12-026.10 • Lakehead University • Moksha Yoga Cover Project No: 12-026.10 A0 Date: 08/11/14 Lakehead University Moksha Yoga CJ Sanders Fieldhouse - Sanders Drive - Thunder Bay - ON Drawing List Consultants Sheet Name Cover Assemblies, Door Schedule and Plan Reflected Ceiling Plans Cross Section Interior Elevations Ceiling Insulation Details KGS - Door Opening Detail Profor - Partial & Key Plans,Electrical Demo and Renovation. Profor - Single Line Diagram and Electrical Specifications Profor - Partial Floor Plan, HVAC Demolition and Renovation Profor - Section and Details Profor - Mech Specs, Scope of work and sequence of Operations. Sheet No. A0 A1 A2 A3 A4 A5 14-1829-003 214060-E1 214060-E2 214060-M1 214060-M2 214060-M3 PROFOR Engineering Services #502- 200 S. Syndicate Ave. Thunder Bay, ON P7E 1C9, Canada t. 807.626.8463 f. 807.626.8086 Lead Consultant Brook McIlroy 202-37 Cumberland St. S. Thunder Bay, Ontario, P7B 2T4 www.brookmcilroy.com t. 807 683 8005 f. (416) 504-5997 KGS Group Consulting Engineers 301A-1001 William Street Thunder Bay, ON P7B 6M1 t. 807-623-2195 ext. 244 f. 807-473-5671 Context Plan
12
Embed
Lakehead University Moksha Yoga · 12-026.10 • Lakehead University • Moksha Yoga Cover Project No: 12-026.10 A0 Date: 08/11/14 Lakehead University Moksha Yoga CJ Sanders Fieldhouse
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
12-026.10 • Lakehead University • Moksha YogaCover
Project No: 12-026.10
A0Date: 08/11/14
Lakehead University Moksha YogaCJ Sanders Fieldhouse - Sanders Drive - Thunder Bay - ON
Drawing List
Consultants
Sheet Name
CoverAssemblies, Door Schedule and PlanReflected Ceiling PlansCross SectionInterior ElevationsCeiling Insulation DetailsKGS - Door Opening DetailProfor - Partial & Key Plans,Electrical Demo and Renovation.Profor - Single Line Diagram and Electrical SpecificationsProfor - Partial Floor Plan, HVAC Demolition and RenovationProfor - Section and DetailsProfor - Mech Specs, Scope of work and sequence of Operations.
-AD Cementitious Thermal Barrier (or approved equal),22m thick. Suitable for exposure in supply and return airceiling conditions
3. Provide 1" coverage to OWSJ webs, see detail A5/2
31' -
9"
1
A1 A3
Floor: Sand exisiting floor(remove squash lines and abrasions)-Patch any damaged boards and holes.-Finish and apply sealant
BONA Sportive Finish (or equivalent)P1
P1
P1
P1
RWL Cleanout. Provide access panel to maintainaccess to the rainwater leader cleanout
A4
1
2
4
A1 A5
Remove metal squash pan, prior to newwall construction, patch floor if required.
-
A1 ---
6' Wall Mirror, provide blocking as req.
9' Vitavibe Ballet Barre, provide blockingas req.
-
D1
Remove exisiting door and infill w/ existing concrete blocks
-
-
Retain existing blocks from new opening and use forinfill of existing door.
4' - 0"
-
-
A1
2
+/- 2 ft, Start at joint in existing block wall+/- 2'
4' - 0" R.O.
7' -
0"
3' - 0" 1' - 0"1 1/2"
2' - 8 1/2"
PAINT FRAME AND STEEL LINTEL ABOVE(CONSULTANT TO PROVIDE COLOUR)
SOLID INFILL PANEL TO MATCH FRAME
12-026.10 • Lakehead University • Moksha YogaAssemblies and Plan
Project No: 12-026.10
A1Date: 08/11/14
1 : 10Assemblies1
1/8" = 1'-0"3 + / Floor
Lock:
Keyed Lock ND53PD-RHO-626
• Push-button locking: Pushing button locksoutside lever until unlocked by key or byturning the inside lever.
Hinges:
Interior Stanley FBB179 4.5" x 4"
FBB179 – (ANSI A8112)
Steel – polished and plated
1/2" = 1'-0"2 Entry Door with Opaque Sidelight
Notes:
Contractor to provide construction core and zero pinnedcylinder to LU for pinning. Keyway to be confirmed at shopdrawing submission to LU.BMI to confirm door closer provided.
Door Angle and paint color T.B.D.
1
A1 A3
18' - 2 3/4"
31' -
9"
6' -
1 1
/4"
4' -
11
1/4"
EQ
12' - 3 1/2"
6' - 2 1/2"
8' -
5 3
/4"
4' - 10 3 /4"
EQ
EQ
EQ
Provide unistrutsupport structure for
light suspension
Enerjoy Panels24.25" x 95.75"
18' - 2 3/4"
2' - 2 1/4" 2' - 2"
EQ EQ
2' -
2 1
/4"
7' -
11
3/4"
EQ7'
- 1
1 3/
4"EQ
7' -
11
3/4"
2' -
1 3
/4"
12-026.10 • Lakehead University • Moksha YogaReflected Ceiling Plans
Project No: 12-026.10
A2Date: 08/11/14
1/8" = 1'-0"1 Reflected Ceiling Plan 1/8" = 1'-0"3 50181 Callisto Pendant Lighting
1/8" = 1'-0"2 Enerjoy Heating Panels RCP
Note:*Dimensions are taken from existing wall
Note:*Dimensions are taken from existing wall
Note:*Dimensions are taken from existing wall
+ / Floor0"
Enerjoy Radiant Heating Panels
Top of 6' wall mirror on paralell wall
50181 Callisto Pendant Lighting
3
A5A3
Recessed Baseboard
R40 Spray foam insulation w/thermal barrier. (See assembly C1)
1
A5A3
3 3/
4"
11' -
11
3/4"
8' - 6 1/4"
Maintain access to rainwaterleader cleanout.
Provide new access panel.
6' -
0"
6' - 0 3/4"
2' - 1 1/2"7' - 11 3/4"
Electrical outlet, typ.
6' -
4 1
/2"
6' -
4 3
/4"
Approximate duct location, see mechanicaldrawing. Consult with engineer/architect priorto installation to determine location.
1" Spray foam insulation w/ thermalbarrier on OWSJ (See assemblyC1)
9' Vitavibe Single Traditional Wood Ballet Barre
31' - 9"
EQ EQ EQ EQ 7" 9' - 0" 3' - 0"
3' -
5 3
/4"
U/S Existing Ceiling
12-026.10 • Lakehead University • Moksha YogaCross Section Scale 1/4"=1'-0"
Project No: 12-026.10
A3Date: 08/11/14
6' Wall Mirror
Recessed baseboard
Enerjoy Panels
Calisto Lighting to becentered on bottom faceof enerjoy panels