LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren de Haan, Gert-Jan Marseille, Emiel van
34

LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Mar 27, 2015

Download

Documents

Melanie Pugh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

LACE Data AssimilationWorking Days

14-16 June 2011, Budapest

HARMONIE DA suiteat KNMI

Jan Barkmeijer

With contributions from: Cisco de Bruijn, Siebren de Haan, Gert-Jan Marseille, Emiel van der Plas, and Wim de Rooy.

Page 2: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Content

- Description KNMI DA suite

- Monitoring tools

- Problems encountered

- Future developments

Page 3: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

3

The KNMI Data assimilation suite

• Initial run at 15 November 2010, but many changes (experimental status) since then.

• Runs at ECMWF, using hourly boundaries and observation set from a H7.2 Hirlam suite at KNMI (ectrans is used to tranfer data vice-versa)

• Cycling time is 6h and a 24h forecast is produced at 00 and 12 UTC.

• Integration area (300x300 gp at 2.5km grid resolution) covers the Netherlands and vertical resolution is 60 levels (Meteo-France definition). Lowest model level around 9m

• Harmonie model cycle H36h1.2 with some modifications

• Data is processed e.g. at DMI/KNMI for monitoring purposes.

Page 4: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.
Page 5: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Area definition

200x200

300x300

400x400

500x500

Page 6: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

LBC data from

Hirlam forecast

for both runs

300x300 400x400

RADAR

Page 7: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Computation of background error statistics

- Used the recipe as described on the Hirlam wiki page for Harmonie Data-assimilation

- Central here is the creation of a series of downscaled Harmonie 6h forecasts for 20060920-20061031 at 00 UTC, using 4 members of the ECMWF EPS

Page 8: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Confusion w.r.t. virtual and real temperature (LSPRT)

DMI Harmonie suite KNMI old

Courtesy Nils Gustafsson

Page 9: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

After correction

DMI KNMI new

Page 10: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Content

- Description KNMI DA suite

- Monitoring tools

- Problems encountered

- Future developments

Page 11: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

What datasets are being used?

SYNOP U,V Z T

AIREP U,V T

RADIOSONDE U,V Z T Q

Mode-S U,V T

Page 12: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

What data sets are being used (2)?

Mode-S drops out

Page 13: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

o-a/o-b statistics for April

negative bias

Page 14: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.
Page 15: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

The Danmark Monotoring Facility

Page 16: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.
Page 17: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Monitoring with KNMI Parametrization Testbed (KPT)

1D column at Cabauw from 3D run

Page 18: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Occurrence of fog

Page 19: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Occurrence of fog (2)

Page 20: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Content

- Description KNMI DA suite

- Monitoring tools

- Problems encountered

- Future developments

Page 21: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Modis VIS satellite image13th of May 2008 1315 UTC Cloud cover Cloud cover

EDMFM and cloud scheme changes

Increase variance computation in the cloud scheme to alleviate the on-offcharacter in the generation of cloud

Page 22: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Instabilities in the canopy model over sea (ECUME)

Page 23: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Using Meteo-France 60 level definition

Page 24: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Switching off ECUME over sea

Page 25: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Occurrence of negative q in the analysisAlso other hydrometeors are affected (e.g. cloud-ice and cloud-water)

First-guess Analysis

Page 26: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Solution: set GFL >=0 at analysis time

Page 27: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Impact on 24-h accumulated precipitation

original analysis modified

Page 28: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Vertical nesting strategy 1.3hPa 10hPa 0.01hPa

Page 29: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

Vertical nesting strategy 1.3hPa 10hPa 0.01hPa

Since 1 June 2011 a parallel 3dvar suite runs atECMWF (cy36h1.3) and with ECMWF boundaries

Page 30: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.
Page 31: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

T+12h forecast for T2m valid 5 June 2011 at 12 UTC

HIRLAM LBC ECMWF LBC

Page 32: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

RADAR 3DVAR + HIRLAM LBC

400x400 500x500

Page 33: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

RADAR 3DVAR + ECMWF LBC

400x400 500x500

Page 34: LACE Data Assimilation Working Days 14-16 June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.

FUTURE PLANS- Get radar data-assimilation running

- Implementation of a 800x800xL60 Harmonie suite at KNMI, 3dvar with cycling time of 3 hour (or less)

- Add more q observations: GPS, Cloud data (e.g. cover)

- Develop more tools for monitoring (MetEvaluation)

- Coupling with other applications:surge model, LOTOS (air pollution model)

- Increase research effort on DA+EPS:+ timing/location of convection+ 4dvar without nonlinear updates