7/28/2019 Lakewood - Budget Study Session 06-11-13
1/102
FY 2013-2014 Budget
7/28/2019 Lakewood - Budget Study Session 06-11-13
2/102
FY 2013-2014 Budget
Economic Review and Forecast
State & Local Overview
Operating Budget
Impacts to the General Fund
Citywide Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
3/102
National Economic
Forecast2009 2010 2011 2012 2013 2014
GDP Growth -2.4% 2.4% 1.8% 2.2% 2.0% 2.1% - 3.5%
Personal Consumption -0.6% 1.8% 2.5% 1.9% 2.4% 2.1%
Business Investment -17.8% 0.7% 8.6% 8.0% 4.6% 5.7%
Residential Investment -20.5% -3.7% -1.4% 12.1% 14.8% 20.6%
Inflation (CPI) -0.3% 1.6% 3.1% 2.1% 1.6% 2.0%
Unemployment 9.3% 9.6% 8.9% 8.1% 7.6% 7.3%
ConsumerConfidence
45 55 61 65 76
Estimated Projected
http://en.wikipedia.org/wiki/File:US-GreatSeal-Obverse.svg7/28/2019 Lakewood - Budget Study Session 06-11-13
4/102
National Deficit & Government Stabilizers
Shadow Banking, Securitization & Dark Pools
Income, Net Worth & Wealth
Housing, Stock Market, Industry & Employment
Equity, Confidence & Credit
Affordable Care Act
The Nation
7/28/2019 Lakewood - Budget Study Session 06-11-13
5/102
The Deficit
Total government spending federal, state and local, adjusted forpopulation growth and inflation, has recently been falling at a rate not seen
since the demobilization that followed the Korean War.
7/28/2019 Lakewood - Budget Study Session 06-11-13
6/102
Government Stabilizers
7/28/2019 Lakewood - Budget Study Session 06-11-13
7/102
Government Stabilizers
In 2012, government stabilizers added $386 billion to the deficit
7/28/2019 Lakewood - Budget Study Session 06-11-13
8/102
Government Stabilizers
Block-Grants are often proposed and implemented to rein in thecost of automatic stabilizers.
Block grants are typically structured to have fixed funding andallows for state flexibility.
This structure works well in
good times, in difficult times itcan leave certain groupsvulnerable.
TANFs Failure to adequately
respond during the recessionhighlights the limitations ofblock grants in getting fundsinto the market.
7/28/2019 Lakewood - Budget Study Session 06-11-13
9/102
Securitization, ShadowBanking & Dark Pools
Financial weapons of mass destruction Warren Buffett
7/28/2019 Lakewood - Budget Study Session 06-11-13
10/102
Shadow Banking
Shadow banks:
Finance companies Asset-backed commercial paper(ABCP) Hedge funds Money Market Funds (MMF)
Securities lenders Credit Default Swaps (CDS)
7/28/2019 Lakewood - Budget Study Session 06-11-13
11/102
Securitization
Assets, such as auto or home loans, are pooledand securities representing the pool are sold
Short-term maturity, so issuer must renew continually
Any slow down by purchasers can cause a serious
liquidity crunch for the issuer Liquidity and credit enhancements were a prerequisite
to receive top credit grades
Enhancements were provided by private sources
Because many of these securitized products were rated AAA,assuming risk mitigation through diversification, they were perceivedas the safest of the safe. This sent broker-dealers into overdrive,producing more of these securities and fueling a flood of credit.
7/28/2019 Lakewood - Budget Study Session 06-11-13
12/102
Dark Pools
Dark pools: in 2007 theSecurity and ExchangeCommission cut back onthe governments
regulatory role, andallowing just about anyoneto start a dark pool. Withina year, 16% of all stock
trading was done in darkpools. By last March, thathad grown to 36%.
7/28/2019 Lakewood - Budget Study Session 06-11-13
13/102
The distinguishing characteristic between
banking and shadow banking remains
the absence of explicit public sectorbackstops, leaving shadow intermediationactivities susceptible to runs. NY Fed
Securitization, ShadowBanking & Dark Pools
7/28/2019 Lakewood - Budget Study Session 06-11-13
14/102
Income
2010 Census: 99% of households
VisualizingEconomics.com
7/28/2019 Lakewood - Budget Study Session 06-11-13
15/102
Income of the Top 0.01%
Hedge Fund
Speculative Fund
Ponzi Fund
Its a slippery
slope
VisualizingEconomics.com
7/28/2019 Lakewood - Budget Study Session 06-11-13
16/102
Income of the Top 0.01%
Annual incomeranges from $5million to justunder $5 billion
VisualizingEconomics.com
VisualizingEconomics.com
7/28/2019 Lakewood - Budget Study Session 06-11-13
17/102
Income & Net Worth
7/28/2019 Lakewood - Budget Study Session 06-11-13
18/102
Wealth Perceptions & Reality
Actual
Perceived
Desired
Top 10%
Top 1%
http://www.marketplace.org/topics/wealth-poverty/surprise-viral-hit-income-inequality-movie
7/28/2019 Lakewood - Budget Study Session 06-11-13
19/102
7/28/2019 Lakewood - Budget Study Session 06-11-13
20/102
Industrial Production
7/28/2019 Lakewood - Budget Study Session 06-11-13
21/102
7/28/2019 Lakewood - Budget Study Session 06-11-13
22/102
Loans
Cash
7/28/2019 Lakewood - Budget Study Session 06-11-13
23/102
Confidence & Credit
7/28/2019 Lakewood - Budget Study Session 06-11-13
24/102
Cost of individual plans willincrease substantially for younghealthy adults, seniors should seea savings
Employment in call centers andmedical centers expected toincrease
Many businesses report beingprepared for 2014, and now arereviewing the scheduled excise taximplementation in 2018
Affordable Care ActDependents up to age 26 covered by their parents
January 2014: Cost of employer pooled PPO type plans are not expected to
increase beyond normal levels
7/28/2019 Lakewood - Budget Study Session 06-11-13
25/102
State Budget & Fiscal Condition
California Housing
Surplus
Federal Sequester Redevelopment Dissolution
7/28/2019 Lakewood - Budget Study Session 06-11-13
26/102
Housing Prices and Sales
7/28/2019 Lakewood - Budget Study Session 06-11-13
27/102
State SURPLUS
The states
econom ic recovery,
pr ior budget cuts,
and the tempo rary
taxes prov ided byPropos it ion 30 have
combined to br ing
Cal i fornia to a
promis ing moment :
the possib le end of
a decade of acute
state budget
chal lenges. - LAOLao.ca.gov
7/28/2019 Lakewood - Budget Study Session 06-11-13
28/102
Sequester - Cuts facing California
$150.5 million in education funding for primary, secondary andspecial-education (1,980 teacher and aide jobs).
Thousands of college students will not receive financial aid or getwork-study jobs, 8,200 children will be excluded from Head Start and
Early Head Start services.
$15.9 million in grants that support law enforcement, courts and anti-crime programs, prevent and treat substance abuse, clean water, airquality and anti-pollution programs, and fish and wildlife protection.
$15.2 million for various social services programs.
64,000 civilian Department of Defense employees are likely to befurloughed.
7/28/2019 Lakewood - Budget Study Session 06-11-13
29/102
Dissolution of Redevelopment
2012-2013
FY 2012-2013:$3.2 billion fromlocal agencies
to the State
FY 2013-2014:Projected RDA
Dissolution FundsReduced by 1/3rd,a total of $1.6billion
Lao.ca.gov
7/28/2019 Lakewood - Budget Study Session 06-11-13
30/102
Local Government Spending
7/28/2019 Lakewood - Budget Study Session 06-11-13
31/102
Lakewood Area
Property values & Property Taxes
Retail Sector & Sales Tax
Local employment Local revenue
7/28/2019 Lakewood - Budget Study Session 06-11-13
32/102
Lakewood Property & HomesTaxable Property Value
MedianHome Value
Propertyassessedvalueincreasedby 1.6%
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
5,810,418,810
6,414,880,074
6,977,720,934
7,269,335,521
7,007,717,290
7,032,247,827
7,168,922,218
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
0
200
400
600
800
1000
1200
1400
2012 Median
single familyhome soldfor about$352,780
7/28/2019 Lakewood - Budget Study Session 06-11-13
33/102
Lakewood Property Tax
Property Tax Revenue
Property taxreceipts areprojected to
remain flat.
May takethree yearsto match FY2008 peak.
$2,000,000
$2,500,000
$3,000,000
$3,500,000
$4,000,000
$4,500,000
7/28/2019 Lakewood - Budget Study Session 06-11-13
34/102
LakewoodRetail &
Sales Taxes
Sales Tax Revenue
Lakewood Sales Tax Composition State Sales Tax Composition
Sales tax receiptsare projected toincrease by 4.5%
$9,500,000
$10,500,000
$11,500,000
$12,500,000
$13,500,000
58%
13%
7%
2%2%
5%13%
General ConsumerGoods
Restaurants &Hotels
Autos &
Transportation
Building &Construction
Business &Industry
Food & Drugs
Fuel & Service
Stations
30%
12%
14%8%
16%
7%13%
7/28/2019 Lakewood - Budget Study Session 06-11-13
35/102
ADMITTING REP
CENTRAL SUPPLY TECH
CENTRAL SUPPLY TECH
CLINICAL DOCMENTATION
CNA -12HR - 2E TELE-
CNA -12HR - 2S MED/SURG
CNA -12HR - 3W MED/SURG
CNA -12HR - 3W MED/SURG
DIRECTOR OF SURGICAL
DIRECTOR, CARDIAC
DIRECTOR, THERAPY
EMT - ER
LEAD PRE-REGISTRATION
ORTHOPEDIC
PHARMACIST
PHYSICAL THERAPIST
PHYSICAL THERAPIST
RESPIRATORY THERAPIST
RESPIRATORY THERAPIST
RN - CHARGE - CCU
RN - RADIOLOGY
RN - RADIOLOGY
RN - RADIOLOGY
STAFF RN - 2S MED/SURGSTAFF RN - 2S PCI UNIT
STAFF RN - 2S PCI UNIT
STAFF RN - 2S PCI UNIT
STAFF RN - 2S PCI UNIT
STAFF RN - 2W TELE
STAFF RN - 3E MED/SURG
STAFF RN - 3W MED/SURG
STAFF RN - CCU
STAFF RN - CCU
STAFF RN - ER - FT
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ER
STAFF RN - ICU
STAFF RN- CATH LAB
STAFFING COORDINATOR
UNIT SECRETARY - 2W TELE
UNIT SECRETARY - ER
Local Employment
Boeing Job Search Location
Systems Engineer 5\6 Anaheim, CA
Test & Evaluation Engineer 1 El Segundo, CA
Test & Evaluation Engineer 1\2 El Segundo, CA
Materials Process & Physics Manager K El Segundo, CA
Maintenance Technician Sr El Segundo, CA
Experienced Analog and Digital Circuit Design Engineer Huntington Beach, CA
Industrial Security Specialist 3\4 Huntington Beach, CA
Information Technology Manager K Huntington Beach, CA
Procurement Analyst 1\2 Huntington Beach, CA
Software Engineer 1\2 Huntington Beach, CAStructural Analysis Engineer 1\2 Huntington Beach, CA
Design and Analysis Engineer 1\2 Long Beach, CA
Aircraft Structural Analysis Engineer (P5\P6) Long Beach, CA
Aircraft Structural Analysis Engineer P1\P2 Long Beach, CA
Systems and Data Analyst 1\2 Long Beach, CA
Software Engineer 3\4 Long Beach, CA
System & Data Analyst 1\2 Seal Beach, CA
Senior Manager Business Systems Domain Architecture Design Seal Beach, CA
Software Engineer 1 (Applications Developer) Seal Beach, CA
0
1.1
2.2
3.3
4.4
5.5
6.67.7
8.8
9.9
Los Angeles
Long Beach
International Container TrafficMillions TEUs
7/28/2019 Lakewood - Budget Study Session 06-11-13
36/102
Lakewood Employment
Lakewood Unemployment Rate
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
1990-2007 2008 2009 2010 2011 2012 2013 YTD
National 5.4% 5.8% 9.3% 9.6% 9.0% 8.1% 7.7%California 6.7% 7.2% 11.3% 12.3% 11.8% 10.5% 8.5%
Los Angeles Region 6.3% 6.9% 10.9% 11.8% 11.4% 10.1% 8.4%
Lakewood 4.2% 4.8% 7.5% 8.2% 8.0% 7.1% 6.3%
7/28/2019 Lakewood - Budget Study Session 06-11-13
37/102
PROPOSED BUDGET 2013-2014
7/28/2019 Lakewood - Budget Study Session 06-11-13
38/102
City of LakewoodAll Funds Summary
REVENUES EXPENSES
Sales tax 19% 13,233,850$ Public Safety 20% 13,965,410$
Water service charges 15% 10,223,535$ Culture and Leisure 17% 11,554,155$
Other agencies (includes VLF 11% 7,304,901$ Water Utility 15% 9,962,534$
Other tax (includes UUT) 9% 6,013,491$ General Government 11% 7,165,363$
Refuse service charges 7% 5,095,227$ Community Development 8% 5,167,073$Transit tax 7% 4,931,510$ Water Capital Improvements 8% 5,166,751$
Water capital reserves 7% 4,722,750$ Capital Improvements 7% 4,942,309$
Property tax 6% 3,895,979$ Refuse Collection & Disposa 7% 4,880,351$
Other agencies - restricted 5% 3,603,034$ Transportation 6% 4,209,137$
Other service charges 4% 2,960,854$ Legislative 2% 1,219,468$
Other agencies - restricted ca 4% 2,648,734$ 68,232,551$
Use of money & property 2% 1,426,198$Capital reserves 0% 786,510$
Fines 1% 743,300$
License & permits 1% 642,678$
68,232,551$
7/28/2019 Lakewood - Budget Study Session 06-11-13
39/102
Revenues
$68,232,551
Sales tax19%
Water servicecharges
15%
Other agencies(includes VLF)
11%Other tax(includes UUT)
9%
Refuse servicecharges
8%
Transit tax7%
Water capitalreserves
7%
Property tax6%
Other agencies -restricted
5%
Other servicecharges
4%
Other agencies -restricted capital
4%
Use of money &
property2%
Capital reserves1%
Fines1%
License &permits
1%
7/28/2019 Lakewood - Budget Study Session 06-11-13
40/102
Appropriations
$68,232,551
Public Safety,20%
Culture andLeisure, 17%
Water Utility,15%
GeneralGovernment,
11%
Community
Development,8%
Water CapitalImprovements
, 8%
CapitalImprovements
, 7%
RefuseCollection &Disposal, 7%
Transportation, 6%
Legislative,2%
7/28/2019 Lakewood - Budget Study Session 06-11-13
41/102
Appropriations
$68,282,551
EmployeeServices, 33%
ContractServices, 34%
OperationalExpenses,
17%
Equipment,1%
CapitalImprovements
, 15%
7/28/2019 Lakewood - Budget Study Session 06-11-13
42/102
Appropriations - Operations
$58,123,491
EmployeeServices, 39%
ContractServices, 40%
OperationalExpenses,
20%
Equipment,2%
7/28/2019 Lakewood - Budget Study Session 06-11-13
43/102
Lakewood Revenues
Rank Description Total % of total
1 Sales tax / ERAF 13,223,850 22%
2 Water utility service charges 10,083,535 16.8%
3 Motor vehicle in lieu / ERAF 7,019,901 11.7%
4 Refuse service charges 5,095,227 8.5%5 Property tax 3,895,979 6.5%
6 Utility users tax 3,616,171 6%
7 Gas tax 2,428,601 4%
8 Franchise fees 1,627,320 2.7%9 Building Permits & Fees 1,474,929 2.5%
10 Prop A Transit 1,368,103 2.3%
TOTAL 46,979,069 83%
7/28/2019 Lakewood - Budget Study Session 06-11-13
44/102
General Fund OperationsRevenues and Expenditures
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
$45,000,000
Revenues
Expenditures
7/28/2019 Lakewood - Budget Study Session 06-11-13
45/102
Top Contract Services
Rank Description Total % of
Total
1 Law Enforcement $ 9,792,917 42%
2 Refuse Collection/Disposal 4,454,796 19%
3 Street Lighting 668,000 3%
4 Street Sweeping 636,000 3%
5 Tree Maintenance 530,000 2%
6 IT Services 495,000 2%
7 Sky Knight 321,000 1.5%
8 Animal Control 320,237 1.5%
9 Building Inspection 318,000 1.5%
10 Engineering Services 282,000 1%
$ 17,817,950 77%
7/28/2019 Lakewood - Budget Study Session 06-11-13
46/102
City Operations Level of Service
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,0002009
2010
2011
2012
2013
2014
7/28/2019 Lakewood - Budget Study Session 06-11-13
47/102
5-year Average
Conservative budgeting:Typically results in actual expenditures being less thanbudgeted.
This occurs because of conservative budget assumptions Employee positions budgeted as filled for the full year Operations are budgeted on actual past trends Operations include funds for what ifs A contingency of $100,000 is maintained
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,0002009
2010
2011
2012
2013
2014
7/28/2019 Lakewood - Budget Study Session 06-11-13
48/102
Future Possible Impacts
to the General Fund
Department of Finance decisionsDDR - original balance (3,486,857)$
City Loan 2011 7,849,061$
City Loan 2012 3,339,521$ROPS II DDR Non-housing Requirements 1,362,997$
ROPS III DDR Non-housing Requirements 3,208,135$
ROPS II Available Funding from the County (1,818,980)$
ROPS III Funded by City Loan (1,120,989)$
DOF Balance 9,332,888$
Oversight Board Approvedlitigation of the $7.8 million
7/28/2019 Lakewood - Budget Study Session 06-11-13
49/102
Future Possible Impacts
to the General Fund
PERS Rates
Change in Discount rate (FY 2013) Change in Methodology (FY 2015)
Change in Demographics
Change in Investment rate
7/28/2019 Lakewood - Budget Study Session 06-11-13
50/102
Citywide Projects
CIPS
Edco / R.F. Dickson Proposal
60th Anniversary
Storm-water Permit Requirements
7/28/2019 Lakewood - Budget Study Session 06-11-13
51/102
FY 2012-2013 CIP Budget
Street and Transit Projects
Parks and Facilities Projects Water Resources Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
52/102
FY 2013-2014 Capital Projects
$10,109,060Sources and Uses
of funds:
GeneralFund 9.7%
CDBG1.8%Prop A
0.6%
River ParkGrant14.2%
TDA-Article 3
0.5%
Prop C
13.8%
Measure R8.2%
WaterFund51.1%
Paving,Hardscape& Transit
41.0%
Facilities2.8%
Parks 5.1%
Wells22.8%
Water
Meters
WaterMains12.0% Water
Facilities &Equip
14.4%
SOURCES OF FUNDS USES OF FUNDS
7/28/2019 Lakewood - Budget Study Session 06-11-13
53/102
Parks & Facilities Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
54/102
CentreProjects
7/28/2019 Lakewood - Budget Study Session 06-11-13
55/102
FY 2012-2013 Centre Projects
Underway (costs are estimated):
Refurbish Second Floor Restrooms ($10,000)
Refurbish/Restore Ballroom Bar Paneling ($15,000)
Exterior Landscape Replacement ($20,000)
Replace carpet ($21,000)
7/28/2019 Lakewood - Budget Study Session 06-11-13
56/102
Maple RoomPatio Fencing
BallroomDivider
Centre Projects
Lighting Improvements
Landscaping
7/28/2019 Lakewood - Budget Study Session 06-11-13
57/102
FY 2013-2014 Centre Projects
Proposed (costs are estimated):
Lighting Improvements ($125,000)
Recover Ballroom Divider ($20,000) Maple Room Patio Fencing ($20,000)
Council Chambers Refurbishment ($75,000)
Replace Ceiling Tiles Meeting Rooms ($15,000)
7/28/2019 Lakewood - Budget Study Session 06-11-13
58/102
FY 2011-2012 Centre Projects
Estimated FY 2012-2013 spending at$101,600
Carry over balance of $196,600 into FY
2013-2014 to complete planned projects New allocation of $103,400 budgeted for
proposed projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
59/102
Annually BudgetedFacility Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
60/102
Continuing Projects Budgeted Annually:
Fire & Security Systems ($25,000) Includes burglar & fire alarms, video cameras
Planning Civic Center CCTV upgrade
Will carry over FY12-13 funds
Park Hardscape Improvements ($50,000) Previously worked on Bolivar Park
For FY 13-14, propose completion of Bolivar andthe picnic shelters at San Martin
Park Fence improvements to be determined
Hiatus on sports lighting FY13-14
Major Facility Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
61/102
Major Facility Projects
West San Gabriel River Parkway Trail Ph. 3
7/28/2019 Lakewood - Budget Study Session 06-11-13
62/102
FY 2012-2013 Major Facility ProjectsUnderway:
West San Gabriel River Trail Phase 3
Advertise for bids scheduled for Fall 2013
Residents notified to remove encroachments
by 9/4/13
Funded primarily with Resources Agency grantfor $1,446,203 plus local match
Includes native landscape, irrigation, trail,fencing and access
Major Facility Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
63/102
Major Facility Projects
Palms Park Activity Building Improvements
7/28/2019 Lakewood - Budget Study Session 06-11-13
64/102
FY 2013-2014 Major Facility ProjectNew:
Palms Park Activity Building Renovation
Combination of CDBG & Prop A funding
Prop A funding used to revise DASH Office($60,000)
Additional funding for CDBG Program to beplaced in this project ($185,740 total)
Staff presently evaluating possiblesupplemental improvements in 5-year plan
Includes replacement of lobby planter,windows, storefront, VCT tile replacement
64
7/28/2019 Lakewood - Budget Study Session 06-11-13
65/102
Major Facility Projects
Mayfair ParkHVAC Project
FY 2012 2013 M j F ilit P j t
7/28/2019 Lakewood - Budget Study Session 06-11-13
66/102
FY 2012-2013 Major Facility ProjectsUnderway:
Mayfair Park Activity Building HVACProject
Design is complete, plan check complete
Replaces all AC and exhaust fan equipment
Cost estimate not final yet
Will request an additional appropriation when
project is awarded on June 25, 2013
7/28/2019 Lakewood - Budget Study Session 06-11-13
67/102
Smaller FY 2013-2014 Projects:
Civic Center Parking Lot Slurry Seal ($50,000) Mayfair Tennis Court surfacing ($30,000)
Mayfair Parking Lot Repairs ($30,000)
Rynerson Park Electrical Restoration ($35,000) Awaiting response from Little League
Insurance Company
Nixon Yard Metal Building Roof & Paint ($40,000)
Focus on Purchasing/Warehouse
7/28/2019 Lakewood - Budget Study Session 06-11-13
68/102
Street and Transit Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
69/102
Public Right-
of-WayProjects
7/28/2019 Lakewood - Budget Study Session 06-11-13
70/102
FY 2013-2014 Proposed Projects:
Woodruff Resurfacing ($1,200,000) Carson to Del Amo
Local Street Projects ($800,000)
Industry, Bixby, Pixie, Kessler
ADA Public ROW (SB821) ($50,988)
Will be included with Local Street Project
Hardscape Repair ($200,000)
Will be included with Local Street Project
Candlewood Repairs ($200,000)
Traffic Management Center ($25,000)
7/28/2019 Lakewood - Budget Study Session 06-11-13
71/102
Water Resources Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
72/102
Water System Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
73/102
Water System Projects
Well #22 Treatment Plant ($2,192,648) Casing liner installed FY2012 reduced capacity but
increased predicted well life and improved waterquality.
Full treatment plant no longer required. Currently redesigning water treatment process.
Downsize project to upgrade treatment equipmentand install more efficient pump and motor. ($500K)
Project to bid in FY 2013-2014.
7/28/2019 Lakewood - Budget Study Session 06-11-13
74/102
Water System Projects
Water Main Replacement Design (FY2013-$63K)
Tetra Tech finishing final phase of currentagreement for five phases of water main design.
Arbor Yard Solar Project Phase 2 (FY2013-$106K)
Completed summer 2012 Provides energy to DWR Office, Meter/Print Shop
and Water Operations Workshops
W t S t P j t
7/28/2019 Lakewood - Budget Study Session 06-11-13
75/102
Plant #13 Rehabilitation ($1,070,266) Feasibility Study complete Project in design ($188K) Construction planned for FY 2013-2014
SCADA System Upgrade (FY2013- $67.5K) Replace 20-year old PLCs at water facilities Well #10 completed May 2013 Well #15 and #8 scheduled for installation by June
30, 2013
Water System Projects
W t S t P j t
7/28/2019 Lakewood - Budget Study Session 06-11-13
76/102
Water Main Replacement Project ($1.08M) Completed February 2013
Hydraulic Model Update & Calibration ($38K) Hydraulic model updated & currently finalizing
calibration Scheduled for completion June 30, 2013
Water System Projects
W t S t P j t
7/28/2019 Lakewood - Budget Study Session 06-11-13
77/102
Water System Projects Water Conservation Garden ($226,454)
Project carried over from FY 2011-2012
Need suitable site
CNG Compressor ($90K) Project removed from CIP Existing system repaired
Proposed FY2013-2014 Water System
7/28/2019 Lakewood - Budget Study Session 06-11-13
78/102
Proposed FY2013-2014 Water SystemProjects
SCADA System Upgrade (FY2013- $67.5K) Replace 20-year old PLCs at water wells,
Proposed $30,000 in FY 2013-2014 for PLCreplacement at Well #13A, Well #6 and central
SCADA controls Final year of a multi-year project
Water Main Project Design ($400K) Design for next five water main replacement
projects
Proposed FY 2013-2014 Water
7/28/2019 Lakewood - Budget Study Session 06-11-13
79/102
Proposed FY 2013 2014 WaterSystem Projects
Water Main Replacement Project ($1,053,600) Currently being designed by Tetra Tech
Includes portions of Centralia St., Fairman St.,Levelside Dr., Downey Ave., Hayter Ave., Elsa St.and Pimenta Ave. south of Delamo Blvd. and westof Lakewood Blvd.
Includes 3 transmission main valves
Proposed FY 2013-2014 Water
7/28/2019 Lakewood - Budget Study Session 06-11-13
80/102
Proposed FY 2013 2014 WaterSystem Projects
Meter Rotation Program ($275K) Install at least 422 replacement water meters
Implement pilot project to test ORION SE datacollection system.
Proposed system can store up to 90 days of hourlywater usage.
Proposed FY 2013-2014 Water
7/28/2019 Lakewood - Budget Study Session 06-11-13
81/102
Proposed FY 2013 2014 WaterSystem Projects
Field Data Work Order System (CIP- $22,300,Total Budget- $41,800)
Project links supervisory personnel to field staff
Integrates water hydraulic model and GIS Data gathering and work dissemination via tablets and
smart phones
Subscription for software use and cloud storage
7/28/2019 Lakewood - Budget Study Session 06-11-13
82/102
Proposal to incorporateStreet Sweeping into
Solid Waste Contract
7/28/2019 Lakewood - Budget Study Session 06-11-13
83/102
Street Sweeping Services
Proposal to incorporate StreetSweeping into Solid Waste Contract
Concept developed by staff and contract
service providersConcept reviewed and recommended byEnvironmental Management Committee
EDCO has provided formal proposal
RF Dickson has agreed to assignment oftheir contract to EDCO
Relieves fiscal burden from GF83
P l P i t
7/28/2019 Lakewood - Budget Study Session 06-11-13
84/102
Proposal Points
EDCO will hire RF Dickson assubcontractor to provide streetsweeping services
City would have rights approve anyother service provider
EDCO will absorb cost of streetsweeping program over 3 year
transition period Includes a 2 part supplemental increaseover three years
84
7/28/2019 Lakewood - Budget Study Session 06-11-13
85/102
Proposal Points
EDCO will be granted add-on increasein addition to contractual escalationformula for each of three years:
July 1, 2013 Contract formula + 1.684%residential or 2% commercial
(Effective Rate of 2.9% for both)
July 1, 2014 Contract formula + 2.4%
July 1, 2015 Contract Formula + 2.9%
Add-on applies to both residential andcommercial rates
85
P l P i t
7/28/2019 Lakewood - Budget Study Session 06-11-13
86/102
Proposal Points
Each year during the transition,EDCO will assume 1/3 more of thecost of the street sweeping program:
July 1, 2013 EDCO assumes 1/3 andCity reduces to 2/3 of program costs
July 1, 2014 EDCO assumes 2/3 andCity reduces to 1/3 of program costs
July 1, 2015 EDCO assumes 100% ofprogram costs
Program cost set at $612,000 on 7/1/1386
7/28/2019 Lakewood - Budget Study Session 06-11-13
87/102
Cost Component Details
FY13-14 FY 14-15 FY 15-16Add-onadjustment:
Residential Incr. BER* + 1.684% BER + 2.4% BER + 2.9%
Comm. Incr. CPI + 2% CPI + 2.4% CPI + 2.9%
Program costtransition:
SS Prog Cost: $612,000 $612,000 $612,000
City: 2/3 1/3 0
Annual Cost: $408,000 $204,000 $0EDCO: 1/3 2/3 All
Annual Respon: 204,000 $408,000 $612,000
87
*BER - Blended Escalation Rate for residential contract 2/3 CPI, 1/3 Tipping fees
7/28/2019 Lakewood - Budget Study Session 06-11-13
88/102
Proposal Points
EDCOs annually renewing termwould be extended to 8.5 year min
If City gives EDCO notice to end
annually renewing term, they wouldno longer be required to providestreet sweeping services
Cumulative add-on increases would bebacked out of monthly payment forresidential services and commercialrates
88
7/28/2019 Lakewood - Budget Study Session 06-11-13
89/102
Proposal Points
EDCO would be responsible fordirecting the disposal/recycling ofstreet sweeping debris
Payment for tipping fees is includedEDCO would be permitted to stop
sending tonnage to SERRF once SH
facility has full sorting lineEDCO must still achieve state mandateddiversion goals
89
7/28/2019 Lakewood - Budget Study Session 06-11-13
90/102
Proposal Points
All operations would remain the sameNo changes would be noticeable in field
Staff would continue to interact directly
with RF Dickson Implemented successfully in La Mirada
Contractual Changes June 25, 2013:
Amendment to EDCO Agreement3-party Assignment agreement
City, EDCO, RF Dickson
90
7/28/2019 Lakewood - Budget Study Session 06-11-13
91/102
Customer Bills
Notice was provided to SFRcustomers in water bills for trash rateincrease of 3.9%
Monthly bill increases from $18.22 to$18.93
Commercial customers to be notifiedof rate increase directly by EDCO
3 yard bin 1X per week increases from$116.48 to $119.86 per month
Survey shows rates at middle of pack 91
7/28/2019 Lakewood - Budget Study Session 06-11-13
92/102
Recommendation
The Environmental ManagementCommittee has reviewed andapproved the proposal for Councilconsideration.
Proceed with incorporating the StreetSweeping program into the solid
waste contractPresent agreements to affect change atJune 25th council meeting
92
Proposed Projects
7/28/2019 Lakewood - Budget Study Session 06-11-13
93/102
Proposed Projects
The Citys 60th AnniversaryCelebration
The Community Promotions Committee
has reviewed and approved the plan forCouncil consideration.
Recommend approving the allocation offunds to plan, promote and carry out the
community events proposed.
60 Years of Success
7/28/2019 Lakewood - Budget Study Session 06-11-13
94/102
NPDES MS4 Update
7/28/2019 Lakewood - Budget Study Session 06-11-13
95/102
New MS4 Permit
Last Briefing on February 26, 2013 New NPDES MS4 Permit
Adopted November 28, 2012
Effective December 28, 2012
Three Choices for ComplianceMinimum Control measures Implement
permit and meet numerical limitsWMP Watershed Management Plan
EWMP Enhanced Watershed Mgmt Plan
7/28/2019 Lakewood - Budget Study Session 06-11-13
96/102
Lakewoods Watersheds
Lakewood belongs to 3 watersheds Los Cerritos Channel 28.06% of watershed
Coyote Creek/SGR 2.5% of watershed
Lower Los Angeles River 0.33% of watershed All three include TMDLs and Implementation
Plans
Lakewood also part of Dominguez
Channel/Harbor Toxics TMDL Due to being in the Los Cerritos Channel WS
We may appeal this designation
7/28/2019 Lakewood - Budget Study Session 06-11-13
97/102
The Path Forward
All three watersheds of which we are a parthave chosen the WMP path Why not EWMP?
Watersheds were reluctant to be committed to
building a project prior to studyWatershed groups are keeping the option open
to change to a EWMP by listing a possibleproject or projects
Minimum control measures are notfeasible because we would be immediatelyout of compliance with the permit numericlimits
7/28/2019 Lakewood - Budget Study Session 06-11-13
98/102
Approaching Deadlines
The next deadline is June 28, 2013Must submit Notice of Intent to prepare a WMP
and CIMP with other cities in the 3 watersheds.
Each watershed is approaching the NOIdifferently
Must also present draft LID Ordinance andGreen Street Policy to Council prior to 6/28/13
Planned for June 25, 2013 Draft LID Ordinance will be similar to initial draft of
LA Countys Ordinance
I iti l C t E ti t
7/28/2019 Lakewood - Budget Study Session 06-11-13
99/102
Initial Cost Estimates
Each watershed will hire consultants toprepare their WMP, CIMP and ReasonableAssurance modeling
Los Cerritos ChannelEstimate is $116,180 per $500,000 of expense(28.06% of all costs)
Coyote Creek/ Lower San Gabriel RiverEstimate is $21,987 per $685,000 of expense
(2.5% of all costs) Lower Los Angeles River Reach 1Estimate is $15,000 per $660,000 of expense
(0.33% of all costs)
Time Frames
7/28/2019 Lakewood - Budget Study Session 06-11-13
100/102
Time Frames
Each WMP will likely qualify for the 18 monthtime frame Must have 50% or more of the watershed members
adopt Green Street Policy and LID Ordinance
Draft CIMP is due June 28, 2014
Draft WMP is due June 28, 2014
MOUs for each watershed will be presented toCouncil July or August, 2013
Appropriations will be requested with MOUs Ultimately, we must have a supplemental stormwater funding source County Fee? City Fee?
Budget Focus Areas
7/28/2019 Lakewood - Budget Study Session 06-11-13
101/102
Budget Focus Areas
1. Budget for Sustainability
2. Keep Lakewood Safe
3. Preserve the Neighborhood Quality of Life
4. Foster a Sense of Community
5. Promote Economic Vitality
6. Support a Caring Community
7. Secure Fiscal Resources
8. Highlight Governmental Transparency
9. Hold on to Local Authority
10. Protect the Environment
7/28/2019 Lakewood - Budget Study Session 06-11-13
102/102
FY 2013-2014 Budget