Page 1: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

Project ReportBENDUNGAN NUNUKAN

MADINA, KABUPATEN TAPANULI SELATAN

SUMATERA UTARA

Page 2: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

SPESIFIKASIBENDUNGAN

‐ MutubetonK‐300

‐ Besibetonuntukdia<13mmadalahBJTPU24(Polos).

‐ Besibetonuntukdia>13mmadalahBJTDU40(Ulir)

PERATURAN,STANDARYANGDIGUNAKAN

‐ SNI0328472002‐TataCaraPerhitunganStrukturBeton

‐ SNI17262002‐StandarPerencanaanKetahananGempaUntukStruktur

BangunanGedung

‐ PeraturanPembebananIndonesiauntukgedung1983

PEMODELANSTRUKTURDIPROGRAMSAP2000

DATADANDIMENSIBENDUNGAN

‐ Ukuranpondasi4x6m,tebal1meter

‐ Tebaldindingbendungan1meter

‐ Lebaratasdindingbendungan12meter,lebarbawah6m.

‐ Tinggibendungan3meter.

‐ Tinggimukaairdidisaindenganketinggianmaximum3meter.

Page 3: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

KOMBINASIPEMBEBANAN

‐ C0 = D+L

‐ C1 = 1.2D+1.6L

‐ C2 = 1.2D+1.3W

‐ C3 = 1.2D+1.3S

‐ C4 = 1.2D+1.3U

‐ C5 = 0.9D+E

‐ C6 = 0,9D+1,3L+1,0E

o Dimana:

D = DeadLoad(beratsendiri+bebanmati)

L = LiveLoad

W = WindLoad

S = Stream(Air)

U = Uplift

E = Gempa

Page 4: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

MATERIALPROPERTY

AREASECTION

S100‐>T.100CM (Dinding& 

Pondasi) 

S30 ‐> T.30CM (Sayap) 

BETON  BESI 

Page 5: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

PEMBEBANAN

1. BEBANMATI(DEADLOAD)

BebanMatiakandihitungsecaraautomatisolehprogramSAP2000

2. BEBANHIDUP(LIVELOAD)

Direncanakan400kg/m2(0.4t/m2)

DiagarambebanLiveLoadpadaSAP2000

Page 6: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

3. BEBANANGIN

16 2

1640

266.67~270 / 2

Dimana Qw= bebanangin

Vw = kecepatanangin(m/dtk),min.40kg/m2.

DiagarambebanAnginpadaSAP2000

Page 7: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

4. BEBANTEKANANAIR

‐ Padadindingbendungan(horizontal)dikedalaman3m.

.

1. 3

3 / 2

‐ Padadasarbendungan(vertikal).

1. 3

3 / 2

‐ Padadasarbendungan(uplift)

.

1. 3

3 / 2

Page 8: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

DiagarambebanairHorizontaldanVertikalpadaSAP2000

DiagarambebanUpliftpadaSAP2000

Page 9: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

5. BEBANGEMPA

MandailingterletakdiSumateraUtara,denganposisididaerahgempazona5.

PetaZonaGempa

0,9.11,6

=0,56(NilaiyangakandiinputdiSAP2000)

Dimana: V=koefisiendasargempa

C=0.9(TanahLunak,TabelWaktuGetarAlamiGempauntuk

Wilayah5)

I=faktorkeutamaanbangunan(1)

R=reduksigempa(Tabel9)

Lokasi

Page 10: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

Waktugetaralamigempadibatasisbb:

T < ζ n

0.16 1

0.16 detik

T pakai = 0.16 detik N=jumlahlantaibangunan

TabelWaktuGetarAlamiGempa

Page 11: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

InputGayaGempaPadaProgramSAP2000

Page 12: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

ANALISASTRUKTUR

DIAGRAMMOMEN1‐1

1. KOMBINASIPEMBEBANANC1

2. KOMBINASIPEMBEBANANC2

M1-1=953.013 kgm

M1-1=117.73 kgm

Page 13: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

3. KOMBINASIPEMBEBANANC3

4. KOMBINASIPEMBEBANANC4

M1-1=4535.366 kgm

M1-1=4535.366 kgm

Page 14: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

5. KOMBINASIPEMBEBANANC5

6. KOMBINASIPEMBEBANANC6 

M1-1=8110,11 kgm

M1-1=11580.44 kgm

Page 15: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

DIAGRAMMOMEN2‐2

7. KOMBINASIPEMBEBANANC1

 

8. KOMBINASIPEMBEBANANC2

 

M2-2=2168.14 kgm

M2-2=191.561 kgm

Page 16: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

9. KOMBINASIPEMBEBANANC3

 

10. KOMBINASIPEMBEBANANC4

M2-2=9385.20 kgm

M2-2=9385.20 kgm

Page 17: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

11. KOMBINASIPEMBEBANANC5

 

12. KOMBINASIPEMBEBANANC6

M2-2=21749,98 kgm

M2-2=29006,17 kgm

Page 18: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

DISAINPENULANGAN

DarianalisayangtelahdilakukanolehprogramSAP2000,makadipilihmomenM1‐1danM2‐2maximumdarikombinasipembebananyangtelahditetapkan.

M1‐1 = 11580,44 kgm 

M2‐2  =  29006,17  kgm 

PERENCANAANSTRUKTURBENDUNGAN

Tebalslab = 100 cmARAHX ARAHY

fy ‐ 4000 kg/cm2 (MutuBaja) fy ‐ 4000 kg/cm2 (MutuBaja)f'c ‐ 300 kg/cm2 (MutuBeton) f'c ‐ 300 kg/cm2 (MutuBeton)b = 100 cm (Lebarplatperstrook1m) b = 100 cm (Lebarplatperstrook1m)Ø = 0.8 (Koefisienreduksi) Ø = 0.8 (Koefisienreduksi)p = 3.25 cm p = 3.25 cmt = 100 cm (Tebalplatlantai) t = 100 cm (Tebalplatlantai)d' = 94.475 cm d' = 96.7 cm

= =

Mmax M 29006.2 kgm (outputSAP2000) Mmax = 11580.4 kgm (outputSAP2000)

Mmax = kgm = 29.01 tm Mmax = kgm = 11.58 tm

Rn = Rn =

F b d2 F b d2

= =0.9 100 94.5 0.9 100 96.7

= 3.6 = 1.4

m = fy f'c = 0.83 f'c m = fy f'c = 0.83 f'c

0.85 f'c = 0.83 0.85 f'c = 0.83= =

= =0.85 249.00 0.85 249.00

= 18.90 = 18.90

r = 1 * r = 1 *m m

= 1 * = 1 *18.90 18.90

= 0.0009 = 0.0003

rr = 1.33 r rr = 1.33 r

= 0.0012 = 0.0005

As = rpakai b d As = rpakai b d

= 0.0012 100 94.5 = 0.0005 100 96.7

= 11.44 cm2 = 4.44 cm2

Apembagi = 25% As Apembagi = 25% As

= 0.25 11.44 = 0.25 4.44

= 0.74 cm2 = 0.74 cm2

Dipakai Ø 19 ‐ 200 ( 248 ) Dipakai Ø 13 ‐ 200 ( 299 )

4000 4000

29006.17 11580.44

Mn Mn

2,900,617 1,158,044

0.0172 0.0065

300 300249.00 249.00

fy

Rnm **211

fy

Rnm **211

Page 19: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

 

SketsPenulangan

Page 20: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

KONTROLSTABILITASSTRUKTURBENDUNGAN

DISTRIBUSIGAYA

1.CheckstabilitasstrukturterhadapGuling

1.5

V1 = b.b.h

= 2,4.1.3

= 7,2t

V2 = t.b.h

= 1,8.1,5.3

= 8,1t

V3 = a.b.h

= 1.1,5.3

= 7,5t

V4 = b.b.h

= 2,4.4.1

= 9,6t

V = 32,4t

H = 0,5.a.h2

= 0,5.1.32

Page 21: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

= 4,5t

Mr1 = b.b.h.(1.5+0.5)

= 2,4.1.3.2

= 14,4tm

Mr2 = t.b.h.(0.75)

= 1,8.1.5.3.2

= 16,2tm

Mr3 = a.b.h.(1.5+1+0.75)

= 1.1,5.3.3,25

= 14,625tm

Mr4 = b.b.h.(2)

= 2,4.4.1.2

= 19,2tm

Mo1= 0,5a.h2.1,333

= 0,5.1.32.1,333

= 5,99tm

14,4 16,2 14,625 19,25,99

1.5

64.4255,99

1.5

10,75 1.5…………………………ok

StrukturamanterhadapGuling(OverturningMoment)

Page 22: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

2.Checkstabilitasstrukturterhadapsettlement/dayadukungtanah

3

3

M = Mr‐Mo

= 64,425–5,99

= 58,43tm

58,4332,4

43

1,80 1,33

q = .. .

<qizinmin

=32,4. . , . <10t/m2

=5,67t/m2 <10t/m2

=0,57kg/cm2 <1kg/cm2…………………………………(ok)

StrukturamanterhadapSettlement

Page 23: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

3.Checkstabilitasstrukturterhadapgelincir/sliding

.

1,5

f=koefisiengesekanantaradasarpondasidengantanah(0.35)

32,4. 0,354,5

1,5

11,344,5

1,5

2,52>1,5…………………………………(ok)

StrukturamanterhadapSliding/Gelincir

Page 24: LAPORAN STRUKTUR BENDUNGAN NUNUKAN REVISI 1.pdf

 

 

KESIMPULAN

1. StrukturBendungandiatassudahamandanstabil.

2. PenulanganstrukturbendunganadalahD19‐200danD13‐200.Sementara

designyangsudahadamemakaiD19‐200danD13‐200.Artinyadesignyang

sudahadasudahlayakuntukditerapkandilapangan.