Page 1: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

LPA Program OverviewLPA Projects

Kenneth D. Fenton P.S.Clark County Engineer’s

Office

Page 2: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

I’m from ODOT and I’m here to help you!

Page 3: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

LPA’s Point of View

Construction of Local Projects

Page 4: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

What Works? What Doesn’t? ODOT’s processes are

tried-and-true

LPA conformance to ODOT’s material and construction requirements

Possible changes and improvements

Page 5: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

ODOT’s processes are Tried-and-True.def. Tested and

proved to be worthy or goodODOT CMS

Office of Material

Management

LPA Construction

Contract Administrati

on

Page 6: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

Put it in writing . . .

Document

Document

Document

Page 7: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

LPA Documentation Checklist Documentation should support an audit. If it isn’t documented, it

didn’t happen.  Project Inspection

Daily Diary. The daily diary should be up to date and contain the following information: All work performed by the contractor List of equipment Project personnel and hours worked Pay quantities. Check to see that they match the calculated

values and how the pay quantity is determined. Daily weather conditions (weather affects the majority of work

performed and is needed to determine time extensions based upon weather delays)

Special notes and instructions to the contractor Any unusual events occurring on or adjacent to the project,

even those not related to construction

Page 8: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

LPA Documentation Checklist Measurements

Measurements should be shown either in the daily diary or some other form of documentation. The inspector must indicate that the measurement is an actual field measurement. Even if the measurement is a plan dimension, note that the dimension has been field verified.

If the measurements in the diary are transferred from other documentation, has the engineer indicated where to find that documentation?

Calculations Do the calculations use the measured or plan dimensions?

This should be indicated; field verification is required. Note whether a tape is included with the calculations. All calculations should include item of work, location, date

and initials.

Page 9: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

LPA Documentation Checklist Tickets

Each tickets must include: JMF, date, location, item and initials

Any sequence of tickets that are not in order or have tickets missing need to have a calculator tape verifying the accumulative total.

Testing and Results Inspections Maintenance of Traffic Document any plan changes 

Material Management Is the inspector getting necessary documentation for the

materials records? Documentation should provide for quality, quantity, and basis for payment.

How is the project manager organizing the materials documentation?

The project engineer must approve all materials and solve any deficiencies.

Page 10: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

LPA Documentation Checklist Payment & Reimbursements

Change Orders / Pricing for extra work Claims / Dispute Resolution Schedule and Completion Date / Time Extensions / Liquidated

Damages Timeliness of payments Railroad, Utility Force Account

Prevailing Wage, EEO, DBE (if applicable)

Page 11: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 12: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 13: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 14: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 15: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 16: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 17: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 18: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 19: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 20: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 21: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

LPA Conformance to ODOT’s Material and

Construction Requirements

Page 22: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 23: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 24: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 25: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

Tracking and

Issuing Payments

Page 26: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 27: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 28: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 29: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 30: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 31: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 32: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 33: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 34: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 35: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

Prevailing Wage

Page 36: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 37: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 38: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 39: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 40: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 41: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 42: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 43: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 44: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 45: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 46: Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Page 47: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

Possible Changes or Improvements

Page 48: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

PULL IT ALL TOGETHER

Utilize ODOT’s resources

Share your knowledge

There is always room to improve

Page 49: Kenneth D. Fenton P.S. Clark County Engineer’s Office.

Thank You&