TEMUDUGA LATIHAN INDUSTRI SESI DISEMBER 2010 POLITEKNIK MEL KEMENTERIAN PELAJARAN TINGGI MALAYSIA SIVASANGKARAN CHINNA SWAMI 1
32

Latihan industri presentation Civil Engineering

Dec 21, 2015

Download

Documents

CvaShangkaran

politeknik civil engineering presentation report
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 1

TEMUDUGA

LATIHAN INDUSTRI SESI DISEMBER 2010

POLITEKNIK MELAKA KEMENTERIAN PELAJARAN TINGGI MALAYSIA

Page 2: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 2

MAKLUMAT DIRI

NAMA : SIVASANGKARAN A/L CHINNA SWAMI

NOM.PENDAFTARAN: 11DKA09F1063

TEMPAT LATIHAN : BAHAGIAN SENGGARA (JABATAN KERJA RAYA) KELAS : DKA 5A

Page 3: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 3

PROJEK-PROJEK DILAKUKAN

• PEMBINAAN SEKOLAH RENDAH JENIS KEBANGSAAN LADANG NAGAPPA, JEMENTAH (SRJKT LN)

• PEMBINAAN BANGUNAN TAMBAHAN SK LADANG WELCH

• KERJA PENYENGGARAAN PEJABAT PERTANIAN SEGAMAT TENGAH

Page 4: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 4

PROJEK-PROJEK DILAKUKAN

• PROJEK PENYENGARAAN KUARTERS IBU PEJABAT POLIS DAERAH SEGAMAT

• PROJEK MENYELENGARA KUARTERS – KUARTERS JKR

• PROJEK SYORROBOH KUARTERS BERLEBIHAN• PROJEK MELEBARKAN JALAN DI FELDA

CHEMPLAK

Page 5: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 5

PROJEK PEMBINAAN SRJK(T) LADANG NAGAPPA

Page 6: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 6

KERJA MENGIKAT BESI TETULANG

Page 7: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 7

KERJA MEMASANG KOTAK BENTUK BAGI TIANG

Page 8: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 8

UJIAN KIUB

Page 9: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 9

UJIAN KADAR PENURUNAN

Page 10: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 10

KERJA MENUANG DAN MEMADATKAN KONKRIT BAGI TIANG DAN RASUK LANTAI

Page 11: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 11

KERJA MENUANG DAN MEMADATKAN KONKRIT BAGI TIANG DAN RASUK LANTAI

Page 12: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 12

KERJA MENGIKAT BESI BRC DAN TETULANG DI TINGKAT 1

Page 13: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 13

KERJA MENGIKAT BESI BRC DAN TETULANG DI TINGKAT 1

Page 14: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 14

MENEMPATKAN KONKRIT PADA LANTAI DAN RASUK DI TINGKAT 1

Page 15: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 15

MENEMPATKAN KONKRIT PADA LANTAI DAN RASUK DI TINGKAT 1

Page 16: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 16

KERJA-KERJA MEGIKAT BATA DAN MEMPLASTER

Page 17: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 17

KERJA-KERJA MEGIKAT BATA DAN MEMPLASTER

Page 18: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 18

PROJEK PENYENGARAAN

KLINIK KESIHATAN BANDAR PUTRA

SEGAMAT

Page 19: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 19

MEMBUAT ASAS PAD DAN RASUK

KERJA MEGIKAT BESI TETULANG DAN KOTAK BENTUK ASAS PAD

Page 20: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 20

KERJA MENUANG KONKRIT PADA ‘FOOTING’

Page 21: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 21

KERJA MENUANG KONKRIT PADA ‘FOOTING ’

Page 22: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 22

KERJA MEMBANCUH KONKRIT NOMINAL BAGI STAMB

BANCUHAN KONKRIT

DILAKUKAN DENGAN

MEGUNAKAN

KAEDAH KOTAK.

NISBAH BANCUHAN YANG DIGUNAKAN ADALAH 1: 3/2: 3

Page 23: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 23

KERJA MENEMPATKAN KONKRIT KE DALAM KOTAK BENTUK STAMB

Page 24: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 24

SELEPAS KONKRIT DI STAMB MENGERAS , KOTAK BENTUK AKAN DITANGGALKAN . BATU DAN TANAH AKAN DIISI SEHINGGA MENCAPAI PARAS STUMP

Page 25: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 25

KERJA MENEMPATKAN KONKRIT PADA RASUK LANTAI

Page 26: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 26

MENGIKAT BESI PADA TETULANG DAN MEMASANG KOTAK BENTUK TIANG

Page 27: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 27

KERJA MENGIKAT BATA DAN MEMASANG KOTAK BENTUK BAGI

RASUK ATAP

Page 28: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 28

KERJA MENEMPATKAN KONKRIT KE DALAM KOTAK BENTUK RASUK ATAP

Page 29: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 29

PROJEK MENYEDIAKAN RINGKASAN SEBUT HARGA BAGI KUARTERS KEDIAMAN

KAKITANGAN JKR

Page 30: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 30

KERJA-KERJA YANG DILAKUKAN

• MEMANTAU KEROSAKKAN-KEROSAKKAN PADA KUARTERS JKR

• MENYENARAIKAN DAN MENYEDIAKAN SENARAI KEROSAKKAN

• MELAKUKAN KERJA TAKING OFF PADA KEROSAKKAN

• MENGIRA KELUASAN DAN KUANTITI KEROSAKKAN

Page 31: Latihan industri presentation Civil Engineering

SIVASANGKARAN CHINNA SWAMI 31

KERJA-KERJA YANG DILAKUKAN

• MERUJUK BUKU KADAR HAGA DAN MENYENARAIKAN HARGA BAGI MEMBAIKI KEROSAKKAN

• MENJUMLAHKAN HARGA KESELURUHAN BAGI MEMBAIKI KEROSAKKAN BAGI SETIAP RUMAH

Page 32: Latihan industri presentation Civil Engineering

32

SEKIAN TERIMA KASIH