Joe Shine Air Permits Division Texas Commission on Environmental Quality Oil and Gas Facilities Workshop 2013 Hot Topics in Oil & Gas Permitting Joe Shine Air Permits Division Texas Commission on Environmental Quality Oil and Gas Facilities Workshop 2013
56
Embed
Joe Shine Air Permits Division Texas Commission on Environmental Quality
Hot Topics in Oil & Gas Permitting Joe Shine Air Permits Division Texas Commission on Environmental Quality Oil and Gas Facilities Workshop 2013. Joe Shine Air Permits Division Texas Commission on Environmental Quality Oil and Gas Facilities Workshop 2013. Topics for Discussion. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Joe ShineAir Permits Division
Texas Commission on Environmental QualityOil and Gas Facilities Workshop 2013
Hot Topics in Oil & Gas PermittingJoe Shine
Air Permits DivisionTexas Commission on Environmental Quality
Oil and Gas Facilities Workshop 2013
Topics for
Discussion
Application ContentQ2
Enhanced Application Review AIROGAlternate Operating Scenarios (AOS)Small Crude Site RegistrationsePermits
Topics for Discussion
Not-Quite-Scorching-But-Still-Pretty-
Hot-Topics
1. Cover letter
2. Core Data Form
3. PI-7, PI-7-Cert, or PI-1S
4. Copy of check or ePay voucher
Application Admin. Documents Preferred Order
• Emission limitations for Title V applicability
• Federal applicability
• Control/destruction efficiency claims
• Operating hours
When Do I Need to Certify?
1. Introduction2. Process and flow diagram3. Summary of emissions4. Emission calculations5. Impact analysis/NAAQS6. Applicability7. Lab analysis8. Maps9. Tables
Application Technical Documents Preferred Order
Summary of Emissions
1. Introduction2. Process and flow diagram3. Summary of emissions4. Emission calculations5. Impact analysis/NAAQS6. Applicability7. Lab analysis8. Maps9. Tables
Application Technical Documents Preferred Order
• Guidance at www.TexasOilandGasHelp.org
• Three criteria–Reservoir/formation–API gravity–Process/treatment
AIROGIn an effort to process your registration request more efficiently, please respond to the following:
1. To confirm if the company agrees to receive the response letter electronically and that no hard copy will need to be sent. All completed projects can be viewed at: https://webmail.tceq.state.tx.us/gw/webpub.
2. If the company has implemented the project.
3. If the company is waiting on a response from the TCEQ before starting construction.
4. If you have any updates to the project listed above, please send them in now.
–New/existing Non-rule Standard Permit registrations
ePermitting
• New projects in ePermitting–New/revision §106.352(l)–New/existing Standard Permit §116.620–New §106.263–APD certifications–Well completion/flowback notification