Page 1: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Jacobs Project Management

Presented by:

Mark Smith, PMP

Jon McVay, PMP

Page 2: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Jacobs Project Management

Today’s Presentation will include: Who we are Some of our tools and techniques in the

context of IPECC (Integration Management) Initiation Planning Execution Control Closure

Page 3: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Who is Jacobs?

Jacobs Engineering Group Inc. is one of the world’s largest and most diverse providers of professional technical services. Annual revenues approaching $8 billion Nearly 45,000 employees, world wide Fundamental business strategy is building long-

term client relationships

Page 4: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Who is Jacobs? (continued)

Fortune Magazine’s 2006 Most Admired Engineering and Construction Company

2006 Leadership Recognition Engineering News-Record Top 500 Design Firms, Jacobs ranked: Overall – No. 3 Hazardous Waste – No. 7 General Building – No. 5 Industrial Process/Petroleum – No. 3 Transportation – No. 5 Manufacturing – No. 2

Page 5: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

What do you do in Alaska?

Our roughly 60-person Anchorage Office primarily performs environmental work for federal clients Engineering, procurement, and construction

management $20M in annual revenues

Penetrating the local oil/gas market Completing modest design/construction projects Support hub for Pacific Rim projects

Page 6: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Initiation

Proposal risk assessment, go/no go Proposal preparation and estimating Project strategy meeting Kickoff meeting Client expectation survey Risk analysis and mitigation

Page 7: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Planning

Refine/define scope Interactive planning Develop project execution plan Develop wbs Sequence/schedule Identify/refine resource needs Write workplan Acquisition planning

Page 8: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Planning (continued)

1.0 Introduction 2.0 Project Description 3.0 Scope of Work 4.0 Design Strategy 5.0 Procurement Strategy 6.0 Execution Strategy 7.0 Schedule 8.0 Resources 9.0 Communications 10.0 Concerns

Page 9: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Execution

Page 10: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Execution (continued)

Manage the work-provide the service/product Scope

Safety Quality

Schedule Budget

Communication / stakeholder management

Page 11: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Control

Cost and schedule Earned Value Operational Project Reviews Client status update Readiness review Quality audit

Page 12: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.
Page 13: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Readiness Review

Approved Designs/plans Approved Permits Temporary facilities Equipment ordered/in place Security clearance Staffing identified/in place Document management/control system in place Work identified/in place Subcontracts in place

Page 14: Jacobs Project Management Presented by: Mark Smith, PMP Jon McVay, PMP.

Closure

Client-specific requirements Subcontract closeout Document retention Client satisfaction survey Lessons learned