CIGRE US National Committee 2014 Grid of the Future Symposium Initial Field Trials of Distributed Series Reactors and Implications for Future Applications Ian Grant Tennessee Valley Authority Presented by: BRUCE ROGERS, Director, Technology Innovation, TVA CHIFONG THOMAS, Director, Transmission Planning and Strategy, SWG Inc. I GRANT Tennessee Valley Authority USA J COUILLARD Smart Wire Grid Inc. USA J SHULTZ Tennessee Valley Authority USA F KREIKEBAUM Smart Wire Grid Inc. USA S OMRAN Virginia Tech USA R BROADWATER Electrical Distribution Design (EDD) USA
25

Initial Field Trials of Distributed Series Reactors and ...

Dec 20, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Initial Field Trials of Distributed Series Reactors and ...

CIGRE US National Committee

2014 Grid of the Future Symposium

Initial Field Trials of Distributed Series Reactors and Implications for Future Applications

Ian Grant Tennessee Valley Authority

Presented by: BRUCE ROGERS, Director, Technology Innovation, TVA CHIFONG THOMAS, Director, Transmission Planning and Strategy, SWG Inc.

I GRANT Tennessee Valley Authority

USA

J COUILLARD Smart Wire Grid Inc.

USA J SHULTZ

Tennessee Valley Authority USA

F KREIKEBAUM Smart Wire Grid Inc.

USA S OMRAN

Virginia Tech USA

R BROADWATER Electrical Distribution Design (EDD)

USA

Page 2: Initial Field Trials of Distributed Series Reactors and ...

Managing Overload and Congestion

2

Transmission Lines are becoming more overloaded and congested as loads and generation move or increase • Typical solutions

– Switching (but this places increased burden on equipment) – Reconductoring – New Line Construction

• Other Lines are Underutilized • Current Power Flow Methods

– Expensive and/or need frequent operations • Older Technologies such as air-core reactors or FACTS are:

– Centralized – All or Nothing – Take up Substation Space

Page 3: Initial Field Trials of Distributed Series Reactors and ...

Background

• Rapidly deployable distributed power flow control for existing transmission lines

• Diverts current from the overloaded lines to underutilized ones • Concept was first demonstrated in 2002-03 and has since

been demonstrated in pilot installations on HV transmission lines.

3

Page 4: Initial Field Trials of Distributed Series Reactors and ...

Distributed Series Reactor

• Injects pre-tuned inductance value to increase line impedance

• Self contained device, powered by induction from a transmission line conductor

• Two methods of control • With secondary winding

shorted injection is negligible

4

Page 5: Initial Field Trials of Distributed Series Reactors and ...

Communication and Control

• Operate autonomously based on preset values (line current)

• Controlled remotely via Power Line Carrier, Cell phone

• DSR information display available in control center

5

Page 6: Initial Field Trials of Distributed Series Reactors and ...

Example Application in Meshed Grid

39 BUS SYSTEM • Baseline MW: 1904 MW • Increase in transfer

capability of 638 MW (33.5%)

• Increase in line availability from 59% to 93%

G1

G8

G10

230

1

G2

G3

G9

G4G5

G6

G7

39

9

8 7

5

4

3

18

37

25

17

26 28 29

38

24

27

15

14

12

13

1011

32 34

20

19

21 2235

23

36

16

6

31

6

Page 7: Initial Field Trials of Distributed Series Reactors and ...

Prototype DSR Installation at TVA

TVA - 14.5 Miles of ACSR 795.0-26/7

7

Page 8: Initial Field Trials of Distributed Series Reactors and ...

Installation Details

• 21 mile segment of 161 kV line • 99 DSRs installed on 17 spans • 33 DSRs per phase

• Clamshell construction • Two halves secured together

with a torque wrench • Approximately 10 min to

install each DSR • Devices run self diagnostics

and can be remotely tested 8

Page 9: Initial Field Trials of Distributed Series Reactors and ...

Pilot Test Results

• Total Impedance Increase (33 DSRs / Phase @ 47 µH / DSR): .226 % (control limited by number of available devices and a test line that was longer than optimal for the demonstration)

• Devices performed as expected over 4-step range (see below) • Devices successfully adjusted phase imbalance • Single point failure of communication system identified for

necessary design upgrade • DSRs presently considered unsuitable for bundled conductor use

9

Page 10: Initial Field Trials of Distributed Series Reactors and ...

Future Applications

• Success of pilot opens path to more critical applications • Simplest application is reduction of maximum contingency load

for postponement of line uprate • Ability to quickly relocate DSRs reduces cost to individual

projects • Extreme case for portion of HV grid to have dynamically

assigned line loading for selected goals, e.g. minimize system losses

• Future designs may provide capacitive injection to reduce reactive impedance

• Future designs with high speed controls may be low cost alternative to FACTS

10

Page 11: Initial Field Trials of Distributed Series Reactors and ...

The IEEE 39 bus standard test system converted to a three phase system with 345kV lines

11

Page 12: Initial Field Trials of Distributed Series Reactors and ...

Structure Type: 3L11Utility: Houston Lighting & Power Company

Reference: EPRI, Transmission Line Reference Book - 345kV and above

The 345kV Line Configuration

12

Page 13: Initial Field Trials of Distributed Series Reactors and ...

Unbalanced:

Positive Sequence:

Positive Sequence Z is derived from the Unbalanced Model Z using the symmetrical components transformation

Line Impedance Models

13

Page 14: Initial Field Trials of Distributed Series Reactors and ...

75

900

1950

3525

5550

675

1650

3750

0

1000

2000

3000

4000

5000

6000

141% 143% 145% 147% 149% 141% 143% 145% 147% 149%

Positive Sequence Unbalanced

No.

of D

SRs d

eplo

yed

System Loading (%)

Line5-6 Line6-7 Line13-14 Total

DSR Design for Load Growth

14

Page 15: Initial Field Trials of Distributed Series Reactors and ...

0

5

10

15

20

25

30

35

40

141% 143% 145% 147% 149%

Slop

e (M

W/D

SR)

System Loading (%)

Positive Sequence Unbalanced

Slope (MW/DSR) for different System Loading % 141% 143% 145% 147% 149%

Positive Sequence 33.60 2.93 1.41 0.81 0.54 Unbalanced 4.09 1.75 0.80

Unbalanced vs. Positive Sequence Impedance Model

15

Page 16: Initial Field Trials of Distributed Series Reactors and ...

DSR Design for Single Contingency: Unbalanced Impedance Model

16

Page 17: Initial Field Trials of Distributed Series Reactors and ...

DSRs Deployed and Load Supplied

17

Page 18: Initial Field Trials of Distributed Series Reactors and ...

Lines with DSRs Reinforced Lines

1500 DSR on line5-6 75 DSR on

line13-14

The Selected Design at 140% System Loading

18

Page 19: Initial Field Trials of Distributed Series Reactors and ...

DSR Design vs. Line Reinforcement for Single Contingency and Load

Growth: Economic Evaluation

19

Page 20: Initial Field Trials of Distributed Series Reactors and ...

• Determine the maximum MW supplied to load while handling all single contingencies – Case1: Three Lines Reinforced with No DSR – Case2: Three Lines Reinforced with DSR

• Economic assessment of both cases

Economic Evaluation

20

Page 21: Initial Field Trials of Distributed Series Reactors and ...

• Case1: With Three Lines Reinforced • 125% loading is reached

• Case2: With Three Lines Reinforced and DSRs Deployed

• 140% loading is reached and selected as a desired DSR Design due to its technical merits

– Fewer number of DSRs deployed. – Least % change in lines impedance.

Economic Evaluation Results

21

Page 22: Initial Field Trials of Distributed Series Reactors and ...

Reinforced Line Length (miles) Line2-3 37 Line6-7 29

Line15-16 29

• Cost of 345 kV, single circuit = 1298 $k /mile

• Total length of the reinforced lines = 95 miles.

Case % Loading Max MW supplied

MW increase

Base 100% 6309.4 Case1 125% 7886.6 1577.2 Case2 140% 8833.1 946.5

• Max MW supplied at different % loading:

Data for the Economic Study

22

Page 23: Initial Field Trials of Distributed Series Reactors and ...

• Cost of 95 miles of line = 95 x 1298 k$ = 123.31 $M • Cost for 1577.2 MW of load increase =

123.31 $M • Cost per MW of load increase for

reinforcing lines = 123.31 $M/1577.2 MW = 78,182 $/MW

Line Reinforcement Cost

23

Page 24: Initial Field Trials of Distributed Series Reactors and ...

• For the selected DSR design, a loading of 140% is achieved using 1575 DSR modules.

• DSR worth in terms of transmission line value: – Cost of 946.5 MW of load increase =

946.5 MW x 78,182.8 $/MW = 74 $M – Thus the equivalent value of 1 DSR =

74 $M/1575 DSRs = 46,984 $/DSR

DSR Design Cost: Unbalanced Model

24

Page 25: Initial Field Trials of Distributed Series Reactors and ...

Questions

25