Page 1: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

Prepared by Planning Department 1

In the Name of Allah

IEEJ : June 2011

Page 2: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

2

Islamic Republic of AfghanistanMinistry of Energy & Water

Status of the Power Sector in Afghanistan

Past, Present, and Future

Page 3: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

3

Ministry of Energy and Water Electricity Sector Policy

Provide overall direction for electricity sector development and formulate broad policies and regulations for the benefit of all of Afghanistan that is consistent with other national development plans and laws;

Initiate the establishment of an independent electric regulatory entity;

Promote private sector participation and investment in the electricity sector;

Encourage the expansion of access to underserved and rural communities;

Stimulate the rational use of new and renewable sources of energy; and

Represent the government of Afghanistan in electricity matters pertaining to regional interconnections and international organizations.

Page 4: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

4

PAST

Page 5: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

5

Electricity Status Pre-2002

Total operating generation capacity was 291 MW

Hydro: 257 MW

Diesel Gen-set: 34 MW

Total consumers supplied: 117,000

Page 6: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

6

PRESENT

Page 7: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

7

Power Sector Status After 2002

Power generation and import has been increased from 264 MW to 700 MW.

Installed capacity to import power from neighboring countries has been raised from 50 MW to 335 MW.

Total 110 KV, 220 KV transmission lines length have been raised from 745 Km to 1,665 Km.

Kabul and provinces distribution networks have been undergoing rehabilitation and extension.

Total number of consumers has been increased from 117,000 to 633029.

Page 8: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

8

Available Power Generation capacities in overall Afghanistan

Hydro 252 MW

Thermal (Kabul & Mazar-e-Sharif) 90 MW

Diesel 74 MW

Import capacity 212 MW

Renewable Energy 13.1 MW

Small Diesel Gen-Set 65.5 MW

Total 706.6MW

Total number of electricity customers is about 633029 representing 36% of the country population.

About 60% of customers are in Kabul.

Page 9: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

Existing Power Plants

Page 10: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

10

Present Capacity of Absorption for Importing Power

From Turkmenistan:

84 MW from 110 KV line to Andkhoy, Jawzjan, Saripul, and Maymana

76 MW from 220 KV line (used at 110 KV) to Herat and Rubat Sangi

From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line.

From Tajikistan 25 MW from 110 KV line to Kunduz

From Islamic Republic of Iran:

72 MW through 132 KV double circuit TL to Herat and Ghorian substations

3 MW through 20 KV double circuit to Herat

4 MW through 20 KV line to Nimroz

Page 11: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

Existing Transmission Import Lines.

Page 12: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

12

Cost of Imported Energy

Average purchase rate of imported energy 3.125 US cent/Kwh

Average overall cost of imported energy 6.5 US cent/KWh

Average selling rate of imported energy 6.026 US cent/KWh

Page 13: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

13

Cost of bill for Imported Energy

Cost for bill of Hydro Power

- Residents (Kabul,Pul-e-Khumri,Jalal Abad, Kandhar, Helmand) 1- 300 KW/h 1.5 Afg

- Industrial Centers (MMI registered) 301-700 KW/h 4 Afg

- Commercial/Governmental/Embassies 701< KW/h 10 Afg

- Residents (Herat, Fariab, Jouzjan, Sar-e-pul, Kundoz) 10 KW/h

Page 14: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

14

Installed Capacity in KabulThe total installed capacity of power generation in Kabul Zone is 258 MW including:

• 188 MW Hydro• 95 MW Thermal • 133 MW Diesel• 128 MW import

Page 15: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

15

Present Status of Electricity in Kabul City

Available capacity in Kabul Zone is 231 MW

Substations absorption ability is about 437 MVA

Network absorption ability is around 200 MVA

Number of Kabul City consumers is 237248

Kabul City energy requirements is about 300MW in summer peak and 400 MW in Winter peak

Page 16: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

16

Energy Sector Development

THE FUTURE

Page 17: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

17

Energy Resources Potential

Hydro power potential: 23,000 MW (large, medium, small dams and micro hydro power plant )

Natural gas: 60 billion cm approx.

Petroleum : 12 million tons

Coal reserves : 100 million tons (in different locations throughout the country (establishing the precise quantities and qualities require further studies)

Solar and wind potential: (Mapping to be completed and least cost options to be pursued )

Most of these foresaid reserves have not been exploited yet.

Page 18: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

18

Power Plant Projects Under Construction

Salma Hydro Power Plant of 42 MW capacity

Parandy of Panjsher Hydro Power Plant of 4.05 MW capacity

Construction of Chamkany ,Bamyan, Charday Ghorband ,Asad Abad of Kunar; and Machlghu of Paktya provinces micro-hydro-Power Plants

Page 19: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

19

Improvement of the Present Status of Power

Short Term Actions (1385-1388)

Purchasing of Diesel Gen-set

Rehabilitation of the existing Hydro and Thermal Power Plants

Upgrading of Distributing Networks in order to reduce technical and commercial losses

Importing power from neighboring countries

Developing Renewable Energy resources

Page 20: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

20

Improvement of the Present Status of power

Short Term Actions (1385-1388)

Completion of NEPS high voltage transmission lines .

Development of domestic sources of energy

Installation of a gas-fired thermal power plant of 105 MW in Sheberghan.

Page 21: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

21

Improvement of the Present Status of Power – Cont.

Medium Term Actions (1385 – 1390)

HPP Feasibility Studies Initiated and ongoing:

Baghdara Hydro Power Plant

Kukcha & Kunar

Kilaghai

Kama River (starting)

Fara Roud

Gul Bahar

HPP Feasibility Studies to be initiated:

Surobi 2

Kajakai 2

Olambagh

Amu & Panj River

Kala Gosh

Page 22: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

22

Improvement of the Present Status of Power – Transmission Grid

National Grid System Development Plan> 500 kV

Turkmenistan to Mazar-i-Sharif> 220 Kv

Hayratan-Kabul

Tajikistan – Pul-i-Khumri

Kunduz-Taluqan

Kabul - Lugar –Gardez – Khost –Ghazni – Paktika

Kajakai – Kandahar

Farah-Herat> 110 Kv

Sher Khan Bandar-Amam Saheb Naghlu – Jalalabad – Mehtarlam Badghees –Turkmenistan Sher Khan Bandar- Quala-e-Zal

Page 23: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

23

Improvement of the Present Status of Power – Transmission Grid

The first phase of the National Grid System is the North East Power System:

NEPS

Page 24: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

24

Objectives of the North-East Power System (NEPS)

Establishing of the first branch of National Grid

Supplying of power to Northern, North-Eastern and Southern Provinces

Possibility of importing power from Uzbekistan, Tajikistan and Turkmenistan

Transmitting of Energy from domestic energy sources

Transmission of Electricity to neighbor countries through Afghanistan.

Page 25: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

The North East Power System

Page 26: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

26

Substation (S/S) Expansion- Construction Program

Expansion of North West and Kabul North S/S

Construction of 220/20 KV Grid S/S in Kunduz, Mazar-e-Sharif Taluqan, Puli-Khumri, Khulm, Aybak, Doshi, Charikar, Chimtala Gardez, Pul-e- Alam, Khost, Ghazni and Paktika

Construction of 110/20KV S/S in Laghman- Jalalabad, Sar-e-Pul, Amam Saheb and Quala- e-Zal

Page 27: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

27

Donor Organizations – NEPS 220 KV Hairatan-Kabul Transmission Line

Asian Development Bank $113.1 million

World Bank $94.383 million

Islamic Development Bank $16.5 million

Gov’t. of India (GoI) $126 million

Gov’t. of Germany (KFW) Euro22.5 millionor $31.5 million

Gov’t. of Afghanistan $118.243 million

Gov’t of Iran $ 7.1 million

US Gov’t. (USAID) $340 million

Total $846.826 million

Page 28: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

28

Progress of Hairatan-Kabul 220KV Transmission Line (442 Km)

Uzbekistan Border to Puli-Khumri Section (240Km) competed:

Hairatan–Naibabad-Mazar-e-Sharif-Puli-Khumri completed.

Hairatan-Naibabad –Mazar-e-Sharif (ADB) completed.

Naibabad to Puli-Khumri (ADB) completed

Naibabad switching station (ADB) completed

Erection of Mazar-e-Sharif (50 MVA) and Puli-Khumri (32 MVA) 220/110 KV (S/S), (Germany-KFW) completed.

Transmission line capacity is 300 MW

Provinces impacted : Balkh, Semangan and Baghlan

Page 29: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

29

Progress of Hairatan-Kabul 220KV Transmission Line (442 Km in length)

Puli-Khumri to Kabul Section (202 Km): Puli-Khumri to Chimtala to Kabul North West S/S to Kabul North S/S

Puli-Khumri to Chimtala (GoI) completed.

Chimtala S/S (GoI) In construction – 95% completed.

Aybak S/S ,Doshi and Charikar S/S (in procurement stage)

Provinces impacted: Baghlan ,Parwan, Kapisa and Kabul

Page 30: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

30

NEPS in Development

NEPS

POWER IMPORT STATUS

Page 31: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

31

Tajikistan- Puli Khumri 220 KV Transmission Line

Capacity : 300 MW (D/C dual conductor)

Donor: ADB

Developing regional energy trade competition

Provinces impacted by grid extension: Northern, North-East and South-East Provinces

Present status : Under Implementation stage

Page 32: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

32

Turkmenistan - Naibabad 500KV Transmission Line

Line Capacity : Nominal 300 MW (TBD)

Donor : Unfunded

Provinces impacted by grid expansion :Northern , North-Eastern, Southern and South-Eastern provinces

Present States: Technical discussions for locating of border point for crossing of the transmission line, between both sides is under way.

Page 33: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

33

Preference to the Importing of Power in Medium Term

Access to cheaper energy in the range of (currently 2 to 6 US cent Per KWh )

Availability of surplus power in neighboring country to be accessed

Purchasing power from neighboring countries is cheaper than the domestic energy sources > Hydro Power 4.6 US cent per KWh > Thermal Power 32 US cent per KWh> Diesel Gen-sets 20 US cent per KWh

Page 34: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

34

Long Term Planning

HPP Construction:• Baghdara (nominally 220 MW)• Surobi 2 (nominally 180 MW) • Kajakai 2 (nominally 100 MW)• Specification of Kukcha River potential• Specification of Kunar River potential

Thermal Plant - Construction of coal fired thermal Power Plants

Page 35: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

35

Sources of Electrical Power in AfghanistanAfghanistan main sources of Power are as

follows :

Hydro

Natural gas

Petroleum

Coal

Renewable Energy

Page 36: In the Name of Allah - IEEJ · From Uzbekistan 300 MW from 220 KV line for Kabul City and provinces situated in traverse to the line. ... 128 MW import. 15. Present Status of Electricity

36

Thanks for Your Kind Attention