Page 1 of 12 Landscape Consulting & Contract Management “Protecting Your Landscape Investment” 925 Florida Avenue, Suite D Palm Harbor, Florida 34683 DRAINAGE SYSTEM MAINTENANCE INSPECTION REPORT Date: November 4, 2019 Inspection # 4 Client: EAST LAKE WOODLANDS COMMUNITY ASSOCIATION Attended by: Drainage Committee-Jack Picker, Jeff Fosbrook AMI-Cary Williams Manager- Debi Hudrlik PSA-Tom Picciano SCOPE This was the fourth of the regularly scheduled maintenance inspections of the stormwater drainage system. During these reviews we inspect for issues that may adversely affect the flow of drainage water through the system. Items such as debris or silt build up in culverts, erosion, excessive vegetation, blocked drainage grates, and any pond control structures that may need maintenance shall be noted and prices for those corrective actions shall be provided. FOR AMI RECYCLING: 1) #1 North green- Add rip rap around weir. $354.50 Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________
12

Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Jul 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 1 of 12

Landscape Consulting & Contract Management “Protecting Your Landscape Investment” 925 Florida Avenue, Suite D Palm Harbor, Florida 34683 DRAINAGE SYSTEM MAINTENANCE INSPECTION REPORT Date: November 4, 2019 Inspection # 4 Client: EAST LAKE WOODLANDS COMMUNITY ASSOCIATION Attended by: Drainage Committee-Jack Picker, Jeff Fosbrook AMI-Cary Williams Manager- Debi Hudrlik PSA-Tom Picciano

SCOPE

This was the fourth of the regularly scheduled maintenance inspections of the stormwater drainage system. During these reviews we inspect for issues that may adversely affect the flow of drainage water through the system. Items such as debris or silt build up in culverts, erosion, excessive vegetation, blocked drainage grates, and any pond control structures that may need maintenance shall be noted and prices for those corrective actions shall be provided.

FOR AMI RECYCLING:

1) #1 North green- Add rip rap around weir. $354.50

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 2: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 2 of 12

2) Woodlands Boulevard at Cross Creek- repair pipe joint. $23,127.25

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

3) Sunflower ballfield parking lot sidewalk- repair pipe joint and clean out inlets on both sides of the road. $6,688.90

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 3: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 3 of 12

4) Sunflower across from Greenhaven Circle-expose headwall in woodline and jet. It is inline with manhole along the sidewalk. $4,485.50

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

5) Sunflower at Elk Drive- repair inlet. Secure with concrete. $908.42

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 4: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 4 of 12

6) Cluster 4 #10 Collette- repair pipe joint, remove pepper tree and clear silt at opening of pipe in pond. $7,114.23

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

7) Poole Place- repair pipe joints on 15th south and replace box along South Woodlands. $29,213.17

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 5: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 5 of 12

PROPOSALS NEEDED:

EAST LAKE WOODLANDS COMMUNITY ASSOCIATION FOR LIBERTY LANDSCAPING:

8) Cypress Estates at Holly Hill- clear debris in front of headwall on entrance and exit side. *Instructed during PSA landscape inspection.

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

FOR EAST LAKE WATER:

9) Nursery Rd-fabricate grate for wet well. Proposal requested by East Lake Water. $2400.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 6: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 6 of 12

FOR CLUB:

10) #1 North tee bridge to driving range at power easement- remove vegetation $18,500.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

NEW 11) Maintenance path between #4 and #15 north. $______

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 7: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 7 of 12

12) Moccasin Creek along Tampa Rd-clear vegetation on both side of creek behind #15 south tee box. $22,850.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

13) Moccasin Creek along Tampa Road at #14 south green-needs to be bush hogged. $650.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 8: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 8 of 12

14) #15 north/ green/# 16 north tee-assumed failure of drainage pipes underneath cart path structure. $_____

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds from creeks on the golf courses.

16) East side of #4 north green-tree lying across the creek. $275.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 9: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 9 of 12

17) Channel on # 3 north fairway-repair creek bank, dead Bermudagrass. The Association previously seeded the bank and installed geo-textile fabric to hasten the seeding. Erosion will now cause sediment to spill into the creek until the bank is again stabilized. $9,500.00 NOT COMPLETED

October 2018

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

18) #1 north bridge to driving range at power easement-remove vegetation. $18,500.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 10: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 10 of 12

19) #1north bridge to fairway-repair weir. $6,800.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

20a) #15t south tee box from bridge 20b) #15t south tee box from bridge Remove low hanging tree limbs $2,590.00 for both pictures NOT COMPLETED October 2018 October 2018

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________

Page 11: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 11 of 12

21) Bridge at #4 north green-repair leaning wall and hole forming along cartpath. The wall behind the rip-rap is leaning, leaving a void between the two walls. Rainfall can get between the wall and rip-rap causing erosion. The hole along the edge of the cartpath is weakening the structural integrity of the path. $42,000.00 NOT COMPLETED

Approved: Initial _______ Date ___________ Initial _______ Date ___________ Initial _______ Date ___________ FOR AQUATIC COMPANY: 22) Channel EL- aquatic weed control. $_______

COST SUMMARY

ELWCA Drainage System Maintenance $71,891.97

Club Drainage System Projects $121,665.00

East Lake Water System Projects $2,400.00

Aquatic Company System Project $________

Page 12: Landscape Consulting & Contract Management …...2019/11/04  · 15) General recommendation- the accumulated debris should be removed from control structures. Remove dead palm fronds

Page 12 of 12

ITEMS TO REMEMBER:

Repair of the drainage box on South Woodlands Drive.

Repair of joints and alternatively, replacement of 36” pipe through Cluster Four.

CLUBCORP RESPONSIBILITY- ITEMS TO REMEMBER:

Cluster 5- Phase 1 Control structure, grate, baffle. $9,395.00 per estimate #323 dated 3/7/2019- placed on hold. Cost could be more if control structure needs repairing.

Cluster 5- Phase 2- Exploratory Excavation for Possible Pipe Collar. $7,900.00 per estimate #323 dated 3/7/2019- placed on hold. Repair costs could be more based on findings.

Weir on pond #55- $5,575.00 per estimate dated 1/15/2019.

SUMMARY

This inspection showed that the majority of the drainage ditches were functioning properly. The most notable repairs from this inspection were the broken pipe joints. These sections of pipe will need to be excavated in order for the repairs to be made. A few areas will require maintenance for the first time. The number of repairs noted from this inspection were less than the prior three.

Respectfully submitted,

Tom Picciano

PSA Horticultural