Top Banner
Common Permit by Rule Authorizations in Texas Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014
41

Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Apr 01, 2015

Download

Documents

Karen Skillman
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Common Permit by Rule Authorizations in Texas

Joe Shine

Air Permits Division

Texas Commission on Environmental Quality

Environmental Trade Fair 2014

Page 2: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Permit by Rule 106.A3168Alchemy

Definition - the ability to transform base metals into the noble metals (gold or silver)

Page 4: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Permit by Rule 106.A3168Alchemy

Rule language –

Equipment and facilities used for the process of alchemy is permitted by rule.

Page 5: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Today’s Topics

General Information About Using PBRs

Most Common PBRs

What to Include in the Application

New Processes

Page 6: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Using a PBR

Pros Other Considerations

No circumvention

No partial permitting

No customization

Lower fees

Faster response time

Quicker response time

Lower fees

Cannot customize – all or nothing

Cannot partially permit a process

Cannot circumvent permitting

Page 7: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Using a PBR

Claiming vs. Registering◦Claiming – Keep records to show compliance

with all rules and regulations

◦Registering – Submitting documentation to TCEQ and paying a fee

Certification vs. Registration◦PI-7

◦PI-7CERT or APD-CERT

Page 8: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Most Common PBRs

§106.433 – Surface Coating

§106.452 – Dry Abrasive Cleaning

§106.261/262 – Facilities

470 series – Tanks, Loading, Storage

140 Series – Aggregate & Pavement

§§106.352, 359, 492, 512 – Oil and Gas

Page 9: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Surface Coating

Page 10: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.433

Enclosed vs. non-enclosed surface coating

13 tpy VOC vs. 25 tpy VOC

Exempt solvents

Process MSS vs. non-process MSS

Page 11: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.433

MSDS: technical and air quality data

Calculations

◦Surface Coating Facilities Guide

◦Calculation Spreadsheet for Estimating Emissions

Chapter 115, Federal Standards, MSS

Page 12: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Dry Abrasive Cleaning

Page 13: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.452

Enclosed vs. non-enclosed

Blast media

Distance limits

Usage limits

MSS

Page 14: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Facilities

Page 15: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.261 and §106.262

Only use when there is not a more specific rule

Account for all upstream/downstream impacts

MSS

Represent all associated NSR Permits

Certify major sites

Page 16: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.261 and §106.262 Common Issues

Can you use current version of TLV?

Annual submittal ◦Easier, cheaper when prepared all together

◦We allow “portable” annual notifications if each site < 5 tpy

Page 17: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.261 and §106.262Limits

6 lb/hr & 10 tpy

1 lb/hr & 4.38 tpy

E=L/K

Net increase on new hour

Netting

Is it okay to exceed permitted allowable?

Page 18: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Tanks, Storage, and Loading

Page 19: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.470 - §106.478

Authorizes:

◦New construction

◦New service of existing tank

◦Change of service

Is “tank memo” still in effect?◦Using PBRs §106.261 and §106.262

Page 20: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Aggregate & Pavement

Page 21: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.141- §106.150

Calculations: AP-42 and throughput

Using engines?

§106.4(a)(4)

◦PM10 limit = 15 tpy

◦PM2.5 limit = 10 tpy

Include a project description

Page 22: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.141- §106.150

MSS: process vs. non-process

Include a plot plan

RFC (site review) required

Distance limitations

Page 23: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Oil and Gas Sites

Page 24: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Oil and Gas §106.352 - Oil and Gas Handling and

Production Facilities

§106.492 - Flares

§106.512 - Stationary Engines and Turbines

§106.359 - Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities

Page 25: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

PBR Options – Location

In Barnett Shale counties

• New – 30 TAC §106.352(a)-(k)

• Existing – 30 TAC §106.352(l)

Not in Barnett Shale counties

• New & existing – 30 TAC §106.352(l)

• May voluntarily register under §106.352 (a)-(k)

Page 26: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Barnett Shale Counties

Page 27: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.352(l)

§106.352 (l)◦Sweet:

No registration required, meet §106.4 limits, and keep records

◦Sour (> 24 ppm H2S): Registration required ¼ mile distance limit, 4.0 lb/hr limit of sulfur

compounds, vent height requirements

Page 28: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.352(a-k)

§106.352 (a-k)◦Notification and registration through ePermits

system

◦Notification - Prior to construction or implementation of changes

◦Registration Level 1 - Within 180 days from start of operation Level 2 - Within 90 days from start of operation

Page 29: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

§106.492 and §106.512

§106.492◦May be used in combination with §106.352 (l)

◦May require certification

§106.512◦May be used in combination with §106.352(l)

◦Requires registration if > 240 hp

◦May require certification

Page 30: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Submitting

the

Application

Page 31: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Application Admin. Documents Preferred Order

Cover letter

Core Data Form

PI-7, PI-7-CERT, APD-CERT

Copy of check or ePay voucher

Page 32: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

When Do I Need to Certify?

Emission limitations for Title V applicability

Federal applicability

Control/destruction efficiency claims

Operating hours

Page 33: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Application Technical Documents Preferred Order

Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables

Page 34: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Summary of Emissions

Page 35: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Application Technical Documents Preferred Order

Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables

Page 36: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Lab AnalysisSite Specific/Representative

Guidance at www.TexasOilandGasHelp.org

Three criteria◦Reservoir/formation

◦API gravity

◦Process/treatment

Page 37: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Application Technical Documents Preferred Order

Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/ NAAQS Applicability Lab analysis Maps Tables

Page 38: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

New Processes

and Changes

New Processesand

Changes

Page 39: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Enhanced Application Review (E.A.R.)

Purpose

E-mail notification ◦[email protected]

Expectations

Approval letter will be sent through e-mail unless specified otherwise.

Page 40: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Auto Deficiency

All Applications Oil & Gas Specific

Emissions Summary Table Gas and liquid analysis

Emission calculations/ documentation

Sour site < ¼ mile (for §106.352 (l) only)

RO signature matches (certifications only)

Flash calculations

Response to a VOID and not all issues addressed

NOX NAAQS compliance(§106.512 only)

Justification for DRE above default allowables

Begins 6/1/2014:

Page 41: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014.

Questions?

[email protected]

Air Permits main line: (512) 239-1250