IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

Jan 10, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

I W O C S U M B I L I C A L SC U R R E N T C H A L L E N G E S

Page 2: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

2

Fibron have been manufacturing workover control umbilicals for over 20 years.

Page 3: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

3

CHALLENGES

• Workover/Intervention umbilicals, out of necessity,

have become longer.

• The deployment reelers now require significant deck

space to accommodate the increased footprint.

• Umbilical reliability is key to minimise down time and

allow the operators to meet their commitments

In this presentation I want to draw your attention to

some of the limitations in using the current standard to

rigidly control the design and manufacture of workover

control (WOC) umbilicals.

Page 4: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

4

ISO 13628-5

• This presentation will focus on the standard 13628-

5:2009 Petroleum and natural gas industries —

Design and operation of subsea production systems

— Part 5: Subsea umbilicals.

• Many of the sections need to be adapted or refined

before they can be applied to IWOCS umbilicals.

• Rather than reviewing the complete standard we’ll

consider how this standard applies to the

subcomponents and then the umbilical verification

tests.

Page 5: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

5

COMPONENTS - CABLES• Minimum nominal cross-sectional area of the

conductors in the umbilical shall be 2.5mm².

• Minimum DC high voltage test requirement of 5 kV

DC.

Page 6: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

6

COMPONENTS - HOSES

• Hose reinforcement shall be comprised of one or

more layers of synthetic fibre.

• Hose should have a burst pressure greater than

4x the DWP.

• For high pressure hoses the standard leaves it up

to the umbilical manufacturer to determine the

appropriate DWP to BP ratio.

Page 7: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

7

BURST/IMPULSE TEST• For HP hydraulic hoses it becomes increasingly

difficult to meet the 4:1 burst to working pressure ratio.

• The impulse test of 1.33x DWP at a rate of .0.5Hz to 1.3Hz is not representative of the actual working conditions

Page 8: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

8

UMBILICAL QUALIFICATION TESTS

Standard qualification tests are:-

1. Lay-up trial

2. Combined torsion balance and tension

3. Bend stiffness test

4. End termination strength and fatigue

5. Combined tension and bending test

6. Crush test

7. Internal/External friction factor assessment

8. Bundle impact test

9. Fatigue

10.Free flooding rate

11.Hydrostatic test

12.Topside termination interface test

13.Repair splice qualification

Page 9: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

9

COMBINED TORSION BALANCE AND TENSILE TEST• Braids inherently torque balanced

• Umbilical usually clamped to a riser or lift line

• Subsea terminations can be slimline,

• Surface (reeler) termination is typically a clamp or

cable grip

Page 10: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

10

BEND STIFFNESS TEST• Stiffness calculated using beam theory.

• Umbilical rotated through 180° and retested.

• Stiffness taken as the average of the 4 rotations.

• Not required for the majority of WOC’s umbilicals

clamped to risers.

Page 11: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

11

END TERMINATION STRENGTH & FATIGUE

• This test is usually replaced with a proof load test

on the actual subsea termination.

• Test normally carried out using a fibre cable grip

platted over the umbilical outer sheath

Page 12: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

12

COMBINED TENSION & BENDING TEST

• By convention this test is replaced with a reeling/unreeling test.

• The test is either 1,500 or 3,000 cycles over two deployment roller sheaves.

• 2nd sheave simulates the reverse bend encountered during deployment in heave compensation mode.

• One cycle comprises an outward and return stroke with the section under test passing back and forward through both sheaves.

Page 13: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

13

CRUSH TEST

• Umbilical clamped between two plates to simulate

over boarding using a hold back caterpuller.

• Should be replaced with a clamp test for WOCS

• Umbilicals clamped to a riser.

Page 14: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

14

INTERNAL/EXTERNAL FRICTION FACTOR

• This test is used to determine the friction factor

between the umbilical sheath and the holdback

caterpuller pads – the test is not carried out on

workover control umbilicals.

• The friction factors between the components is

not directly measured but the umbilical fatigue

test, described in a later slide, tests the umbilical's

ability to meet the operational requirements.

Page 15: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

15

BUNDLE IMPACT TEST

• Impact test not normally applicable as the

umbilical is not subject to rock dumping.

Page 16: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

16

FATIGUE TEST

• By convention fatigue test taken as either 100,000

or 120,000 cycles over the deployment roller

sheave

• One cycle comprises an outward and return stroke.

• The stroke length is taken as a multiple of the

umbilical assembly pitch.

Page 17: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

17

FREE FLOODING TEST

• To determine the longitudinal flow rate through the

interstices of the umbilical.

• Again this test is not normally carried out on

workover control umbilicals.

• The picture on the right shows an umbilical clamp

attached to the umbilical to test if the clamp

restricts the flow through the interstices.

Page 18: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

18

HYDROSTATIC TEST

• The interstices of the umbilical are free flooding and so the hydrostatic test is not carried out on the umbilical bundle.

• Hydraulic hoses are either fluid filled or pressure compensated to counteract the external pressure.

• Non-collapse hoses are tested under external pressurised to determine their collapse rating.

• The insulated conductors are subjected to an external pressure test.

Page 19: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

19

REPAIR SPLICE QUALIFICATION

• IWOC’s umbilicals are deployed from a reeler

– no topside termination to test.

• The umbilicals are dynamic and pass over a

roller sheave. Repair splices are emergency

repairs to complete a task

• Repair splice will usually require the ‘keeper’

rollers to be disconnected from the roller box

and possibly the fleeting mechanism to allow

the repair to pass through to the reeler drum.

Page 20: IWOCS UMBILICALS CURRENT CHALLENGES kearney.pdf · control (WOC) umbilicals. 4 ISO 13628-5 ... •One cycle comprises an outward and return stroke with the section under test passing

I M M E R S EReview, Observation, Assemble Team and Lead Times

S U B M E R G EDesign Review & Issue Specs

E N G A G EManufacture of Product

D E P L O YPacking, Launch and Maintain

I M P L E M E N T AT I O NFactory Acceptance and Qualification Testing