrutiny.

Page 31: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

31

(B) Engine System

37. Filter elements

for EMD

Locomotives-

Soak Back

Lube Oil Filter

M/s Baldwin

Filters, USA

07.09.11 Deficiencies viz. Undertaking for infringement

of IPR, digital signature, QAP, declaration of

confidentiality, ISO Certificate factory license,

registration certificate, balance sheet etc.

advised to firm on 21.9.11. More deficiencies

advised on 30/11/11. Reply received from firm

on 19.03.2012. Firm has been advised for

rig/type test on 18.04.2012. Reminder sent to

firm on 15.06.2012 & 22.08.2012. In reply

received on 10.09.2012. Prototype inspection

conducted on 17.10.12 to 19.10.12 but could

not be completed due to lack of necessary

facilities at the firm’s premises. Firm is yet to

complete the facilities and advise to this office

for next inspections. Letter sent to firm on

11.01.2013 regarding suitable action &

reminder sent to firm on 01.03.2013 &

20.05.2013. Firm advised regarding

compliance of last reminder on 03.07.2013.

Again reminder given to firm on 09.09.13 for

compliance. Reply awaited.

38. Filter Dyna

Cell

M/s Baldwin

Filters, USA

26.12.11 Deficiencies viz. Undertaking for infringement

of IPR, declaration of confidentiality, ISO

certificate, availability of plant & machinery date

for allied/sister concern& QAP etc. advised to

firm on 10.01.12. Reply received from firm on

19.03.2012. Firm has been advised for rig/type

test on 18.04.2012. Reminder sent to firm on

15.06.2012 & 22.08.2012. In reply received on

10.09.2012. Prototype inspection conducted on

17.10.12 to 19.10.12 but could not be

completed due to lack of necessary facilities at

the firm’s premises. Firm is yet to complete the

facilities and advise to this office for next

inspections. Letter sent to firm on 11.01.2013

regarding suitable action & reminder sent to

firm on 01.03.2013 & 20.05.2013. Firm advised

regarding compliance of last reminder on

03.07.2013. Again reminder given to firm on

09.09.13 for compliance. Reply awaited.

39. Filter comp. Oil

Spin-on for

EMD

locomotives

M/s Baldwin

Filters, USA

26.12.11 Deficiencies viz. Undertaking for infringement

of IPR, declaration of confidentiality, ISO

certificate, availability of plant & machinery date

for allied/sister concern & QAP etc. advised to

firm on 10.01.12. Reply received from firm on

19.03.2012. Firm has been advised for rig/type

test on 18.04.2012. Reminder sent to firm on

15.06.2012 & 22.08.2012. In reply received on

10.09.2012. Prototype inspection conducted on

17.10.12 to 19.10.12 but could not be

completed due to lack of necessary facilities at

the firm’s premises. Firm is yet to complete the

Page 32: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

32

facilities and advise to this office for next

inspections. Letter sent to firm on 11.01.2013

regarding suitable action & reminder sent to

firm on 01.03.2013 & 20.05.2013. Firm advised

regarding compliance of last reminder on

03.07.2013. Again reminder given to firm on

09.09.13 for compliance. Reply awaited.

40. Filter elements

for EMD

locomotives-

Spin-on fuel

filter

M/s Baldwin

Filters. USA

26.12.11 Deficiencies viz. Undertaking for infringement

of IPR, declaration of confidentiality, ISO

certificate, availability of plant & machinery date

for allied/sister concern & QAP etc. advised to

firm on 10.01.12. Reply received from firm on

19.03.2012. Firm has been advised for rig/type

test on 18.04.2012. Reminder sent to firm on

15.06.2012 & 22.08.2012. In reply received on

10.09.2012. Prototype inspection conducted on

17.10.12 to 19.10.12 but could not be

completed due to lack of necessary facilities at

the firm’s premises. Firm is yet to complete the

facilities and advise to this office for next

inspections. Letter sent to firm on 11.01.2013

regarding suitable action & reminder sent to

firm on 01.03.2013 & 20.05.2013. Firm advised

regarding compliance of last reminder on

03.07.2013. Again reminder given to firm on

09.09.13 for compliance. Reply awaited.

41. Filter elements

for EMD

locomotives

Spin-on turbo

lube oil filter

M/s Baldwin

Filters.USA

26.12.11 Deficiencies viz. Undertaking for infringement

of IPR, declaration of confidentiality, ISO

certificate, availability of plant & machinery date

for allied/sister concern & QAP etc. advised to

firm on 10.01.12. Reply received from firm on

19.03.2012. Firm has been advised for rig/type

test on 18.04.2012. Reminder sent to firm on

15.06.2012 & 22.08.2012. In reply received on

10.09.2012. Prototype inspection conducted on

17.10.12 to 19.10.12 but could not be

completed due to lack of necessary facilities at

the firm’s premises. Firm is yet to complete the

facilities and advise to this office for next

inspections. Letter sent to firm on 11.01.2013

regarding suitable action & reminder sent to

firm on 01.03.2013 & 20.05.2013. Firm advised

regarding compliance of last reminder on

03.07.2013. Again reminder given to firm on

09.09.13 for compliance. Reply awaited.

42. Injector

Assembly for

EMD

locomotives

M/s Bosch

limited,

Bangaluru.

01.09.11 Deficiencies viz. copy of ISO 9001 certificate,

factory license, and proof of registration with

IREPS etc. not submitted, advised to the firm on

15.09.11. Reply received from the firm on

18.10.11. The firm has submitted latest

clarification on 08.11.11. Reply sent to firm

regarding test bed evaluation of MUI at ED Dte.

On 14.11.11. Report received from ED Dte on

06.07.2012. Letter sent to firm on 22/27.08.2012

Page 33: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

33

regarding expediting online vendor registration

process for manufacturing of MUI. Reply received

from firm on 15.11.2012. Further deficiencies

advised to firm on 22.11.2012 and reminder sent

to firm on 14.12.2012. On firm’s advise, capacity

& capability assessment and Prototype inspection

has been completed from 04.01.2013 to

10.01.2013. IC issued on 30.01.2013. Advised to

DLW on 06.02.2013 for fitment details. 16 No.

MUI under fitment at DLW. In the meeting held at

DLW, it was decided to fit MUI on an engine.

16MUIs have been fitted and two MUIs showed

teething troubles during testing on ETS. DLW

have informed vide their letter no. dlw.m.65.9G

dated 23.07.2013 that they have fitted 14 nos

Bosch make and 2 nos interstate make MUI of on

loco no 12829 and dispatched to GOC shed/SR

on 20.07.2013. Next, DLW advised that 3 sets of

MUI have been fitted in Loco No. 40161/

Raipur/SECR, 12885/GOC/SR & Power Pack No.

G4-1133 to Gooty/SCR. Performance awaited.

43. Radiator for

EMD

Locomotives

M/s Fine

Automotive &

Industrial

Radiator Pvt.

Ltd., Pondicherry

16.07.12 Deficiencies like QAP, flow chart, infringement of

IPR, ISO Certificate & Digital signature certificate

etc. Deficiencies advised to firm on 25.07.2012.

Reminder sent to firm on 14.09.2012. Reply

received from firm on 03.10.2012. Further

deficiencies advised to firm on 09.10.2012. Reply

received on 23.10.2012. Further deficiencies

advised to firm on 02.11.2012 & reminder sent to

firm on 03.12.2012. Reply received from firm on

18.12.2012. Firm has been advised sending the

revised QAP as per guideline for vendor approval

on 28.12.2012. Reminder sent to firm on

29/30.01.2013, 27.02.2013 & 03.04.2013. Reply

received from firm on 22.04.2013. The visit of M/s

Fine Automotive & Industrial Radiator Pvt. Ltd.,

Pondicherry has been carried by SSE/MP on

dated 08.0713 & 09.0713 to see the infrastructure

facilities available in the firm. Capability

assessment has been completed, letter sent to

DLW/BSB on 10.10.2013 for developmental order

on the firm.

44. Filter Housing,

Secondary

Engine Air

Filters, for

ALCo& EMD

Locomotives

M/s G.B.

Equipments

System Ltd.,

Dehradun (India)

13.05.13 Deficiencies advised to firm on 07/06/13. Firm

Reply received on 26-06-2013. Deficiencies

advised to firm on 09.07.13. Reply received on

22.7.2013. File has been sent to legal cell for

legal clearance on 02.8.13. File returned from

legal cell on 21.10.2013 with remarks.

Deficiencies advised to firm on 07/11/13. Reply

received from firm on 18.11.13. Further

deficiency advised to firm on 04.12.2013. Reply

awaited.

45. Injector

Assembly for

EMD

locomotives

M/s Haynes

Corporation,

USA

06.06.12 Deficiencies like QAP, Digital Signature

Certificate, Balance sheet, Factory License &

Proof of address etc. Deficiency advised to firm

on 08.06.2012. Reply received from firm on

Page 34: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

34

09.10.2012. Further last deficiencies advised to

firm on 19.10.2012 and reminder sent to firm

on 27.02.2013. Letters sent on 19.03.2013 to

RITES and on 18.03.2013 to M/s Haynes

regarding capacity cum capability assessment.

Reply awaited. M/s RITES has informed that

M/s Haynes have not submitted complete

details and have also not confirmed

acceptance to pay RITES charges. Letter dt.

11.6.13 sent to firm to submit complete details

and remit RITES’ charges. Reply awaited.

46. Filter

elements, spin

on fuel filter for

EMD

locomotives

M/s Pioneer Fil

Med(P) Ltd.,

Gurgaon

05.06.13 Deficiencies advised to firm on 03-07-2013.

Reply awaited.

47. Filter elements fibre glass ECC for EMD locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reply awaited.

48. Filter, compressor oil spin on for EMD locomotives

M/s Pioneer Fil Med(P) Ltd., Gurgaon

06.06.13 Deficiencies advised to firm on 03-07-2013. Reply awaited.

49. Radiator Assly. M/s Poona

Radiator, Pune

12.01.11 Deficiencies viz. Undertaking for infringement of IPR, details of digital signature certificate, QAP advised to the firm on 28.04.11. Firm sent incomplete information. Deficiencies viz. unsigned QAP, Undertaking for infringement of IPR again advised on 11.5.11. Reminder has been sent to firm on 04.07.11. Reply received on 13.07.11. Letter sent to firm on 15.07.11 for further clarification on deficiencies viz drawings, process flow chart etc. Last reply received from firm on 26.03.12. Deficiency advised to firm on 20.04.2012. Reminder again sent to firm on 14.06.12. Reply received on 16.07.2012. Further deficiency advised to firm on 11/13.09.2012. Reply received on 21.09.2012. Letter sent to firm on 01.10.2012 to seek action taken in regard to points raised in RDSO letter dt. 11.07.2012. Last reminder letter sent to firm on 08.11.2012, 06.12.2012 & 19.12.2012. Vith Reminder sent to firm again on 29/30.01.2013. Reply received from firm on 04.03.2013. Visit of firm premises has been done and based on report letter has been sent on 07.05.2013 to DLW/BSB for dev. Order to firm.

50. Filter Element,

Fuel, Primary

& Secondary

(low mean

pore size) for

ALCo

locomotives

M/s Sequoia

Safety Products

Pvt. Ltd.

Roorkee

29.04.13 Deficiencies like ISO certificate, Digital signature

certificate, declaration of confidentiality,

undertaking for infringement of IPR, vendor code

& production capacity etc. Advised to firm on

14.05.2013. Firm has submitted the required

documents on 12.07.13. The file has been sent to

legal cell for legal clearance on 25.07.13.File

received from legal cell with minor Deficiencies

on 11.09.13. Deficiencies advised to firm on

12.09.13. Reply received on 24.09.13. Firm has

Page 35: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

35

requested for Capability assessment on 09.10.13

& Capability assessment done on 17.10.13 &

18.10.13. Advised to firm on 07.11.13 to advise

necessary preparedness for manufacturing of

samples for type / rig testing. Reply awaited.

51. Filter

elements,

Long Life(180

days) Lube

and Fuel Oil

for EMD

Locomotives

M/s Sequoia

Safety Products

Pvt. Ltd.

Roorkee

04.06.13 Deficiencies advised to firm on 25-06-2013. . Firm

has submitted the required documents on

12.07.13. The file has been sent to legal cell for

legal clearance on 25.07.13. File received from

legal cell with minor Deficiencies on 11.09.13.

Deficiencies advised to firm on 12.09.13. Reply

received on 24.09.13. Firm has requested for

Capability assessment on 09.10.13 & Capability

assessment done on 17.10.13 & 18.10.13.

Advised to firm on 07.11.13 to advise necessary

preparedness for manufacturing of samples for

type / rig testing. Reply awaited.

52. Filter

Elements,

Longe Life,

Lube Oil, for

ALCo

locomotives

M/s Sequoia

Safety Products

Pvt. Ltd.

Roorkee

04.06.13 Deficiencies advised to firm on 25-06-2013. Firm

has submitted the required documents on

12.07.13. The file has been sent to legal cell for

legal clearance on 25.07.13. File received from

legal cell with minor Deficiencies on 11.09.13.

Deficiencies advised to firm on 12.09.13. Reply

received on 24.09.13. Firm has requested for

Capability assessment on 09.10.13 & Capability

assessment assessment done on 17.10.13 &

18.10.13. Advised to firm on 07.11.13 to ensure

necessary preparedness for manufacturing of

samples for type / rig testing. Reply awaited.

53. Filter

Elements-

Secondary

Engine Air

Filters-

(A) Element

Filter, Glass

Fibre Bag

Filter & Glass

Fibre

Secondary

Engine Air

Filter (Deep

Design)

(B) Glass Fiber

Secondary

Engine Air

Filter

M/s USHA

Filters Pvt. Ltd.,

Meerut (UP)

16.07.12 Deficiencies like QAP, Digital signature

certificate, undertaking for infringement of IPR,

Factory License & declaration of confidentiality

etc. Deficiency advised to firm on 27.07.2012.

Reply received on 17.09.2012. Further

deficiencies advised to firm on 28.09.2012.

Reminder sent to firm on 07.11.2012 &

11.01.2013 &14.05.2013. Firm reply received

on 23.05.2013. Further deficiencies advised to

firm on 07.06.2013. Reply received on

29.07.13. File has been sent to legal cell for

legal clearance on 30.07.13. File received from

legal cell with minor Deficiencies, which were

advised to firm on 20.09.13. Capability

assessment was done on 14.10.13 & 15.10.13.

Incomplete testing facilities & shortcoming in

QAP etc was noticed. The same are indicated

in MOM with the firm.

54. Engine Inertial

Primary Filter

(ALCO)

SPX India Pvt.

Ltd. G-72/73,

RIICO Industrial

Area,

Mansarovar–

Jaipur-02020.

20.06.13 Deficiencies advised to firm on 10.07.13 &

reminder sent to firm on 03.12.2013. Reply

awaited.

55. Radiator for M/s Dolphin 15.07.13 Complete documents uploaded by the firm

Page 36: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

36

EMD Loco Manufacturing

Ltd. L.L.C, U.A.E

could not be downloaded due to downloading

problem. Firm has been requested to send the

hard copies of the documents. After scrutiny,

deficiency has been advised to firm. Reply

received on 22.08.13. Deficiencies advised to

firm on 30.08.13. Reply received on

07.11.2013. Firm vide letter dated 18.11.13 has

further intimated that legal documents will be

submitted within 10 days. Documents received

on 26.11.2013. Documents sent to legal

cell/RDSO for legal scrutiny on 28.11.2013.

56. Filter Element,

Long Life (180

days) Lube Oil

for EMD

Locomotives

M/s Pioneer Fil

Med(P) Ltd.,

Gurgaon

20.08.13 Deficiencies advised to firm on 06.09.13. Reply

received from firm on 12.09.13 and file sent to

legal cell on 13.09.13. Capacity assessment

done on 21.09.13 and firm have been advised

vide letters 26.09.13 & 11.10.13 for

manufacturing of samples & prototype test.

Firm, vide letter no. nil dated 26.11.2013 has

requested for conducting type test at their

premises without fixing actual date.

57. Engine Inertial

Primary Filter

(ALCO)

M/s Trident

Pneumatics Pvt.

Ltd. Coimbatore.

17.10.13 Deficiencies like mandatory declaration by firm

for ISO, QAP & detail of Digital Signature

Certificate etc. Deficiency advised to firm on

31.10.2013. Reply awaited.

58. Filter

Elements, Fuel

Primary &

Secondary

(low mean

pore size) for

Alco

locomotives.

M/s Pioneer Fil

Med(P) Ltd.,

Gurgaon

24.10.13 Deficiencies like statutory compliance, QAP,

factory license, power of attorney for authorized

signatory etc. Deficiencies advised to firm on

07.11.13. Reply awaited.

dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu

fnukad

Date of applicati

on

orZeku fLFkfr

Current status

pkyu 'kfDr& ,y-Mh] vkbZVe

Motive Power – LD items

1 Coupler Assembly, H type Tight lock for ALCo / Electric locomotives.

M/s Escorts Limited/ New Delhi

19.09.11 Under type testing.

2 Draft gear with Yoke assembly for EMD locomotives ( part no. 8439090)

M/s FASL, Kanpur 09.02.11 Under field trial.

3 Draft gear with Yoke

M/s FASL, Kanpur 17.08.12 Under type testing.

Page 37: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

37

assembly for EMD locomotives ( part no. 8420236)

4 Spring Pads Assembly, Side Buffer, Long life

M/s Prag Industries (India) Pvt Ltd Lucknow

04.08.12 Advised for development of prototype.

5 Coupler E-type for EMD locomotives

M/s Raneka Industries Ltd/ Pithampur

29.09.12 Failures of similar E-type couplers used on electric locomotives have been received. Firm has been advised to commission ‘No bake’ moulding system, after which your application will be processed further.

6 Coupler Assembly, H type Tight lock for ALCo / Electric locomotives.

M/s Sanrok Enterprises/NDLS

14.06.11 DM & ICs of prototype have been issued. Waiting for fitment trail. At DLW/BSB & DMW/PTA.

7 Draft Gear Soft with Yoke Assembly.

M/s Sanrok Enterprises/NDLS

07.06.11 Fitment trial of Prototype has been conducted at DMW/PTA. 6 nos. supplied to Patiala and waiting for fitment.

8 Draft gear with Yoke assembly for EMD locomotives ( part no. 8420236 & 8439090)

M/s Prag Industries (India) Pvt Ltd Lucknow

15.12.12 Prototype under development.

9 Spring Pads Assembly, Side Buffer, Long life

M/s Aryan Exporters Pvt Ltd Lucknow

05.09.13 Under scrutiny.

10 Draft Gear Soft with Yoke Assembly

M/s Prag Industries (India) Pvt Ltd Lucknow

17.10.13 Under scrutiny.

dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu

fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& Ogh-Mh-th] vkbZVe

Motive Power – VDG items

1. Centre Pivot Liners for locomotives

M/s Engineered Polymers(I) Pvt. Ltd., Banglore

15.10.10 Shortcomings communicated to the firm several times vide letters dated 27.10.2010, 03.03.2011, 01.06.2011, 19.07.2011 & 18.11.2011. The test results of their product, as submitted by the firm were at variance with the specification. Specification of the item was reviewed. Meeting was held with approved manufacturers & fresh applicants Specification revised. Firm intimated about the finalized specification on 16.11.2012 and advised to submit compliance and QAP as per revised specification. Reminder sent on 14.02.13. Firm’s reply received on 04.03.13 and

Page 38: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

38

scrutinized, shortcomings communicated to the firm on 23.04.2013. Firm’s reply received on 11.07.13, deficiencies communicated to firm on 24.07.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Documents received on 03.10.13. Firm has not sent documents as desired, shortcomings communicated to firm on 15.10.2013.

2. Centre Pivot Liners for locomotives

M/s Aryan Exporter Pvt. Ltd., Lucknow

03.12.11 Shortcomings sent to firm on 26.12.11, 25.01.12. The test results of their product, as submitted by the firm were at variance with the specification. Specification of the item was reviewed. Meeting was held with approved manufacturers & fresh applicants Specification revised. Firm intimated about the finalized specification on 16.11.2012 and advised to submit compliance and QAP as per revised specification. Reminder sent on 14.02.13. Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has submitted only legal documents on 13.08.2013. Vide letter dated 03.09.13, firm has intimated that they are developing new material source as per revised specification & they will submit the test result shortly.

3. Vertical and Lateral hydraulic dampers

M/s Gabriel India Ltd., Distt.- Pune

29.10.10 Firm has been cleared for developmental order. Letter sent on 26.04.2012 to DLW & DMW for developmental order to firm. Letter again sent to DMW about this for developmental order on 07.11.2012. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has got P.O. from Eastern Railway for 24 nos. of ALCo dampers. Inspection done on 12.07.2013. Dispatch memo issued on 16.07.13., I.C. issued on 22.07.2013. Letter sent to CWM/KPA on 24.07.2013 for fitment of inspected dampers in one locomotive and for monitoring of performance. Letter sent to E. Rly on 03.12.13 and N.E.Rly. On 02.12.13, for consideration of developmental order of 02 loco sets.

4. Vertical and Lateral hydraulic dampers

M/s Gerep Maschinenbau GMBH, Germany

22.03.13 Application scrutinized. Firm has not uploaded the desired documents, communicated to firm on 26.03.2013. Reply of the firm received on 06.06.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Shortcomings communicated to firm on 29.08.2013. Reminder sent on 27.12.2013.

5. TPU spring pad (Happy Pad) for locomotives

M/s Quadrant EPP Surlon Uttaranchal Pvt. Limited, Dehradun

15.10.10 Cleared for developmental order on 22.06.2011. Purchase Order has been placed by DMW vide P.O. No. 21/12/1053/1/761284 dated 09.12.2011 for 140 nos. for WDM3D locomotives and by CLW for 64 Nos. vide P.O. no. 32/2012/3249/24664 dated 20.02.2012. One loco set fitted by CLW. Under field trial. Documents as per para 5.1.2 of revised

Page 39: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

39

guideline (Version 7.0) has been asked from firm on 19.06.2013, received on 29.07.13, sent to legal cell on 14.08.13.

6. TPU spring pad (Happy Pad) for locomotives

M/s Rama Engineering Works, Hyderabad

01.11.11 Cleared for developmental order on 21.08.12. DLW placed P.O. No. 041211390.12158984 dated 28.09.2012 (Qty 361 Nos). As prototype testing had already been done by MP Dte, DLW P.O. inspection clause was amended, to facilitate inspection by QA dte. Firm has intimated regarding supply of material vide his letter dated 16.04.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013.

7. TPU spring pad (Happy Pad) for locomotives

M/s Micro Engineers, Plot No.104, Udyog Kendra Extn. 1, Near Habibpur Village Greater Noida

26.12.12 Application scrutinized. Shortcomings communicated to firm on 15.02.13. Firm’s reply received on 07.03.2013. Reply scrutinized, shortcomings again observed, communicated to firm on 01.05.2013. Reply received on 24.05.13. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm’s legal documents received on 01.07.13; send to legal cell on 30.07.13. Legal cell has pointed out some shortcomings, communicated to firm on 03.10.2013. Capacity assessment done on 28.10.2013. On dated 01.11.2013, firm has been advised to develop prototype sample and offer the same for inspection. Firm has developed prototype & submitted internal test results on 06.12.2013. Internal test results has been scrutinized and put up for further necessary action.

8. Motor Nose Link Bushing for EMD Locomotives.

M/s Manisha Rubeer Enterprises. Mumbai

26.11.10 Prototype inspection done on 12.04.2013. Cleared for developmental order, Letter send to CDE/DLW for dev order of 05 loco sets on 25.04.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has got P.O. for 296 Nos. from DLW. Letter sent to DLW on 05.07.13 for necessary action as inspection of only 05 loco sets will be done by MP Dte. With a copy to firm. Inspection of 05 loco sets done on 08.08.13 and I.C. issued on 16.08.13. Fitment detail asked from DLW vide letter dated 26.12.2013.

9. Motor Nose Link Bushing for EMD Locomotives

M/s Frontier Alloy Steels Ltd., KM 25/5 & 6, Kalpi Road, Rania, Kanpur Dehat

10.10.12 Shortcomings communicated to firm on 12.10.2012, 19.11.12 & 29.01.2013. Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Reply of firm against RDSO’s letter dated 29.01.13 has been received on 12.08.13 and found in order. Legal documents have not been submitted by the firm. Capacity assessment of the firm has been done on 25.09.2013. Shortcoming noticed during assessment has been communicated to firm on 08.10.2013. Technical comments on injection moulding process adopted by the firm & scorch time of rubber compound asked from M & C Dte vide note dated 08.10.13. Firm’s

Page 40: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

40

reply received on 18.10.2013, case will be reviewed after getting M & C comments. Legal document received on 04.11.2013, Legal documents sent to legal cell on 14.11.2013. RDSO official visit for verification of assessment shortcomings, planned on 27.12.13.verification of compliance of short coming put on 30.12.2013M&C dte, comments not received till date.

10. Motor Nose Link Bushing for EMD Locomotives

M/s Prag Industries (I) Pvt. Ltd., E-7 Talkatora Industrial Estate, Lucknow

05.06.13 Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Documents received on 23.08.13, sent to legal cell on 29.08.2013. Shortcomings of QAP communicated to firm on 30.09.2013. Firm has complied shortcomings of QAP on 24.10.13, QAP provisionally approved. Inspection of one loco set of prototype samples manufactured by the firm against DLW P.O. No. 04101370030.13160836 dated 08.08.13 (Qty- 60 Nos.) has been completed on 02.11.2013. I.C. issued on 06.11.2013.

11. Bushing Traction Rod for EMD Locomotives.

M/s Manisha Rubeer Enterprises. Mumbai

26.11.10 Prototype inspection done on 12.04.2013. Cleared for developmental order, Letter send to CDE/DLW for dev order of 05 loco sets on 25.04.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013.

12. Spring Single coil for EMD locomotives

M/s B. P. Springs, Howrah

13.05.11 Capacity assessment done on 02.04.12. Firm cleared for prototype development vide letter dated 27.04.2012. DLW also intimated. Firm is to offer prototype for inspection. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013.

13. Spring Single coil for EMD locomotives

M/s Abok Springs, Jaipur

25.11.11 Firm has been cleared for prototype. Firm has offered prototype on 29.01.13. Prototype inspection completed on 26.02.13, dispatch memo issued. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Fitment detail received from DLW on 06.08.13. Performance feedback asked vide letter 21.08.13.

14. Spring Single coil for EMD locomotives

M/s MEW Suspension Pvt Ltd, Jamshedpur

14.08.12 Application has been scrutinized. Comments communicated to firm on 18.09.12 & 01.11.2012. Reminder sent on 02.05.2013. Reply received on 10.05.2013, shortcomings communicated to firm on 11.06.13. Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm’ reply received on 26.06.2013. Capacity assessment done on 29.07.2013, shortcomings communicated to firm on 16.08.2013. Vide letter dated 06.09.13, firm has intimated that they had complied the shortcomings of assessment, verified on 21.09.2013. Shortcoming still exists, communicated to firm on 26.09.13. Firm’s reply received on 23.10.13.

15. Rubber Spring

M/s Frontier Alloy Steels Limited,

28.04.11 Shortcomings communicated to firm on 19.07.2011, 23.12.11. Reply of the firm recd.

Page 41: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

41

Assembly for WDG4 locomotive

Kanpur Dehat on 20.12.2012. RDSO official inspected for capacity of injection moulding machine, shortcoming communicated to firm on 20.02.2013. Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm’s reply against RDSO’s letter dated 20.02.13 has been received on 12.08.13 and found in order. Legal documents have not been submitted by the firm. Capacity assessment of the firm has been done on 25.09.2013. Shortcoming noticed during assessment has been communicated to firm on 08.10.2013. Firm’s reply received on 18.10.2013. Technical comments on injection moulding process adopted by the firm & scorch time of rubber compound asked from M & C Dte vide note dated 08.10.13. Firm’s reply received on 18.10.2013, case will be reviewed after getting M & C comments. Legal document received on 04.11.2013, Legal documents sent to legal cell on 14.11.2013. RDSO official visit for verification of assessment shortcomings, planned on 27.12.13. verification of compliance of short coming put on 30.12.2013M&C dte, comments not received till date

16. Rubber Spring Assembly for WDG4 locomotive

M/s Aryan Exporter Pvt. Ltd., Lucknow

18.05.12 Comments communicated to firm on 15.06.2012, 27.09.12 & 21.11.12. The documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm’s legal documents received on 13.08.2013, sent to legal cell on 20.08.2013. Shortcomings observed by legal cell have been communicated to firm on 22.10.2013. Firm’s reply received on 28.10.2013. Legal documents sent to legal cell on 14.11.2013.

17. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Simplex Castings Limited, Bhilai

28.10.09 Cleared for prototype on 10.09.12. Verification of manufacturing facilities available with the firm has been done on 19.10.12 as per the new STR. First stage prototype inspection done. Firm has offered for next stage inspection vide his letter dated 22.04.13. As 1st stage was not cleared by M & C dte, note sent on 30.04.13. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has submitted request for left over inspection of 1st stage and for 2nd stage on 30.07.13. Note sent to Dir/M & C on 08.08.13. M&C comments received on 30.08.2013, communicated to firm on 03.09.13. Firm’s reply received on 03.10.2013, sent to M&C dte.. M & C dte. Observations communicated to firm on 10.10.2013. Firm’s reply received on 06.11.2013, sent to M&C dte for scrutiny. WPSS/WPQR approved by the M&C dte and same send to the firm on date 27.11.2013. 2nd stage completed on dated 28.12.2013

Page 42: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

42

18. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Nava Nirman Fabrication Pvt.Ltd., Hooghly

01.02.10 Capability assessment done on 26.07.2011, Shortcomings of assessment communicated to firm on 05.08.2011. Firm has been again advised on 10.04.12 to comply with the deficiencies pointed out during capacity assessment. Reminder sent on 07.08.12. Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Documents received on 30.07.2013. Letter sent to firm on 13.08.2013 to apprise status of STR compliance and for submission of valid factory license. Vide his letter dated 23.08.13, firm has again requested to give some more time for compliance to STR. Vide letter dated 18.09.2013, it has been asked from firm, to give a time frame for compliance to STR. Vide letter dated 24.08.2013, firm has intimated that Plano-miller will be installed within 6 months.

19. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Trident Auto Components Pvt. Ltd, Kanpur

31.07.10 Prototype inspection done. One bogie fitted in loco no.13391 at Diesel shed AMV on 21.09.2010. After STR compliance, firm has been cleared for developmental order for Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Documents received on 05.07.13, sent to legal cell on 30.07.13. Firm has been cleared for developmental order of 02 loco bogies vide letter dated 31.07.2013. Revised QAP sent to M & C dte. For scrutiny on 09.12.2013.

20. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Ashika commercial Pvt. Ltd.Kishangarh

17.08.10 Prototype Inspection completed & I.C. issued on 17.01.12. Bogies supplied by the firm are under field trial of one year. During STR verification of the firm by RDSO official on 09.04.2013, shortcomings were observed, communicated to firm on 22.04.2013. Reply of the firm received on 03.05.13. Letter sent to firm to complete the deficiencies on 13.05.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013.

21. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Beekay Engineering Corporation, Bhilai

24.02.11 Cleared for developmental order on 29.12.11. As the firm has not got order from DMW, letter sent to CDE/DLW for developmental order on 12.07.12 as per firm’s request. Firm has got P.O. from DLW for Fab-II bogie frame, QAP received on 27.05.2013, shortcomings has been communicated to firm on 11.06.2013. Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm’s reply on QAP shortcomings dated 11.06.2013, received on 13.08.13, sent to Director M &C on 22.08.13, for scrutiny. Shortcomings observed by M & C dte. has been communicated to firm on 10.10.2013.Firm has submitted the QAP and QAP send to M&C dte for scrutiny on date 28.11.2013. Observations of M & C dte. Communicated to firm on 27.12.2013.

Page 43: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

43

22. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Burn Standard Company Ltd. 22 B Raja Santosh Road, Kolkata

12.07.11 Letter sent to firm to give his readiness for capability assessment on 08.06.2012. Reminder sent on 20.11.12. Firm has not yet replied. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013.

23. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Simplex Engg & Foundry Works Pvt. Ltd. Additional unit: 11, Industrial estate, Bhilai

07.11.12 Application scrutinized, Shortcomings communicated to firm on 07.12.2012, 09.05.2013, 06.08.2013. Firm’s reply received on 20.02.2013, 14.05.2013, 17.08.2013. Clarification on few points of the reply asked from firm vide letter dated 08.10.2013. Reply received on 04.12.2013. Legal documents sent to legal cell on 06.08.2013. Firm’s premises have been verified for their infrastructural facilities on 10.12.2013.

24. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s ISGEC Heavy Engineering Limitedadaur Road, Yamunanagar Haryana

15.1.13 Shortcoming in the application has been noticed, communicated to firm on 04.03.2013. Reply received on 27.05.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Shortcomings observed in STR compliance, QAP and in legal documents, communicated to firm on 23.08.2013. Firm has not yet replied.

25. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Hindustan Engg. & Industries Ltd. Kolkata – 700 001

17.05.13 Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013, documents received on 03.09.2013, being send to legal cell for scrutiny. A shortcoming in application form has been noticed, communicated to firm on 01.10.2013.

26. Fabricated Bogie Frame & Bolster Assembly for locomotive

Amtek Railcar Industries Pvt. Ltd, Village-Phatak Majri, Tehsil & District - Fatehgarh Sahib, Punjab

22.10.13 Application scrutinized, shortcomings communicated to the firm on 14.11.2013.

27. Fabricated Bogie Frame & Bolster Assembly for locomotive

Texmaco UGL Rail Pvt. Ltd., Belgharia, Kolkata-700 056, West Bengal, India

03.11.13 Application scrutinized, shortcomings communicated to the firm on 26.12.2013.

28. Truck frame assembly for EMD locomotives

M/s Hindustan Engg. & Industries Ltd. Kolkata – 700 001

23.09.11 Cleared for developmental order on 24.08.12. For consideration of developmental order of 02 nos. prototype truck frame, intimated to DLW. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has got P.O. from DLW for 20 nos. of Truck frame assembly. Letter sent to firm on 11.06.13 to first comply with the conditions laid down in clause 6 of P.O. Firm has submitted a call letter for pouring witness vide letter dated 23.07.13, note sent to Dir/M&C for stage-I inspection on 22.08.2013. Shortcomings of QAP have been communicated to firm on 17.10.2013.

Page 44: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

44

29. Truck frame assembly for EMD locomotives

M/s UP Steels, Nara, Meerut Road Distt. Muzaffarnagar U.P.

16.07.12 Application scrutinized, comments communicated to firm on 02.08.12 & 27.12.2012. Reply of the firm received on 02.05.2013, shortcomings has been communicated to firm on 19.06.2013. Reply received on 11.07.13, M & C dte view asked vide note dated 24.07.13. Also, the documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. STR shortcomings communicated to firm on 14.08.2013. Vide letter dated 19.08.13, firm has intimated for they have complied the shortcomings of STR. Capacity assessment has been done on 26.09.2013. Shortcomings of assessment communicated to firm on 08.10.2013. Vide letter dated 21.10.2013, firm has intimated that the horizontal boring machine having bed size 8x4m has been commissioned. Firm has been recommended for developmental order of 02 nos. of truck frame assemblies on 14.11.13, to DLW.

30. Journal axle box assembly for WDG3A locomotives

M/s SKF India Limited, Gurgaon

05.10.11 Developmental order of 27 Nos. given by DMW on 21.09.2010. Prototype inspection of 08 Nos. bearings done on 07.07.2012 by RDSO and rest done by RITES. The bearings have been supplied to DMW in Feb 2013. Fitment & performance feedback of the bearings has been called from DMW vide letter dated 24.05.2013. DMW has send fitment detail vide his letter dated 19.08.2013. Performance feedback asked from zonal Railways vide letter dated 24.09.2013. Material under field trial of one year. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013, reminder sent on 17.10.2013.

31. Primary vertical damper for EMD locomotives

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

24.01.12 Shortcomings communicated to firm on 24.02.12. & 08.01.2013. Reply received on 23.01.13. Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Vide letter dated 27.06.2013, firm intimated that vibration test machine source is not yet established so far and asked more time for arranging the same. Firm also intimated that they will offer prototype in the last week of July.

32. Primary vertical damper for EMD locomotives

M/s Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

04.04.13 Application scrutinized, Shortcoming noticed, to be communicated to firm on 06.05.2013. Reply of the firm received on 21.05.2013, shortcomings communicated to firm on 18.06.2013, Reply received on 05.07.13, under scrutiny. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has asked some clarification regarding legal documents, Law officer view asked vide note dated 01.08.13. It has been intimated to firm on 30.08.2013, to

Page 45: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

45

submit the declarations either in your own country stamp paper or Indian Govt stamp paper stamp paper. Firm has been cleared for developmental order on 30.08.2013, intimated to CDE/DLW.

33. Primary vertical damper for EMD locomotives

M/s Knorr Bremse India Pvt Ltd., Palwal, Haryana (India)

07.08.13 Legal documents sent to legal cell for scrutiny on 06.09.2013. QAP scrutinized, shortcomings communicated to firm on 08.10.2013. Firm has complied shortcomings vide his letter dated 17.10.2013. Legal documents are in order. Firm has been advised on 07.11.2013, to offer damper for type testing & inspection against DLW development order.

34. Secondary Yaw Damper for EMD locomotives

Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

24.06.11 A clearance letter sent to CDE/DLW on 14.01.2013 for developmental order of 05 loco sets subject to condition that initial 02 nos. of prototype dampers pass during testing. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has asked some clarification regarding legal documents, Law officer view asked vide note dated 01.08.13. It has been intimated to firm on 30.08.2013, to submit the declarations either in your own country stamp paper or Indian Govt stamp paper stamp paper.

35. Secondary Yaw Damper for EMD locomotives

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

24.01.12 Application scrutinized, comments communicated to firm on 24.02.12 & 08.01.2013. Reply received on 23.01.13. Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Vide letter dated 27.06.2013, firm intimated that vibration test machine source is not yet established so far and asked more time for arranging the same. Firm also intimated that they will offer prototype in the last week of July. Reminder sent to firm on date 25.11.2013 in reference to Compliance of short coming during capacity assessment and for legal document submission.

36. Secondary Yaw Damper for EMD locomotives

M/s Knorr Bremse India Pvt Ltd., Palwal, Haryana (India)

07.08.13 Legal documents sent to legal cell for scrutiny on 06.09.2013. QAP scrutinized, shortcomings communicated to firm on 08.10.2013. Firm has complied shortcomings vide his letter dated 17.10.2013. Legal documents are in order. Firm has been advised on 07.11.2013, to offer damper for type testing & inspection against DLW development order.

37. Bearing adapter with journal bearing assembly (Without bushing traction rod)

M/s FAG Bearings India Ltd., Maneja, Vadodara-390 013

20.04.12 Application scrutinized, comments communicated to firm on 28.05.2012. Reminder sent on 16.11.2012. Firm’s reply received on 20.12.2012.The shortcomings communicated to the firm on 18.04.2013. Vide letter dated 23.05.13, firm has intimated that their product is as per AAR norms and only field performance should be considered. The

Page 46: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

46

for EMD locomotives.

documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Some clarification regarding AAR approval of product has been asked from firm on 26.09.2013 and reminded to submit legal documents. Firm legal document received 02.12.2013 same send to law officer /RDSO for necessary action. Firm’s clarification received on 02.12.13, under review.

38. Rubber Spring assembly –A & B for WDP4

M/s Prag Industries (I) Pvt. Ltd., E-7 Talkatora Industrial Estate, Lucknow

08.05.12 Application scrutinized, comments communicated to firm on 15.06.2012. Reply received on 17.07.12 and found in order. Letter sent to CMPE/SWR & CMPE/NFR for consideration of developmental order of 10 loco sets on 24.08.2012. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Reminder sent to CMPE/SWR & CMPE/NFR on 24.06.13, for dev. Order.

39. Half cylinder wear for EMD locomotives

M/s A-One Enterprises Pvt. Ltd, Gurgaon.

24.07.12 Application scrutinized, comments communicated to firm on 06.09.12. Reply received on 26.10.12. Comments communicated to firm on 20.11.2012. Firm’s reply received on 04.02.13. Capacity assessment done on 29.04.2013. Firm has been cleared to offer prototype, intimated vide letter dated 06.05.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has offered prototype on 04.07.2013 but the test result submitted by the firm was not as per specification, intimated to firm vide letter dated 09.07.2013. Prototype test result received on 12.08.13. Prototype inspection completed on 06.09.2013. As the firm has not submitted the legal documents, it is again advised vide letter dated 09.10.2013, to submit the documents. Firm has submitted the same, sent to legal cell on 28.10.13.

40. Half cylinder wear for EMD locomotives

M/s Prag Industries (I) Pvt. Ltd., E-7 Talkatora Industrial Estate, Lucknow

23.08.13 Documents received on 23.08.13, sent to legal cell on 29.08.2013. Shortcomings of application communicated to firm on 20.09.2013.

41. Vertical and Lateral Hydraulic Dampers (WDM3D)

M/s India Auto Industries Pvt.Ltd. Janakpuri, New Delhi

03.12.12 Application scrutinized, comments communicated to firm on 04.01.2013. Reply received on 23.01.13. Capacity assessment has been done on 21.03.2013. Shortcomings of assessment communicated to firm on 09.04.2013. Documents as per para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Vide letter dated 27.06.2013, firm intimated that vibration test machine source is not yet established so far and asked more time for arranging the same. Firm also intimated that they will offer prototype in the last week of July.

42. Vertical and Lateral Hydraulic

M/s Knorr Bremse India Pvt Ltd., Palwal, Haryana

07.08.13 Legal documents sent to legal cell for scrutiny on 06.09.2013. QAP scrutinized, shortcomings communicated to firm on 08.10.2013. Firm has

Page 47: layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj vkosnu ...rdso.indianrailways.gov.in/works/uploads/File/Status of fresh... · 1 layXud % , Annexure-A fnukad % 03-01-2014 dks os.Mj

47

Dampers (WDM3D)

(India) complied shortcomings vide his letter dated 17.10.2013. Legal documents are in order.

43. Bushing Rubber for EMD locomotives

M/s Manisha Rubeer Enterprises. Mumbai

03.12.12 Application scrutinized, comments communicated to firm on 14.12.2012. Reply of the firm recd. on 08.01.2013. The shortcomings communicated to firm on 08.0213. Reply of firm received on 28.02.13. Cleared to offer prototype vide letter dated14.05.2013. Documents as per Para 5.1.2 of revised guideline (Version 7.0) has been asked from firm on 19.06.2013. Firm has not yet offered prototype.

44. Equaliser beams, Compensating beams and Links of locomotive high adhesion bogies & Equaliser beams (long & short) of locomotive Trimount Bogies.

M/s Standard Engineering Corporation, P- 50 Princep Street, Kolkata - 700072

06.02.13 Application scrutinized, shortcomings communicated to firm on 28.02.2013. Reply received on 26.03.2013. Shortcomings again observed, communicated to firm on 12.04.2013. Reply of the firm received on 21.05.2013, Shortcoming communicated to firm on 17.06.13 and 01.07.2013. Waiting for firm’s reply.

45. Equaliser beams, Compensating beams and Links of locomotive high adhesion bogies & Equaliser beams (long & short) of locomotive Trimount Bogies.

M/s Meenakshi Metal Forms, Plot No.13 & 14,Gat No.2892/2895, WMDC, Chakan-Ambethan Road, Chakan, Tal-Khed, Dist-Pune

19.07.13 Documents as per para 5.1.2 of revised guideline (Version 7.1) has been asked from firm on 01.08.2013. Legal documents sent to legal cell for scrutiny on 12.09.2013. Application scrutinized, shortcomings has been communicated to firm on 18.10.2013.

46. Equaliser beams, Compensating beams and Links of locomotive high adhesion bogies & Equaliser beams (long & short) of locomotive Trimount Bogies.

Bhilai Engineering Corporation Ltd, Hathkhoj Village, Industrial Area, Bhilai

30.09.13 Application scrutinized, shortcomings has been communicated to firm on 18.10.2013.