1 LET’S GET IT DONE INSTALLATION GUIDE ®
12

INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

Jun 30, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

1LET’S GET IT DONE

INSTALLATION GUIDE

®

Page 2: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

2

Tools You’ll Needo Laser or Transito Measuring Tape (long enough to mark R-Tank® footprint)o Razor Knifeo Screw Driver / Nut Driver Set (for pipe boots)o String Lineo Marking Painto Reciprocating Saw (to cut in inspection & maintenance ports) If you’re assembling R-Tanks®

o Dead-Blow Malletso Work Tables (3/4" plywood placed on R-Tanks® works well)

Materials You’ll Needo R-Tank® Unitso Geotextileo Geogrid (only for load bearing applications)o Liner (only if required by plans)oBase&BackfillMaterial(perspecsection2.03)o Pipe Boot Kits (If not using kits, you’ll need duct tape and a stainless steel band clamp for each inlet and outlet pipe,andforeachinspectionormaintenanceport.)oMaintenancePortKits(Ifnotusingkits,youwillneednoncorrosiverigidanti-scourpad[15”x15”tofitbelow MaintenancePorts.],fabricpipeboot,ducttape,stainlesssteelbandclamp12”schedule40pvcpipeandH20 ratedringandcover.)o Metallic Tape

Equipment You’ll Needo Forklift and other equipment/tools needed to unload box trucko Pallet jack (to unload material from box truck)o Walk-Behind Trench Roller (Plate compactor may work for smaller projects)oLowGroundPressure(LGP)trackedSkidSteerorDozer(<7.0psiGrossOperatingPressure)oLGPDozer-10TonMaxGrossVehicleWeightand7.0psiMaxOperatingPressureoRoller-6TonMaxGrossVehicleWeight

Note:Thislistdoesnotincludeequipmentortoolsneededtoexcavateorleveltheflooroftheexcavation.

Fig.4Excavateaccordingtoplans,followingallgovernmentalregulations.

PRE-CONSTRUCTION CHECKLIST

The excavation limits and the location of the R-Tank® System should bestakedout.Thedesigndrawingsshouldbeused todetermine theselocations.Iftheexcavationlimitsarenotshownontheplans,thenadd2’on each side of the R-Tank®systemtodeterminethelimits.

Excavate thedesignated surveyedareaaccording toplans followingallrelevantlocal,stateandOSHAguidelines.Typicalexcavationsshouldinclude:- Two foot perimeter around R-Tank® to allow for proper compaction of backfill.- Enoughdepthtoaccommodateaminimum3”base(ifrequired)below the R-Tank®.

Level the bottomof the excavation (Fig. 4) as shownonplans.Mostexcavationshaveaflatbottomwhilesomewillslopetowardtheoutletpipe.

STEP 1 - EXCAVATION

R-TANK® INSTALLATION

Page 3: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

3

If R-Tank®unitsarriveonyourproject inflatpanelstheywillneedtobeassembledon-site.Buildingtheunitsshouldtake2-3minutespersegment.This is a conservative estimate used to approximate the total man hours neededforassembly.Theestimateincludestheworkersdoingtheassemblyaswellasmaterialhandlerstokeeptheassemblyworkersmoving.

Unit Time Single 2-3 Minutes

Double 4-6 Minutes

Triple 6-9 Minutes

Quad 8-12 Minutes

Pent 10-15Minutes

AssemblyInstructions–Usingthecorrectnumberofsmallplates(R-TankLD® = 4, R-TankHD® = 5, and R-TankSD ® = 5), connect small panels into one large panel(Fig.2A)inlocationsshowninFig.1.R-TankLD® modules will use the pinholelocationsmarkedwithreddotsinFig.1,whileHDandSDunitswillusepinholelocationscircledingreen.Use4-plateLDmodulesonlyfornon-traffic,greenspaceinstallations.

Next, working from one end to the other, attach a second large plate on the oppositesideofthefirst(Fig.2B).

Fig.1ForstandardR-TankLD® (4-plate) projects, attachsmallplatesatlocationswithreddots.ForR-TankHD® and R-TankSD ® (5-plate) projects, attach smallplatesatlocationscircledingreen.

EXCAVATION - CONT.

Fig.3Installationcanbespedupbyeitherassembling the tanks in the excavation or placing thepre-assembledtanksintheexcavation.

STEP 2 - ASSEMBLE R-TANK® UNITS

Figure 2 Follow these steps to assemble a 5-plate R-TankHD®.

TIP: To increase the speed of the installation, many contractors choose to assemble the R-Tank®unitspriortoorduringexcavationandbasepreparation(Step1). Othercontractorswaituntilthesestepsarecompletedandthenperformthe assemblyINTHEEXCAVATION(Fig3)allowingcompletedunitstobeplacedinto theirfinallocationastheyareassembled.Considerwhichoptionwillworkbest foryourproject.

TIP: ACFoffersanon-siteassemblyservice.Calltorequestaquote,800-448-3636.

Oncethetopandbottomlargeplatesareattached,twomoresideplatesareattachedtocompletethesidesoftheR-Tank®unit(Fig.2C).ThisisaSINGLER-Tank®.Forvideodemonstrationofstandard4plateR-TankLD® assembly go to:https://www.youtube.com/watch?v=0MTzTVkTq5Q

TobuildaDOUBLEunit(orlarger),followthedirectionsabove,startingat“AssemblyInstructions:”usingthetopoftheexistingunitasthelargeplate.

CompletedR-Tank®unitsshouldbestagedasclosetotheinstallationareaaspossible.

Preparethesubgradeaccordingtoplans.Baseofexcavationmustbeuniform,levelandfreeofdebrisandsoftoryieldingsubgradeareas.Compacttoatleast95%StandardProctorDensity(orasrequiredbyEngineer)unlessinfiltrationofstormwaterintosubgradeisdesired.Aminimumbearingcapacityof2,000psf(perspecsection3.02D)mustbeachieved prior to beginning installation of R-Tanks®.

Ifthesubgradeispumpingorappearsexcessivelysoft,thedesignengineershouldbeconsultedforadvice.

A

C

B

D

R-TANK® INSTALLATION 800.448.3636 acfenvironmental.com

Page 4: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

4

STEP 3 - PREPARE BASE

TIP: Creatingasmooth,levelplatformwillallowforfasterinstallation of R-Tank®modules,astheywillfittogetherevenly,eliminating detailworkthatcandelayyourprogress.

Fig.4Basemustbesmoothtoensureunitsfittogetherwithoutgaps.

Athinlayer(3”)ofmaterialisrecommendedtoestablishalevelworkingplatform.

In regions with sandy soils meeting the requirements noted and where the subgrade elevation is above the groundwater table, imported base materials maynotbeneeded.(Formoreinformationseespecificationsection2.03A.)

Standing water in the excavation will prevent proper base preparation and mustberemoved,ifpresent.

Installbasematerials.Basematerialsmustmeetspecsection2.03A.

Grade and level base as shown on plans with no more than 1/2” variance (+/-1/4”).Basemustbefreeofdebrisandlargerocks.

Geotextile will be required below the R-Tank®onmostprojects,butnotall.Checkyourplanstoensurethatgeotextileistobeplacedbetweenthebaseand the R-Tank®units.

Cutfull-widthstripsofGeotextiletotheproperlengthandplacethemoverthebase,coveringtheflooroftheexcavation.Thegeotextileshouldextendat least 2’ beyond the edge of the R-Tank®footprint.

TIP: Some contractors choose to cut the geotextile strips long enough to wrap up the sides and over the top of the R-Tank® inasinglepiece(Fig.5).Ifspaceallowsandthefoldedflaps of geotextile will not slow your progress, you may want to considerdoingthis.Ifalinerisrequiredonyourproject,this methodshouldbeusedtoprotecttheliner.

STEP 4 - PLACE GEOTEXTILE

Fig.5Pullwrinklesoutofgeotextilessomateriallaysflat.

R-TANK® INSTALLATION

Page 5: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

5

Geotextiles are flammable. No smoking should be permitted on thegeotextile.Adjacentpanelsofmaterialshouldbeoverlappedby12”ormore,asshownontheplans.

Use pins, staples, sandbags or other ballast to hold the geotextile in place, preventingitfromblowingorslidingoutofposition.

Patch any holes made in the Geotextile by placing a small patch of fabric over thedamagedarea.Thepatchmustbelargeenoughtocoverthedamagedareawithatleast12”ofoverlaponundamagedmaterial.

If a liner and/or additional geotextile is required per plans, install these now asshownontheprojectplans.

Determinethestartinglocation.Itisoftenhelpfultouseaninletoroutletpipetoguideyou.Usingastringline,establishtwoadjacentedgesoftheR-Tank®footprint.Ensurethatyourcornerissquare.Markthesetwoedgeswithmarkingpaintandremovethestringline(Fig.7).

IMPORTANT: If using a liner, be careful not to puncture it withstakesorpinswhileplacingyourstringline.

Begin placing R-Tanks®inthecornerofthemarkedarea.DoNOTplaceunitsontheirsides,asthiswillvoidthewarranty.Checkyourplanstoensurecorrect orientation of the R-Tanks®(Fig.8).

ChecktheplanstoensuretheR-Tanks® are running in the correct direction (North/Southvs.East/West)tomatchthefootprintshownonplans.- R-Tank®Width–15.75”- R-Tank®Length–28.15”

TIP: Moving R-Tank® units into the excavation quickly is essentialtoaprofitableinstallation.Manycontractors fabricate a platform that can be lifted by their forklift to quicklymovealargenumberofunitswitheachtrip.

PLACE GEOTEXTILE - CONT.

Fig.6Reducedoverlapsdon’tcreatesignificantsavingsandcancreatedelays.

TIP: Manycontractorsfindthatitisbotheasierandless expensive to have specialty contractors install the liner (typicallyusedwhenbuildingacistern).Ifyouare installingalineryourself,handleitVERYCAREFULLYto avoiddamage.

Fig.8Makesurethetanksareorientedproperlyintheexcavation.

Fig.7Useastringlineandmarkingpainttosquarethesystemfootprint.

R-TANK® INSTALLATION 800.448.3636 acfenvironmental.com

STEP 5 - INSTALL R-TANK® MODULES

Page 6: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

6

INSTALL R-TANK® MODULES - CONT.

Fig.9Minorvariations(lessthanwidthoftopplate)intankheightareacceptable.

Fig.10Planviewshowingtheendrowsturnedper-pendicular.Thecornersmaynotmatchupperfectly,sotwoacceptablealternativesareshown.Mostplansdonotshowthisconfiguration.Fieldadjustmentsareeasilymade.

Fig.11InstalledInspectionPort

Fig.12Cutthehorizontalplatestoaccommodateallports.

STEP 6 - INSTALL INSPECTION / MAINTENANCE PORTS

R-Tank®unitsshouldfittogetherevenly.Occasionalminorgapsbetweenunits(<½”)orvariationsintheheightoftheunits(<½”)areacceptable(Fig.9),butreasonableeffortsshouldbemadetominimizethesevariations.Ifgaps or height variations persist through 3 or more adjacent units, remove themodulesandpullbackthetextiletorepairbase.

No lateral connections between adjacent R-Tank®unitsarerequired.

IMPORTANT: Anyonewalkingdirectlyontopoftheunitsshould be instructed to keep their weight over the vertical supportsofthetanktopreventdamagingtheunits.

The large side plate of the tanks should be placed on the perimeter of the system.Thiswillrequirethattwoendsofthetankareawillhavearowoftanksplacedperpendiculartoallothertanks(Fig.10).

Option1:Endcolumnshouldcover75%ofthefinalmodule.Option2:Endcolumnmayextendbeyondthefinalrow.

Allportsshouldbemadefrompipelongenoughtoextendfromthebottomof the R-Tank®tofinishedgrade.TheyaretypicallySchedule40PVCpipe,butcanbeformedfromothertypesofpipe,aswell.

Identify the location of all ports and remove the R-Tank®fromeachlocation.

Inspection Ports (if required):Typicallymadefrom6”Schedule40PVCpipe,cutthepipetolength,leavingenoughexcesstotrimthetopwhenfinalgradeisreached(Fig.11).

If the pipe is not already perforated, cut several horizontal slots in the pipe startingatthebottom.Perforationsshouldextendashighastheheightofthe R-Tank®unitsbeingused.Noperforationsshouldbevisibleabovethetop of the R-Tank®oncetheportisinplace.

Using your reciprocating saw, cut the horizontal R-Tank®plates(Fig.12)toaccommodatetheport.Ifthepipewillnotfitbetweentheverticalinteriorplates,removingthecenterplatewillcreateadequatespacefortheport.Ifspace allows, shift the two remaining internal plates to the inner connection points(shownasreddotsinFigure1)tobalancetheunit.

TIP: InspectionPortsarenotcommonlyused.Ifnotshown onyourplansskipaheadtoMaintenancePortsonpage7.

lOption 1

kOption 2

R-TANK® INSTALLATION

Page 7: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

7

INSTALL INSPECTION / MAINTENANCE PORTS - CONT.

For all units larger than a Single R-Tank®, you will need to disassemble the R-Tank®inordertocuttheinteriorplates.ReassembletheR-Tank® when cutting is completed, and replace the R-Tank®intotheproperlocation.

Install the pipe into the R-Tank®unit.

Seal the opening on top of the pipe with a cap or temporary lid to prevent debrisfromenteringthesystem.

Maintenance Ports:Typicallymadefrom12”Schedule40PVCpipe(checkplansforactualsizeand type of pipe), cut the pipe to length, leaving enough excess to trim the topwhenfinalgradeisreached.

Using your reciprocating saw, cut several 8” triangular notches into the bottomofthepipeasshownonplans(Fig.14).Drillseveralairventsintothe pipe just below where the top of the R-Tank® will be once the pipe is installedintothetank.

Fig.13Additionalspaceforportscanbe created by removing the center plate and moving the remaining internal plates towardthecenter(ifpossible).

IMPORTANT: Do not over-cut the R-Tank®plates.Minimizethe gaps between the pipe and the R-Tank®plates. Thisisparticularlyimportantwiththetopplate.

TIP: If using Prefabricated Pipe Boot Kits, install them onto the pipe now, leaving the band clamps loose so that finaladjustmentsmaybemadeinStep7.

TIP: If the location of Maintenance Ports is not shown on your plans,includeaportwithin10’ofallinletandoutletpipes (a single Maintenance Port can cover multiple pipe connections), and include additional Maintenance Ports as needed to prevent the distance between ports fromexceeding50feet. Fig.14Cut8”notchesintothebottomof

MaintenancePort.

800.448.3636 acfenvironmental.comR-TANK® INSTALLATION

UNIT CUT Single 1 Plate Double 2 Plates Triple 3 Plates Quad 4 Plates Pent 5 Plates

Page 8: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

8

INSTALL INSPECTION / MAINTENANCE PORTS - CONT.

Fig.15Ifafteradjustingtheinternalplates,thepipewillnotfit,thetopplatecanbecutoff-centerandoneoftheinternalplatescanberemoved.

To accomodate the maintenance port, remove the center interior small plate(notrequiredforLD).Usingyourreciprocatingsaw,cutthehorizontalR-Tank®platesinthecenter,betweenthetworemaininginternalplates.Allhorizontally oriented plates will needtobecutEXCEPTFORTHEBOTTOMPLATE.Intotalyouwillneedto:

Single 1 Large Plate Double 2 Large Plates Triple 3 Large Plates Quad 4 Large Plates Pent 5 Large Plates

For all units you will need to disassemble the R-Tank® in order to cut and/ormovetheinteriorplates.

Reassemble the R-Tank®whencuttingiscompleted.Remembertoinsertthe non-corrosive anti-scour pad in the bottom of the R-Tank®(shouldfitdirectly below the Maintenance Port), and replace the R-Tank® into the properlocation.(Fig.15)

Install the pipe into the R-Tank®unit(Fig.16)andmakesureitisplumb.

Temporarily seal the opening on top of the pipe with a cap or temporary lid topreventdebrisfromenteringthesystemduringconstruction.

Cleanoffanydebris thatmaybe lyingon topof theexposedgeotextilearound the perimeter of the R-Tank®.

CutstripsofgeotextiletofitoverthetopanddownbothsidesoftheR-Tank® withatleast2’ofexcessmaterialoneachsideofthesystem.This2’flapshould overlay the geotextile placed below the R-Tank® units, creating a clean24”overlaptosealthesystem.

Fig.16Installedmaintenanceport

Fig.17InstallportintoR-Tank®.

TIP: If using Prefabricated Pipe Boot Kits, install them onto the pipenow,leavingthebandclampsloosesothatfinal adjustmentsmaybemadeinStep7.

Unit Cut

Fig.18Maintain12”overlapontextile.

R-TANK® INSTALLATION

IMPORTANT: Do not over-cut the R-Tank®plates.Minimizethe gaps between the pipe and the R-Tank®plates. Thisisparticularlyimportantwiththetopplate.

STEP 7 - SEAL R-TANKS® WITH GEOTEXTILE

Page 9: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

9

Adjacentstripsofgeotextileshouldoverlapatleast12”orasshownonplans.Useducttape,sandbagsorotherballasttotemporarilysecureoverlaps.

WherethegeotextileintersectsanInspectionorMaintenancePort,cutan“X”intothegeotextileandpullitoverthepipe.Theflapsofthe“X”shouldpointAWAYfromtheR-Tank®(Fig.19).Useafabricbootandastainlesssteelbandclamptosealtheflapstothepipe.

Fold geotextile for outside corners similar to sheets on a bed, and lay excess materialflatagainstR-Tank®(Fig.21).Leavecornersloosetoavoidcreatingweakspotsinthematerial.Temporarilysecureexcessfabricwithducttape.

ConnectInlet&Outlet Pipes

Where the inlet and outlet pipes connect to the R-Tank®,cutan“X”intothegeotextilesothatthepipemakesDIRECTcontactwiththeR-Tank®.Pulltheflapsofthe“X”overthepipesothattheflapsofthe“X”pointAWAYfromtheR-Tank®.Useastainlesssteelbandclamptosealtheflapstothepipe.

If used, adjust all pipe boots so that the fabric lays snug against the R-Tank®.Tightenthebandclampswithascrew/nutdriver.Useducttapetosecurethebootflaptotheoutsideofthegeotextileenvelope.

Walk bottom edge of geotextile along the sides of R-Tank to eliminate gaps between the fabric and the bottom corner of the R-Tank®.

Fig.19Cutan“X”intotextiletoaccomodatepipepenetrationandsealwithaboot.

SEAL R-TANKS® WITH GEOTEXTILE - CONT.

Fig.20EncapsulateR-Tanks®withgeotextile.

TIP: If using Prefabricated Pipe Boot Kits, install them onto the Inlet andOutletPipes,leavingthebandclampsloosesothat finaladjustmentsmaybemade.(Fig.22)

R-TANK® INSTALLATION 800.448.3636 acfenvironmental.com

IMPORTANT: TakespecialcarewithInsideCornersonthefootprintof thesystem.Cutgeotextileasneededtoensurethatit laysflatagainsttheR-Tank®.Useadditionalpiecesof geotextile to seal the corner and any cuts that are made (12”overlap).

WARNING: InletandOutletpipesmustmakeDIRECTcontactwith the R-Tank®,allowingwatertoflowdirectlyintooroutof the R-Tank®withoutfilteringthroughthegeotextile.Failing tocorrectlyconnectpipeswillcausethesystemtomalfunction.

Fig.22Sealthepipebootwiththeincludedbandclampsandducttape.

Fig.21FinishedenvelopeshouldlayflatagainstR-Tank®.

Page 10: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

10

DumpbackfillmaterialadjacenttotheR-Tank® and, using your LGP Skid Steer or Dozer, push the material over the R-Tank®system(Fig.24).Backfillmustmeetrequirementslistedinspecificationsection2.03B.

Thislistisnotintendedtobeallinclusive,butrepresentative.

Ifyourmachine isnot listedandyoucannotfinditsgroundpressure,you’llneedtofindyourvehicle’sOperatingWeightandmeasuretheareawherethetrackscontacttheground.Takethesedimensionsandmultiplythem (Length xWidth),thenmultiplyby2(sincethemachinehastwotracks),thendividetheOperatingWeightbythetotalsquareinchesofcontactareatodeterminethecontactpressureofthemachine.Ifthecontactpressureislessthan7.0psiandtheoperatingweightislessthan20,000lbs,themachinewillworkwith12”ofcover.

Placebackfillmaterial(seespecificationsection2.03B)aroundperimeterof the R-Tank®, distributing the material evenly to prevent shoving of the R-Tank®units. Allbackfillmaterialmustmeetrequirementslistedinthespecification.

Useatrenchrollerorplatecompactortocompactbackfillin12”lifts(Fig.23).

Continueplacingandcompactingbackfillin12”liftsuntilthematerialreachesthe top of the R-Tank®units.

STEP 8 - BACKFILL SIDES

STEP 9 - BACKFILL TOP

Fig.23VibratorycompactionofsidebackfillisALWAYSREQUIRED,regardlessofwhatbackfillmaterialisused.

R-TANK® INSTALLATION

IMPORTANT: Vibratorycompactionofthesidebackfill(Fig. 23)isacriticalstepthatbothcompactsthebackfill and eliminates the minor gaps between individual R-Tank®units.Whilesomebackfillmaterials willyielda95%proctordensitywithoutcompaction, vibratory compaction of the material must be completed toensurethestabilityofthesystem.Skippingthis stepwillvoidthemanufacturer’swarranty.

Machine Operating Track Ground Weight Dimensions Pressure

Case850KLGP 20,700lbs 28”x92.6”=2593si 4.0psiCaterpillarD5KLGP 21,347lbs 26”x91”=2366si 4.52psiJohnDeere550JLGP 18,252lbs 24”x86”=2064si 4.2psiKomatsuD39PX-21 19,620lbs 25”x93”=2325si 4.27psiNewHollandD95LGP 20,700lbs 28”x93”=2604si 4.0psi

Largest Track Dozers that can be used with 12” of cover over R-Tank®

Page 11: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

11

BACKFILL TOP - CONT.

Lightlycompacttopbackfillto95%standardproctordensityorasshownonplansusingyourwalk-behindtrenchroller.Alternately,aroller(maximumgrossvehicleweightof6tons)maybeused.Rollermustremaininstaticmode until a minimum of 24” of cover has been placed over the modules (perspec,section3.05AS).Sheepfootrollersshouldnotbeused.

Geogridisrequiredforallload-bearingapplications(Fig.25),suchassystemsplacedbeneathparkinglotsandroads.Itisnotrequiredabovesystemsusedinopenspacewheretrafficisprohibited,suchassportfieldsornaturalareas.

Geogrid must be placed 12” above the R-Tank®.Overlapadjacentpanelsby18”minimumorasspecifiedinplans.RolloutGeogridoverthetopofthesystem, with the edges of the grid extending 5’ from R-Tank® footprint or 3’beyondtheedgeofexcavationormoreasshowonplans(refertoCADdetailHS20loads).

Ifmetallictapeusedtolocatethesystemhasbeenspecified,nowisagoodtimetoinstallit.

Fig.24UseanLGPdozertopushbackfilloverR-Tank®units.

TIP: WhenpushingbackfilloverR-Tank® units, work in the direction of the geotextile overlap to avoid shovingmaterialbetweenthefabriclayers.

WARNING: Aminimumof12”ofmaterialmustbemaintained between the Dozer tracks and the top of the R-Tank®. For best results, push at least 14” (or more if needed) ofbackfillovertheunitssothatasthematerial compacts beneath the dozer, a 12” minimum lift is maintained.Itisrecommendedthatthedozer drivestraightonandthenbackstraightoffofthe systemduringbackfillplacement.Turning movementsarelikelytoshovethebackfill material, reducing the thickness of the lift and potentially damaging the R-Tank®modules.

WARNING: Somematerialswillcompactsignificantlywhile othersmayshoveexcessivelyasyouwork.Never allow your lift thickness to compact to less than 12” withoutaddingmorematerial.

WARNING: Dump trucks should not drive over or dump material on top of the R-Tank®.

STEP 10 - PLACE GEOGRID

Fig.25OverlapGeogrid18”orasrequiredbyplans.

R-TANK® INSTALLATION 800.448.3636 acfenvironmental.com

Page 12: INSTALLATION GUIDE - Bowman Construction Supply · o Forklift and other equipment/tools needed to unload box truck o Pallet jack (to unload material from box truck) ... pipe to guide

12

If additional cover or pavement base is required by the plans, begin placing andcompactingmaterialinthesamemannerasdiscussedinStep9.Pushcovermaterialparalleltothegeogridforbestresults(Fig.26).Allcovermaterialmustmeetrequirementsofspecificationsection2.03.

ConstructionloadsareoftentheheaviestloadsthateverdriveovertheR-Tank® System, and there are many construction vehicles that exceedtheHS20standardthatmostdetentionsystemsaredesignedtomeet.Toprevent damage from these vehicles, the installation should be securedtopreventunauthorizedtrafficfromdrivingoverthesystemonceithasbeeninstalled.

Projects nearing completion (within three months) should use warning tapeortemporaryfencingtosecuretheinstallation(Figure27).

For larger projects with ongoing construction activities, consider a more durablemethodforpreventingunauthorizedtrafficfromaccessingthesystem(Figure28).

Regardless of what method is selected to secure the installation, it must remain in place until construction activity has concluded and no further accessofvehiclesexceedingtheHS20standardisnecessary.

Install pre-treatment devices prior to activating R-Tank® System to keep anydebrisfromenteringthesystem(Figure29).

Fig.26PushingbackfillparalleltotheGeogridpreventsthegridfromshoving.

STEP 11 - PLACE ADDITIONAL COVER AS NEEDED

Fig.27Securetheinstallationwithtemporaryfencing.

STEP 12 - SECURE THE INSTALLATION

Fig.28SecuredR-Tank® installation using Jersey Barriers.

STEP 13 - INSTALL PRETREATMENT DEVICES

For more information about Stormwater Management, contact Inside Sales at 800.448.3636email at [email protected]

TIP: To achieve proper compaction requirements, it maybebeneficialtobeginplacingmaterialin6”lifts.

Fig.29TrashGuardPluspreventscontaminationofyoursystem.

R-TANK® INSTALLATION

2 2017

WARNING: Maximum cover for standard R-TankLD® systems (4-plate)is3’.UseR-TankHD® units for cover depthsless than 7’, R-TankSD ® units for cover depths up to10’,andR-TankXD®unitsforcoverdepthsupto16’.If you suspect the incorrect module is being used onyourproject,pleasecontactACFEnvironmentalat800-448-3636.