  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    1/13

    Productivity

    Available

    Labour

    Hours

    Actual

    Hours

    (Work

    orders)

    %Estimated

    Hours

    Actual

    Hours%

    Lab.Utilisation X Effi.

    100

    Estmiated

    Hours of

    completed

    jobs(excluding

    unplanned)

    Estimated

    time of all

    jobs

    %

    Preventive

    Maintenanc

    e Routine

    Hours

    Availa

    Labo

    Hou

    1RAW MILLS & STACKER

    RECLAIMER SECTION273.00 273.00 100 261 275.5 96.91 96.91 267 267 100 145 275.

    2PYRO & COAL MILL,

    HANDLING SECTION603.00 603.00 100 472.5 483 97.83 97.83 472.5 822.5 57.45 284.5 630

    3CEMENT MILLS & PACKING

    PLANT SECTION319.00 319.00 100 311 325 95.69 95.69 311 311 0 199 325

    4WORKSHOP & WATER

    WORKS185.50 185.50 100 178 183.5 97 97.00 178 178 100

    5 PROJECT & DEVELOPMENTWORKS

    347.50 347.50 100 184 191.5 96.08 96.08

    6 AUTO GARAGE 96.00 96.00 100 90 96 93.75 93.75 90 90 100 40 96

    PIONEER CEMENT INDUSTRIES LLC, RAK, UAE

    KEY PERFORMANCE INDICATORS - Maintenance Dept.

    SECOND WEEK OF 2012

    MECHANICAL DEPT.

    PMR

    Sl.No DESCRIPTION

    Plan AttainmentLabour Utilisation Efficiency

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    2/13

    Labour Utilization(%) = Actual Labour Hours on work orders/Available Labour Hours X 100

    Sl. No NamesAvailable Labour

    hours

    Actual Labour

    Hours(Work

    Orders)

    Labour Utilization(%)

    1 Sandeep Singh 0 0

    2 Pillai 48 48

    3 Bhanu Pratap 48 48

    4 Ramana Reddy 48 48

    5 Hanumath Reddy 48 48

    6 Abu Backer 48 48

    7 Jose 48 48

    8 Bhukya Sreenu 48 48

    9 Assan 48 48

    10 Vallabha Rao 48 48

    11 Moinuddin 48 48

    12 Babu Kumar 48 48

    13 Chendra Sekhar 48 48

    14 Dhanesh Gupta 48 48

    15 Naresh Rauth 48 48

    16 Anil 48 48

    17 Saleem 48 48

    18 Rajiman 48 48

    20 Prasannan 48 48

    21 Jamshid 48 4822 Firoz Khan 48 48

    23 Radha Krishna 48 48

    24 Shabir ali 48 48

    25 Iqbal Basha 48 48

    26 Rajesh Kumar Kusva 48 48

    27 Ansari 48 48

    28 Murali Dharan 48 48

    29 Ajmal Basha 48 48

    30 Jelaludhin 48 48

    31 Babu Babi 48 4832 Paswan 48 48

    33 Ramesh 48 48

    34 Asraf 48 48

    35 Suru Kumar 48 48

    36 Musthafa 48 48

    37 Mahindra 48 48

    38 Murthy 48 48

    39 Ramakrishna 48 48

    40 Rajesh yadav 48 48

    PIONEER CEMENT INDUSTRIES LLC, RAK, UAE

    MECHANICAL DEPT KEY PERFORMANCE INDICATORS - KPI

    SECOND WEEK OF 2012

    100.00

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    3/13

    Sl

    No

    . Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Comple

    ted Efficiency

    RAW MILLS & STACKER RECLAIMER SECTION

    1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes

    2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes

    3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes

    4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes

    5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes

    6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes

    7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed bolts re-

    tightening. PM 11 11 Yes

    8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes

    9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes

    10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes

    11 General Maintenance:-

    1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes

    2.Rawmill area checklist & general maintenance works PM 17 17 Yes

    3.Enmass conveyor-1,2,3&7 inspection PM 4 4

    267 275.5

    PYRO & COAL MILL, HANDLING SECTION

    1 Cooler Back side castable box fabrication and f ixing work. Repair 24 24 Yes

    2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . 24 28 Yes

    3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards fabrication work.68 74.5

    Yes

    4 Hot kiln Alignment Preparation works. PM 350 147 No

    5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes

    6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes

    Kiln Out let dust protection baffle plate (2nos ) Fixing work.

    Fine coal pumping line slide gate bolts retightening

    P.C Simplex Bin Inspection door opening for inspection.

    Kiln II tyre lifting side roller up hill bearing oil replacement

    Pre heater fan motor Vibration sensor fixing work.10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes

    Kiln feed Standby Bucket Elevator change over

    Fine coal pumping roots blower belts tightening work

    12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes

    P.C and K.C FK pumps bearings Greasing work.

    Kiln II tyre up hill chair pad shim adjustment

    14 Coal Mill maintenance :-

    Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes

    Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes

    15 General Maintenance:- Yes

    1. Kiln all Tyres lubricated PM 6 6 Yes

    2. Cooler Drives Chain lubricated PM 6 6 Yes

    3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes

    4.DDPC-1 chain condition inspection PM 4 4 Yes

    5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes

    6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes

    7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes

    8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes

    9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes

    10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes

    472.5 483

    CEMENT MILLS & PACKING PLANT SECTION

    1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes

    2 spare Belt preparation for hopper feed belt. PM 15 17 Yes

    3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes

    4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes

    5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes

    6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes

    7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes

    8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes

    9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes

    10Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing work.

    PM 12 12 Yes

    13 PM 25.5 25.5 Yes

    11 PM 25.5 25.5 Yes

    PIONEER CEMENT INDUSTRIES LLC, RAK, UAE

    MECHANICAL DEPT. KEY PERFORMANCE INDICATORS - KPI

    SECOND WEEK OF 2012

    Efficiency (%) = Estimated Time of completed Jobs / Actual Time of Completed Jobs

    97.83

    96.91

    7 PM 34 34 Yes

    8 PM 25.5 25.5 Yes

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    4/13

    Sl

    No

    . Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Comple

    ted Efficiency

    11

    Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing replaced

    with new ( Bearing No 22220 cck ) and Bearings Greasing done. PM 15 17 Yes

    12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes

    Packing Plant

    13

    Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad holes

    tapping work and Roto packer blower suction filter changing. PM 8.5 8.5 Yes

    14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes

    15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes

    16

    Roto Packing and auto packer Schedule maintenance works and packer Bucket elevator

    inspection, Bulk loading and Roto packer De-dusting system Pipe line patch up work. PM 34 34 Yes

    17Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses replacement.

    PM 8.5 8.5 Yes

    18 House keeping PM 8.5 8.5 Yes

    311 325

    WORKSHOP & WATER WORKS

    1 Clinker breaker pin tapping work 8.5 8.5 Yes

    2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes

    3 cooler track wheel rough maching 34 34 Yes

    4 Lathe machines maintenance works 8.5 8.5 Yes

    5 Cooler spare track wheel welding work 34 39.5 Yes

    6 Miscellaneous mahining works 21 21 Yes

    7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes

    178 183.5

    PROJECT & DEVELOPMENT WORKS

    1 Paper Bags Go down opening Covering clading fabrication and erection work. Developme 200 56 No

    2 SRC clinker tank approaching stair case fabrication & erection Project 350 347.5 No

    3 SRC Clinker tank Civil structure side cladding work. Developme 150 157.5 Yes

    4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes

    5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No

    6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection work.

    Project 180 146 No

    184 191.5

    AUTO GARAGE

    1 General maintenance PM 28 28 Yes

    2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes

    3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes

    4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes

    5 Fork lift front steering bearing replaced Repair 16 17 Yes

    6 Fork lift engine service PM 6 6 Yes

    93.75

    97.00

    96.08

    95.69

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    5/13

    Sl.No Section Labour Utilisation Efficiency Productivity

    1 RAW MILLS & STACKER RECLAIMER SECTION 100.00 96.91 96.91

    2 PYRO & COAL MILL, HANDLING SECTION 100.00 97.83 97.83

    3 CEMENT MILLS & PACKING PLANT SECTION 100.00 95.69 95.69

    4 WORKSHOP & WATER WORKS 100.00 97 97.00

    5 PROJECT & DEVELOPMENT WORKS 100.00 96.08 96.08

    6 AUTO GARAGE 100.00 93.75 93.75

    PIONEER CEMENT INDUSTRIES LLC, RAK, UAE

    MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI

    SECOND WEEK OF 2012

    Productivity

    Productivity(%) = 100

    Labour Utilisation X Efficiency

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    6/13

    Sl

    No. Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Complet

    ed Plan Attainment

    RAW MILLS & STACKER RECLAIMER SECTION

    1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes

    2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes

    4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes

    5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes

    6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes

    7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed PM 11 11 Yes

    8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes

    9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes

    10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes

    11 General Maintenance:-

    1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes

    2.Rawmill area checklist & general maintenance works PM 17 17 Yes

    3.Enmass conveyor-1,2,3&7 inspection PM 4 4

    267 275.5

    PYRO & COAL MILL, HANDLING SECTION

    1 Cooler Back side castable box fabrication and fixing work. Repair24 24

    Yes

    2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . 24 28 Yes

    3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards fabrication 68 74.5 Yes

    4 Hot kiln Alignment Preparation works. PM 350 147 No

    5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes

    6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes

    Kiln Out let dust protection baffle plate (2nos ) Fixing work.

    Fine coal pumping line slide gate bolts retightening

    P.C Simplex Bin Inspection door opening for inspection.

    Kiln II tyre lifting side roller up hill bearing oil replacement

    Pre heater fan motor Vibration sensor fixing work.

    10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes

    Kiln feed Standby Bucket Elevator change over

    Fine coal pumping roots blower belts tightening work

    12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes

    P.C and K.C FK pumps bearings Greasing work.

    Kiln II tyre up hill chair pad shim adjustment

    14 Coal Mill maintenance :-

    Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes

    Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes

    15 General Maintenance:- Yes

    1. Kiln all Tyres lubricated PM 6 6 Yes

    2. Cooler Drives Chain lubricated PM 6 6 Yes

    3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes

    4.DDPC-1 chain condition inspection PM 4 4 Yes

    5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes

    6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes

    7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes

    8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes

    9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes

    10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes

    472.5 483

    CEMENT MILLS & PACKING PLANT SECTION

    1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes

    2 spare Belt preparation for hopper feed belt. PM 15 17 Yes

    3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes

    4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes

    5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes

    6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes

    7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes

    8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes

    10Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing work.

    PM 12 12 Yes

    11

    Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing

    replaced with new ( Bearing No 22220 cck ) and Bearings Greasing done. PM 15 17 Yes

    SECOND WEEK OF 2012

    PIONEER CEMENT INDUSTRIES LLC, RAK, UAE

    Plan Attainment (%) = Estimated Time of completed Jobs excluding unplanned works / Estimated Time of all Jobs

    MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI

    267 x 100

    267

    = 100

    7 PM 34 34 Yes

    8 PM 25.5 25.5 Yes

    11 PM 25.5 25.5 Yes

    13 PM 25.5 25.5 Yes

    472.5 x 100

    822.5

    = 57.45

    311 x 100

    311

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    7/13

    Sl

    No. Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Complet

    ed Plan Attainment

    12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes

    Packing Plant

    13

    Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad holes

    tapping work and Roto packer blower suction filter changing. PM 8.5 8.5 Yes

    14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes

    15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes

    16

    Roto Packing and auto packer Schedule maintenance works and packer Bucket elevatorinspection, Bulk loading and Roto packer De-dusting system Pipe line patch up work.

    PM 34 34 Yes

    17

    Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses

    replacement. PM 8.5 8.5 Yes

    18 House keeping PM 8.5 8.5 Yes

    311 325

    WORKSHOP & WATER WORKS

    1 Clinker breaker pin tapping work 8.5 8.5 Yes

    2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes

    3 cooler track wheel rough maching 34 34 Yes

    4 Lathe machines maintenance works 8.5 8.5 Yes

    5 Cooler spare track wheel welding work 34 39.5 Yes

    6 Miscellaneous mahining works 21 21 Yes

    7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes

    178 183.5

    PROJECT & DEVELOPMENT WORKS

    1 Paper Bags Go down opening Covering clading fabrication and erection work. Developm 200 56 No

    2 SRC clinker tank approaching stair case fabrication & erection Project 350 68 No

    3 SRC Clinker tank Civil structure side cladding work. Developm 150 157.5 Yes

    4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes

    5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No

    6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection work.

    Project 180 146 No

    184 191.5

    AUTO GARAGE

    1 General maintenance PM 28 28 Yes

    2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes

    3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes

    4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes5 Fork lift front steering bearing replaced Repair 16 17 Yes

    6 Fork lift engine service PM 6 6 Yes

    7 Komatsu loader engine service PM 6 6 Yes

    90 96

    90 x 100

    90= 100

    = 100

    178 x 100

    178

    = 100

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    8/13

    Sl

    No. Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Complet

    ed P.M.R(%)

    RAW MILLS & STACKER RECLAIMER SECTION

    1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes

    3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes

    4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes

    5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes

    6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes

    7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed PM 11 11 Yes

    8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes

    9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes

    10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes

    11 General Maintenance:-

    1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes

    2.Rawmill area checklist & general maintenance works PM 17 17 Yes

    3.Enmass conveyor-1,2,3&7 inspection PM 4 4

    267 275.5

    PYRO & COAL MILL, HANDLING SECTION

    1 Cooler Back side castable box fabrication and fixing work. Repair 24 24 Yes

    2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . Repair 24 28 Yes

    3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards Safety 68 74.5 Yes

    4 Hot kiln Alignment Preparation works. PM 350 147 No

    5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes

    6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes

    Kiln Out let dust protection baffle plate (2nos ) Fixing work.

    Fine coal pumping line slide gate bolts retightening

    P.C Simplex Bin Inspection door opening for inspection.

    Kiln II tyre lifting side roller up hill bearing oil replacement

    Pre heater fan motor Vibration sensor fixing work.

    10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes

    Kiln feed Standby Bucket Elevator change over

    Fine coal pumping roots blower belts tightening work

    12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes

    P.C and K.C FK pumps bearings Greasing work.

    Kiln II tyre up hill chair pad shim adjustment

    14 Coal Mill maintenance :-

    Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes

    Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes

    15 General Maintenance:- Yes

    1. Kiln all Tyres lubricated PM 6 6 Yes

    2. Cooler Drives Chain lubricated PM 6 6 Yes

    3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes

    4.DDPC-1 chain condition inspection PM 4 4 Yes

    5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes

    6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes

    8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes

    9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes

    10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes

    472.5 483

    CEMENT MILLS & PACKING PLANT SECTION

    1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes

    2 spare Belt preparation for hopper feed belt. PM 15 17 Yes

    3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes

    4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes

    5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes

    6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes

    7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes

    8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes

    10Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing work.

    PM 12 12 Yes

    11

    Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing

    replaced with new ( Bearing No 22220 cck ) and Bearings Greasing done. PM 15 17 Yes

    Available Labour Hoursx 100PMR =

    145 x 100

    275.5

    = 52.63

    284.5 x 100

    630

    = 45.16

    PIONEER CEMENT INDUSTRIES LLC, RAK, UAE

    MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI

    SECOND WEEK OF 2012

    PMR

    Preventive Maint. Routine Hrs

    7 PM 34 34 Yes

    8 PM 25.5 25.5 Yes

    11 PM 25.5 25.5 Yes

    13 PM 25.5 25.5 Yes

    199 x 100

    325

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    9/13

    Sl

    No. Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Complet

    ed P.M.R(%)

    12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes

    Packing Plant

    13

    Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad holes

    tapping work and Roto packer blower suction filter changing. PM 8.5 8.5 Yes

    14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes

    15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes

    16

    Roto Packing and auto packer Schedule maintenance works and packer Bucket elevatorinspection, Bulk loading and Roto packer De-dusting system Pipe line patch up work.

    PM 34 34 Yes

    17

    Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses

    replacement. PM 8.5 8.5 Yes

    18 House keeping PM 8.5 8.5 Yes

    311 325

    WORKSHOP & WATER WORKS

    1 Clinker breaker pin tapping work 8.5 8.5 Yes

    2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes

    3 cooler track wheel rough maching 34 34 Yes

    4 Lathe machines maintenance works 8.5 8.5 Yes

    5 Cooler spare track wheel welding work 34 39.5 Yes

    6 Miscellaneous mahining works 21 21 Yes

    7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes

    178 183.5

    PROJECT & DEVELOPMENT WORKS

    1 Paper Bags Go down opening Covering clading fabrication and erection work. Developmen 200 56 No

    2 SRC clinker tank approaching stair case fabrication & erection Project 350 68 No

    3 SRC Clinker tank Civil structure side cladding work. Developmen 150 157.5 Yes

    4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes

    5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No

    6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection work.

    Project 180 146 No

    184 191.5

    AUTO GARAGE

    1 General maintenance PM 28 28 Yes

    2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes

    3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes

    4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes5 Fork lift front steering bearing replaced Repair 16 17 Yes

    6 Fork lift engine service PM 6 6 Yes

    7 Komatsu loader engine service PM 6 6 Yes

    90 96

    = 61.23

    40 x 100

    96= 41.66

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    10/13

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    11/13

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    12/13

    Sl

    No. Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Completed Unplanned(%)

    RAW MILLS & STACKER RECLAIMER SECTION

    1 RABH 2nd module inspection & damaged bags to be replaced. PM 30 30 Yes2 Raw mill-2 O-sepa Cyclone Patch up and Raw mill-1 O-sepa Hopper patch up work. Repair 25.5 25.5 Yes

    3 Raw mill-1 & 2 Vent bag filters Impeller inspection and coating cleaning work. PM 17 17 Yes

    4 Stacker Spare bogie wheels bearings assembling work . PM 34 34 Yes

    5 Raw mills section general checklist checking and Raw mill-1 condition monitoring. PM 8.5 8.5 Yes

    6 Stacker drive bogie wheel assembling and replacement towards stock pile side work . Repair 79.5 88 Yes

    7 Raw mills 1&2 O-sepa impellers coating cleaning and raw mill-2 O-sepa fan Bearings bed PM 11 11 Yes

    8 Raw mill-1 Vent bag filter Fan impeller coating cleaning work. PM 19.5 19.5 Yes

    9 Raw mill-2 Silica Weigh feeder discharge chute patch up work. Repair 7 7 Yes

    10 Raw mill-2 Inlet chute patch up work. Repair 10 10 Yes

    11 General Maintenance:-

    1.RM-1&2 slide shoe bearings visual checking PM 4 4 Yes

    2.Rawmill area checklist & general maintenance works PM 17 17 Yes

    3.Enmass conveyor-1,2,3&7 inspection PM 4 4

    267 275.5

    PYRO & COAL MILL, HANDLING SECTION

    1 Cooler Back side castable box fabrication and fixing work. Repair 24 24 Yes

    2 Alkali Baghouse hopper-2 Bulk loading head flange fabrication . 24 28 Yes

    3 Alkali Baghouse Inlet duct bleed air damper flanges fabrication and safety guards 68 74.5 Yes

    4 Hot kiln Alignment Preparation works. PM 350 147 No

    5 Kiln Girth gear to pinion Root Clearance and backlash readings taken. PM 36 36 Yes

    6 Kiln inlet Pneumatic Cylinders replacement work( Leakage Cylinders only ). Repair 34 34 Yes

    Kiln Out let dust protection baffle plate (2nos ) Fixing work.

    Fine coal pumping line slide gate bolts retightening

    P.C Simplex Bin Inspection door opening for inspection.

    Kiln II tyre lifting side roller up hill bearing oil replacement

    Pre heater fan motor Vibration sensor fixing work.

    10 Cooler RFT Cross head shaft NDE Wheel Track replacement with spare. PM 34 34 Yes

    Kiln feed Standby Bucket Elevator change over

    Fine coal pumping roots blower belts t ightening work

    12 Cooler Drive -1 Chain tentioning work. PM 34 34 Yes

    P.C and K.C FK pumps bearings Greasing work.

    Kiln II tyre up hill chair pad shim adjustment

    14 Coal Mill maintenance :-

    Raw coal dump hopper top grills repair work and housekeeping. Repair 34 34 Yes

    Coal mill girth gear grease spray pattern checking work. PM 6 6 Yes

    15 General Maintenance:- Yes

    1. Kiln all Tyres lubricated PM 6 6 Yes

    2. Cooler Drives Chain lubricated PM 6 6 Yes

    3. En-mass conveyors chain condition inspected&missed chain pins circlips refixed. PM 12 12 Yes

    4.DDPC-1 chain condition inspection PM 4 4 Yes

    5. Compressors Suction Filter & Cooler cleaned PM 6 6 Yes

    6. K.C. & P.C. Roots Blowers Suction Filters cleaned PM 10 10 Yes

    7. Silo bottom & Pre-heater top Blowers Suction Filters cleaned. PM 10 10 Yes8. Kiln Supporting Rollers Bearings Oil Seals lubricated. PM 10 10 Yes

    9. Air blaster Quick exhaust valves replaced & Overhauled Repair 2.5 2.5 Yes

    10.Cooler spillage hopper double flap valve pneumatic cylinder recondtioned Repair 1.5 1.5 Yes

    472.5 483

    CEMENT MILLS & PACKING PLANT SECTION

    1 Cement Silo-1 4th comportment dosing Valve replacing with reconditioning one. PM 15 17 Yes

    2 spare Belt preparation for hopper feed belt. PM 15 17 Yes

    3 O-Sepa outlet duct patch up work and Vent bag house inlet duct patch up work. Repair 25.5 25.5 Yes

    4 BC-21 Input Coupling Head and tail pulleys bearings inspection and greasing work. PM 17 17 Yes

    5 Base frames fabrications for Online centrifugal separator units ( For C.M-1&2 ). PM 20 20 Yes

    6 Cement mill-1&2 O-sepa Return Oil Protection pipes fabrication work. PM 14 14 Yes

    7 DDPC-4 Discharge chute Worn out plate replacing with new plate. Repair 34 34 Yes

    8 Cement mill-1 outlet airslide blower motor(7.5 KW) replacement work. Repair 10 10 Yes

    9 DDPC-4 Discharge chute Full welding. Repair 5.5 5.5 Yes10 Cement mills 1&2, Clinker , Lime Stone & Gypsum Weigh Feeders Bearings Greasing PM 12 12 Yes

    11 Gypsum Dump hopper bottom feed belt no-26 Drive pulley non drive end side bearing PM 15 17 Yes

    12 Cement mill area general checklist and general maintenance works PM 25.5 25.5 Yes

    Packing Plant

    13 Auto packer roller locking plate fabrication and Bottom timing belt Spare gear box bad PM 8.5 8.5 Yes

    PIONEER CEMENT INDUSTRIES LLC, RAK, UAE

    MECHANICAL DEPT.KEY PERFORMANCE INDICATORS - KPI

    SECOND WEEK OF 2012

    UNPLANNED

    Unplanned % =Actual hours on completed unplanned work orders

    Estimated hours on all completed work ordersX 100

    0 x 100

    267

    = 0

    0 x 100

    472.5

    = 0

    0 x 100311

    = 0

    7 PM 34 34 Yes

    8 PM 25.5 25.5 Yes

    11 PM 25.5 25.5 Yes

    13 PM 25.5 25.5 Yes

  • 8/22/2019 KPI-MECH-2nd WK.xlsx

    13/13

    Sl

    No. Job Type

    Estimated

    Hours

    Actual

    Hours

    Job

    Completed Unplanned(%)

    14 Bulk loading spout no-3 Repairing work. Repair 22 25.5 Yes

    15 Bulk loading spout no-3 Fixing work. Repair 21 25.5 Yes

    16 Roto Packing and auto packer Schedule maintenance works and packer Bucket elevator PM 34 34 Yes

    17 Bulk loading spout no-2 inspection and bulk loading bin-1 aeration flexible hoses PM 8.5 8.5 Yes18 House keeping PM 8.5 8.5 Yes

    311 325

    WORKSHOP & WATER WORKS

    1 Clinker breaker pin tapping work 8.5 8.5 Yes

    2 Gypsum schuttle conveyor coupling bolts maching work 24 24 Yes

    3 cooler track wheel rough maching 34 34 Yes

    4 Lathe machines maintenance works 8.5 8.5 Yes

    5 Cooler spare track wheel welding work 34 39.5 Yes

    6 Miscellaneous mahining works 21 21 Yes

    7 STP,staff colony plumbing works& plant drip line repair works 48 48 Yes

    178 183.5

    PROJECT & DEVELOPMENT WORKS

    1 Paper Bags Go down opening Covering clading fabrication and erection work. Developme 200 56 No

    2 SRC clinker tank approaching stair case fabrication & erection Project 350 68 No3 SRC Clinker tank Civil structure side cladding work. Developme 150 157.5 Yes

    4 SRC Hopper De-dusting Bag filter fan erection Project 34 34 Yes

    5 SRC Hopper De-dusting Bag filter Ducting fabrication work. Project 170 141.5 No

    6SRC Clinker tank De-dusting Bag filter Supporting structure fabrication and erection

    work.Project 180 146 No

    184 191.5

    AUTO GARAGE

    1 General maintenance PM 28 28 Yes

    2 Man truck 21475 tyres have been interchanged Repair 16 20 Yes

    3 Man truck 21475 rear tyre puncture Unplanned 6 6 Yes

    4 Man truck 21476 leaf springs pad has been replaced Unplanned 12 13 Yes

    5 Fork lift front steering bearing replaced Repair 16 17 Yes

    6 Fork lift engine service PM 6 6 Yes

    7 Komatsu loader engine service PM 6 6 Yes

    90 96

    21 x 100

    178

    = 11.79

    19 x 100

    90

    = 21.11