8/22/2019 KPI-MECH-2nd WK.xlsx
1/13
Productivity
Available
Labour
Hours
Actual
Hours
(Work
orders)
%Estimated
Hours
Actual
Hours%
Lab.Utilisation X Effi.
100
Estmiated
Hours of
completed
jobs(excluding
unplanned)
Estimated
time of all
jobs
%
Preventive
Maintenanc
e Routine
Hours
Availa
Labo
Hou
1RAW MILLS & STACKER
RECLAIMER SECTION273.00 273.00 100 261 275.5 96.91 96.91 267 267 100 145 275.
2PYRO & COAL MILL,
HANDLING SECTION603.00 603.00 100 472.5 483 97.83 97.83 472.5 822.5 57.45 284.5 630
3CEMENT MILLS & PACKING
PLANT SECTION319.00 319.00 100 311 325 95.69 95.69 311 311 0 199 325
4WORKSHOP & WATER
WORKS185.50 185.50 100 178 183.5 97 97.00 178 178 100
5 PROJECT & DEVELOPMENTWORKS
347.50 347.50 100 184 191.5 96.08 96.08
6 AUTO GARAGE 96.00 96.00 100 90 96 93.75 93.75 90 90 100 40 96
PIONEER CEMENT INDUSTRIES LLC, RAK, UAE
KEY PERFORMANCE INDICATORS - Maintenance Dept.
SECOND WEEK OF 2012
MECHANICAL DEPT.
PMR
Sl.No DESCRIPTION
Plan AttainmentLabour Utilisation Efficiency
8/22/2019 KPI-MECH-2nd WK.xlsx
2/13
Labour Utilization(%) = Actual Labour Hours on work orders/Available Labour Hours X 100
Sl. No NamesAvailable Labour
hours
Actual Labour
Hours(Work
Orders)
Labour Utilization(%)
1 Sandeep Singh 0 0
2 Pillai 48 48
3 Bhanu Pratap 48 48
4 Ramana Reddy 48 48
5 Hanumath Reddy 48 48
6 Abu Backer 48 48
7 Jose 48 48
8 Bhukya Sreenu 48 48
9 Assan 48 48
10 Vallabha Rao 48 48
11 Moinuddin 48 48
12 Babu Kumar 48 48
13 Chendra Sekhar 48 48
14 Dhanesh Gupta 48 48
15 Naresh Rauth 48 48
16 Anil 48 48
17 Saleem 48 48
18 Rajiman 48 48
20 Prasannan 48 48
21 Jamshid 48 4822 Firoz Khan 48 48
23 Radha Krishna 48 48
24 Shabir ali 48 48
25 Iqbal Basha 48 48
26 Rajesh Kumar Kusva 48 48
27 Ansari 48 48
28 Murali Dharan 48 48
29 Ajmal Basha 48 48
30 Jelaludhin 48 48
31 Babu Babi 48 4832 Paswan 48 48
33 Ramesh 48 48
34 Asraf 48 48
35 Suru Kumar 48 48
36 Musthafa 48 48
37 Mahindra 48 48
38 Murthy 48 48
39 Ramakrishna 48 48
40 Rajesh yadav 48 48
PIONEER CEMENT INDUSTRIES LLC, RAK, UAE
MECHANICAL DEPT KEY PERFORMANCE INDICATORS - KPI
SECOND WEEK OF 2012
100.00
8/22/2019 KPI-MECH-2nd WK.xlsx
3/13
Sl
No
. Job Type
Estimated
Hours
Actual
Hours
Job
Comple
ted Efficiency
RAW MILLS & STACKER RECLAIMER SECTION
1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes
2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes
3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes
4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes
5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes
6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes
7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed bolts re-
tightening. PM 11 11 Yes
8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes
9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes
10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes
11 General Maintenance:-
1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes
2.Rawmill area checklist & general maintenance works PM 17 17 Yes
3.Enmass conveyor-1,2,3&7 inspection PM 4 4
267 275.5
PYRO & COAL MILL, HANDLING SECTION
1 Cooler Back side castable box fabrication and f ixing work. Repair 24 24 Yes
2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . 24 28 Yes
3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards fabrication work.68 74.5
Yes
4 Hot kiln Alignment Preparation works. PM 350 147 No
5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes
6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes
Kiln Out let dust protection baffle plate (2nos ) Fixing work.
Fine coal pumping line slide gate bolts retightening
P.C Simplex Bin Inspection door opening for inspection.
Kiln II tyre lifting side roller up hill bearing oil replacement
Pre heater fan motor Vibration sensor fixing work.10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes
Kiln feed Standby Bucket Elevator change over
Fine coal pumping roots blower belts tightening work
12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes
P.C and K.C FK pumps bearings Greasing work.
Kiln II tyre up hill chair pad shim adjustment
14 Coal Mill maintenance :-
Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes
Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes
15 General Maintenance:- Yes
1. Kiln all Tyres lubricated PM 6 6 Yes
2. Cooler Drives Chain lubricated PM 6 6 Yes
3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes
4.DDPC-1 chain condition inspection PM 4 4 Yes
5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes
6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes
7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes
8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes
9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes
10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes
472.5 483
CEMENT MILLS & PACKING PLANT SECTION
1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes
2 spare Belt preparation for hopper feed belt. PM 15 17 Yes
3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes
4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes
5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes
6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes
7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes
8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes
9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes
10Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing work.
PM 12 12 Yes
13 PM 25.5 25.5 Yes
11 PM 25.5 25.5 Yes
PIONEER CEMENT INDUSTRIES LLC, RAK, UAE
MECHANICAL DEPT. KEY PERFORMANCE INDICATORS - KPI
SECOND WEEK OF 2012
Efficiency (%) = Estimated Time of completed Jobs / Actual Time of Completed Jobs
97.83
96.91
7 PM 34 34 Yes
8 PM 25.5 25.5 Yes
8/22/2019 KPI-MECH-2nd WK.xlsx
4/13
Sl
No
. Job Type
Estimated
Hours
Actual
Hours
Job
Comple
ted Efficiency
11
Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing replaced
with new ( Bearing No 22220 cck ) and Bearings Greasing done. PM 15 17 Yes
12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes
Packing Plant
13
Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad holes
tapping work and Roto packer blower suction filter changing. PM 8.5 8.5 Yes
14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes
15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes
16
Roto Packing and auto packer Schedule maintenance works and packer Bucket elevator
inspection, Bulk loading and Roto packer De-dusting system Pipe line patch up work. PM 34 34 Yes
17Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses replacement.
PM 8.5 8.5 Yes
18 House keeping PM 8.5 8.5 Yes
311 325
WORKSHOP & WATER WORKS
1 Clinker breaker pin tapping work 8.5 8.5 Yes
2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes
3 cooler track wheel rough maching 34 34 Yes
4 Lathe machines maintenance works 8.5 8.5 Yes
5 Cooler spare track wheel welding work 34 39.5 Yes
6 Miscellaneous mahining works 21 21 Yes
7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes
178 183.5
PROJECT & DEVELOPMENT WORKS
1 Paper Bags Go down opening Covering clading fabrication and erection work. Developme 200 56 No
2 SRC clinker tank approaching stair case fabrication & erection Project 350 347.5 No
3 SRC Clinker tank Civil structure side cladding work. Developme 150 157.5 Yes
4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes
5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No
6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection work.
Project 180 146 No
184 191.5
AUTO GARAGE
1 General maintenance PM 28 28 Yes
2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes
3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes
4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes
5 Fork lift front steering bearing replaced Repair 16 17 Yes
6 Fork lift engine service PM 6 6 Yes
93.75
97.00
96.08
95.69
8/22/2019 KPI-MECH-2nd WK.xlsx
5/13
Sl.No Section Labour Utilisation Efficiency Productivity
1 RAW MILLS & STACKER RECLAIMER SECTION 100.00 96.91 96.91
2 PYRO & COAL MILL, HANDLING SECTION 100.00 97.83 97.83
3 CEMENT MILLS & PACKING PLANT SECTION 100.00 95.69 95.69
4 WORKSHOP & WATER WORKS 100.00 97 97.00
5 PROJECT & DEVELOPMENT WORKS 100.00 96.08 96.08
6 AUTO GARAGE 100.00 93.75 93.75
PIONEER CEMENT INDUSTRIES LLC, RAK, UAE
MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI
SECOND WEEK OF 2012
Productivity
Productivity(%) = 100
Labour Utilisation X Efficiency
8/22/2019 KPI-MECH-2nd WK.xlsx
6/13
Sl
No. Job Type
Estimated
Hours
Actual
Hours
Job
Complet
ed Plan Attainment
RAW MILLS & STACKER RECLAIMER SECTION
1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes
2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes
4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes
5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes
6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes
7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed PM 11 11 Yes
8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes
9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes
10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes
11 General Maintenance:-
1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes
2.Rawmill area checklist & general maintenance works PM 17 17 Yes
3.Enmass conveyor-1,2,3&7 inspection PM 4 4
267 275.5
PYRO & COAL MILL, HANDLING SECTION
1 Cooler Back side castable box fabrication and fixing work. Repair24 24
Yes
2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . 24 28 Yes
3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards fabrication 68 74.5 Yes
4 Hot kiln Alignment Preparation works. PM 350 147 No
5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes
6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes
Kiln Out let dust protection baffle plate (2nos ) Fixing work.
Fine coal pumping line slide gate bolts retightening
P.C Simplex Bin Inspection door opening for inspection.
Kiln II tyre lifting side roller up hill bearing oil replacement
Pre heater fan motor Vibration sensor fixing work.
10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes
Kiln feed Standby Bucket Elevator change over
Fine coal pumping roots blower belts tightening work
12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes
P.C and K.C FK pumps bearings Greasing work.
Kiln II tyre up hill chair pad shim adjustment
14 Coal Mill maintenance :-
Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes
Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes
15 General Maintenance:- Yes
1. Kiln all Tyres lubricated PM 6 6 Yes
2. Cooler Drives Chain lubricated PM 6 6 Yes
3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes
4.DDPC-1 chain condition inspection PM 4 4 Yes
5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes
6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes
7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes
8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes
9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes
10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes
472.5 483
CEMENT MILLS & PACKING PLANT SECTION
1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes
2 spare Belt preparation for hopper feed belt. PM 15 17 Yes
3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes
4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes
5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes
6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes
7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes
8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes
10Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing work.
PM 12 12 Yes
11
Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing
replaced with new ( Bearing No 22220 cck ) and Bearings Greasing done. PM 15 17 Yes
SECOND WEEK OF 2012
PIONEER CEMENT INDUSTRIES LLC, RAK, UAE
Plan Attainment (%) = Estimated Time of completed Jobs excluding unplanned works / Estimated Time of all Jobs
MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI
267 x 100
267
= 100
7 PM 34 34 Yes
8 PM 25.5 25.5 Yes
11 PM 25.5 25.5 Yes
13 PM 25.5 25.5 Yes
472.5 x 100
822.5
= 57.45
311 x 100
311
8/22/2019 KPI-MECH-2nd WK.xlsx
7/13
Sl
No. Job Type
Estimated
Hours
Actual
Hours
Job
Complet
ed Plan Attainment
12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes
Packing Plant
13
Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad holes
tapping work and Roto packer blower suction filter changing. PM 8.5 8.5 Yes
14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes
15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes
16
Roto Packing and auto packer Schedule maintenance works and packer Bucket elevatorinspection, Bulk loading and Roto packer De-dusting system Pipe line patch up work.
PM 34 34 Yes
17
Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses
replacement. PM 8.5 8.5 Yes
18 House keeping PM 8.5 8.5 Yes
311 325
WORKSHOP & WATER WORKS
1 Clinker breaker pin tapping work 8.5 8.5 Yes
2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes
3 cooler track wheel rough maching 34 34 Yes
4 Lathe machines maintenance works 8.5 8.5 Yes
5 Cooler spare track wheel welding work 34 39.5 Yes
6 Miscellaneous mahining works 21 21 Yes
7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes
178 183.5
PROJECT & DEVELOPMENT WORKS
1 Paper Bags Go down opening Covering clading fabrication and erection work. Developm 200 56 No
2 SRC clinker tank approaching stair case fabrication & erection Project 350 68 No
3 SRC Clinker tank Civil structure side cladding work. Developm 150 157.5 Yes
4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes
5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No
6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection work.
Project 180 146 No
184 191.5
AUTO GARAGE
1 General maintenance PM 28 28 Yes
2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes
3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes
4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes5 Fork lift front steering bearing replaced Repair 16 17 Yes
6 Fork lift engine service PM 6 6 Yes
7 Komatsu loader engine service PM 6 6 Yes
90 96
90 x 100
90= 100
= 100
178 x 100
178
= 100
8/22/2019 KPI-MECH-2nd WK.xlsx
8/13
Sl
No. Job Type
Estimated
Hours
Actual
Hours
Job
Complet
ed P.M.R(%)
RAW MILLS & STACKER RECLAIMER SECTION
1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes
3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes
4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes
5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes
6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes
7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed PM 11 11 Yes
8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes
9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes
10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes
11 General Maintenance:-
1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes
2.Rawmill area checklist & general maintenance works PM 17 17 Yes
3.Enmass conveyor-1,2,3&7 inspection PM 4 4
267 275.5
PYRO & COAL MILL, HANDLING SECTION
1 Cooler Back side castable box fabrication and fixing work. Repair 24 24 Yes
2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . Repair 24 28 Yes
3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards Safety 68 74.5 Yes
4 Hot kiln Alignment Preparation works. PM 350 147 No
5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes
6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes
Kiln Out let dust protection baffle plate (2nos ) Fixing work.
Fine coal pumping line slide gate bolts retightening
P.C Simplex Bin Inspection door opening for inspection.
Kiln II tyre lifting side roller up hill bearing oil replacement
Pre heater fan motor Vibration sensor fixing work.
10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes
Kiln feed Standby Bucket Elevator change over
Fine coal pumping roots blower belts tightening work
12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes
P.C and K.C FK pumps bearings Greasing work.
Kiln II tyre up hill chair pad shim adjustment
14 Coal Mill maintenance :-
Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes
Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes
15 General Maintenance:- Yes
1. Kiln all Tyres lubricated PM 6 6 Yes
2. Cooler Drives Chain lubricated PM 6 6 Yes
3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes
4.DDPC-1 chain condition inspection PM 4 4 Yes
5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes
6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes
8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes
9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes
10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes
472.5 483
CEMENT MILLS & PACKING PLANT SECTION
1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes
2 spare Belt preparation for hopper feed belt. PM 15 17 Yes
3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes
4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes
5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes
6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes
7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes
8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes
10Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing work.
PM 12 12 Yes
11
Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing
replaced with new ( Bearing No 22220 cck ) and Bearings Greasing done. PM 15 17 Yes
Available Labour Hoursx 100PMR =
145 x 100
275.5
= 52.63
284.5 x 100
630
= 45.16
PIONEER CEMENT INDUSTRIES LLC, RAK, UAE
MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI
SECOND WEEK OF 2012
PMR
Preventive Maint. Routine Hrs
7 PM 34 34 Yes
8 PM 25.5 25.5 Yes
11 PM 25.5 25.5 Yes
13 PM 25.5 25.5 Yes
199 x 100
325
8/22/2019 KPI-MECH-2nd WK.xlsx
9/13
Sl
No. Job Type
Estimated
Hours
Actual
Hours
Job
Complet
ed P.M.R(%)
12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes
Packing Plant
13
Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad holes
tapping work and Roto packer blower suction filter changing. PM 8.5 8.5 Yes
14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes
15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes
16
Roto Packing and auto packer Schedule maintenance works and packer Bucket elevatorinspection, Bulk loading and Roto packer De-dusting system Pipe line patch up work.
PM 34 34 Yes
17
Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses
replacement. PM 8.5 8.5 Yes
18 House keeping PM 8.5 8.5 Yes
311 325
WORKSHOP & WATER WORKS
1 Clinker breaker pin tapping work 8.5 8.5 Yes
2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes
3 cooler track wheel rough maching 34 34 Yes
4 Lathe machines maintenance works 8.5 8.5 Yes
5 Cooler spare track wheel welding work 34 39.5 Yes
6 Miscellaneous mahining works 21 21 Yes
7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes
178 183.5
PROJECT & DEVELOPMENT WORKS
1 Paper Bags Go down opening Covering clading fabrication and erection work. Developmen 200 56 No
2 SRC clinker tank approaching stair case fabrication & erection Project 350 68 No
3 SRC Clinker tank Civil structure side cladding work. Developmen 150 157.5 Yes
4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes
5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No
6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection work.
Project 180 146 No
184 191.5
AUTO GARAGE
1 General maintenance PM 28 28 Yes
2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes
3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes
4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes5 Fork lift front steering bearing replaced Repair 16 17 Yes
6 Fork lift engine service PM 6 6 Yes
7 Komatsu loader engine service PM 6 6 Yes
90 96
= 61.23
40 x 100
96= 41.66
8/22/2019 KPI-MECH-2nd WK.xlsx
10/13
8/22/2019 KPI-MECH-2nd WK.xlsx
11/13
8/22/2019 KPI-MECH-2nd WK.xlsx
12/13
Sl
No. Job Type
Estimated
Hours
Actual
Hours
Job
Completed Unplanned(%)
RAW MILLS & STACKER RECLAIMER SECTION
1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes
3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes
4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes
5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes
6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes
7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed PM 11 11 Yes
8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes
9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes
10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes
11 General Maintenance:-
1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes
2.Rawmill area checklist & general maintenance works PM 17 17 Yes
3.Enmass conveyor-1,2,3&7 inspection PM 4 4
267 275.5
PYRO & COAL MILL, HANDLING SECTION
1 Cooler Back side castable box fabrication and fixing work. Repair 24 24 Yes
2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . 24 28 Yes
3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards 68 74.5 Yes
4 Hot kiln Alignment Preparation works. PM 350 147 No
5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes
6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes
Kiln Out let dust protection baffle plate (2nos ) Fixing work.
Fine coal pumping line slide gate bolts retightening
P.C Simplex Bin Inspection door opening for inspection.
Kiln II tyre lifting side roller up hill bearing oil replacement
Pre heater fan motor Vibration sensor fixing work.
10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes
Kiln feed Standby Bucket Elevator change over
Fine coal pumping roots blower belts t ightening work
12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes
P.C and K.C FK pumps bearings Greasing work.
Kiln II tyre up hill chair pad shim adjustment
14 Coal Mill maintenance :-
Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes
Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes
15 General Maintenance:- Yes
1. Kiln all Tyres lubricated PM 6 6 Yes
2. Cooler Drives Chain lubricated PM 6 6 Yes
3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes
4.DDPC-1 chain condition inspection PM 4 4 Yes
5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes
6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes
7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes
9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes
10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes
472.5 483
CEMENT MILLS & PACKING PLANT SECTION
1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes
2 spare Belt preparation for hopper feed belt. PM 15 17 Yes
3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes
4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes
5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes
6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes
7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes
8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes
9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes10 Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing PM 12 12 Yes
11 Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing PM 15 17 Yes
12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes
Packing Plant
13 Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad PM 8.5 8.5 Yes
PIONEER CEMENT INDUSTRIES LLC, RAK, UAE
MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI
SECOND WEEK OF 2012
UNPLANNED
Unplanned % =Actual hours on completed unplanned work orders
Estimated hours on all completed work ordersX 100
0 x 100
267
= 0
0 x 100
472.5
= 0
0 x 100311
= 0
7 PM 34 34 Yes
8 PM 25.5 25.5 Yes
11 PM 25.5 25.5 Yes
13 PM 25.5 25.5 Yes
8/22/2019 KPI-MECH-2nd WK.xlsx
13/13
Sl
No. Job Type
Estimated
Hours
Actual
Hours
Job
Completed Unplanned(%)
14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes
15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes
16 Roto Packing and auto packer Schedule maintenance works and packer Bucket elevator PM 34 34 Yes
17 Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses PM 8.5 8.5 Yes18 House keeping PM 8.5 8.5 Yes
311 325
WORKSHOP & WATER WORKS
1 Clinker breaker pin tapping work 8.5 8.5 Yes
2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes
3 cooler track wheel rough maching 34 34 Yes
4 Lathe machines maintenance works 8.5 8.5 Yes
5 Cooler spare track wheel welding work 34 39.5 Yes
6 Miscellaneous mahining works 21 21 Yes
7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes
178 183.5
PROJECT & DEVELOPMENT WORKS
1 Paper Bags Go down opening Covering clading fabrication and erection work. Developme 200 56 No
2 SRC clinker tank approaching stair case fabrication & erection Project 350 68 No3 SRC Clinker tank Civil structure side cladding work. Developme 150 157.5 Yes
4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes
5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No
6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection
work.Project 180 146 No
184 191.5
AUTO GARAGE
1 General maintenance PM 28 28 Yes
2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes
3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes
4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes
5 Fork lift front steering bearing replaced Repair 16 17 Yes
6 Fork lift engine service PM 6 6 Yes
7 Komatsu loader engine service PM 6 6 Yes
90 96
21 x 100
178
= 11.79
19 x 100
90
= 21.11